CN102776313B - Method for smelting high-phosphorus steel by low-temperature low-silicon molten iron in converter - Google Patents

Method for smelting high-phosphorus steel by low-temperature low-silicon molten iron in converter Download PDF

Info

Publication number
CN102776313B
CN102776313B CN2012102962897A CN201210296289A CN102776313B CN 102776313 B CN102776313 B CN 102776313B CN 2012102962897 A CN2012102962897 A CN 2012102962897A CN 201210296289 A CN201210296289 A CN 201210296289A CN 102776313 B CN102776313 B CN 102776313B
Authority
CN
China
Prior art keywords
steel
converter
molten iron
smelting
phosphorus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012102962897A
Other languages
Chinese (zh)
Other versions
CN102776313A (en
Inventor
杨治争
魏伟
庞建飞
王羽
万立新
曹同友
邱丹
彭著刚
孙伟
洪霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Iron and Steel Co Ltd
Original Assignee
Wuhan Iron and Steel Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Iron and Steel Group Corp filed Critical Wuhan Iron and Steel Group Corp
Priority to CN2012102962897A priority Critical patent/CN102776313B/en
Publication of CN102776313A publication Critical patent/CN102776313A/en
Application granted granted Critical
Publication of CN102776313B publication Critical patent/CN102776313B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P40/00Technologies relating to the processing of minerals
    • Y02P40/40Production or processing of lime, e.g. limestone regeneration of lime in pulp and sugar mills

Abstract

The invention discloses a method for smelting high-phosphorus steel by low-temperature low-silicon molten iron in a converter. The method comprises the following steps that: scrap steel is added into the converter; active lime is added in the converter for the first time, and an oxygen lance, the position of which is lower than the normal position for 10-20 centimeters, blows oxygen; after the oxygen blowing is performed for 50-60 seconds, dolomite is added into the converter at one time; when the oxygen blowing is performed for 90-110 seconds, the oxygen lance is lifted to the normal oxygen blowing position, and active lime is added into the converter again; and tapping is carried out. The method fully utilizes the conditions of the low-temperature low-silicon molten iron in reducing a phosphorus removal rate to smelt the high-phosphorus steel, the phosphorus removal rate can be reduced to 40%-50% from the above 85% of the current conventional smelting, and thus the phosphorus content of the smelting at the end point is effectively improved; the lime addition amount is reduced to be not over 25Kg/ton of steel from 40Kg-60Kg/ton of steel, and the usage amount of phosphorus alloy can also be reduced; the waste residue discharge can be reduced; and moreover, a fluorite slagging agent is not used, and thus the environmental burden can be relieved.

Description

Utilize the low temperature hot metal containing low silicon in converter, to smelt the method for high phosphoretic steel
Technical field
The present invention relates to Metal smelting, specifically belong to the method for utilizing the low temperature hot metal containing low silicon to smelt high phosphoretic steel in converter, it is applicable to converter smelting more than 50 tons.
Background technology
For being the ferrous metallurgy flow process of core process with blast furnace-converter-external refining, suitable blast-melted temperature and composition are the bases that guarantees this flow process direct motion.Yet, along with the variation day by day of present steel enterprise raw material sources, cost control pressure is increasing, the molten iron temperature that blast-furnace smelting is produced and composition fluctuation range obviously strengthen, the frequency also increases gradually, and particularly the molten iron condition of the low silicon of low temperature is had higher requirement to converter smelting.At present the low temperature hot metal containing low silicon is one of the most outstanding difficult problem that will face of converter smelting.
Molten iron is the core source of heat in the converter steelmaking process, and the oxidizing reaction of the silicon in the molten iron in converter steelmaking process then is the main chemical reactions heat source of heat in the converter steelmaking process.The low temperature hot metal containing low silicon (refers to that molten iron is blended into temperature before the converter≤1220 ℃, silicone content≤0.25% simultaneously) directly caused the bigger change of converter smelting initial temperature and process origin of heat, be one of non-normal condition of converter smelting, converter steelmaking process control, terminal temperature and composition are hit all have a direct impact.At first, because charging temperature is on the low side serious, the early stageization slag may encounter difficulties; Secondly, because molten iron silicon content reduces, in order to make the suitable slag of basicity, slag charge add-ons such as corresponding lime reduce, and slag steel ratio reduces,, terminal temperature stable in the maintenance of finishing slag basicity reaches under the situation of smelting requirements, the slag steel partition ratio of phosphorus changes little, and then dephosphorization rate directly descends thereupon, therefore, with the low temperature hot metal containing low silicon be raw material when smelting conventional steel grade, the control of dephosphorization effect is one of maximum difficult point.
At present, be that raw material is when smelting common steel grade with the low temperature hot metal containing low silicon, multiple coping style is arranged, basically controlling party is to being by adjusting the rifle position, oxygen supply intensity and slag charge structure and adding mode etc., make particularly phosphorus content of smelting endpoint composition, terminal temperatures etc. are suitable during with conventional smelting condition, and keep dephosphorization rate in higher level, guarantee that low-phosphorous tapping (phosphorus in the general requirement molten steel≤0.02%) is core control target, but because the extreme characteristics of the low silicon material condition of low temperature, bring more difficulty to converter steelmaking process and terminal point control, overall terminal temperature, composition hit rate level is lower than the situation of conventional smelting condition.
Development along with Iron And Steel Industry, the user requires to become increasingly conspicuous to the personalization of steel performance, and phosphorus is broken as the concept of steel grade harmful element, in recent years, high phosphorus content steel grade such as weather resisting steel, freight container are increasing with the kind of steel and phosphor intensified steel etc., and demand is obviously amplified.And the low temperature hot metal containing low silicon obviously reduces owing to corresponding slag add-on in smelting process, be the favourable condition that reduces the phosphorus decreasing ratio, in smelting high phosphorus steel grade process, can be by further optimizing slag charge structure and process control, reduce the basicity of slag, reduce the slag steel partition ratio of phosphorus, reach the purpose of high phosphorus tapping, that brings when avoiding on the one hand the low temperature hot metal containing low silicon to smelt conventional steel grade controls risk, simultaneously this non-normal condition is become the favourable condition of high phosphorus tapping, improve the molten steel recovery rate on the whole, reduce slag charge consumption, deoxygenated alloy consumes and high phosphorus steel grade ferrorphosphorus consumption, saves cost, reduce and consume, reduce waste discharge.
Summary of the invention
The objective of the invention is to utilize the low temperature hot metal containing low silicon to smelt the high phosphorus molten steel, the recovery rate of phosphorus brings up to 50 ~ 60% in the molten steel, and the consumption of phosphorus alloy reduces waste discharge when reducing slag charge consumption, minimizing manufacturing high phosphorus steel grade.
Realize the measure of above-mentioned purpose:
The low temperature hot metal containing low silicon method of the high phosphoretic steel of converter smelting, its step:
1) in converter, adds steel scrap, its add-on is carried out according to following principle: be blended into molten iron that silicon weight percent content 0.3% is the calculating benchmark that adds scrap ratio in 1250 ℃ of temperature before the converter, the molten iron, when 1 ℃ of the every reduction of molten iron temperature, the corresponding reduction by 0.055 ~ 0.06% of scrap ratio; When the every reduction by 0.01% of molten iron silicon content, scrap ratio is corresponding to reduce by 0.018% ~ 0.022% again;
2) add quickened lime for the first time according to 10 ~ 15Kg/ ton steel; Carry out conventional oxygen blast after quickened lime add to finish, and make oxygen lance position be lower than the normal position to carry out oxygen blast for 10~20 centimetres;
3) when oxygen blast proceeds to 50~60 seconds, according to the disposable adding rhombspar of 5 ~ 8Kg/ ton steel;
4) when oxygen blast proceeds to 90~110 seconds, oxygen lance position is risen to normal oxygen blast position finish until oxygen blast, adding quickened lime again according to 5 ~ 10Kg/ ton steel;
5) tapping, the control Molten Steel End Point is at 1670~1690 ℃, and the finishing slag basicity of slag is 2.5~3, and total quantity of slag of smelting endpoint is at 40 ~ 50Kg/ ton steel.
It is characterized in that: when adding for the first time behind the quickened lime oxygen blast, the adjusting range that oxygen lance position is lower than 10~20 centimetres of normal positions becomes positive correlation with heat size.
The present invention has compared with prior art taken full advantage of the low temperature hot metal containing low silicon in the favourable condition that reduces aspect the phosphorus decreasing ratio, adds the technological measure of coupling and smelts high phosphoretic steel; The present invention also can evade process and the terminal point control difficult problem for guaranteeing that high dephosphorization rate produces, with dephosphorization rate by present conventional 40~50% the level of being reduced to more than 85% of smelting, effectively improve the smelting endpoint phosphorus content, the add-on of lime is reduced to by 40~60Kg/ ton steel and is no more than 25Kg/ ton steel, and iron scale, phosphorus alloy usage quantity also can be reduced; And can reduce the waste sludge discharge amount, and owing to do not use environmentally hazardous dissolving agent such as fluorite, thereby environmental pressure can be reduced.
Embodiment
Below the present invention is described in detail:
Embodiment 1
90 tons of converters are smelted; It is 1220 ℃ that molten iron is gone into the preceding temperature of converter, and silicone content is 0.246%, and phosphorus content is 0.105%; It is 0.06 ~ 0.08% that the steel grade finished product phosphorus content of smelting requires;
To go into that temperature is 1220 ℃ before the converter, silicone content is 0.246%, and phosphorus content is that 0.105% molten iron reaches 0.0578%, its step with converter smelting endpoint molten steel phosphorus weight percentage:
1) in converter, adds steel scrap: because the molten iron temperature of going into before the converter is 1220 ℃, reduced by 30 ℃ than 1250 ℃ of reference condition temperature; The silicon weight percent content is owing to be 0.246% in the molten iron, is lower than 0.3% reference condition 0.054% according to 1 ℃ of the every reduction of molten iron temperature, the corresponding reduction by 0.055 ~ 0.06% of scrap ratio; The every reduction by 0.01% of molten iron silicon content, scrap ratio is corresponding to be reduced by 0.018% ~ 0.022% again and calculates, and the scrap ratio that present embodiment reduces is: 0.055%/℃ Х, 30 ℃+0.020% Х, 0.054 ≈ 1.651%; Go into according to molten iron that temperature is 1250 ℃ before the converter, silicone content is 0.3% calculating, and the scrap ratio of adding should be 15%, and the scrap ratio of this actual adding is about 13.4%;
2) add quickened lime for the first time according to 15Kg/ ton steel; Carry out conventional oxygen blast after quickened lime add to finish, and oxygen lance position is lower than normally open and blows 13 centimetres of positions (normally open blow the rifle position be 1.65 meters) and carry out oxygen blast;
3) when oxygen blast proceeds to 50 seconds, according to the disposable adding rhombspar of 8Kg/ ton steel;
4) when oxygen blast proceeds to 105 seconds, the adjustment of oxygen lance position is transformed into normal mode finishes until oxygen blast, add quickened lime again according to 5Kg/ ton steel;
5) tapping, the control Molten Steel End Point is at 1670~1673 ℃, and finishing slag basicity is 2.6, and the finishing slag amount is 50Kg/ ton steel, and in the smelting endpoint composition, phosphorus content is 0.0578% in the molten steel, dephosphorization rate is 45%.
This quickened lime add-on added 20Kg/ ton steel at least than lacking originally; Dephosphorization rate has descended at least 40%, for reaching this steel grade finished product phosphorus content minimum requirements, need add ferrorphosphorus in the operation after smelting, be example with the ferrorphosphorus that adds 25% quality percentage composition, yield of alloy by 90% calculates, this alloy amount that only needs to add is 0.01kg/ ton steel, reduces 0.18Kg/ ton steel at least than original ferrorphosphorus add-on; Slag mobile fine do not occur in the smelting process returning and does the splash phenomenon.
Embodiment 2
250 tons of converters are smelted; It is 1205 ℃ that molten iron is gone into the preceding temperature of converter, and silicone content is 0.24%, and phosphorus content is 0.095%; It is 0.07 ~ 0.09% that the steel grade finished product phosphorus content of smelting requires;
To go into that temperature is 1205 ℃ before the converter, silicone content is 0.24%, and phosphorus content is that 0.095% molten iron reaches 0.057%, its step with converter smelting endpoint molten steel phosphorus weight percentage:
1) in converter, adds steel scrap: because the molten iron temperature of going into before the converter is 1205 ℃, reduced by 45 ℃ than 1250 ℃ of reference condition temperature; Silicon weight percent content in the molten iron is owing to be 0.24%, be lower than 0.3% reference condition 0.06%, according to 1 ℃ of the every reduction of molten iron temperature, the corresponding reduction by 0.055 ~ 0.06% of scrap ratio, the every reduction by 0.01% of molten iron silicon content, scrap ratio is corresponding to be reduced by 0.018% ~ 0.022% again and calculates, and the scrap ratio that present embodiment reduces is: 0.06%/℃ Х, 45 ℃+0.018% Х, 0.06 ≈ 2.701%; Go into according to molten iron that temperature is 1250 ℃ before the converter, silicone content is 0.3% calculating, and the scrap ratio of adding should be 16%, and the scrap ratio of this actual adding is about 12.3%;
2) add quickened lime for the first time according to 10Kg/ ton steel; Carry out conventional oxygen blast after quickened lime add to finish, and oxygen lance position is lower than normally open and blows 20 centimetres of positions (normally open blow the rifle position be 1.95 meters) and carry out oxygen blast;
3) when oxygen blast proceeds to 58 seconds, according to the disposable adding rhombspar of 5Kg/ ton steel;
4) when oxygen blast proceeds to 90 seconds, the adjustment of oxygen lance position is transformed into normal mode finishes until oxygen blast, add quickened lime again according to 6Kg/ ton steel;
5) tapping, the control Molten Steel End Point is at 1687~1690 ℃, and finishing slag basicity is 2.5, and the finishing slag amount is 40Kg/ ton steel, and in the smelting endpoint composition, phosphorus content is 0.057% in the molten steel, dephosphorization rate is 40%.
This quickened lime add-on added 24Kg/ ton steel at least than lacking originally; Dephosphorization rate has descended at least 45%, for reaching this steel grade finished product phosphorus content minimum requirements, need add ferrorphosphorus in the operation after smelting, be example with the ferrorphosphorus that adds 25% quality percentage composition, yield of alloy by 90% calculates, this alloy amount that only needs to add is 0.06kg/ ton steel, reduces 0.18Kg/ ton steel at least than original ferrorphosphorus add-on; Slag mobile fine do not occur in the smelting process returning and does the splash phenomenon.
Embodiment 3
50 tons of converters are smelted; It is 1210 ℃ that molten iron is gone into the preceding temperature of converter, and silicone content is 0.20%, and phosphorus content is 0.102%; It is 0.05 ~ 0.07% that the steel grade finished product phosphorus content of smelting requires;
To go into that temperature is 1210 ℃ before the converter, silicone content is 0.20%, and phosphorus content is that 0.095% molten iron reaches 0.051%, its step with converter smelting endpoint molten steel phosphorus weight percentage:
1) in converter, adds steel scrap: because the molten iron temperature of going into before the converter is 1210 ℃, reduced by 40 ℃ than 1250 ℃ of reference condition temperature; Silicon weight percent content in the molten iron is lower than 0.3% reference condition 0.10% owing to be 0.20%; According to 1 ℃ of the every reduction of molten iron temperature, the corresponding reduction by 0.055 ~ 0.06% of scrap ratio; The every reduction by 0.01% of molten iron silicon content, scrap ratio is corresponding to be reduced by 0.018% ~ 0.022% again and calculates, and the scrap ratio that present embodiment reduces is: 0.058%/℃ Х, 40 ℃+0.022% Х 0.10=2.54%; Go into according to molten iron that temperature is 1250 ℃ before the converter, silicone content is 0.3% calculating, and the scrap ratio of adding should be 12%, and the scrap ratio of this actual adding is about 9.5%;
2) add quickened lime for the first time according to 15Kg/ ton steel; Carry out conventional oxygen blast after quickened lime add to finish, and make oxygen lance position be lower than 10 centimetres of normal positions (normally open blow the rifle position be 1.35 meters) to carry out oxygen blast;
2) when oxygen blast proceeds to 53 seconds, according to the disposable adding rhombspar of 8Kg/ ton steel;
3) when oxygen blast proceeds to 96 seconds, the adjustment of oxygen lance position is transformed into normal mode finishes until oxygen blast, add quickened lime again according to 10Kg/ ton steel;
4) tapping, the control Molten Steel End Point is at 1678~1680 ℃, and the finishing slag basicity of slag is 3.0, and the finishing slag amount is 50Kg/ ton steel.In the smelting endpoint composition, phosphorus content is 0.051% in the molten steel, and dephosphorization rate is 50%.
This quickened lime add-on added 15Kg/ ton steel at least than lacking originally; Dephosphorization rate has descended at least 35%, and phosphorus content has satisfied this steel grade finished product phosphorus content requirement in the molten steel, need not add ferrorphosphorus again in the operation after smelting, and reduces 0.15Kg/ ton steel at least than original ferrorphosphorus add-on; Slag mobile fine do not occur in the smelting process returning and does the splash phenomenon.

Claims (2)

1. the low temperature hot metal containing low silicon is with the method for converter smelting high phosphoretic steel, its step:
1) in converter, adds steel scrap, its add-on is carried out according to following principle: be blended into molten iron that silicon weight percent content 0.3% is the calculating benchmark that adds scrap ratio in 1250 ℃ of temperature before the converter, the molten iron, when 1 ℃ of the every reduction of molten iron temperature, the corresponding reduction by 0.055 ~ 0.06% of scrap ratio; When the every reduction by 0.01% of molten iron silicon content, scrap ratio is corresponding to reduce by 0.018% ~ 0.022% again;
2) add quickened lime for the first time according to 10 ~ 15kg/ ton steel; Carry out conventional oxygen blast after quickened lime add to finish, and make oxygen lance position be lower than the normal position to carry out oxygen blast for 10~20 centimetres;
3) when oxygen blast proceeds to 50~60 seconds, according to the disposable adding rhombspar of 5 ~ 8kg/ ton steel;
4) when oxygen blast proceeds to 90~110 seconds, oxygen lance position is risen to normal oxygen blast position finish until oxygen blast, adding quickened lime again according to 5 ~ 10kg/ ton steel;
5) tapping, the control Molten Steel End Point is at 1670~1690 ℃, and the finishing slag basicity of slag is 2.5~3, and total quantity of slag of smelting endpoint is at 40 ~ 50kg/ ton steel.
2. low temperature hot metal containing low silicon as claimed in claim 1 is characterized in that with the method for the high phosphoretic steel of converter smelting: when adding for the first time behind the quickened lime oxygen blast, the adjusting range that oxygen lance position is lower than 10~20 centimetres of normal positions becomes positive correlation with heat size.
CN2012102962897A 2012-08-20 2012-08-20 Method for smelting high-phosphorus steel by low-temperature low-silicon molten iron in converter Expired - Fee Related CN102776313B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012102962897A CN102776313B (en) 2012-08-20 2012-08-20 Method for smelting high-phosphorus steel by low-temperature low-silicon molten iron in converter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012102962897A CN102776313B (en) 2012-08-20 2012-08-20 Method for smelting high-phosphorus steel by low-temperature low-silicon molten iron in converter

Publications (2)

Publication Number Publication Date
CN102776313A CN102776313A (en) 2012-11-14
CN102776313B true CN102776313B (en) 2013-08-21

Family

ID=47121415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012102962897A Expired - Fee Related CN102776313B (en) 2012-08-20 2012-08-20 Method for smelting high-phosphorus steel by low-temperature low-silicon molten iron in converter

Country Status (1)

Country Link
CN (1) CN102776313B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103266195B (en) * 2013-05-15 2015-12-23 武汉钢铁(集团)公司 A kind of method improving converter smelting dephosphorization
CN103266196B (en) * 2013-05-15 2014-10-08 武汉钢铁(集团)公司 Method for producing carbon steel by using low-temperature low-silicon molten iron in 90-ton converter
CN103388043B (en) * 2013-07-23 2016-09-07 山东莱钢永锋钢铁有限公司 Converter low silicon smelting method
CN103361462B (en) * 2013-08-02 2015-11-25 武汉钢铁(集团)公司 The control method of converter low-carbon (LC) high phosphorus tapping
CN103555878B (en) * 2013-11-25 2015-02-04 武钢集团昆明钢铁股份有限公司 Safe and high-efficient low-silicon molten-ion blowing process
CN104294000B (en) * 2014-10-23 2016-08-24 武汉钢铁(集团)公司 The method producing high phosphoretic steel in the stove of 180t ore deposit
CN106381358B (en) * 2016-11-14 2018-05-01 攀钢集团攀枝花钢铁研究院有限公司 The method of semisteel smelting high-phosphorus iron ore
CN108396093A (en) * 2017-02-05 2018-08-14 鞍钢股份有限公司 A method of improving the residual manganese content of converter terminal molten steel
CN108396096B (en) * 2017-02-08 2019-09-20 鞍钢股份有限公司 A kind of extremely low temperature, the method for ultra-high-sulfur(UHS) molten iron converter desulfuration in furnace
CN110643778B (en) * 2018-12-10 2021-08-31 广东韶钢松山股份有限公司 Method for smelting high-phosphorus steel by converter
CN110724784B (en) * 2019-10-14 2021-09-14 盐城市联鑫钢铁有限公司 Low-silicon high-phosphorus molten iron converter smelting method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101117651A (en) * 2006-07-31 2008-02-06 宝山钢铁股份有限公司 Converting process for converter low-silicon molten iron
CN102776311A (en) * 2012-06-28 2012-11-14 辽宁天和科技股份有限公司 Dephosphorization process for high phosphorous molten iron

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101117651A (en) * 2006-07-31 2008-02-06 宝山钢铁股份有限公司 Converting process for converter low-silicon molten iron
CN102776311A (en) * 2012-06-28 2012-11-14 辽宁天和科技股份有限公司 Dephosphorization process for high phosphorous molten iron

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
秦波.高磷低硅(无硅)电工钢试验研究.《武钢技术》.1978,(第3期),46-51.
高磷低硅(无硅)电工钢试验研究;秦波;《武钢技术》;19781231(第3期);46-51 *

Also Published As

Publication number Publication date
CN102776313A (en) 2012-11-14

Similar Documents

Publication Publication Date Title
CN102776313B (en) Method for smelting high-phosphorus steel by low-temperature low-silicon molten iron in converter
CN104911295B (en) The smelting process that a kind of converter less-slag material is added
CN102212643B (en) Converter less-slag smelting process
CN101314805B (en) High-efficiency dephosphorization smelting method for medium phosphor hot metal revolving furnace
CN105483314B (en) A kind of control method for improving the residual manganese content of converter terminal
CN102943145B (en) Converter smelting method of ultra-low phosphorus steel
CN100453657C (en) Mono-slag converter process for producing high carbon low-phosphorus molten steel
CN108624735A (en) A method of low phosphorus steel by smelting is consumed based on the low slag charge of high-silicon high ferrophosphorus water converter
CN102168160B (en) Converter steelmaking technology for directly reducing-alloying manganese ore
CN109280731A (en) The method of the high phosphorus hot metal production steel of converter terminal P≤0.01% is smelted using few slag charge
CN103320566B (en) Double slag process smelts the method for half steel
CN103352101A (en) Low-cost smelting technology of converter
CN104762435A (en) Method for reducing smelting cost by improving molten iron ratio of converter
CN103146873A (en) Enriching sludge ball for semisteel steelmaking and slagging method for semisteel steelmaking
CN103866077A (en) Semi-steel steelmaking double remaining slag steelmaking method
CN103555879B (en) Control method for reducing total iron content of SPHC (steel plate heat commercial) final slag
CN103409595B (en) Dephosphorization and steel-making method of vanadium-containing molten iron
CN110699511B (en) Method for smelting high-silicon molten iron
CN103205522B (en) Method for smelting plain carbon steel from semi-steel
CN109280734B (en) Smelting method of medium and high alloy ultra-low phosphorus steel
CN108624734A (en) A method of decarbonized slag circulatory stove number in control converter less-slag melting technique
CN109112250B (en) Gasification dephosphorization and cyclic utilization method in semi-steel smelting converter final slag furnace
CN102634626A (en) Method for reducing lime consumption of revolving furnace
CN109280733A (en) A kind of smelting process of dephosphorization converter terminal low phosphorus content molten steel
CN106011362B (en) The method for making steel of semisteel smelting constant pressure and constant rifle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170711

Address after: 430083 Qingshan District, Hubei, Wuhan factory before the door No. 2

Patentee after: Wuhan iron and Steel Company Limited

Address before: 430080 Wuhan, Hubei Friendship Road, No. 999, Wuchang

Patentee before: Wuhan Iron & Steel (Group) Corp.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130821