CN102761900A - Power margin report triggering method and device - Google Patents

Power margin report triggering method and device Download PDF

Info

Publication number
CN102761900A
CN102761900A CN201110108561XA CN201110108561A CN102761900A CN 102761900 A CN102761900 A CN 102761900A CN 201110108561X A CN201110108561X A CN 201110108561XA CN 201110108561 A CN201110108561 A CN 201110108561A CN 102761900 A CN102761900 A CN 102761900A
Authority
CN
China
Prior art keywords
power
phr
subscriber equipment
headroom reporting
power management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201110108561XA
Other languages
Chinese (zh)
Other versions
CN102761900B (en
Inventor
刘扬
黄亚达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201110108561.XA priority Critical patent/CN102761900B/en
Priority to PCT/CN2011/077886 priority patent/WO2012145974A1/en
Publication of CN102761900A publication Critical patent/CN102761900A/en
Application granted granted Critical
Publication of CN102761900B publication Critical patent/CN102761900B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/30TPC using constraints in the total amount of available transmission power
    • H04W52/36TPC using constraints in the total amount of available transmission power with a discrete range or set of values, e.g. step size, ramping or offsets
    • H04W52/365Power headroom reporting
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/02Traffic management, e.g. flow control or congestion control
    • H04W28/06Optimizing the usage of the radio link, e.g. header compression, information sizing, discarding information

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention provides a power margin report triggering method and a device. The method comprises the steps as follows: whether a power margin report timer times out or not is judged; and if so, user equipment is triggered to deliver a power margin report according to the power management influence of the user equipment, wherein the power management influence of the user equipment is a power change value caused by the power management of the user equipment. According to the invention, because the power margin report of the user equipment is triggered on the basis of the power management influence of the user equipment, the problem of inaccurate power margin reports in the prior art is solved, and the correct power adjustment on the side of a base station is realized through a reported power margin. Therefore, power adjustment overhead is saved.

Description

Power headroom reporting (PHR) triggering method and device
Technical field
The present invention relates to the communications field, in particular to a kind of power headroom reporting (PHR) triggering method and device.
Background technology
At present, wireless communication system uses electromagnetic wave and wireless telecommunications user equipment fixing or that move (for example, radio telephone or all can be called as subscriber equipment with notebook, the apparatus such as computer of wireless communication card) to communicate.In general, when carrying out radio communication, subscriber equipment (User Equipment is called for short UE) is positioned within the wireless coverage of system, and communicates through radio communication channel and system.Concrete, radio communication channel is divided into a plurality of carrier frequencies with wave frequency, and a carrier frequency or a plurality of carrier frequency can constitute a wireless service areas.Subscriber equipment can be got in touch through other equipment in one or more carrier wave homologous rays (for example controlling network element or other subscriber equipmenies).
The control network element of wireless communication system can be according to other equipment of communication protocol/technique control of system's agreement.The control network element comprises control station and network.Control station includes but not limited to base station (Base Station; Abbreviation BS), relay station (Relay Station; Be called for short RS) and subscriber equipment, when subscriber equipment was used as control station, this subscriber equipment can be the interim control station of in subscriber equipment, selecting according to pre-defined rule of conduct.Communication protocol/technique includes but not limited to GSM (Global System for MobileCommunications; Global system for mobile communications), CDMA (Code Division Multiple Access; Code division multiple access), EDGE (Enhanced Data Rate for GSM Evolution; The enhanced data rates for gsm evolution technology), CDMA2000, TD-SCDMA (Time Division-Synchronous Code Division Multiple Access; TD SDMA), HSPA (High Speed Packet Access; The high-speed packet access), WCDMA (Wideband Code Division MultipleAccess, WCDMA), EVDO (Evolution Data Only, only evolution data), HSOPA (High Speed OFDMPacket Access; The access of high speed orthogonal frequency division multiplexed packet), WiMAX (World Interoperability for MicrowaveAccess; Micro-wave access global inter communication), LTE (Long Term Evolution, Long Term Evolution) and LTE-A (LTE-Advanced, Long Term Evolution-senior).
Wireless communication system can utilize the wireless channel of appointment in certain geographic range, wireless coverage to be provided through the base station, and this geographic range is called the sub-district.Usually, in theory, the base station should be positioned at the central authorities of sub-district.According to the size of base station range, the base station can be divided into grand (Macro) base station, little (Pico) base station and slight (Femto) base station.In the LTE/LTE-A system, the base station is also referred to as and strengthens B node (eNodeB), and femto base station is also referred to as Home eNodeB or family strengthens B node (HomeeNodeB is called for short HeNodeB).
In addition, cover or the expansion capacity in order to expand, one or more relay stations can be placed between subscriber equipment and the base station.For subscriber equipment, relay station just is equivalent to a base station.Perhaps; In the extremely many networks of subscriber equipment quantity; Subscriber equipment also can be formed adhoc network (perhaps being called cluster) voluntarily, and as interim control station, assistance system is managed by certain subscriber equipment in the adhoc network; Interim control station can be accepted original control station control, management subordinate's subscriber equipment.
The main process of the uplink power control of LTE is:
(1) UE receives TPC (transmitting power control, power control command);
(2) UE (subscriber equipment) carries out the measurement of downlink wireless channel pilot reception power, calculating path loss Pathloss, and UE is with calculation of parameter transmitting power P such as Pathloss, Uplink Shared Channel bandwidth, transport block format and TPC; If subscriber equipment has triggered PHR (power headroom report, power headroom reporting (PHR)), and satisfied transmission condition, UE also need send PHR on Uplink Shared Channel so.
(3) after eNodeB (evolved base station) received Physical Uplink Shared Channel and/or PHR, the Physical Downlink Control Channel through DCI Format 0/3/3A sent TPC to UE; Return execution in step (1).
UE adopts dynamic resource distribution mode in the system; And adopt adaptive chnnel coding modulation system (adaptivemodulation and coding; AMC), LTE UE uplink transmission power and resource allocation, code modulation mode are relevant, and therefore independent power control mode also is not enough to accomplish the power control task of LTE UE; The PHR that sends to eNodeB through UE provides foundation as the resource budget information of PUSCH for eNodeB carries out uplink resource allocation.If PHR reflects UE bigger power headroom is arranged, eNodeB can distribute more wireless resource block to give UE so; Do not had power headroom if PHR reflects UE, perhaps do not had more power headroom, eNodeB can only distribute less wireless resource block or low-order-modulated to order to UE so.
UE is lower than eNodeB to the TPC of UE transmission frequency to the PHR transmission frequency of eNodeB in the LTE system.The transmission of PHR needs two steps: at first be to trigger, report then.UE when cycle PHR timer expires or path loss changes greatly or during the PHR configuration/reconfiguration triggering PHR report, after UE had obtained enough to be used for the PUSCH resource of PHR, UE reported PHR to eNodeB.
PHR is calculated as PH (i)=P CMAX-P Ue, tx, P CMAXBe UE configuration maximum transmission power (configuredmaximum output power); PCMAX_L≤PCMAX≤PCMAX_H; The span of PCMAX mainly contains 2 kinds of limited resource: 1) be subject to the control of eNodeB; Such as the little covering scene in little base station, eNodeB can control the maximum transmission power of UE, to reduce the interference of UE to the adjacent area; 2) the useless out-of-band radiation of UE (Out of band emission) is as in order to satisfy SEM (Spectrum emission mask, spectrum emission mask (SEM)) and ACLR (Adjacent Channel LeakageRatio; The adjacent band reveal than) etc. requirement; UE can design responsible filter, is used for reducing out-of-band radiation, and perhaps UE reduces maximum transmission power; The former can increase the cost of UE, and the latter has reduced the uplink capacity of UE.Because the reduction transmitting power (be also referred to as back-off, power reduce, method PR) is simply effective, and a large amount of UE can adopt this method to reach the requirement of out-of-band radiation when realizing.But, do not allow the unconfined reduction power of UE, to such an extent as to can not carry out basic uplink service in order to guarantee the up transmitting capacity of UE; MPR (the Maximum Power Reduction that definition allows in the agreement; Maximum power rollback value), because the size of out-of-band radiation is followed the modulation configuration of sending data, and the bandwidth that takies all has relation; Like LTE in agreement 36.101; Be provided with different MPR by different transmission bandwidth with the modulation pattern, as shown in table 1 below: each UE can be provided with actual PR value by the realization of self, as long as satisfy PR≤MPR.
Table 1
Figure BDA0000058094010000031
So after considering back-off, UE deducts actual back-off value on the basis of specified transmitting power Ppowerclass, and after needing to consider the maximum transmission power of above-mentioned network permission, the minimum value of getting among both is actual PCMAX.P Ue, txBe the up theoretical transmitting power of UE.In LTE, only consider the transmitting power of PUSCH among the PHR, so P Ue, tx=P Ue, pusch, P Ue, puschIn LTE, be the transmitting power of PUSCH, be defined as P Ue, pusch=10log 10(M PUSCH(i))+P O_PUSCH(t)+α (t) PL+ Δ TF(i)+and f (i), M wherein PUSCH(i) be MCS (Modulation and Coding Scheme, modulating-coding form) configuration decision, the P of the transmission bandwidth of PUSCH by scheduling O_PUSCH(t) be that part path loss offset, t are that semi-static variable, PL are path loss, Δ for open loop power control adjusted value, α (t) TF(i) be that transformat offset, f (i) are the closed-loop power control adjusted value, promptly the transmitting power of PUSCH is with the bandwidth that takies resource of PUSCH, and the path loss between UE and base station and the configuration of open loop power control and closed-loop power control are relevant.So the PHR computing formula is PH (i)=P CMAX-{ 10log 10(M PUSCH(i))+P O_PUSCH(t)+α (t) PL+ Δ TF(i)+f (i) }.
PHR's is unit with dB, and power is unit with dBm in the formula.
In LTE, the triggering that PHR reports (trigger) mainly contains following three kinds of situation:
1) PHR forbids that timer (prohibitPHR-Timer) is overtime, and the variable quantity that reports with respect to last PHR of path loss is during greater than predetermined threshold dl-PathlossChange (unit is a decibel dB);
2) PHR cycle timer (periodicPHR-Timer) is overtime;
3) configuration of PHR functional entity or reshuffle;
After PHR was triggered, when UE had the uplink scheduling resource to hold PHR, UE sent to eNB with PHR.
Along with development of Communication Technique, because the P that the subscriber equipment power management causes CMAXChange and also need consider in the calculating of PHR.Concrete; The requirement source of this power adjustment can be that regional absorptivity requires (regional SAR; Power need be reduced or the transmitter power of work before dual transmitter when work need be adjusted etc. when SpecificAbsorption Rate), SAR requirement scene comprised subscriber equipment near human body.
Because the subscriber equipment power management causes P CMAXChange, corresponding, might cause PH to change, under this new situation, how eNodeB and subscriber equipment carry out the assessment of power headroom, and how subscriber equipment carries out PHR reports, and all is the problem of needing solution badly.
For above-mentioned existing problem; There is technology to think at present; A trigger condition should be set separately; PHR forbids that timer (prohibitPHR-Timer) is overtime, and the variable quantity that reports with respect to last PHR of subscriber equipment power management value just needs to trigger PHR during greater than dl-PathlossChange.
The problem of doing like this is: owing to report the thresholding of variable quantity the same with existing path loss variable quantity thresholding; But in fact the variation of power management value changes irrelevant with path loss; Therefore the PHR that triggers is easy to cause and makes a false report or fail to report, thereby causes the wasting of resources or the misjudgment in the power adjustment.
In addition; If too frequent, may cause relevant PHR to report too much, because the adjustment of PHR needs the time for the variation of the power variation in the SAR scene; Too frequent PHR not only can not reach the purpose of rapid power adjustment, and can waste the resource of the expense that is used for the power adjustment.
Summary of the invention
Main purpose of the present invention is to provide a kind of power headroom reporting (PHR) triggering method and device, to solve the inaccurate problem of above-mentioned power headroom reporting (PHR) of the prior art at least.
According to an aspect of the present invention, a kind of power headroom reporting (PHR) triggering method is provided, has comprised: behind the power headroom reporting (PHR) timer expiry, subscriber equipment is according to the power headroom reporting (PHR) of subscriber equipment power management influence triggering subscriber equipment; Wherein, the subscriber equipment power management influences the power variation that causes for the subscriber equipment power management.
Preferably, the power variation that the subscriber equipment power management causes is: current time reports virtual power surplus report constantly with respect to the last time, taken place because the power variation that power management causes.
Preferably, the power variation that the subscriber equipment power management causes is: current time reports the report of non-virtual power surplus constantly with respect to the last time, taken place because the power variation that power management causes.
Preferably, influence triggers before the power headroom reporting (PHR) of subscriber equipment according to the subscriber equipment power management, also comprises: Filtering Processing is carried out in influence to the subscriber equipment power management.
Preferably, Filtering Processing is layer three Filtering Processing or uses the method that triggers moment TTT to carry out Filtering Processing.
Preferably, subscriber equipment comprises according to the power headroom reporting (PHR) of subscriber equipment power management influence triggering subscriber equipment: whether judges plant capacity management influence is greater than predetermined threshold, and wherein, predetermined threshold is not equal to descending path loss and changes threshold value; If then trigger the power headroom reporting (PHR) of subscriber equipment.
Preferably, predetermined threshold changes threshold value less than descending path loss.
Preferably, the time-out time of power headroom reporting (PHR) timer is not equal to the time-out time that power headroom reporting (PHR) is forbidden timer prohibitPHR-Timer.
Preferably, the power headroom reporting (PHR) timer is that power headroom reporting (PHR) is forbidden timer prohibitPHR-Timer.
According to a further aspect in the invention, a kind of power headroom reporting (PHR) trigger equipment is provided, has comprised: the power headroom reporting (PHR) timer; Trigger module is used for behind the power headroom reporting (PHR) timer expiry, triggers the user equipment to report power headroom reporting (PHR) according to influence of subscriber equipment power management and path loss influence.
Preferably, power headroom reporting (PHR) triggers and also to comprise: filtration module is used for to the subscriber equipment power management influence and carries out Filtering Processing.
Preferably, trigger module comprises: judge submodule, whether be used for judges plant capacity management influence greater than predetermined threshold, wherein, predetermined threshold is not equal to descending path loss and changes threshold value; Trigger submodule, under the situation of subscriber equipment power management influence, trigger the power headroom reporting (PHR) of subscriber equipment greater than predetermined threshold.
In the present invention; Influence according to the subscriber equipment power management and to trigger the subscriber equipment power headroom reporting (PHR); Solved the inaccurate problem of power headroom reporting (PHR) in the prior art; Make base station side to make correct power adjustment, and then reached the effect of saving power adjustment expense according to the power headroom that reports.
Description of drawings
Accompanying drawing described herein is used to provide further understanding of the present invention, constitutes the application's a part, and illustrative examples of the present invention and explanation thereof are used to explain the present invention, do not constitute improper qualification of the present invention.In the accompanying drawings:
Fig. 1 is the power headroom reporting (PHR) triggering method flow chart according to the embodiment of the invention one;
Fig. 2 is the power headroom reporting (PHR) triggering method flow chart according to the embodiment of the invention two;
Fig. 3 is the power headroom reporting (PHR) triggering method flow chart according to the embodiment of the invention three;
Fig. 4 is the power headroom reporting (PHR) trigger equipment structured flowchart according to the embodiment of the invention four;
Fig. 5 is the power headroom reporting (PHR) trigger equipment structured flowchart according to the embodiment of the invention five.
Embodiment
Hereinafter will and combine embodiment to specify the present invention with reference to accompanying drawing.Need to prove that under the situation of not conflicting, embodiment and the characteristic among the embodiment among the application can make up each other.
Embodiment one
Fig. 1 is the power headroom reporting (PHR) triggering method flow chart according to the embodiment of the invention one, and is as shown in Figure 1, may further comprise the steps:
Step S102 judges whether the power headroom reporting (PHR) timer expiry is overtime.
Step S104, behind the power headroom reporting (PHR) timer expiry, influence triggers the user equipment to report power headroom reporting (PHR) to subscriber equipment according to the subscriber equipment power management; Wherein, the subscriber equipment power management influences the power change values that is caused for the subscriber equipment power management;
In embodiment one; Influence according to the subscriber equipment power management and to trigger the subscriber equipment power headroom reporting (PHR); Solved the inaccurate problem of power headroom reporting (PHR) in the prior art; Make base station side to make correct power adjustment, and then reached the effect of saving power adjustment expense according to the power headroom that reports.
Wherein, Power headroom reporting (PHR) timer among the step S102 can be a timer of the prior art; For example PHR forbids timer (prohibitPHR-Timer); Also can be the timer different with prior art, the time-out time that timer is provided be smaller or equal to the prohibitPHR-Timer time-out time.
Wherein, in step S104, can add filtering, filter out the subscriber equipment power influences of frequent variations the subscriber equipment power management influence of moment.The influence of subscriber equipment power management for example, is subject to the back-off amount of P-MPR for the power variation that the subscriber equipment power management causes, and perhaps is exactly the variable quantity of P-MPR.
Wherein, the predetermined threshold among the step S104 is to be different from the threshold value that existing descending path loss changes threshold value dlPathlossChange.This threshold value can be independent of descending path loss and change the threshold value setting, also can be relevant with descending path loss variation threshold value, and for example, this thresholding is that dlPathlossChange deducts or add a deviant.
Wherein, after triggering subscriber equipment power headroom reporting (PHR) is accomplished, restart the power headroom reporting (PHR) timer.
Embodiment two
Fig. 2 is the power headroom reporting (PHR) triggering method flow chart according to the embodiment of the invention two, and is as shown in Figure 2, may further comprise the steps:
Step S202, starting power surplus report timer.
Step S204 judges whether the power headroom timer is overtime.
Step S206, if the timer expiry of power headroom reporting (PHR), further whether judges plant capacity management influence is greater than predetermined threshold.
Step S208 is if then trigger the subscriber equipment power headroom reporting (PHR) and restart the power headroom reporting (PHR) timer.
Wherein, the influence of subscriber equipment power management for example, is subject to the back-off amount of P-MPR for the power variation that the subscriber equipment power management causes, and perhaps is exactly the variable quantity of P-MPR.
Wherein, the timer of power headroom reporting (PHR) can be that PHR of the prior art forbids timer (prohibitPHR-Timer).In another embodiment of the present invention, timer is the timer different with prior art, and the time-out time of timer is forbidden timer less than PHR of the same period.
Wherein, predetermined threshold is different from descending path loss variation threshold value (for example dl-PathlossChange) of the prior art.In the present embodiment, can set the relative value that this predetermined threshold is a predetermined threshold of the prior art.For example, existing descending path loss change threshold value add a predetermined negative value or on the occasion of parameter value or existing descending path loss change threshold value multiply by one less than or greater than 1 parameter or directly set the existing descending path loss of a ratio and change the little or big independently threshold value of threshold value.
Embodiment three
Fig. 3 is the power headroom reporting (PHR) triggering method flow chart according to the embodiment of the invention three; As shown in Figure 3; Embodiment three is basic identical with the step of embodiment two; Difference only is: before triggering power headroom reporting, increased the filter step for power variation, i.e. step S306 is to filter out the subscriber equipment power influences of frequent variations.
Wherein, the method for filtering can be to adopt existing technology, and for example the L3 filtering mode is pressed the some cycles sampling subscriber equipment power management value power variation of moment, like 20ms.Computing formula is: P-MPR_L=a*P-MPR_L_old+ (1-a) * P-MPR_new; A<1 wherein; P-MPR_new is the subscriber equipment power management value of the new moment of sampling; P-MPR_L is filtered subscriber equipment power management value, and P-MPR_L_old is the preceding subscriber equipment power management value of this sampling.Or with trigger constantly (time to trigger, method TTT) is carried out filtering, promptly on original trigger mechanism, adds the period TTT of an appointment again, power variation changes when surpassing predetermined threshold, TTT begins to start.If said condition has continued a TTT cycle, subscriber equipment carries out PHR.Special rise when surpassing predetermined threshold, can not use above-mentioned filtering for power variation.
Embodiment four
Fig. 4 is the power headroom reporting (PHR) trigger equipment structured flowchart according to the embodiment of the invention four.As shown in Figure 4, this device comprises: power headroom reporting (PHR) timer 20 and trigger module 30.Power headroom reporting (PHR) timer 20 is connected with trigger module 30.
Wherein, trigger module 30 is used for behind the power headroom reporting (PHR) timer expiry, and influence triggers the user equipment to report power headroom reporting (PHR) according to the subscriber equipment power management.
In embodiment four; Through when triggering the subscriber equipment power headroom reporting (PHR), considering the thresholding of subscriber equipment power management influence; Thereby solved the inaccurate problem of power headroom reporting (PHR) in the prior art; Make base station side to make correct power adjustment, and then reached the effect of saving power adjustment expense according to the power headroom that reports.
Wherein, above-mentioned power headroom reporting (PHR) trigger equipment also can comprise: filtration module 40 is used for Filtering Processing is carried out in subscriber equipment power management influence.Power headroom reporting (PHR) timer 20 also can adopt existing power headroom reporting (PHR) to forbid timer prohibitPHR-Timer.
Embodiment five
Fig. 5 is the power headroom reporting (PHR) trigger equipment structured flowchart according to the embodiment of the invention five.As shown in Figure 5, this device each functional module in comprising embodiment four, trigger module 30 further comprises: judge submodule 301 and trigger submodule 302.
Wherein, judge submodule 301, whether be used for judges plant capacity management influence greater than predetermined threshold, wherein, said predetermined threshold is greater than or less than descending path loss and changes threshold value.Trigger submodule 302, be used under the situation of subscriber equipment power management influence, triggering the power headroom reporting (PHR) of subscriber equipment greater than predetermined threshold.
Embodiment six
The handling process of this enforcement is identical with embodiment one, that is: behind the power headroom reporting (PHR) timer expiry, influence triggers the user equipment to report power headroom reporting (PHR) to subscriber equipment according to power management; Wherein, the subscriber equipment power management influences the power change values that causes for the subscriber equipment power management.
Wherein, predetermined threshold is to be different from the new threshold value that existing descending path loss changes threshold value dlPathlossChange.New threshold value can be independent of said descending path loss and change the threshold value setting, also can be relevant with said descending path loss variation threshold value, and be that dlPathlossChange deducts or add a deviant like new thresholding.
Wherein, after triggering subscriber equipment power headroom reporting (PHR) is accomplished, restart the power headroom reporting (PHR) timer.
In the above-described embodiments, subscriber equipment power management influence for current time with respect to before report the virtual power surplus constantly, the actual power change values that causes owing to power management that takes place.Promptly when at carrier aggregation scene, when the power headroom that reports constantly at n was virtual, P-MPR for being set at 0, at n ' constantly, was still used the actual constantly P-MPR that takes place of actual n to judge the variation of n to n ' by the people.Perhaps subscriber equipment power management influence for current time with respect to before report non-virtual power surplus constantly (have P-MPR and not by the people for being set at 0 o'clock) the actual power change values that causes owing to power management that takes place.
In above-mentioned each embodiment of the present invention; In order to satisfy the power control requirement that the subscriber equipment power management brings; Influence according to the subscriber equipment power management and to trigger the subscriber equipment power headroom reporting (PHR); Solved the inaccurate problem of power headroom reporting (PHR) in the prior art, made base station side to make correct power adjustment, and then reached the effect of saving power adjustment expense according to the power headroom that reports.
Obviously, it is apparent to those skilled in the art that above-mentioned each module of the present invention or each step can realize with the general calculation device; They can concentrate on the single calculation element; Perhaps be distributed on the network that a plurality of calculation element forms, alternatively, they can be realized with the executable program code of calculation element; Thereby; Can they be stored in the storage device and carry out, and in some cases, can carry out step shown or that describe with the order that is different from here by calculation element; Perhaps they are made into each integrated circuit modules respectively, perhaps a plurality of modules in them or step are made into the single integrated circuit module and realize.Like this, the present invention is not restricted to any specific hardware and software combination.
The above is merely the preferred embodiments of the present invention, is not limited to the present invention, and for a person skilled in the art, the present invention can have various changes and variation.All within spirit of the present invention and principle, any modification of being done, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (12)

1. a power headroom reporting (PHR) triggering method is characterized in that, comprising:
Behind the power headroom reporting (PHR) timer expiry, subscriber equipment is according to the power headroom reporting (PHR) of the said subscriber equipment of subscriber equipment power management influence triggering;
Wherein, said subscriber equipment power management influences the power variation that causes for said subscriber equipment power management.
2. method according to claim 1 is characterized in that, the power variation that said subscriber equipment power management causes is:
Current time reports virtual power surplus report constantly with respect to the last time, taken place because the power variation that power management causes.
3. method according to claim 1 is characterized in that, the power variation that said subscriber equipment power management causes is:
Current time reports the report of non-virtual power surplus constantly with respect to the last time, taken place because the power variation that power management causes.
4. method according to claim 1 is characterized in that, influence triggers before the power headroom reporting (PHR) of said subscriber equipment according to the subscriber equipment power management, also comprises:
Filtering Processing is carried out in said subscriber equipment power management influence.
5. method according to claim 4 is characterized in that, said Filtering Processing is layer three Filtering Processing or uses the method that triggers moment TTT to carry out Filtering Processing.
6. according to each described method of claim 1 to 5, it is characterized in that subscriber equipment comprises according to the power headroom reporting (PHR) of the said subscriber equipment of subscriber equipment power management influence triggering:
Whether judge said subscriber equipment power management influence greater than predetermined threshold, wherein, said predetermined threshold is not equal to descending path loss and changes threshold value;
If then trigger the power headroom reporting (PHR) of said subscriber equipment.
7. method according to claim 6 is characterized in that, said predetermined threshold changes threshold value less than said descending path loss.
8. method according to claim 6 is characterized in that the time-out time of said power headroom reporting (PHR) timer is not equal to the time-out time that power headroom reporting (PHR) is forbidden timer prohibitPHR-Timer.
9. method according to claim 6 is characterized in that, said power headroom reporting (PHR) timer is that power headroom reporting (PHR) is forbidden timer prohibitPHR-Timer.
10. a power headroom reporting (PHR) trigger equipment is characterized in that, comprising:
The power headroom reporting (PHR) timer;
Trigger module is used for behind said power headroom reporting (PHR) timer expiry, triggers the user equipment to report power headroom reporting (PHR) according to influence of subscriber equipment power management and path loss influence.
11. device according to claim 10 is characterized in that, also comprises:
Filtration module is used for Filtering Processing is carried out in subscriber equipment power management influence.
12., it is characterized in that said trigger module comprises according to claim 10 or 11 described devices:
Judge submodule, whether be used to judge said subscriber equipment power management influence greater than predetermined threshold, wherein, said predetermined threshold is not equal to descending path loss and changes threshold value;
Trigger submodule, under the situation of said subscriber equipment power management influence, trigger the power headroom reporting (PHR) of said subscriber equipment greater than said predetermined threshold.
CN201110108561.XA 2011-04-28 2011-04-28 Power headroom reporting (PHR) triggering method and device Active CN102761900B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201110108561.XA CN102761900B (en) 2011-04-28 2011-04-28 Power headroom reporting (PHR) triggering method and device
PCT/CN2011/077886 WO2012145974A1 (en) 2011-04-28 2011-08-01 Method and device for triggering power headroom report

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110108561.XA CN102761900B (en) 2011-04-28 2011-04-28 Power headroom reporting (PHR) triggering method and device

Publications (2)

Publication Number Publication Date
CN102761900A true CN102761900A (en) 2012-10-31
CN102761900B CN102761900B (en) 2016-08-24

Family

ID=47056188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110108561.XA Active CN102761900B (en) 2011-04-28 2011-04-28 Power headroom reporting (PHR) triggering method and device

Country Status (2)

Country Link
CN (1) CN102761900B (en)
WO (1) WO2012145974A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104053222A (en) * 2013-03-14 2014-09-17 电信科学技术研究院 Base station transmitting power adjusting method and apparatus
CN105357682A (en) * 2015-11-27 2016-02-24 京信通信系统(广州)有限公司 Configuration method and apparatus for power headroom report, and base station
CN107371229A (en) * 2016-05-13 2017-11-21 中兴通讯股份有限公司 Poewr control method, device and user equipment
CN108401525A (en) * 2017-12-25 2018-08-14 北京小米移动软件有限公司 Power headroom reporting (PHR) transmission method and device
WO2019101204A1 (en) * 2017-11-27 2019-05-31 华为技术有限公司 Power control method, apparatus and system

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI699128B (en) 2018-05-10 2020-07-11 華碩電腦股份有限公司 Method and apparatus for triggering power headroom report for multiple pathloss reference in a wireless communication system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090175187A1 (en) * 2008-01-07 2009-07-09 Kristina Jersenius Method and Arrangement for Triggering Power Headroom Report Transmissions in a Telecommunications System
CN101925105A (en) * 2009-06-15 2010-12-22 大唐移动通信设备有限公司 Method and device for reporting uplink power margin information
CN101932087A (en) * 2009-06-19 2010-12-29 大唐移动通信设备有限公司 Method, device and system for reporting power headroom
CN102740346A (en) * 2011-04-01 2012-10-17 中兴通讯股份有限公司 Method and device for triggering power headroom report

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090175187A1 (en) * 2008-01-07 2009-07-09 Kristina Jersenius Method and Arrangement for Triggering Power Headroom Report Transmissions in a Telecommunications System
CN101925105A (en) * 2009-06-15 2010-12-22 大唐移动通信设备有限公司 Method and device for reporting uplink power margin information
CN101932087A (en) * 2009-06-19 2010-12-29 大唐移动通信设备有限公司 Method, device and system for reporting power headroom
CN102740346A (en) * 2011-04-01 2012-10-17 中兴通讯股份有限公司 Method and device for triggering power headroom report

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
3GPP: "《3GPP》", 25 February 2011, article "PHR Trigger for Power Reduction Due to Power Management" *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104053222A (en) * 2013-03-14 2014-09-17 电信科学技术研究院 Base station transmitting power adjusting method and apparatus
CN104053222B (en) * 2013-03-14 2017-07-14 电信科学技术研究院 Base station transmitting power method of adjustment and device
CN105357682A (en) * 2015-11-27 2016-02-24 京信通信系统(广州)有限公司 Configuration method and apparatus for power headroom report, and base station
CN105357682B (en) * 2015-11-27 2018-09-25 京信通信系统(中国)有限公司 A kind of configuration method of power headroom reporting (PHR), device and base station
CN107371229A (en) * 2016-05-13 2017-11-21 中兴通讯股份有限公司 Poewr control method, device and user equipment
CN107371229B (en) * 2016-05-13 2022-10-11 中兴通讯股份有限公司 Power control method, device and user equipment
WO2019101204A1 (en) * 2017-11-27 2019-05-31 华为技术有限公司 Power control method, apparatus and system
CN109842926A (en) * 2017-11-27 2019-06-04 华为技术有限公司 A kind of method, apparatus and system of power control
CN109842926B (en) * 2017-11-27 2021-06-29 华为技术有限公司 Power control method, device and system
CN108401525A (en) * 2017-12-25 2018-08-14 北京小米移动软件有限公司 Power headroom reporting (PHR) transmission method and device
WO2019126954A1 (en) * 2017-12-25 2019-07-04 北京小米移动软件有限公司 Power headroom report transmission method and device
CN108401525B (en) * 2017-12-25 2020-12-04 北京小米移动软件有限公司 Power headroom report transmission method and device

Also Published As

Publication number Publication date
CN102761900B (en) 2016-08-24
WO2012145974A1 (en) 2012-11-01

Similar Documents

Publication Publication Date Title
JP7022948B2 (en) User equipment and method
US10165527B2 (en) Method of efficiently reporting user equipment transmission power and apparatus thereof
KR101565764B1 (en) Methods of setting maximum output power for user equipment and reporting power headroom, and the user equipment
US10264532B2 (en) Method for controlling uplink power, eNodeB, and user equipment
EP2995139B1 (en) Timing relation of tpc command and ue transmit power adjustment in adaptive tdd systems
CN103503525B (en) Power headroom reporting related to power management maximum power reduction
CN102932892B (en) A kind of Poewr control method and device
US20120178494A1 (en) Methods, apparatus and systems for handling additional power backoff
CN106465300A (en) Method and terminal for transmitting power headroom report in dual connection between terminal and base station
CN103813430A (en) Power report method and device in carrier aggregation system
CN102761900B (en) Power headroom reporting (PHR) triggering method and device
US20160323835A1 (en) Method for Power Processing and Terminal
CN103313372A (en) Power control method and device
CN104254121A (en) PUSCH (physical uplink shared channel) power control method and PUSCH power control device
WO2012058945A1 (en) Method and device for evaluating and reporting terminal power headroom
WO2015032023A1 (en) Power headroom report
CN102740346B (en) Method and device for triggering power headroom report
CN105379368A (en) Separate accumulation of UE transmit power adjustment in adaptive TDD systems
CN113543042B (en) Power reporting method and equipment
CN113939003A (en) Uplink power control method and device
JPWO2015194430A1 (en) Terminal device
CN115474265A (en) Data transmission scheduling method and equipment
WO2022076513A1 (en) Power headroom reporting for simultaneous transmissions of new radio pucch and pusch on different component carriers
CN117939608A (en) Power headroom indication information reporting method, electronic equipment and storage medium
CN105594264A (en) Timing relation of TPC command and UE transmit power adjustment in adaptive TDD systems

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant