CN102776869A - 一种梯级水电站群的无预报洪水调度方法 - Google Patents
一种梯级水电站群的无预报洪水调度方法 Download PDFInfo
- Publication number
- CN102776869A CN102776869A CN2012102412647A CN201210241264A CN102776869A CN 102776869 A CN102776869 A CN 102776869A CN 2012102412647 A CN2012102412647 A CN 2012102412647A CN 201210241264 A CN201210241264 A CN 201210241264A CN 102776869 A CN102776869 A CN 102776869A
- Authority
- CN
- China
- Prior art keywords
- flood
- reservoir
- water level
- gate
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Barrages (AREA)
- Control Of Non-Electrical Variables (AREA)
Abstract
本发明公开了一种梯级水电站群的无预报洪水调度方法,所述方法包括以下步骤:S1,水位测量仪测量水库的初始水位并确定水位允许的波动值;S2,调整闸门的开启方案使其跟踪实时洪水入库流量;S3,若水位测量仪检测到水位连续下降,则计算出本次入库洪水的洪峰流量,并根据水库洪水的峰量关系求出退水段洪水水量,修正闸门开启方案逐步关闭闸门;S4,若水位测量仪未检测到水位连续下降,则转到S2。本发明可以有效保证大坝及电站的安全,防止漫坝事故的发生,另外通过水库历史洪水退水规律、峰量关系通过预先模拟仿真演算及在线动态调整可以确保在洪水退水阶段,将水库充蓄至预定的高水位。
Description
技术领域
本发明涉及一种梯级水电站群的无预报洪水调度方法,属于洪水调度技术领域。
背景技术
在水库遭遇无预报洪水时,无法预先拟定调度方案进行有计划的洪水调度,但确保大坝、电站的安全仍然是必需要遵守的原则,在此前提下尽可能的将洪水安全下泄,并将水库尤其是库水位较高的水库充蓄到预定的高水位。现有技术中常采用跟踪洪水入库流量过程的方法来进行调度,该方法的缺点是无法在洪水结束时将水库充蓄到预定高水位,无法有效地进行洪水资源化利用。
发明内容
本发明的目的在于,提供一种梯级水电站群的无预报洪水调度方法,它不仅可以在遭遇无预报洪水后,确保大坝、电站的安全,而且还能在洪水结束时将水库充蓄到预定的高水位,实现洪水的资源化利用。
为解决上述技术问题,本发明采用如下的技术方案:一种梯级水电站群的无预报洪水调度方法,包括以下步骤:
S1,水位测量仪测量水库的初始水位并确定水位允许的波动值;
S2,调整闸门的开启方案使其跟踪实时洪水入库流量;
S3,若水位测量仪检测到水位连续下降,则计算出本次入库洪水的洪峰流量,并根据水库洪水的峰量关系求出退水段洪水水量,修正闸门开启方案逐步关闭闸门;
S4,若水位测量仪未检测到水位连续下降,则转到S2。
该方法适用于初始水位较高的水库进行洪水调度。
前述的梯级水电站群的无预报洪水调度方法中,步骤S1所述的水位允许的波动值是指初始水位与预定高水位的差值。
前述的梯级水电站群的无预报洪水调度方法中,步骤S2,确定实时洪水入库流量采用以下方式:根据时段初末水位、闸门下泄流量反推总入库流量。
前述的梯级水电站群的无预报洪水调度方法中,步骤S2所述的调整闸门的开启方案使其跟踪实时洪水入库流量具体包括涨水段调度:
(Ⅰ)洪水在t0时刻起涨,t1时刻观测水位,并记录得Z1;
(Ⅲ)t1时刻开启闸门,开启度B在Z1条件下,下泄2Qm;
(Ⅳ)维持闸门开度,并记录水位由Z1下降至最低点的时间t′1(历时△t′),再将闸门维持时间延长△t′;
(Ⅴ)观测t2时刻水位,并记录到Z2;由t2、t′1两时刻记录到的水位差,求出库容增加值
(Ⅶ)在原开度的基础上,在t2时刻增大闸门开度,使其满足以下条件:
(a)控制库水位维持在Z2水位条件下;
(Ⅷ)从闸门增大开度后,观测并记录水位下降到最低点时刻t′2(历时△t″),并将闸门的维持时间延长△t″;判断调节是否达到洪峰,即判断水位测量仪连续两次采集的库水位是否均为下降趋势,若是,则结束,若否,则转到(Ⅰ);
Qm为t1时刻的入库流量;
△v01为t0~t1时段的库容变化值;
Z1为t1时刻的库水位。
前述的梯级水电站群的无预报洪水调度方法中,步骤S3所述的计算出本次入库洪水的洪峰流量,并根据水库洪水的峰量关系求出退水段洪水水量,修正闸门开启方案逐步关闭闸门具体包括退水段调度:
(Ⅱ)由公式求出维持减少后的下泄流量历时为tfe,即从t7时刻至te结束;
(Ⅲ)校核(检验)并使其满足:
其中,△v为t6~t7时段的库容变化值;
△V为t6时段的待蓄库容;
△Qcf为t7时段的出库流量减小值。
与现有技术相比,本发明通过采用水位波动法,即在无预报洪水的涨水阶段调整闸门开启方案,使其跟踪洪水过程线,控制库水位基本维持在起调水位上、下波动,从而可以有效保证大坝及电站的安全,防止漫坝事故的发生,另外通过水库历史洪水退水规律、峰量关系通过预先模拟仿真演算(即根据实测的洪峰流量、历史退水规律得到退水曲线,再根据该退水曲线进行在线模拟仿真调度)及在线动态调整可以确保在洪水退水阶段,将水库充蓄至预定的高水位。
附图说明
图1是本发明的一种实施例的工作流程图;
图2是水位波动法调洪示意图;
图3是水位波动法调洪计算基本流程图。
下面结合附图和具体实施方式对本发明作进一步的说明。
具体实施方式
本发明的实施例:一种梯级水电站群的无预报洪水调度方法,如图1所示,一种梯级水电站群的无预报洪水调度方法,包括以下步骤:
S1,水位测量仪测量水库的初始水位并确定水位允许的波动值;
S2,调整闸门的开启方案使其跟踪实时洪水入库流量;
S3,若水位测量仪检测到水位连续下降,则计算出本次入库洪水的洪峰流量,并根据水库洪水的峰量关系求出退水段洪水水量,修正闸门开启方案逐步关闭闸门;
S4,若水位测量仪未检测到水位连续下降,则转到S2。
该方法适用于初始水位较高的水库进行洪水调度。
所述的水位允许的波动值是指初始水位与预定高水位的差值。
步骤S2,确定实时洪水入库流量采用以下方式:根据时段初末水位、闸门下泄流量反推总入库流量。
所述的调整闸门的开启方案使其跟踪实时洪水入库流量具体包括涨水段调度:
(Ⅶ)在原开度基础上,在t2时刻增大闸门开度,使得以下条件能满足:
(a)控制库水位维持在Z2水位条件下;
(Ⅷ)从闸门增大开度后,观测并记录水位下降到最低点时刻t′2(历时△t″),并将闸门的维持时间延长△t″;判断调节是否达到洪峰,即判断水位测量仪连续两次采集的库水位是否均为下降趋势,若是,则结束,若否,则转到(Ⅰ);
Qm为t1时刻的入库流量;
△v01为t0~t1时段的库容变化值;
Z1为t1时刻的库水位。
所述的计算出本次入库洪水的洪峰流量,并根据水库洪水的峰量关系求出退水段洪水水量,修正闸门开启方案逐步关闭闸门具体包括退水段调度:
(Ⅰ)退水段调度的原则
无预报洪水退水调度必需遵守大坝、电站安全的原则,在此前提下要利用退水段洪水将库水位充蓄至预定的高水位Z正。
(Ⅱ)退水调度的方法
如图2所示,退水段调度通过控制水位波动幅度,逐渐关闭闸门开度,根据水库洪水退水规律和本次洪峰流量关系,即可求出退水段洪水水量。在此基础上,设计闸门关闸方案,既可保证洪水下泄,又可将水库充蓄至预定的水位。
由(1)式可求出闸门应从bc时段的下泄流量(已知)继续减少△Qcf;
由(2)式可求出维持减少后的下泄流量历时为tfe,即从t7时刻至te结束;上述计算和分析是假定洪水退水段呈线性关系。
另外,必须校核(检验)下述关系:
若(3)式成立,水库可蓄满,否则水库无法充蓄至预定的高水位;
具体的计算流程如图3所示;
其中,△v为t6~t7时段的库容变化值;
△V为t6时段的待蓄库容;
△Qcf为t7时段的出库流量减小值。
本发明根据水利历史长系列资料的分析总结洪水退水规律,当水位连续下降时计算出本次入库洪水的洪峰流量,并根据水库洪水峰量关系,求出退水段洪水水量,在此基础上拟定合理的闸门逐步关闭方案,使得洪水结束时恰好蓄至设定高水位;同时,在退水段根据库水位的实际波动情况,进一步在线调整闸门开启方案,确保库水位蓄至设定高水位。
Claims (3)
1.一种梯级水电站群的无预报洪水调度方法,其特征在于,包括以下步骤:
S1,水位测量仪测量水库的初始水位并确定水位允许的波动值;
S2,调整闸门的开启方案使其跟踪实时洪水入库流量;
S3,若水位测量仪检测到水位连续下降,则计算出本次入库洪水的洪峰流量,并根据水库洪水的峰量关系求出退水段洪水水量,修正闸门开启方案逐步关闭闸门;
S4,若水位测量仪未检测到水位连续下降,则转到S2。
2.根据权利要求1所述的梯级水电站群的无预报洪水调度方法,其特征在于,步骤S2中所述的调整闸门的开启方案使其跟踪实时洪水入库流量具体包括涨水段调度:
(Ⅰ)洪水在t0时刻起涨,t1时刻观测水位,并记录得Z1;
(Ⅲ)t1时刻开启闸门,开启度B在Z1条件下,下泄2Qm;
(Ⅳ)维持闸门开度,并记录水位由Z1下降至最低点的时间t′1(历时△t′),再将闸门维持时间延长△t′;
(Ⅴ)观测t2时刻水位,并记录到Z2;由t2、t′1两时刻记录到的水位差,求出库容增加值
(Ⅶ)在原开度的基础上,在t2时刻增大闸门开度,使其满足以下条件:
(a)控制库水位维持在Z2水位条件下;
(b)下泄的流量为
(Ⅷ)从闸门增大开度后,观测并记录水位下降到最低点时刻t′2(历时△t″),并将闸门的维持时间延长△t″;判断调节是否达到洪峰,即判断水位测量仪连续两次采集的库水位是否均为下降趋势,若是,则结束,若否,则转到(Ⅰ);
Qm为t1时刻的入库流量;
△v01为t0~t1时段的库容变化值;
Z1为t1时刻的库水位。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210241264.7A CN102776869B (zh) | 2012-07-12 | 2012-07-12 | 一种梯级水电站群的无预报洪水调度方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210241264.7A CN102776869B (zh) | 2012-07-12 | 2012-07-12 | 一种梯级水电站群的无预报洪水调度方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102776869A true CN102776869A (zh) | 2012-11-14 |
CN102776869B CN102776869B (zh) | 2015-04-01 |
Family
ID=47121966
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210241264.7A Expired - Fee Related CN102776869B (zh) | 2012-07-12 | 2012-07-12 | 一种梯级水电站群的无预报洪水调度方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102776869B (zh) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103631234A (zh) * | 2013-12-06 | 2014-03-12 | 云南电网公司大理供电局 | 一种梯级水电集控站自动化系统的智能优化调度方法 |
CN104179148A (zh) * | 2014-04-29 | 2014-12-03 | 河海大学 | 一种基于不可控洪水特性的洪水调度安全度评价方法 |
CN106874657A (zh) * | 2017-01-18 | 2017-06-20 | 贵州黔源电力股份有限公司 | 一种汛期常遇洪水下的水库水位控制方法 |
CN107330274A (zh) * | 2017-06-30 | 2017-11-07 | 中国水利水电科学研究院 | 考虑上游溃坝洪水的土石坝群控制梯级泄水安全计算方法 |
CN108985140A (zh) * | 2018-03-19 | 2018-12-11 | 孙磊 | 大数据式搜索系统 |
CN109002929A (zh) * | 2018-08-20 | 2018-12-14 | 雅砻江流域水电开发有限公司 | 一种水电站水库水位预测分析与控制方法 |
CN109272245A (zh) * | 2018-09-30 | 2019-01-25 | 国电大渡河流域水电开发有限公司 | 梯级水电站泄洪闸门开度实时自动分配方法及系统 |
CN113112054A (zh) * | 2021-03-22 | 2021-07-13 | 中建三局绿色产业投资有限公司 | 高密度建成区合流制溢流污染削减系统及联动联调方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101705671A (zh) * | 2009-11-19 | 2010-05-12 | 武汉大学 | 黄河上游梯级水电站运行设计与优化调度方法及设备 |
JP2011065354A (ja) * | 2009-09-16 | 2011-03-31 | Toshiba Corp | 水力発電所の水位管理システムおよびその方法 |
CN102182159A (zh) * | 2011-03-21 | 2011-09-14 | 武汉大学 | 一种梯级水库汛限水位联合运用调度方法 |
CN102296562A (zh) * | 2010-06-25 | 2011-12-28 | 华东电网有限公司 | 防洪与发电相耦合的梯级水库联合洪水调度优化方法 |
CN102419580A (zh) * | 2011-10-13 | 2012-04-18 | 贵州东方世纪科技有限责任公司 | 洪水预报调度系统 |
-
2012
- 2012-07-12 CN CN201210241264.7A patent/CN102776869B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011065354A (ja) * | 2009-09-16 | 2011-03-31 | Toshiba Corp | 水力発電所の水位管理システムおよびその方法 |
CN101705671A (zh) * | 2009-11-19 | 2010-05-12 | 武汉大学 | 黄河上游梯级水电站运行设计与优化调度方法及设备 |
CN102296562A (zh) * | 2010-06-25 | 2011-12-28 | 华东电网有限公司 | 防洪与发电相耦合的梯级水库联合洪水调度优化方法 |
CN102182159A (zh) * | 2011-03-21 | 2011-09-14 | 武汉大学 | 一种梯级水库汛限水位联合运用调度方法 |
CN102419580A (zh) * | 2011-10-13 | 2012-04-18 | 贵州东方世纪科技有限责任公司 | 洪水预报调度系统 |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103631234A (zh) * | 2013-12-06 | 2014-03-12 | 云南电网公司大理供电局 | 一种梯级水电集控站自动化系统的智能优化调度方法 |
CN104179148A (zh) * | 2014-04-29 | 2014-12-03 | 河海大学 | 一种基于不可控洪水特性的洪水调度安全度评价方法 |
CN104179148B (zh) * | 2014-04-29 | 2016-02-03 | 河海大学 | 一种基于不可控洪水特性的洪水调度安全度评价方法 |
CN106874657A (zh) * | 2017-01-18 | 2017-06-20 | 贵州黔源电力股份有限公司 | 一种汛期常遇洪水下的水库水位控制方法 |
CN106874657B (zh) * | 2017-01-18 | 2018-05-22 | 贵州黔源电力股份有限公司 | 一种汛期常遇洪水下的水库水位控制方法 |
CN107330274A (zh) * | 2017-06-30 | 2017-11-07 | 中国水利水电科学研究院 | 考虑上游溃坝洪水的土石坝群控制梯级泄水安全计算方法 |
CN108985140A (zh) * | 2018-03-19 | 2018-12-11 | 孙磊 | 大数据式搜索系统 |
CN108985140B (zh) * | 2018-03-19 | 2019-04-30 | 山东鼎龙卓越信息科技有限公司 | 大数据式搜索系统 |
CN109002929A (zh) * | 2018-08-20 | 2018-12-14 | 雅砻江流域水电开发有限公司 | 一种水电站水库水位预测分析与控制方法 |
CN109272245A (zh) * | 2018-09-30 | 2019-01-25 | 国电大渡河流域水电开发有限公司 | 梯级水电站泄洪闸门开度实时自动分配方法及系统 |
CN109272245B (zh) * | 2018-09-30 | 2021-09-07 | 国能大渡河流域水电开发有限公司 | 梯级水电站泄洪闸门开度实时自动分配方法及系统 |
CN113112054A (zh) * | 2021-03-22 | 2021-07-13 | 中建三局绿色产业投资有限公司 | 高密度建成区合流制溢流污染削减系统及联动联调方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102776869B (zh) | 2015-04-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102776869A (zh) | 一种梯级水电站群的无预报洪水调度方法 | |
CN102776870B (zh) | 基于水位流量的梯级水电站的无预报洪水调度方法 | |
CN101705671B (zh) | 黄河上游梯级水电站运行设计与优化调度方法及设备 | |
US10482549B2 (en) | Daily electricity generation plan making method of cascade hydraulic power plant group | |
Jiang et al. | Runoff forecast uncertainty considered load adjustment model of cascade hydropower stations and its application | |
Ding et al. | A forecast-driven decision-making model for long-term operation of a hydro-wind-photovoltaic hybrid system | |
CN102817335A (zh) | 一种梯级水库群联合防洪优化调度的方法及系统 | |
CN104674748B (zh) | 一种梯级水电站群弃水概率量化方法 | |
CN104967149A (zh) | 一种微电网风光储模型预测控制方法 | |
Chen et al. | Research on a layered coupling optimal operation model of the Three Gorges and Gezhouba cascade hydropower stations | |
CN107862408B (zh) | 一种水电厂弃水最小预警协调滚动优化方法 | |
CN106284239B (zh) | 一种大型坝式水电站初步选址方法 | |
CN114021500A (zh) | 一种基于退水过程拟合的水库闸门泄流曲线率定方法及系统 | |
Hug-Glanzmann | Predictive control for balancing wind generation variability using run-of-river power plants | |
CN108547250B (zh) | 模拟水电站叠梁门分层取水甩增负荷实验系统及方法 | |
CN116738841A (zh) | 一种用于水电站水能动态模拟的算法及装置 | |
CN116048142A (zh) | 一种供水调度方法 | |
CN113642256B (zh) | 一种基于主题数据库的实用闸门启闭优化方法 | |
CN104037815B (zh) | 消除电网传输功率越限的光伏电站有功功率自动控制方法 | |
CN110318455A (zh) | 一种恒流量排水控制方法及控制系统 | |
CN114881548A (zh) | 一种水电站闸门下泄流量实时监控方法及系统 | |
CN104635769B (zh) | 一种梯级水电站群水电站汛期最优水位范围控制方法 | |
CN108335045A (zh) | 一种基于开度调节的径流式水电站自动优化方法 | |
CN110714509B (zh) | 一种多泥沙河流河口滩区恒流补水系统及方法 | |
CN110311424B (zh) | 一种基于双时间尺度净负荷预测的储能调峰控制方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150401 Termination date: 20190712 |
|
CF01 | Termination of patent right due to non-payment of annual fee |