CN102765870B - Inner liner fixing structure for glass furnace tin bath and fixing method - Google Patents

Inner liner fixing structure for glass furnace tin bath and fixing method Download PDF

Info

Publication number
CN102765870B
CN102765870B CN201110113422.6A CN201110113422A CN102765870B CN 102765870 B CN102765870 B CN 102765870B CN 201110113422 A CN201110113422 A CN 201110113422A CN 102765870 B CN102765870 B CN 102765870B
Authority
CN
China
Prior art keywords
groove
liner
draw
tin bath
boss
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110113422.6A
Other languages
Chinese (zh)
Other versions
CN102765870A (en
Inventor
董清世
查雪松
邓胜勇
辛崇飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinyi Electronics (wuhu) Co Ltd Glass
Original Assignee
Xinyi Electronics (wuhu) Co Ltd Glass
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinyi Electronics (wuhu) Co Ltd Glass filed Critical Xinyi Electronics (wuhu) Co Ltd Glass
Priority to CN201110113422.6A priority Critical patent/CN102765870B/en
Publication of CN102765870A publication Critical patent/CN102765870A/en
Application granted granted Critical
Publication of CN102765870B publication Critical patent/CN102765870B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C03GLASS; MINERAL OR SLAG WOOL
    • C03BMANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
    • C03B18/00Shaping glass in contact with the surface of a liquid
    • C03B18/02Forming sheets
    • C03B18/16Construction of the float tank; Use of material for the float tank; Coating or protection of the tank wall

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

The invention is suitable for the technical field of glassmaking and discloses an inner liner fixing structure for a glass furnace tin bath and a fixing method. The fixing structure is used to install and fix an inner liner on side wall bricks in the glass furnace tin bath. The top edge of the side wall bricks is provided with a groove. The inner liner is placed in the groove which is provided with a protruding boss. The inner liner is correspondingly provided with a channel section for clamping the boss. According to the invention, by disposing the inner liner on the groove at the top of the side wall bricks, on one hand, by means of the support of the groove bottom, the inner liner is arranged more stably than a present hanging design; and on the other hand, as a clamping structure is arranged between the inner liner and the groove, the inner liner is fixed more stably, and it brings convenience for installation and operation.

Description

A kind of lining fixing structure for glass melting furnace tin bath and fixing means
Technical field
The invention belongs to glass manufacture technical field, relate in particular to a kind of lining fixing structure for glass melting furnace tin bath and fixing means thereof.
Background technology
Abutment wall brick in glass melting furnace tin bath generally adopts refractory materials to make, this refractory materials can react with sheet glass, for preventing that in the time there is industrial accident glass metal from sticking in the pollution glass metal that reacts with it on the abutment wall brick of molten tin bath, is provided with graphite liner between the inherent sheet glass of existing molten tin bath and abutment wall brick.The liner of this graphite material does not react with sheet glass.As shown in fig. 1, be the mounting structure of the liner of molten tin bath in prior art.The groove shape structure that described molten tin bath 91 is upper end open, in it, be provided with abutment wall brick 92, on the sidewall of molten tin bath 91, level welding one is positioned at the stainless steel lath 93 of abutment wall brick 92 tops, the edge of stainless steel lath 93 protrudes out the edge of abutment wall brick 92, holds in protruding out of stainless steel lath 93 liner 95 that is fixed on an employing graphite material by screw 94.By finding out in figure, adopt this fixed sturcture, the bottom of liner 95 and sidepiece contact with the tin liquor 96 in molten tin bath 91, and liner 95 is unsettled being fixed in molten tin bath 91, and this unsettled stability maintenance is poor.And because graphite material is softer, temperature in molten tin bath 91 is higher, generally between 600~1100 DEG C, at high temperature, graphite is easily oxidized, time is length or touching in the time of operation slightly, above-mentioned this unsettled fixing mode more makes easily fragmentation of liner 95, coming off falls in the tin liquor 96 of molten tin bath 91, cause detrimentally affect to producing, once and liner 95 comes off, glass metal contacts with the abutment wall piece 92 of being made up of refractory materials in molten tin bath 91, can infiltrate glass metal and cause the final sheet glass 97 forming to have defect after refractory materials weathers for a long time.
Summary of the invention
Technical problem to be solved by this invention is to overcome the defect of prior art, and a kind of lining fixing structure for glass melting furnace tin bath and fixing means are provided, and this fixed sturcture is simple, connection is reliable, and installation easy to operate.
For solving the problems of the technologies described above, technical scheme of the present invention is: a kind of lining fixing structure for glass melting furnace tin bath is provided, for a liner is mounted on to the abutment wall brick in glass melting furnace tin bath, the top place of described abutment wall brick is provided with groove, described liner is placed in described groove, on described groove, protrude out boss, be lining with correspondence in described and be provided with and can hold the draw-in groove that described boss snaps in.
Further, the physical dimension of described liner and described groove matches.
Particularly, the cross section of described draw-in groove is wedge shape, and the cross section of described boss is the wedge shape suitable with described draw-in groove, and the widest part width of described draw-in groove is less than the half of described liner width, and the degree of depth of described draw-in groove is no more than the half of described liner height.
Or the cross section of described draw-in groove is rectangular, the cross section of described boss is the rectangle suitable with described draw-in groove, and the width of described draw-in groove is less than the half of described liner width, and the degree of depth of described draw-in groove is no more than the half of described liner height.
Further, the bottom of described draw-in groove and the corresponding connecting hole that is provided with on described boss, be equipped with locking piece in described connecting hole.
The present invention also provides a kind of liner fixing means for glass melting furnace tin bath,
Prepare a liner, offer a draw-in groove in this liner bottom;
Top place in the abutment wall brick of glass melting furnace tin bath offers a groove, and on groove the reserved boss that protrudes groove floor;
Described liner is placed on described groove, and the draw-in groove of liner bottom is engaged mutually with the boss on groove.
Further, after engaging, draw-in groove and the corresponding connecting hole of offering on boss arrange locking piece and are locked in described connecting hole.
In above-mentioned fixing means, the liner of described preparation with described in the groove topography size offered match, when installation, described liner is advanced until whole liner is placed in described groove by a side direction opposite side of described groove.
Wherein, the draw-in groove cross section of offering in described liner bottom is wedge shape, the cross section of the boss protruding out on described groove is the wedge shape suitable with described draw-in groove, the wide half that is less than described liner width of filling of the widest part of described draw-in groove, the degree of depth of described draw-in groove is no more than the half of described liner height.
Or, the draw-in groove cross section of offering in described liner bottom is rectangular, the cross section of the boss protruding out on described groove is the rectangle suitable with described draw-in groove, and the width of described draw-in groove is less than the half of described liner width, and the degree of depth of described draw-in groove is no more than the half of described liner height.
In the present invention, liner is positioned on the groove at abutment wall brick top, on the one hand, by the support of groove bottom land, the more existing unsettled design of the placement of liner is more firm; On the other hand, between liner and groove, snap-in structure is set, makes the fixing more firm of liner, also facilitated fitting operation.
Brief description of the drawings
Fig. 1 is the lining fixing structure in glass melting furnace tin bath in prior art;
Fig. 2 is the lining fixing structure in the glass melting furnace tin bath that provides of the embodiment of the present invention.
Embodiment
In order to make object of the present invention, technical scheme and advantage clearer, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be appreciated that specific embodiment described herein, only in order to explain the present invention, is not intended to limit the present invention.
The invention provides a kind of lining fixing structure for glass melting furnace tin bath, for a liner is mounted on to the abutment wall brick in glass melting furnace tin bath, the top place of described abutment wall brick is provided with groove, described liner is placed in described groove, on described groove, establish and protruded out boss, be lining with correspondence in described and be provided with and can hold the draw-in groove that described boss snaps in.In the present invention, liner is positioned on the groove at abutment wall brick top, on the one hand, by the support of groove bottom land, the more existing unsettled design of the placement of liner is more firm; On the other hand, between liner and groove, snap-in structure is set, makes the fixing more firm of liner, also facilitated fitting operation.
Below in conjunction with accompanying drawing, the specific implementation of the embodiment of the present invention is described in further detail.
With reference to Fig. 2, it is the structural representation of the lining fixing structure in glass melting furnace tin bath provided by the invention.The molten tin bath 100 of described glass melter is the groove shape structure of an end opening.On the diapire 110 of molten tin bath 100 and sidewall 120 edges are equipped with abutment wall brick 200, wherein be positioned at the abutment wall brick 200 at sidewall 110 edges higher than the abutment wall brick 200 on diapire 120, like this, the abutment wall brick 200 of molten tin bath 100 4 sidewall settings forms one for holding the spatial accommodation of tin liquor 300 with the abutment wall brick 200 of diapire.Sheet glass 400 is formed in tin liquor 300.Shown in figure, the top place that is positioned at the abutment wall brick 200 at sidewall 110 edges is provided with groove 210, places a liner 500 on groove 210.The middle part of groove 210 has protruded out boss 220, and liner 500 bottom correspondences are provided with can hold the draw-in groove 510 that boss 220 snaps in.Like this, be fixed on abutment wall brick 200 by liner 500 by draw-in groove 510 and the boss 220 of mutual engaging.
Further, in the present embodiment, the physical dimension of the physical dimension of liner 500 and groove 210 is suitable, after liner 500 is placed in groove 210 and abutment wall brick 200 shapes in aggregates.Like this, on the one hand, by the supporting role of groove 210 bottom lands, fixing of liner 500 is more firm, and on the other hand, liner 500 can, as stretched out the upper end of molten tin bath 100 in prior art, not saved the operating space in molten tin bath 100 greatly.
Preferably, in the present embodiment, the cross section of draw-in groove 510 is wedge shape, and correspondingly, the cross section of the boss 220 on groove 210 is the wedge structure matching with draw-in groove 510.Described wedge shape draw-in groove 510 wide bottoms, top are narrow, and boss 220 snaps in rear fixing more firm.In the present embodiment, in order to ensure the intensity of liner 500, in the time offering draw-in groove 510, the width of the widest part on draw-in groove 510 tops is less than the half of liner 500 width, and the degree of depth of draw-in groove 510 is no more than the half of liner 500 height.It should be noted that, draw-in groove 510 also can be rectangular with the cross section of boss 220, and similarly, for ensureing the intensity of liner 500, the width of rectangle is less than the half of liner 500 width, and the degree of depth of rectangle is no more than the half of liner 500 height.
For realizing further the firm installation of liner 500, prevent that its edge by groove 210 from deviating from, as a prioritization scheme of the present embodiment, the bottom of draw-in groove 510 and the corresponding connecting hole (in figure not label) that is provided with on boss 220, realize liner 500 and fix with the secondary of abutment wall brick 200 by being arranged in locking piece 600 in described connecting hole.In the present embodiment, described connecting hole is screw, and locking piece 600 is for being combined on the screw in screw.
In the present embodiment, also provide a kind of for the liner fixing means in glass melting furnace tin bath, with reference to Fig. 2, its concrete grammar is as follows:
Preparation one liner 500 as shown in Figure 2, offers a draw-in groove 510 in these liner 500 bottoms;
Offer a groove 210 in the top place of the abutment wall brick 200 of glass melting furnace tin bath 100, and reserve the boss 220 that protrudes groove 210 bottom surfaces on groove 210;
Described liner 500 is placed on groove 210, and the draw-in groove 510 of liner 500 bottoms is engaged mutually with the boss 220 on groove 210.
In order to strengthen further connection effect, after engaging, draw-in groove 510 and the corresponding connecting hole of offering on boss 220 arrange locking piece 600 and are locked in described connecting hole.Described connecting hole is screw, and locking piece 600 is for being combined on the screw in screw.
In above-mentioned fixing means, the liner of described preparation 500 with described in groove 210 physical dimension offered match, when installation, liner 500 is advanced until whole liner 500 is placed in groove 210 by a side direction opposite side of groove 210.
In above-mentioned fixing means, when preparation liner 500, draw-in groove 510 cross sections of offering in liner 500 bottoms are wedge shape, correspondingly, the cross section of the boss 220 protruding out on groove 210 is the wedge shape suitable with draw-in groove 510, for ensureing the intensity of liner 500, the wide half that is less than liner 500 width of filling of the widest part of draw-in groove 510, the degree of depth of draw-in groove 510 is no more than the half of liner 500 height.It should be noted that, draw-in groove 510 also can be rectangular with the cross section of boss 220, and similarly, for ensureing the intensity of liner 500, the width of rectangle is less than the half of liner 500 width, and the degree of depth of rectangle is no more than the half of liner 500 height.
To sum up, adopt above-mentioned fixed sturcture and method, can realize quickly and easily the reliable installation of liner 500 and fix.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, all any amendments of doing within the spirit and principles in the present invention, be equal to and replace or improvement etc., within all should being included in protection scope of the present invention.

Claims (10)

1. the lining fixing structure for glass melting furnace tin bath, for a liner is mounted on to the abutment wall brick in glass melting furnace tin bath, it is characterized in that: the top place of described abutment wall brick is provided with groove, described liner is placed in described groove, on described groove, protrude out boss, be lining with correspondence in described and be provided with and can hold the draw-in groove that described boss snaps in.
2. a kind of lining fixing structure for glass melting furnace tin bath as claimed in claim 1, is characterized in that: the physical dimension of described liner and described groove matches.
3. a kind of lining fixing structure for glass melting furnace tin bath as claimed in claim 1 or 2, it is characterized in that: the cross section of described draw-in groove is wedge shape, the cross section of described boss is the wedge shape suitable with described draw-in groove, the widest part width of described draw-in groove is less than the half of described liner width, and the degree of depth of described draw-in groove is no more than the half of described liner height.
4. a kind of lining fixing structure for glass melting furnace tin bath as claimed in claim 1 or 2, it is characterized in that: the cross section of described draw-in groove is rectangular, the cross section of described boss is the rectangle suitable with described draw-in groove, the width of described draw-in groove is less than the half of described liner width, and the degree of depth of described draw-in groove is no more than the half of described liner height.
5. a kind of lining fixing structure for glass melting furnace tin bath as claimed in claim 1, is characterized in that: the bottom of described draw-in groove and the corresponding connecting hole that is provided with on described boss, be equipped with locking piece in described connecting hole.
6. for a liner fixing means for glass melting furnace tin bath, it is characterized in that:
Prepare a liner, offer a draw-in groove in this liner bottom;
Top place in the abutment wall brick of glass melting furnace tin bath offers a groove, and on groove the reserved boss that protrudes groove floor;
Described liner is placed on described groove, and the draw-in groove of liner bottom is engaged mutually with the boss on groove.
7. a kind of liner fixing means for glass melting furnace tin bath as claimed in claim 6, is characterized in that: draw-in groove and the corresponding connecting hole of offering on boss after engaging arrange locking piece and be locked in described connecting hole.
8. a kind of liner fixing means for glass melting furnace tin bath as claimed in claim 7, it is characterized in that: the liner of described preparation with described in the groove topography size offered match, when installation, described liner is advanced until whole liner is placed in described groove by a side direction opposite side of described groove.
9. a kind of liner fixing means for glass melting furnace tin bath as claimed in claim 6, it is characterized in that: the draw-in groove cross section of offering in described liner bottom is wedge shape, the cross section of the boss protruding out on described groove is the wedge shape suitable with described draw-in groove, the wide half that is less than described liner width of filling of the widest part of described draw-in groove, the degree of depth of described draw-in groove is no more than the half of described liner height.
10. a kind of liner fixing means for glass melting furnace tin bath as claimed in claim 6, it is characterized in that: the draw-in groove cross section of offering in described liner bottom is rectangular, the cross section of the boss protruding out on described groove is the rectangle suitable with described draw-in groove, the width of described draw-in groove is less than the half of described liner width, and the degree of depth of described draw-in groove is no more than the half of described liner height.
CN201110113422.6A 2011-05-04 2011-05-04 Inner liner fixing structure for glass furnace tin bath and fixing method Active CN102765870B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110113422.6A CN102765870B (en) 2011-05-04 2011-05-04 Inner liner fixing structure for glass furnace tin bath and fixing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110113422.6A CN102765870B (en) 2011-05-04 2011-05-04 Inner liner fixing structure for glass furnace tin bath and fixing method

Publications (2)

Publication Number Publication Date
CN102765870A CN102765870A (en) 2012-11-07
CN102765870B true CN102765870B (en) 2014-08-20

Family

ID=47093487

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110113422.6A Active CN102765870B (en) 2011-05-04 2011-05-04 Inner liner fixing structure for glass furnace tin bath and fixing method

Country Status (1)

Country Link
CN (1) CN102765870B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109665697A (en) * 2019-01-28 2019-04-23 中建材蚌埠玻璃工业设计研究院有限公司 A kind of self-positioning graphite liner device of molten tin bath
CN114620925B (en) * 2020-12-11 2023-10-03 中国建材国际工程集团有限公司 Fixing structure of graphite lining and tin bath

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6110035A (en) * 1984-06-26 1986-01-17 Nippon Sheet Glass Co Ltd Melted tin bath for making flat glass
CN1170701A (en) * 1996-05-17 1998-01-21 日本板硝子株式会社 Float bath for manufacturing float glass
CN2743344Y (en) * 2004-06-25 2005-11-30 中国洛阳浮法玻璃集团有限责任公司 Fusion glass guide device of float glass production line tin channel inlet
CN2744680Y (en) * 2004-06-25 2005-12-07 中国洛阳浮法玻璃集团有限责任公司 Graphite liner connection structure of tin bath in floating glass production line
CN201648217U (en) * 2010-02-08 2010-11-24 上海吉驰建材科技有限公司 Graphite liner fixed iron weight and float tin bath with same
CN202046991U (en) * 2011-05-04 2011-11-23 信义电子玻璃(芜湖)有限公司 Lining fixing structure for glass melting furnace tin bath

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6110035A (en) * 1984-06-26 1986-01-17 Nippon Sheet Glass Co Ltd Melted tin bath for making flat glass
CN1170701A (en) * 1996-05-17 1998-01-21 日本板硝子株式会社 Float bath for manufacturing float glass
CN2743344Y (en) * 2004-06-25 2005-11-30 中国洛阳浮法玻璃集团有限责任公司 Fusion glass guide device of float glass production line tin channel inlet
CN2744680Y (en) * 2004-06-25 2005-12-07 中国洛阳浮法玻璃集团有限责任公司 Graphite liner connection structure of tin bath in floating glass production line
CN201648217U (en) * 2010-02-08 2010-11-24 上海吉驰建材科技有限公司 Graphite liner fixed iron weight and float tin bath with same
CN202046991U (en) * 2011-05-04 2011-11-23 信义电子玻璃(芜湖)有限公司 Lining fixing structure for glass melting furnace tin bath

Also Published As

Publication number Publication date
CN102765870A (en) 2012-11-07

Similar Documents

Publication Publication Date Title
CN202046991U (en) Lining fixing structure for glass melting furnace tin bath
CN102765870B (en) Inner liner fixing structure for glass furnace tin bath and fixing method
CN205341902U (en) Ladle structure
CN203419843U (en) Fixing device for plate glass tin groove bottom brick
CN204598508U (en) A kind of packaging outdoor cabinet
CN204994961U (en) Prefabricated section and be equipped with express delivery cabinet of this prefabricated section
CN204097309U (en) A kind of platinum primary and secondary crucible sleeve
CN108793690A (en) A kind of replaceable graphite liner for molten tin bath
CN204902393U (en) Door shell and refrigerator
CN206624775U (en) A kind of bottom brick of molten tin bath smooth using face
CN210195263U (en) Supporting die frame for heat preservation template
CN201152561Y (en) Electric pottery furnace
CN103872588A (en) Mother board of modular mounting plate of intelligent power distribution cabinet
CN209823378U (en) Cable installation device for high-speed railway tunnel trench
CN203352845U (en) Thin-type induction cooker and electromagnetic wire disc
CN206494837U (en) The platinum alumina composite crucible prepared suitable for electric slurry glass dust
CN201159596Y (en) Flame-proof lining brick for revolving furnace, electric furnace and ladle
CN203542803U (en) Molding die of full-right-angle single-edge-tilting interlocking tile
CN102852285A (en) Multifunctional reinforcement protective cover cushion block
CN204786216U (en) Lampholder
CN203491519U (en) One-piece distribution box fixing frame for mounting of electric switches and panel
CN203774619U (en) Intelligent power distribution cabinet modularization installing plate motherboard
CN204590457U (en) Stair and girder thereof
CN203687490U (en) Freezer
CN204590459U (en) Stair and suspension member thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant