CN102773384B - Line press component of hole check apparatus for assembling harness cord - Google Patents

Line press component of hole check apparatus for assembling harness cord Download PDF

Info

Publication number
CN102773384B
CN102773384B CN201210260089.6A CN201210260089A CN102773384B CN 102773384 B CN102773384 B CN 102773384B CN 201210260089 A CN201210260089 A CN 201210260089A CN 102773384 B CN102773384 B CN 102773384B
Authority
CN
China
Prior art keywords
fixed
plate
harness
tightening
line ball
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210260089.6A
Other languages
Chinese (zh)
Other versions
CN102773384A (en
Inventor
胡金永
翁华轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG KD TEXTILE MACHINERY CO Ltd
Original Assignee
ZHEJIANG KD TEXTILE MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG KD TEXTILE MACHINERY CO Ltd filed Critical ZHEJIANG KD TEXTILE MACHINERY CO Ltd
Priority to CN201210260089.6A priority Critical patent/CN102773384B/en
Publication of CN102773384A publication Critical patent/CN102773384A/en
Application granted granted Critical
Publication of CN102773384B publication Critical patent/CN102773384B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a line press component of a hole check apparatus for assembling a harness cord, wherein the line press component comprises a left goalpost and a right goalpost fixed on a fixture base; the left goalpost and the right goalpost are fixedly provided with upper press blocks; the lower ends of the upper press blocks are provided with lower press blocks corresponding to the upper press blocks; the lower press blocks are connected with a lifting plate by two press block guide pillars; the lifting plate is connected with a lifting cylinder; the lifting plate is provided with two line press guide pillars; the lower ends of the two line press guide pillars are fixed on the fixture base while the upper ends are connected by a beam; the lifting plate is capable of sliding vertically along the line press guide pillars; a buffer spring is arranged between the lifting plate and the lower press blocks; the lifting plate is provided with a main line press body which is provided with a square tightening bar for tightening the harness cord; a plurality of tightening slots arrayed in the vertical direction are arranged in the square tightening bars; the amount of the tightening slots is same as that of sleeve grooves; a left blocking plate and a right blocking plate are fixed on the main line press body; the upper ends of the left blocking plate and the right blocking plate are provided with fixing bars which are provided with a plurality of small guide pillars arranged in the vertical direction.

Description

A kind of line ball parts of the school eye equipment of making for harness
Technical field
The present invention relates to field of textile machinery, particularly a kind of school eye equipment of making for harness.
Background technology
At present, have supporting harness to make on various jacquards, weaving loom, harness is made for the carrying out of warp constantly being promoted and declined in the process of weaving cotton cloth.As Fig. 1, harness is made and is generally comprised harness cord thread 1010, heald bar 1020, spring 1030, heald bar 1020 one end are communicated with silk thread 1010, the other end is connected on spring 1030, on heald bar 1020, be provided with harness eye 1040, the warp of the use of weaving cotton cloth is just through harness eye 1040, in the process of weaving cotton cloth, having a lot of cover harness, to make group in a row, by pulling harness cord thread 1010 to drive warp constantly promote and decline.In order can, by a lot of warps easily through harness eye 1040, before threading, the harness eye on this row's heald bar 1040 can be alignd in same level, a lot of like this warps can pass harness eye simultaneously, greatly raises the efficiency.Now for all harness eyes can be alignd, being to adopt the mode of artificial school eye to carry out, is exactly whether workman's inspection harness eye one by one aligns, and unevenly will pull harness cord thread adjustment, until all harness eyes all reach the requirement of alignment, well imagine that efficiency is low-down.
Summary of the invention
In order to improve the efficiency of heald bar school eye, need to automatically complete whole school eye process by school eye equipment, the object of the present invention is to provide a kind of line ball parts of the school eye equipment of making for harness, can press fixingly to being hooked in harness cord thread on billhook, make it possible to easily harness cord thread be cut off.
In order to reach above-mentioned target, technical scheme of the present invention is: a kind of line ball parts of the school eye equipment of making for harness, comprise the left-hand door post being fixed on tooling base, right door pillar, on left-hand door post and right door pillar, be fixed with upper holder block, upper holder block lower end is provided with corresponding with it lower lock block, lower lock block is connected with lifter plate by two briquetting guide pillars, lifter plate connects lift cylinder, on described lifter plate, be provided with two line ball guide pillars, two line ball guide pillar lower ends are fixed on tooling base, upper end connects by crossbeam, lifter plate can slide up and down along line ball guide pillar, between lifter plate and lower lock block, be provided with buffer spring, on lifter plate, be fixed with line ball body, on line ball body, be provided with the side's of the tightening bar for tightening harness cord thread, on the side's of tightening bar, be provided with multiple grooves of tightening of longitudinal arrangement, the quantity of tightening groove is identical with sleeve pipe groove, on line ball body, be fixed with left clamp and right clamp, left clamp and right clamp upper end are provided with fixed strip, on fixed strip, be provided with the multiple little guide pillar of longitudinal arrangement, harness cord thread passes from the gap between little guide pillar.
Line ball parts of the present invention are used on the school eye equipment that harness makes, the harness cord thread that billhook is hooked is pushed down and is fixed and tighten, then in place harness cord thread is cut off by cutter, whole process is quick and convenient, make it possible to enter fast the next step of school eye work, greatly improved school eye equipment and carry out the efficiency of school eye.
Accompanying drawing explanation
Fig. 1 is the harness cord thread connection diagram that in existing weaving loom, harness is made.
Fig. 2 is the schematic diagram of the heald bar in Fig. 1.
Fig. 3 is that the steel in Fig. 2 is combined head part enlarged diagram.
Fig. 4 is the structural representation one of school of the present invention eye equipment.
Fig. 5 is the structural representation two of school of the present invention eye equipment.
Fig. 6 is the semi-section schematic diagram of Fig. 5.
Fig. 7 is the structural representation three of school of the present invention eye equipment.
Fig. 8 is the structural representation four of school of the present invention eye equipment.
Fig. 9 is the structural representation of the line ball parts of school of the present invention eye equipment.
Figure 10 is the structural representation of the hook line parts of school of the present invention eye equipment.
School of the present invention eye equipment is arranged on the overall structure schematic diagram on long guideway by Figure 11.
Figure 12 is by the carrier wheel assembly schematic diagram on school of the present invention eye equipment and long guideway.
Figure 13 is the structural representation one of long guideway assembly.
Figure 14 is the structural representation two of long guideway assembly.
Figure 15 is the structural representation of the lowering or hoisting gear of school eye equipment.
Figure 16 is the A place internal structure schematic diagram in Figure 15.
Figure 17 is the B place internal structure schematic diagram in Figure 15.
Figure 18 is the structural representation of the flexible broach shell of billhook parts.
Figure 19 is the structural representation one of harness eye plate.
Figure 20 is the structural representation two of harness eye plate.
Figure 21 is the structural representation three of harness eye plate.
Figure 22 is the top view of Figure 21.
Figure 23 is the left view of Figure 21.
Figure 24 is the enlarged drawing at A place in Fig. 6.
Figure 25 is the enlarged drawing at B place in Fig. 6.
The specific embodiment
Line ball parts of the present invention are arranged on the eye equipment of school, as Fig. 4, 5, school eye equipment comprises tooling base 100, on tooling base 100, be provided with fixture component, hook line parts, line ball parts, secant parts, described fixture component comprises the sleeve pipe fixed form 11 being arranged on tooling base 100, sleeve pipe fixed form 11 comprises end template 36, lower bolster 35 and cope match-plate pattern 32, end template 36, lower bolster 35 and cope match-plate pattern 32 are all provided with multiple sleeve pipe grooves 23 of longitudinal arrangement, the top of sleeve pipe like this, bottom and bottom can snap onto in sleeve pipe groove 23 and be fixed, on cope match-plate pattern 32, be provided with keeper 27, cope match-plate pattern 32 both sides are provided with keeper fixed frame 31, on lower bolster 35, be provided with lower keeper 29, lower bolster 35 both sides are provided with lower keeper fixed frame 33, between upper keeper 27 and lower keeper 29, connect by keeper connecting plate 28, upper keeper 27 is or/and lower keeper 29 connects keeper cylinder 26.On upper keeper 27, be provided with keeper guide pad 43.Upper keeper 27 slides along upper keeper guide pad 43, and lower door Hinge 29 can also can be driven by keeper connecting plate 28 by upper keeper 27 by the direct drive of keeper cylinder 26, and keeper slides in the keeper fixed head of both sides and just sleeve pipe fixed.
Cope match-plate pattern 32 upper ends of sleeve pipe fixed form are provided with steel and combine location-plate 30, and steel is combined location-plate 30 and can be opened by handle, and the steel that harness is made closes inside combining and all putting into again, just can play the fixing comprehensive effect of steel in location.Steel is combined location-plate 30 upper ends and is provided with line pressure plate 20, on line pressure plate 20, be provided with roof door bolt 16, roof door bolt 16 connects roof door bolt cylinder 17, line pressure plate 20 both sides are provided with roof door bolt fixed frame 38, line pressure plate 20 is connected with line pressure plate cylinder 9, line pressure plate cylinder 9 is fixed in air cylinder fixed plate 10, on roof door bolt 16, be provided with roof door bolt guide pad 21, roof door bolt cylinder 17 drives roof door bolt 16 to slide along roof door bolt guide pad 21, roof door bolt 16 slides in roof door bolt fixed frame 38, line pressure plate 20 is covered, then line pressure plate cylinder 9 drives line pressure plate 20 to withstand on forward on roof door bolt 16, because harness cord thread can pass between line pressure plate 20 and roof door bolt 16, so harness cord thread is just pressed and has been fixed.
End template 36 lower ends of sleeve pipe fixed form are provided with harness eye plate location-plate 39, on harness eye plate location-plate 39, be provided with harness eye plate backstay 40, harness eye plate location-plate 39 connected positioning plates pull cylinder 1, harness eye plate location-plate 39 is arranged on location-plate mount pad 37, location-plate mount pad 37 is fixed on tooling base 100, location-plate mount pad 37 is provided with chute and slides up and down for harness eye plate location-plate 39, is provided with the little cylinder that promotes harness eye plate in location-plate mount pad 37.
When carrying out school eye, after the heald bar that needs school eye is put to sleeve pipe, all neat being fixed on harness eye plate, then harness eye sleeve-board is positioned on two harness eye plate backstays 40, harness eye plate is just fixed on harness eye plate location-plate 39 like this, and location-plate pulls cylinder 1 can pull the chute of harness eye plate location-plate 39 on location-plate mount pad 37 downward, like this after harness cord thread passes heald bar, by harness cord thread tension, the steel that penetrates heald bar is combined the inside.
Cope match-plate pattern 32, lower bolster 35 and the integrative-structure of end template 36 for being fixedly connected with, cope match-plate pattern 32 both sides are fixed with slide block 44 simultaneously, the upper keeper fixed frame 31 of both sides is separately fixed on the slide block 44 of both sides, the slide block 44 of both sides is separately positioned on template guide pillar 22, template guide pillar 22 lower ends are fixed in work base 100 through location-plate mount pad 37, template guide pillar 22 upper ends are fixed in air cylinder fixed plate 10, sleeve pipe fixed form is connected with template and promotes cylinder 4, template promotes cylinder 4 and drives cope match-plate pattern 32, lower bolster 35 and end template 36 slide along template guide pillar 22.
As Figure 10, hook line parts comprise billhook 119, billhook 119 is fixed on billhook mounting 107, billhook mounting 107 connects billhook cylinder 102, billhook cylinder 102 is fixed on billhook air cylinder support 101, billhook air cylinder support 101 is arranged on tooling base 100, billhook 119 is transversely arranged multiple, billhook 119 one end are fixed on billhook mounting 107, the other end is through billhook frame 114, on billhook 119, cover has flexible broach shell 118, flexible broach shell 118 is stuck on billhook frame 114, between billhook frame 114 and billhook mounting 107, be provided with Compress Spring 113, Compress Spring 113 is enclosed within on screw shaft 108.As Figure 18,24, flexible broach shell 118 holds 1180 to be stuck on billhook frame 114 by card, and 1181 of pressure sides are used for pressing harness cord thread.Under nature, Compress Spring 113 pushes away forward billhook frame 114, billhook frame 114 is just pressed in card flexible broach shell 118 therein on the point of a knife of billhook 119, if be hooked to harness cord thread on point of a knife, the pressure side 1181 of flexible broach shell 118 will be pressed on harness cord thread on point of a knife.
As Fig. 9, line ball parts comprise the left-hand door post 201 being fixed on tooling base 100, right door pillar 205, on left-hand door post 201 and right door pillar 205, be fixed with upper holder block 211, upper holder block 211 lower ends are provided with corresponding with it lower lock block 209, lower lock block 209 is connected with lifter plate 208 by two briquetting guide pillars 210, lifter plate 208 connects lift cylinder 203, on lifter plate 208, be provided with two line ball guide pillars 204, two line ball guide pillar 204 lower ends are fixed on tooling base 100, upper end connects by crossbeam 212, lifter plate 208 can slide up and down along line ball guide pillar 204, between lifter plate 208 and lower lock block 209, be provided with buffer spring 207, on lifter plate 208, be fixed with line ball body 221, on line ball body 221, be fixed with the side's of the tightening bar 220 for tightening harness cord thread, on the side's of tightening bar 220, be provided with multiple grooves of tightening of longitudinal arrangement, the quantity of tightening groove is identical with sleeve pipe groove 23, on line ball body 221, be fixed with left clamp 216 and right clamp 219, left clamp 216 and right clamp 219 upper ends are provided with fixed strip 215, on fixed strip 215, be provided with the multiple little guide pillar 218 of longitudinal arrangement, harness cord thread passes from the gap between little guide pillar.Harness cord thread is past pulling back after being hooked by billhook 119, the gap of each root harness cord thread through each little guide pillar 218, make like this harness cord thread can not twine together, then lift cylinder 203 drives lifter plate 208 to rise along line ball guide pillar 204, lifter plate 208 drives lower lock block 209 to rise, last lower lock block 209 compresses with upper holder block 211, so just the harness cord thread through two briquettings is compressed, when lifter plate 208 rises simultaneously, can drive line ball body 221 to rise, thereby the side's of the tightening bar on line ball body 221 220 can up lift harness cord thread to be tightened, on the side's of tightening bar 220, be provided with a lot of grooves of tightening, each root harness cord thread is tightened groove through one.
As Fig. 4,6,25, secant parts comprise the cutter cylinder 25 that contains cutter, and knife guide 45, cutter is connected on the piston rod of cutter cylinder, on knife guide 45, have the cutter passage 451 through cutter, on cutter passage 451, be provided with cutting seam 453, cutter is driven and is carried out secant through cutter passage by piston rod.
Secant parts also comprise the second cutter cylinder 24 that contains the second cutter, and hair-dryer assembly 46, hair-dryer assembly 46 comprises hot hair dryer and drives the hair-dryer cylinder 47 of hot hair dryer transverse shifting, on knife guide 45, have the second cutter passage 452 through the second cutter, on the second cutter passage 452, be provided with the second cutting seam 454, the second cutteves and carry out secant through the second cutter passage.
The cutter of cutter cylinder 25 is for having the harness cord thread of plastic bushing to carry out secant to cover, and the second cutter of the second cutter cylinder 24 is for having the harness cord thread of heat-shrink tube to carry out secant to cover, selects according to actual needs corresponding cutter.Having the harness cord thread of heat-shrink tube to carry out after secant to cover, hair-dryer cylinder 47 can drive hot hair dryer to carry out blowing hot wind to heat-shrink tube, and the steel that encases that heat-shrink tube is shunk is tightly combined.
Cutter cylinder 25, the second cutter cylinder 24 are all fixed on cylinder fixed head assembly 23, and hair-dryer assembly 46 is fixed on blower fan fixed head 48, and blower fan fixed head 48 is fixed on tooling base 100.
In order to make equipment fixation, between left-hand door post 201 and air cylinder fixed plate 10, reinforce the connection by connecting plate 8 simultaneously, between location-plate mount pad 37 and air cylinder fixed plate 10, reinforce the connection by fixed head 49.
As Figure 11, can add a panel beating cover 1000 in equipment outside and be covered the effect of playing protection in addition.
Due in actual production process, the harness cord thread that harness is made is lining up of the whole row of whole row, in order to make school eye equipment after often completing once school eye work, after being about to a row the heald bar school eye of harness cord thread, a row school eye work after can carrying out easily, we by whole equipment be arranged on can transverse translation long guideway on (as Figure 11), concrete structure is as follows
As Figure 11, 12, 13, 14, on tooling base 100, be fixed with left clamp 411, right clamp 404, between left clamp 411 and right clamp 404, being provided with can be along the adjustable plate of its slip 410, on adjustable plate 410, be provided with adapter sleeve 416, adapter sleeve 416 connects gear reduction unit 401, gear reduction unit 401 connects motor for speed reducer 417, on adapter sleeve 416, be fixed with gear 414, gear 414 engages with tooth bar 504, tooth bar 504 is fixed on long guideway seat 503, on adjustable plate 410, be provided with Compress Spring 409, Compress Spring 409 presses adjustable plate 410, on long guideway seat 503, be fixed with long linear guides 502, on tooling base 100, be fixed with transverse translation slide block 518, transverse translation slide block 518 is arranged on long linear guides 502 and laterally slides along it.Transverse translation slide block 518 is fixing with tooling base 100 by slide block fixed head 519.Be provided with travel switch 800 at the two ends of long linear guides 502, in the time that equipment moves to fast approaching long linear guides 502 two ends, travel switch 800 can play the effect of prompting, prevents that its translation is excessive.
By by left clamp 411, right clamp 404 is fixed on tooling base 100, whole equipment and power set are coupled together, left clamp 411, in the middle of right clamp 404, an adjustable plate 410 is set, adjustable plate 410 is stuck in the middle of two clamps, left clamp 411, right clamp 404 inner sides are all provided with chute, adjustable plate 410 can slide along chute, adjustable plate 410 intermediate sleeve have a deep groove ball bearing 413, deep groove ball bearing 413 is fixed on adapter sleeve 416, on adapter sleeve 416, cover has gear 414, gear 414 engages with tooth bar 504, in adjustable plate 410, be provided with Compress Spring 409, Compress Spring 409 is enclosed within on spring spindle 408, spring spindle 408 is fixed on limiting plate 406, limiting plate 406 is fixed on tooling base 100, limiting plate 406 is provided with two screw rods 405, screw rod 405 one end are fixed on adjustable plate 410, on screw rod 405 other ends, cover has nut 407, thereby adjustable plate 410 is fixed on screw rod 405, screw rod 405 is fixed on limiting plate 406, when needing adjustable plate 410 front and back to adjust, the nut 407 of only need to outwarding winding, then turn screw rod 405 moves forward and backward along limiting plate 406, adjustable plate 410 also just follows screw rod to move forward and backward like this, reach the object of adjusting adjustable plate 410, after adjusting to the right place, screwing nut fixes screw rod again.Compress Spring 409 is between adjustable plate 410 and limiting plate 406, thus Compress Spring 409 squeeze adjustments plates 410.
Spring spindle 408 is oppressed Compress Spring 409 and is pressed adjustable plate 410, adjustable plate 410 is pushed to tooth bar 504 directions, because adjustable plate 410 is connected with gear 414 with adapter sleeve 416 by deep groove ball bearing 413, so Compress Spring 409 also just tightly suppresses gear 414 and engages with tooth bar 504, motor for speed reducer 417 driven gear reductors 401, gear reduction unit 401 driven gears 414 rotate, between gear 414 and tooth bar 504, engage, the circular-rotation motion of gear 414 is become to rectilinear motion, gear 414 is along tooth bar 504 rectilinear motions, thereby drive adapter sleeve 416, adjustable plate 410 and left and right clamp rectilinear motion together, due to left clamp 411, right clamp 404 is fixed on tooling base 100, on tooling base 100, be fixed with transverse translation slide block simultaneously, transverse translation slide block is arranged on long linear guides 502, so whole school eye equipment also laterally slides along long linear guides 502.After can setting and often completing once school eye work, school how many distances of eye equipment transverse shifting, can just get at after reaching a row and wait for that the harness of school eye makes position.
In order to make translation power set more firm, fix two support plates for 410 times at adjustable plate, left supported plate 412, right supported plate 403, left supported plate 412, right supported plate 403 are all fixed on reductor fixed head 402 below.Can regulate position on limiting plate 406 to regulate the degree of tightness of Compress Spring 409 by screw rod 405 in addition, thus the degree of tightness between adjusting gear 414 and tooth bar 504.
In order to adapt to the heald bar of different length, need to regulate the height of school eye equipment, so be provided with long guideway seat lifting and lowering mechanism in long guideway seat 503 lower ends, as Figure 15, 16, 17, long guideway seat lifting and lowering mechanism comprises two lifting base 604A, 604B, two lifting base 604A, on 604B, be respectively arranged with elevating screw 616A, 616B, elevating screw 616A, 616B is separately positioned on screw rodb base 601A, on 601B, elevating screw 616A, on 616B, be respectively arranged with turbine 623A, 623B, turbine 623A, 623B respectively with worm screw 629A, 629B connects, turbine 623A, 623B and worm screw 629A, 629B is separately positioned on turbine box 620A, in 620B, turbine is all provided with up and down thrust ball bearing 622 turbine is fixed relatively. Worm screw 629A, 629B respectively with connecting axle 612A, 612B connects, two connecting axle 612A, between 612B, connect by power transmission shaft 611, worm screw 629A is connected with endless screw electric motor 615 by motor adapter sleeve 617, is fixed with lifting fixed head 632 on power transmission shaft 611, lifting fixed head 632 and two lifting base 604A, 604B is fixing with long guideway seat 503; Described screw rodb base 601A, 601B is fixed on school eye plant bottom case 600, is also fixed with two lifting short lead rail 501A on school eye plant bottom case 600,501B, on long guideway seat 503, be fixed with respectively and lifting short lead rail 501A the lifting slider 517A that 501B connects, 517B.School eye plant bottom case 600 can arrange control apparatus case 700.
Tell about the course of work of school eye below, paper harness is made and original artificial school eye process, as Fig. 2,3, harness is made and is generally comprised harness cord thread 1010, heald bar 1020, spring 1030, heald bar 1020 one end are communicated with silk thread 1010, and the other end is connected on spring 1030, is provided with harness eye 1040 on heald bar 1020, one end that heald bar 1020 connects harness cord thread 1010 is called comprehensive 1050 of steel, and steel is combined head and is divided into through wires hole 1060, line fixing hole 1070.On heald bar 1020, also cover has sleeve pipe simultaneously, puts plastic bushing or heat-shrink tube according to different requirements.Harness cord thread 1010 is all generally to hang down from above, the a lot of harness cord threads that are all the whole rows of whole row in factory the inside now hang down from above, then combine the through wires hole 1060 on head by one one of workman through steel, then strain heald bar, harness cord thread is drawn in to line fixing hole 1070, and then heald bar is one by one carried out to the alignment of harness eye 1040, after alignment, again the sleeve pipe being enclosed within advance on heald bar 1020 is pushed to, comprehensive the steel that puts harness cord thread 1010 1050 is encased, making harness cord thread 1010 can not combine 1050 the inside from steel runs out, so just complete the whole course of work.
Complete whole work by school eye equipment now, school eye work at first, first the whole row's who needs school eye heald bar 1020(heald bar 1020 is put to sleeve pipe in advance) all snap onto in the groove 98 on harness eye plate 99, as Figure 19-Figure 23, on harness eye plate 99, have the longitudinal groove of whole row 98, heald bar 1020 is just all stuck in groove 98, on harness eye plate 99, be also provided with horizontal knockout groove 97, knockout groove 97 is communicated with all grooves 98, the simultaneously just position to harness eye on heald bar just, the position of knockout groove 97, after heald bar all snaps onto in groove 98, with steel bar through reserved knockout groove 97 on harness eye plate 99, so just interior all grooves 98 harness eye is worn, thereby all heald bars are worn together and are fixed, all heald bars all separate again simultaneously, and the harness eye of heald bar is all worn except can heald bar is all fixing together with steel bar, the harness eye of all heald bars also all flushes simultaneously.
Then harness eye plate 99 being fixed to school eye equipment gets on, two fixing holes 96 on harness eye plate 99 are nested on two harness eye plate backstays 40 on harness eye plate location-plate 39, sleeve pipe on heald bar is all snapped in the sleeve pipe groove of corresponding sleeve pipe template simultaneously, be that sleeve pipe will all snap in end template 36, in the sleeve pipe groove 23 arranging on lower bolster 35 and cope match-plate pattern 32, then comprehensive the steel of heald bar head being combined to location-plate 30 by steel locates, the inner side that steel is combined location-plate 30 has groove corresponding to line fixing hole 1070 multiple and on the comprehensive head of steel, making each steel combine head can be positioned apart separately, through wires hole 1060 is combined between location-plate 30 and cope match-plate pattern 32 at steel simultaneously, then go up keeper 27, lower door Hinge 29 slides in corresponding keeper fixed frame under the drive of cylinder, sleeve pipe is fixed, then billhook cylinder 102 starts, promote billhook mounting 107, a final row the billhook 19 that drives is successively through the top board 211 and lower platen 209 of line ball parts, through the side's of the tightening bar 220 on line ball body 221, each billhook passes between any two from little guide pillar 218 respectively, final billhook can arrive at steel and combine location-plate 30 places, in arriving at herein, first billhook frame 114 can be blocked by the comprehensive location-plate 30 of a steel base plate behind, billhook can continue to go ahead like this, billhook frame 114 is blocked, just being equivalent to billhook frame 114 walks back, billhook frame 114 just tightly suppresses Compress Spring 113 backward, the flexible broach shell 118 being simultaneously stuck on billhook frame 114 is also and then walked back, be exactly finally that billhook is stretched forward, stretch out billhook frame and broach shell.Billhook is combined location-plate 30 by steel forward and is backed down and therefrom wear out, and combines through steel the comprehensive head of steel that location-plate 30 is located.
When each billhook wears out, all pass a corresponding steel and combine the through wires hole 1060 on head, at this time workman wins over the harness cord thread coming by hanging down in advance on one one point of a knife that is through billhook above, then billhook cylinder 102 starts again, billhook 119 is retracted to original position along opposite direction, billhook is reciprocal again combines head through steel, the harness cord thread being through like this on point of a knife is just pulled through the through wires hole 1060 on the comprehensive head of steel, and be hooked on the point of a knife of billhook, after billhook return, Compress Spring 113 is no longer subject to compressing and replys original shape simultaneously, billhook frame 114 and flexible broach shell 118 are pushed away to point of a knife direction, so just flexible broach shell 118 is pressed on the harness cord thread pulling back on point of a knife, at this time the lift cylinder 203 of line ball parts starts, lift cylinder 203 drives lifter plate 208 upwards, first lifter plate 208 upwards drives lower lock block 209 upwards to compress with upper holder block 211, also be pressed between upper lower lock block by harness cord thread, drive line ball body 221 upwards simultaneously, upwards jack-up harness cord thread of the side's of tightening bar 220 on line ball body 221, on the side's of tightening bar 220, have multiple grooves of tightening, each tightening has a harness cord thread in groove, roof door bolt cylinder 17 drives roof door bolt 16 to be inserted in roof door bolt fixed frame 38 simultaneously, line pressure plate cylinder 9 promotes line pressure plate 20 and withstands roof door bolt 16, by hanging down above, the harness cord thread coming is pushed down, then location-plate pulls cylinder 1 to start harness eye plate location-plate 39 is pulled downwards, thereby the harness eye plate being fixed on harness eye plate location-plate 39 is pulled down, thereby all heald bars are pulled down, make so to be all pulled in line fixing hole 1070 through the harness cord thread of through wires hole 1060, the state of whole like this harness cord thread in fixedly tightening, at this time cutter cylinder 25 starts, drive cutter to slide along knife guide 45, in the cutter passage 451 that cutter has from knife guide 45, pass, thereby the knife edge of cutter just passes harness cord thread is cut off from cutting seam 453, then template promotes upwards jack-up of cylinder 4, sleeve pipe fixed form 11 is upwards taken up, the sleeve pipe being stuck in like this in sleeve pipe fixed form 11 sleeve pipe grooves 23 is all brought to, just comprehensive the steel on heald bar head and harness cord thread above are all encased, like this harness cord thread is penetrated to heald bar, shift sleeve pipe onto steel comprehensive head and above harness cord thread is encased to the harness eye alignment that makes it fix tightly and heald bar, all working all completes, deactivate below, first three keepers have corresponding cylinder all to keep in the center, lift cylinder 203 drives upper lower lock block and line ball body etc. all to keep in the center, the stingy cylinder being simultaneously arranged in location-plate mount pad 37 starts, band piston rod outwards promotes harness eye plate, harness eye plate just withdraws from harness eye plate location-plate 39, then workman just can will complete threading with hand, the harness of school eye work is made from school eye equipment and is lifted down, and the harness cord thread of giving up originally cutting off is taken clean just passable.
After completing once school eye work, motor for speed reducer 417 starts, driven gear reductor 401, gear reduction unit 401 driven gears 414 rotate, between gear 414 and tooth bar 504, engage, the circular-rotation motion of gear 414 is become to rectilinear motion, gear 414 is along tooth bar 504 rectilinear motions, thereby drive adapter sleeve 416, adjustable plate 410 and left and right clamp rectilinear motion together, due to left clamp 411, right clamp 404 is fixed on tooling base 100, on tooling base 100, be fixed with transverse translation slide block simultaneously, transverse translation slide block is arranged on long linear guides 502, so whole school eye equipment also laterally slides along long linear guides 502.
After can setting and often completing once school eye work, school eye equipment automatic transverse-moving certain distance, can just get at after reaching a row and wait for that the harness of school eye makes position, and horse back just can carry out work next time like this.
The above course of work is for plastic bushing, if heat-shrink tube, in secant, change exactly the second cutter cylinder 24 that contains the second cutter into, simultaneously when being completed after secant by the second cutter, hair-dryer cylinder 47 drove the hot hair dryer translation past to carry out blowing hot wind to heat-shrink tube, thereby heat-shrink tube is shunk, comprehensive steel head was packed tightly.
In order to adapt to the heald bar of different length, need to regulate the height of school eye equipment, when highly adjusting, endless screw electric motor 615 drives the worm screw 629A of a side to rotate, worm screw 629A drives turbine 623A to rotate, turbine 623A is enclosed within on elevating screw 616A, 616A is threaded with elevating screw, so turbine 623A is along elevating screw 616A lifting, simultaneously because an other side also has a set of identical structure, comprise worm screw 629B, turbine 623B and elevating screw 616B, and between worm screw 629A and worm screw 629B by two connecting axle 612A, 612B and power transmission shaft 611 connect, the turbine 623A of such side can be synchronous along elevating screw 616A lifting the turbine 623B of drive opposite side along elevating screw 616B lifting, the turbine box at whole like this two ends, lifting base and power transmission shaft, the whole liftings of lifting fixed head on power transmission shaft, because two lifting bases and lifting fixed head are all fixed on long guideway seat 503, and screw rodb base 601A, 601B is fixed on school eye plant bottom case 600, on school eye plant bottom case 600, be also fixed with two lifting short lead rail 501A, 501B, on long guideway seat 503, be fixed with respectively and lifting short lead rail 501A, the lifting slider 517A that 501B connects, 517B, so just drive long guideway seat 503 along lifting short lead rail 501A, 501B slides up and down, because school eye equipment is to be relatively fixedly installed on long guideway seat 503, so whole school eye equipment just can carry out oscilaltion adjusting.

Claims (1)

1. the line ball parts of a school eye equipment of making for harness, it is characterized in that, comprise the left-hand door post (201) being fixed on tooling base (100), right door pillar (205), on tooling base (100), be provided with sleeve pipe fixed form (11), sleeve pipe fixed form (11) comprises end template (36), lower bolster (35) and cope match-plate pattern (32), end template (36), lower bolster (35) and cope match-plate pattern (32) are all provided with multiple sleeve pipe grooves (23) of longitudinal arrangement, on left-hand door post (201) and right door pillar (205), be fixed with upper holder block (211), upper holder block (211) lower end is provided with corresponding with it lower lock block (209), lower lock block (209) is connected with lifter plate (208) by two briquetting guide pillars (210), lifter plate (208) connects lift cylinder (203), on described lifter plate (208), be provided with two line ball guide pillars (204), two line ball guide pillars (204) lower end is fixed on tooling base (100), upper end connects by crossbeam (212), lifter plate (208) can slide up and down along line ball guide pillar (204), between lifter plate (208) and lower lock block (209), be provided with buffer spring (207), on lifter plate (208), be fixed with line ball body (221), on line ball body (221), be provided with the side's of the tightening bar (220) for tightening harness cord thread, on the side's of tightening bar (220), be provided with multiple grooves of tightening of longitudinal arrangement, the quantity of tightening groove is identical with sleeve pipe groove (23), on line ball body (221), be fixed with left clamp (216) and right clamp (219), left clamp (216) and right clamp (219) upper end are provided with fixed strip (215), on fixed strip (215), be provided with the multiple little guide pillar (218) of longitudinal arrangement, harness cord thread passes from the gap between little guide pillar.
CN201210260089.6A 2012-07-25 2012-07-25 Line press component of hole check apparatus for assembling harness cord Expired - Fee Related CN102773384B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210260089.6A CN102773384B (en) 2012-07-25 2012-07-25 Line press component of hole check apparatus for assembling harness cord

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210260089.6A CN102773384B (en) 2012-07-25 2012-07-25 Line press component of hole check apparatus for assembling harness cord

Publications (2)

Publication Number Publication Date
CN102773384A CN102773384A (en) 2012-11-14
CN102773384B true CN102773384B (en) 2014-06-25

Family

ID=47118619

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210260089.6A Expired - Fee Related CN102773384B (en) 2012-07-25 2012-07-25 Line press component of hole check apparatus for assembling harness cord

Country Status (1)

Country Link
CN (1) CN102773384B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107414462A (en) * 2017-08-17 2017-12-01 杭州天宏智能科技有限公司 A kind of automatic press-in device of chaise longue pin
CN109570938B (en) * 2017-09-28 2024-01-05 宁波飞图自动技术有限公司 Novel drive intubate mechanism and drive intubate device
CN110328531A (en) * 2019-07-18 2019-10-15 宁波市姚江机床制造有限公司 A kind of intelligence line burying machine

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101959667A (en) * 2008-02-28 2011-01-26 贝恩德·汉森 Separating device
CN202282251U (en) * 2011-10-26 2012-06-20 黄国观 Winding needle mouth and automatic winding machine
CN102594053A (en) * 2011-01-07 2012-07-18 山东中际电工装备股份有限公司 Line end pressing mechanism
CN202683866U (en) * 2012-07-25 2013-01-23 浙江旷达纺织机械有限公司 String pressing component of hole correcting equipment used for harness production

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101959667A (en) * 2008-02-28 2011-01-26 贝恩德·汉森 Separating device
CN102594053A (en) * 2011-01-07 2012-07-18 山东中际电工装备股份有限公司 Line end pressing mechanism
CN202282251U (en) * 2011-10-26 2012-06-20 黄国观 Winding needle mouth and automatic winding machine
CN202683866U (en) * 2012-07-25 2013-01-23 浙江旷达纺织机械有限公司 String pressing component of hole correcting equipment used for harness production

Also Published As

Publication number Publication date
CN102773384A (en) 2012-11-14

Similar Documents

Publication Publication Date Title
CN102773384B (en) Line press component of hole check apparatus for assembling harness cord
CN104041997B (en) A kind of upper of a shoe closing in threader
CN202684487U (en) Eye calibration equipment for harness device
CN202684482U (en) Heald eye plate locating structure of eye calibration device for harness cord assembly
CN102773694B (en) Camb aligning machine for harness cord jacquard
CN202684489U (en) Hook line part of eye calibration device for harness cord assembly
CN102773700A (en) Lateral translation structure of camb aligning device for harness cord jacquard
CN202683867U (en) Thread cutting component for hole correcting equipment of harness cord jacquard making equipment
CN202684486U (en) Casing pipe fixing template structure for hole-collating device for assembling and manufacturing harness cord
CN202684488U (en) Transverse translation structure of eye calibration device for harness cord assembly
CN202684490U (en) Eye calibration machine for harness cord assembly
CN102773693B (en) Camb aligning machine for harness cord jacquard
CN202683866U (en) String pressing component of hole correcting equipment used for harness production
CN202684484U (en) Heald eye plate for eye calibration equipment of harness device
CN202684485U (en) Hook knife case of eye calibration device for harness cord assembly
CN103252427B (en) Yarn cutting part of heddle eye correcting machine for harness cord making equipment
CN202684481U (en) Harness cord thread compaction structure for eye-correcting equipment of harness core assembly
CN202684480U (en) Long-guide-rail base lifting device of eye calibration device for harness cord assembly
CN102773692A (en) Casing fixing template used in eye aligning device of harness cord assembly
CN202684483U (en) Bushing fixing template of eye calibration device for harness cord assembly
CN102773696B (en) Sleeve fixing template structure of heald eye aligning device for harness cord jacquard
CN102773695B (en) Hook line part used in eye aligning device of harness cord assembly
CN102773701B (en) Hook cutter case used for eye aligning equipment for harness cord assembly
CN102825457B (en) A kind of harness eye plate location structure of the school eye equipment made for harness
CN102773385B (en) Line cutting part of camb-aligning device for harness assembling

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140625

Termination date: 20150725

EXPY Termination of patent right or utility model