CN102758635B - Construction method for tool changing under pressure in shield of water-rich silty soil and silty sand stratum under station tracks of railways - Google Patents

Construction method for tool changing under pressure in shield of water-rich silty soil and silty sand stratum under station tracks of railways Download PDF

Info

Publication number
CN102758635B
CN102758635B CN201210268682.5A CN201210268682A CN102758635B CN 102758635 B CN102758635 B CN 102758635B CN 201210268682 A CN201210268682 A CN 201210268682A CN 102758635 B CN102758635 B CN 102758635B
Authority
CN
China
Prior art keywords
soil
tool changing
pressure
shield
shield machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210268682.5A
Other languages
Chinese (zh)
Other versions
CN102758635A (en
Inventor
陈强
卿三惠
段绍和
陈卓
盛亮
王家祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 2 Engineering Group Co Ltd
Original Assignee
China Railway Erju Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Erju Co Ltd filed Critical China Railway Erju Co Ltd
Priority to CN201210268682.5A priority Critical patent/CN102758635B/en
Publication of CN102758635A publication Critical patent/CN102758635A/en
Application granted granted Critical
Publication of CN102758635B publication Critical patent/CN102758635B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a construction method for tool changing under pressure in a shield of the water-rich silty soil and silty sand stratum under station tracks of railways. The construction method comprises the following steps of: carrying out reinforcement on a soil body at a tool changing position by adopting a high-pressure rotary jet pile; inspecting whether holes exist on the ground surface in the soil reinforcing area, and adjusting the tunneling posture and the tunneling direction of a shield machine; after reinforcing soil enters a cutting port of the shield machine, reducing the pressure of a soil warehouse, and adjusting construction parameters; injecting bentonite into the soil warehouse of the shield; determining an air pressure value, and determining a tool-changing air pressure value in the soil warehouse according to the obtained water-soil pressure value; and finally, clearing the warehouse, and reducing the pressure; and workers enter to change a tool, and after tool changing, the shield machine restores the tunneling working state. The construction method disclosed by the invention has the advantages that the risk that water-rich soft soil is easy to flow to cause collapse when the tool is changed under pressure in tunnel shield construction of the water-rich silty soil and silty sand stratum is overcome, and the operation safety of upper railways is ensured.

Description

The construction method of rich pigment soil sandy silt soil stratum shield structure tool changing with pressure under railway station track
Technical field
The present invention relates to Shield Construction Technique field, particularly the construction method of rich pigment soil sandy silt soil stratum shield structure tool changing with pressure under a kind of railway station track.
Background technology
" shield construction " is a kind of set of tunneling construction method that mechanization and automaticity are higher, and since the sixties in 20th century, western developed country is applied to this technology city underground and the construction of large size city outlet tunnel in a large number.Along with developing rapidly of urban track traffic field, metro shield working skill is used widely.Shield construction is taking shield machine as tunneling equipment, does supporting with the shield shell of shield machine, with the front end knife cutting soil body, is advanced by jack pushing tow shield machine, does lining cutting with assembled prefabricated section of jurisdiction in excavation face, thereby forms the construction method in tunnel.Shield machine carries out earth cutting and catalase by cutter in tunnel excavating process, after shield machine long distance driving because tool wear need to be carried out cutter changing, an excessive risk operation and carry out tool changing with pressure, especially be rich pigment soil sandy silt soil stratum under railway station track in construction environment, slightly control accidentally, may there is because ground settlement is excessive ground, railway station track, top and cave in, have a strong impact on railway operation safety.
Summary of the invention
The object of the invention is to overcome existing above-mentioned deficiency in prior art, the construction method of rich pigment soil sandy silt soil stratum shield structure tool changing with pressure under a kind of railway station track is provided.The risk that when the inventive method has overcome under railway station track tool changing with pressure in rich pigment soil sandy silt soil stratum constructing tunnel, the easy quicksand of rich water weak soil caves in, guarantees the operation security of top railway.
In order to realize foregoing invention object, the invention provides following technical scheme:
A construction method for rich pigment soil sandy silt soil stratum shield structure tool changing with pressure under railway station track, described method comprises the steps:
Preparation before A, tool changing:
Adopt high-pressure rotary jet grouting pile to reinforce the tool changing place soil body; Whether earth's surface in soil stabilization district be there is to hole inspection, if exist hole to utilize cement mortar to carry out shutoff to hole; Feed back to shield structure measuring system by concrete measurement earth's surface tool changing mileage and determine shield machine tool changing place, before shield machine arrives tool changing place, adjust driving attitude and the direction of shield machine, guarantee that shield machine arrives tool changing point smoothly.
Construction parameter adjustment after B, shield machine contact compacted soil:
Shield machine otch slowly reduces support pressure according to detection case after entering compacted soil, and support pressure is not less than 1.5bar; Shield machine shield structure fltting speed is controlled in 1cm/min; Cutter head of shield machine rotating speed is controlled at 1 rev/min; Shield machine shield tail grease is controlled at 29-31kg/ ring.
C, pressure injection swell soil:
Shield structure soil injects swell soil in storehouse, utilizes the radial hole of shield machine fuselage to carry out bentonitic pressure injection to the gap between fuselage and compacted soil.
D, tool changing with pressure:
Determine atmospheric pressure value, determine tool changing atmospheric pressure value in native storehouse according to the Water And Earth Pressures value calculating.
Bring down stocks to build pressure, export the dregs in native storehouse to native storehouse topmost peep hole, after being unearthed, survey situation in native storehouse; Soil is in storehouse in all right situation, continues to be unearthed to 4-6cm place below people's lock, now adopts respirator system to pressurize, and the person of sending someone enters people's lock and observes native storehouse environment; Again be unearthed to shield machine middle part, personnel enter tool changing, and after tool changing, shield machine recovers headwork state.
Wherein, in described steps A, tool changing place soil stabilization adopts φ 600 high-pressure rotary jet grouting piles to reinforce, stake stake overlap joint 200mm, and cement mixing content is 35%, cement 28d compressive strength is not less than 2.0Mpa; Reinforcement depth is below ground 25.45m, and earth's surface 3.45m does not reinforce, and effective reinforcement depth is 22m, and strengthening length is 37.2m, and reinforcing width is 7.6m, guarantees railway security and tool changing safety.
In described steps A, before shield machine arrival tool changing place, adjust driving attitude and the direction of shield machine, guarantee that shield machine arrives tool changing point smoothly, shield machine arrives tool changing place front 30 and encircles driving attitude and the direction of checking a shield machine, encircle the normal range (NR) of adjust to ± 50mm of the attitude of shield structure and tunneling direction by front 15, now cutter head of shield machine stretches out 5cm, prevents that shield structure stabilization zone driving is stuck.
Preferably, in described step B, shield machine shield tail grease is 30kg/ ring.
The swell soil using in described step C adopts thin mould degree sodium bentonite, and bentonite slurry fit quality is than for swell soil: water=250kg:1000kg, and swell soil proportion is 1.2g/ , swell soil viscosity is 35s, guarantees that swell soil injects the good gas retaining after the soil body.
Further, swell soil adopts external pipe directly to carry out pressure injection, and pressure injection mode has two kinds,
1) 5 encircle radial hole pressure injection in shields in advance, set up shield body periphery mud film, swell soil pressure injection, according to pressure control, when pressure is greater than after 5bar, stops pressure injection; Or
2) pressure injection swell soil in native storehouse, sets up face mud film; Set up mud and constantly carry out dregs displacement in native storehouse by conveying worm when unconcerned, the slag going out when conveying worm soil outlet stops displacement while being swell soil; Per tour utilizes fresh bentonite slurry to carry out the maintenance work of face mud desert, and maintenance adopts fresh swell soil to fill Tu Cang.
In described step D, determine that according to the Water And Earth Pressures value calculating native storehouse internal gas pressure value is specially: according to formula P= calculate Water And Earth Pressures value, in native storehouse, tool changing atmospheric pressure value is than the high 0.1~0.2bar of Water And Earth Pressures value, and wherein P is Water And Earth Pressures value, for native side direction static balance pressure coefficient, for the weighted average severe of the soil body, h is center, tunnel buried depth.
compared with prior art, beneficial effect of the present invention:
The inventive method is by reinforcing the tool changing place soil body, adjust attitude of shield machine, tunneling direction and construction parameter, pressure injection swell soil guarantees that it injects the good gas retaining after the soil body, tool changing atmospheric pressure value in the unearthed storehouse of accurate Calculation, and by on-the-spot unmanned warehouse entry test, determine that tool changing atmospheric pressure value carries out tool changing with pressure, safe and reliable, especially under railway station track, in rich pigment soil sandy silt soil stratum constructing tunnel, carry out tool changing with pressure, overcome the risk that the easy quicksand of rich water weak soil caves in, guaranteed the operation security of top railway.
brief description of the drawings:
Fig. 1 is Hangzhou Subway Line 1 tool changing ground plane schematic diagram in the specific embodiment of the invention.
Fig. 2 is Hangzhou Subway Line 1 tool changing place surrounding environment floor map in the specific embodiment of the invention.
mark in figure: 1-stabilization zone, 2-pastes Shahe.
Detailed description of the invention
Below in conjunction with test example and detailed description of the invention, the present invention is described in further detail.But this should be interpreted as to the scope of the above-mentioned theme of the present invention only limits to following embodiment, all technology realizing based on content of the present invention all belong to scope of the present invention.
Under railway of the present invention station track, the construction method of rich pigment soil sandy silt soil stratum shield structure tool changing with pressure is mainly used in rich pigment soil sandy silt soil stratum, comprises the steps:
Preparation before A, tool changing:
Adopt high-pressure rotary jet grouting pile to reinforce the tool changing place soil body, understand in detail railway main track settlement Control standard, uplift capacity≤2mm as per hour in rail track to railway interests; Settling amount≤4mm per hour; Often add up round the clock uplift capacity≤4mm; Often add up round the clock settling amount≤10mm; The two top-of-rail level discrepancy in elevation≤2mm; Accumulative total uplift capacity≤the 10mm of final circuit in half a year; Accumulative total sedimentation≤40mm.In Qian Dui stabilization zone, arrival tool changing region, whether earth's surface there is hole inspection, prevents in process with pressure, and gas is overflowed and cannot be pressurizeed from hole, if exist hole to utilize cement mortar to carry out shutoff to hole; Feed back to shield structure measuring system by concrete measurement earth's surface tool changing mileage and determine shield machine tool changing place, guarantee that shield structure shutdown tool change position is accurate.Before shield machine arrives tool changing place, adjust driving attitude and the direction of shield machine, the attitude of shield structure and tunneling direction are adjusted to normal range (NR), guarantee that shield machine arrives tool changing point smoothly.
Construction parameter adjustment after B, shield machine contact compacted soil:
Shield machine otch slowly reduces support pressure according to detection case after entering compacted soil, and support pressure is not less than 1.5bar; Shield machine shield structure fltting speed is controlled in 1cm/min; Cutter head of shield machine rotating speed is controlled at 1 rev/min; Shield machine shield tail grease is controlled at 29-31kg/ ring.Preferably, shield tail grease is 30kg/ ring.
C, pressure injection swell soil:
Shield structure soil injects swell soil in storehouse, utilizes the radial hole of shield machine fuselage to carry out bentonitic pressure injection to the gap between fuselage and compacted soil.
D, tool changing with pressure:
First determine atmospheric pressure value, determine tool changing atmospheric pressure value in native storehouse according to the Water And Earth Pressures value calculating, concrete, according to formula P= calculate Water And Earth Pressures value, in native storehouse, tool changing atmospheric pressure value is than the high 0.1~0.2bar of Water And Earth Pressures value, and wherein P is Water And Earth Pressures value, for native side direction static balance pressure coefficient, for the weighted average severe of the soil body, h is center, tunnel buried depth.
P=in the specific embodiment of the invention =0.32*1.85*17.85*1000=1.05bar, atmospheric pressure value is initially set 1.2bar, afterwards according to changing and carry out actual adjustment in ground settlement and native storehouse.In rich pigment soil silty strata, warehouse entry with pressure is to resist underground water soil pressure by air pressure, stops underground water to flow to Tu Cang, to guarantee the certainly steady of sandy soil, prevents from caving in.Determining of atmospheric pressure value played very important effect to the safety in tool changing construction with pressure.
Then, bring down stocks to build pressure, export the dregs in native storehouse to native storehouse topmost peep hole, after being unearthed, survey situation in native storehouse; Soil in all right situation, continues to be unearthed to 4-6cm place, people's lock below, 5cm place below preferred people's lock in storehouse.Now adopt respirator system to pressurize, the person of sending someone enters people's lock and observes native storehouse environment; Again be unearthed to shield machine middle part, personnel enter tool changing, and after tool changing, shield machine recovers headwork state.Tool changing requires to tear one open, fills one.The principle of cutter changing is easy first and difficult later, and disassembling bolts and fastening employing pneumatic impact wrench, guarantee Cutting tool installation manner quality.Adding Decompression Controlling must have professional to operate, and in strict accordance with " 0.6~3.0kgf/ tunnel hyperbar operation decompression table " carry out operation.
Tool changing place is positioned at intensive below, railway station track, for ensureing railway and tool changing safety, in advance tool changing place is reinforced, in described steps A, tool changing place soil stabilization adopts φ 600 high-pressure rotary jet grouting piles to reinforce, stake stake overlap joint 200mm, cement mixing content is 35%, and cement 28d compressive strength is not less than 2.0Mpa; Reinforcement depth is below ground 25.45m, and earth's surface 3.45m does not reinforce, and effective reinforcement depth is 22m, and strengthening length is 37.2m, and reinforcing width is 7.6m, guarantees railway security and tool changing safety.
Preferably, in described steps A, before shield machine arrival tool changing place, adjust driving attitude and the direction of shield machine, shield machine arrives tool changing place front 30 and encircles driving attitude and the direction of checking a shield machine, by the normal range (NR) of adjust to ± 50mm of the attitude of shield structure and tunneling direction, guarantee that shield machine arrives tool changing point smoothly by front 15 rings.Now cutter head of shield machine stretches out 5cm, prevents that shield structure stabilization zone driving is stuck.
Under railway station track, the tool changing construction with pressure of rich pigment soil sandy silt soil stratum shield structure is excessive risk operation, before construction, need to personnel check UP, machinery overhauls and all goods and materials need be reached the spot and enough, especially, the swell soil using in described step C adopts thin mould degree sodium bentonite, and bentonite slurry fit quality is than being swell soil: water=250kg:1000kg, and swell soil proportion is 1.2g/ , swell soil viscosity is 35s, and needs within 24 hours, to carry out mixing fermentation in advance, guarantees that it injects good gas retaining, sealing after the soil body, thereby prevents in process with pressure, gas is overflowed and cannot be pressurizeed.
Further, swell soil adopts external pipe directly to carry out pressure injection, and pressure injection mode has two kinds,
1) 5 encircle radial hole pressure injection in shields in advance, set up shield body periphery mud film, swell soil pressure injection, according to pressure control, when pressure is greater than after 5bar, stops pressure injection; Or
2) pressure injection swell soil in native storehouse, sets up face mud film; Set up mud and constantly carry out dregs displacement in native storehouse by conveying worm when unconcerned, the slag going out when conveying worm soil outlet stops displacement while being swell soil; Per tour utilizes fresh bentonite slurry to carry out the maintenance work of face mud desert, and maintenance adopts fresh swell soil to fill Tu Cang.
Briefly explain as an example of Hangzhou Subway Line 1 example below, as depicted in figs. 1 and 2, interval tool changing place, Hangzhou Subway Line 1 Qiu Tao way station to station, station, city is positioned at the 11st station track, railway terminal, station, city, the 12nd station track (parking line, ballast aggregate railway roadbed) between, distance is pasted Shahe 2 riverbank 25m, center, tunnel buried depth 17.7m, the other about 25m scope in tool changing stabilization zone 1 is pastes Shahe 2, Project Areas superficial part underground water belongs to porosity diving type, main tax is stored in that upper layer is banketed and large layer silt, in flour sand, Source Of Supply is mainly Atmospheric precipitation and surface water, and be recharge connection each other with river embankment, groundwater table is with seasonal variety.It is 0.50m left and right under earth's surface that water level is superlatively descended in place annual mean, and the reinforcing tool changing district water yield is very abundant.This region Tunnel Passing soil layer is sandy silt; Tunnel upper formation is miscellaneous fill, sandy silt, sandy silt folder flour sand; Understratum, tunnel is silty clay, easily liquefaction of flour sand vibration, easily Collapse Deformation, under groundwater effect, easily produce quicksand, carry out tool changing with pressure in this region and have very big risk, adopted the construction method of rich pigment soil sandy silt soil stratum shield structure tool changing with pressure under railway of the present invention station track, the safety that shield machine has been constructed in this region along having guaranteed of determining, overcome the risk that the easy quicksand of rich water weak soil caves in, guaranteed the operation security of top railway.And because tool changing with pressure under rich pigment soil sandy silt soil stratum railway station track is that the whole nation is the first, between this Project Areas, left and right tape is pressed the successful implementation of tool changing, has ensured railway and follow-up safety of passing through useless stake, has also filled up the blank of Hangzhou Subway construction simultaneously.
By reference to the accompanying drawings embodiments of the present invention are described in detail above; but the present invention is not limited to above-mentioned embodiment; in the ken possessing those of ordinary skill in the art, can also make various variations, within these variations all belong to protection scope of the present invention.

Claims (7)

1. a construction method for rich pigment soil sandy silt soil stratum shield structure tool changing with pressure under railway station track, is characterized in that, described method comprises the steps:
Preparation before A, tool changing:
Adopt high-pressure rotary jet grouting pile to reinforce the tool changing place soil body; Whether earth's surface in soil stabilization district be there is to hole inspection, if exist hole to utilize cement mortar to carry out shutoff to hole; Feed back to shield structure measuring system by concrete measurement earth's surface tool changing mileage and determine shield machine tool changing place, before shield machine arrives tool changing place, adjust driving attitude and the direction of shield machine;
Construction parameter adjustment after B, shield machine contact compacted soil:
Shield machine otch slowly reduces support pressure according to detection case after entering soil stabilization district, and support pressure is not less than 1.5bar; Shield machine shield structure fltting speed is controlled in 1cm/min; Cutter head of shield machine rotating speed is controlled at 1 rev/min; Shield machine shield tail grease is controlled at 29-31kg/ ring;
C, pressure injection swell soil:
Shield structure soil injects swell soil in storehouse, utilizes the radial hole of shield machine fuselage to carry out bentonitic pressure injection to the gap between fuselage and compacted soil;
D, tool changing with pressure:
Determine atmospheric pressure value, determine tool changing atmospheric pressure value in native storehouse according to the Water And Earth Pressures value calculating;
Bring down stocks to build pressure, export the dregs in native storehouse to native storehouse topmost peep hole, after being unearthed, survey situation in native storehouse; Soil is in storehouse in all right situation, continues to be unearthed to 4-6cm place below people's lock, now adopts respirator system to pressurize, and the person of sending someone enters people's lock and observes native storehouse environment; Again be unearthed to shield machine middle part, personnel enter tool changing, and after tool changing, shield machine recovers headwork state.
2. the construction method of rich pigment soil sandy silt soil stratum shield structure tool changing with pressure under railway according to claim 1 station track, it is characterized in that, in described steps A, tool changing place soil stabilization adopts φ 600 high-pressure rotary jet grouting piles to reinforce, stake stake overlap joint 200mm, cement mixing content is 35%, and cement 28d compressive strength is not less than 2.0Mpa; Reinforcement depth is below ground 25.45m, and earth's surface 3.45m does not reinforce, and effective reinforcement depth is 22m, and strengthening length is 37.2m, and reinforcing width is 7.6m.
3. the construction method of rich pigment soil sandy silt soil stratum shield structure tool changing with pressure under railway according to claim 1 station track, it is characterized in that, in described steps A, shield machine arrives tool changing place front 30 and encircles driving attitude and the direction of checking a shield machine, by front 15 rings, by the normal range (NR) of adjust to ± 50mm of the attitude of shield structure and tunneling direction, now cutter head of shield machine stretches out 5cm.
4. the construction method of rich pigment soil sandy silt soil stratum shield structure tool changing with pressure under railway according to claim 1 station track, is characterized in that, in described step B, shield machine shield tail grease is 30kg/ ring.
5. according to the construction method of rich pigment soil sandy silt soil stratum shield structure tool changing with pressure under the railway station track described in claim 1 to 4 any one, it is characterized in that, the swell soil using in described step C adopts thin mould degree sodium bentonite, and bentonite slurry fit quality is than being swell soil: water=250kg:1000kg, and swell soil proportion is 1.2g/ , swell soil viscosity is 35s.
6. the construction method of rich pigment soil sandy silt soil stratum shield structure tool changing with pressure under railway according to claim 5 station track, is characterized in that, swell soil adopts external pipe directly to carry out pressure injection, and pressure injection mode has two kinds,
1) 5 encircle radial hole pressure injection in shields in advance, set up shield body periphery mud film, swell soil pressure injection, according to pressure control, when pressure is greater than after 5bar, stops pressure injection; Or
2) pressure injection swell soil in native storehouse, sets up face mud film; Set up mud and constantly carry out dregs displacement in native storehouse by conveying worm when unconcerned, the slag going out when conveying worm soil outlet stops displacement while being swell soil; Per tour utilizes fresh bentonite slurry to carry out the maintenance work of face mud desert, and maintenance adopts fresh swell soil to fill Tu Cang.
7. the construction method of rich pigment soil sandy silt soil stratum shield structure tool changing with pressure under railway according to claim 1 station track, is characterized in that, in described step D, determines that according to the Water And Earth Pressures value calculating native storehouse internal gas pressure value is specially:
According to formula P= calculate Water And Earth Pressures value, in native storehouse, tool changing atmospheric pressure value is than the high 0.1~0.2bar of Water And Earth Pressures value, and wherein P is Water And Earth Pressures value, for native side direction static balance pressure coefficient, for the weighted average severe of the soil body, h is center, tunnel buried depth.
CN201210268682.5A 2012-07-31 2012-07-31 Construction method for tool changing under pressure in shield of water-rich silty soil and silty sand stratum under station tracks of railways Active CN102758635B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210268682.5A CN102758635B (en) 2012-07-31 2012-07-31 Construction method for tool changing under pressure in shield of water-rich silty soil and silty sand stratum under station tracks of railways

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210268682.5A CN102758635B (en) 2012-07-31 2012-07-31 Construction method for tool changing under pressure in shield of water-rich silty soil and silty sand stratum under station tracks of railways

Publications (2)

Publication Number Publication Date
CN102758635A CN102758635A (en) 2012-10-31
CN102758635B true CN102758635B (en) 2014-10-29

Family

ID=47053256

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210268682.5A Active CN102758635B (en) 2012-07-31 2012-07-31 Construction method for tool changing under pressure in shield of water-rich silty soil and silty sand stratum under station tracks of railways

Country Status (1)

Country Link
CN (1) CN102758635B (en)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102913250B (en) * 2012-11-12 2014-07-16 中铁二局股份有限公司 Shield tunnel-entering construction method at stratum rich in water powder and soil powder sand
CN102966358B (en) * 2012-11-12 2014-08-06 中铁二局股份有限公司 Construction method for shield-cut reinforced concrete pile under main line of operational railway
CN103113052A (en) * 2013-01-18 2013-05-22 中铁隧道集团有限公司 High viscosity slurry for water-rich sandy gravel stratum slurry shield construction
CN103244135B (en) * 2013-04-26 2015-02-25 广东华隧建设股份有限公司 Construction method for manufacturing mud film in high-permeability stratum
CN103696779B (en) * 2013-12-31 2015-08-19 中铁一局集团有限公司 Shield structure is calmed the anger operation tunnel face breast wall filter cake construction technology
CN105317441A (en) * 2014-06-30 2016-02-10 宏润建设集团股份有限公司 Pressure maintaining type tool changing method adopted during shield tunneling
CN104564092B (en) * 2014-11-17 2016-09-07 上海隧道工程有限公司 Slurry shield more change owner in bad ground drives the method sealed
CN104989411B (en) * 2015-06-16 2017-03-08 河海大学 Saturated sand Liquefaction device and method around the section of jurisdiction that shield-tunneling construction causes
CN105257308B (en) * 2015-10-30 2017-07-11 上海交通大学 Native storehouse mortar mixes the shield machine tool changing construction method of bentonite mud film in a kind of layer of sand
CN105422108B (en) * 2015-11-16 2017-11-10 广东华隧建设股份有限公司 A kind of cutter replacing method based on the slurry balance shield machine with freezing function
CN105464674A (en) * 2015-12-29 2016-04-06 上海市基础工程集团有限公司 Construction method of cutter replacing under pressure in shield-method tunnel construction
CN105736004B (en) * 2016-03-11 2018-01-09 广州轨道交通建设监理有限公司 Shield is opened a position pressurize panelling construction method with weighing apparatus shield mud air pressure
CN108756916B (en) * 2018-06-12 2019-11-05 中铁隧道局集团有限公司 High-intensitive basement rock protrusion stratum shield construction method
CN110397444A (en) * 2019-08-19 2019-11-01 中铁十二局集团有限公司 Shallow earthing upper-soft lower-hard ground shield machine opens a position the method for tool changing
CN113847042B (en) * 2021-09-01 2023-07-21 宁波市轨道交通集团有限公司 Construction method for side-penetrating high-voltage electric tower of subway shield tunnel
CN114033402A (en) * 2021-11-16 2022-02-11 中铁十二局集团有限公司 Hard rock stratum shield tunneling machine cutter head repairing construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101899978A (en) * 2010-02-04 2010-12-01 上海隧道工程股份有限公司 Method for replacing shield cutter in sand-pebble layer
CN102052079A (en) * 2010-11-19 2011-05-11 中铁一局集团有限公司 Method for exchanging tool of shield machine for tunnel construction
CN101666231B (en) * 2009-06-24 2011-11-16 中铁隧道股份有限公司 Shield machine warehouse entry method
CN101539023B (en) * 2008-03-21 2012-07-04 中铁二局股份有限公司 Shield machine belt pressure chamber opening operation construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101539023B (en) * 2008-03-21 2012-07-04 中铁二局股份有限公司 Shield machine belt pressure chamber opening operation construction method
CN101666231B (en) * 2009-06-24 2011-11-16 中铁隧道股份有限公司 Shield machine warehouse entry method
CN101899978A (en) * 2010-02-04 2010-12-01 上海隧道工程股份有限公司 Method for replacing shield cutter in sand-pebble layer
CN102052079A (en) * 2010-11-19 2011-05-11 中铁一局集团有限公司 Method for exchanging tool of shield machine for tunnel construction

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
NFM盾构机带压开舱换刀技术;缪忠尚;《现代隧道技术》;20120430;第49卷(第343期);全文 *
杨小平.地基处理.《基础工程》.2010,第225-227页. *
缪忠尚.NFM盾构机带压开舱换刀技术.《现代隧道技术》.2012,第49卷(第343期),

Also Published As

Publication number Publication date
CN102758635A (en) 2012-10-31

Similar Documents

Publication Publication Date Title
CN102758635B (en) Construction method for tool changing under pressure in shield of water-rich silty soil and silty sand stratum under station tracks of railways
Zhang et al. Key techniques for the largest curved pipe jacking roof to date: A case study of Gongbei tunnel
CN106369223B (en) A kind of silt stratum pipe jacking construction method
CN106402490B (en) Silt stratum push pipe jacking construction method based on steel bushing head tool pipe
Chen et al. Long rectangular box jacking project: a case study
Hong Typical underwater tunnels in the mainland of China and related tunneling technologies
CN100501124C (en) Construction method for tunnel contact passage in shield section of underground railway
CN109458185B (en) Construction method for vertically overlapped crossed parallel tunnel shield
CN108775244A (en) A kind of Mining Method receives shield machine and shield sky pushes away construction method
CN107269288A (en) The non-explosion water mill of hard stone section push pipe bores two-way drilling construction method
CN109386293A (en) The sealed reception construction method of large section rectangular top pipe
CN105888675A (en) Construction method for shield crossing railway line
CN110259490A (en) A kind of Underground Subway Station construction method
CN111706342A (en) Shield end reinforcing method based on closed stratum in water-rich sandy gravel stratum
Chen et al. Construction technology of large diameter underwater shield tunnel
CN104315251B (en) Artificial pipe jacking construction method under soil stone combination geological conditions
CN115681613A (en) Pipe jacking construction method for silt silty clay layer construction
Atzl Challenges and Solutions for large scale Tunnelling in Urban Environment
CN114542092A (en) Shield receiving construction method without bottom plate structure
Li et al. The hugest curved jacking pipe roof tunnel of Hong Kong-Zhuhai-Macao bridge
CN212359768U (en) Shield end reinforcing structure based on closed stratum in water-rich sandy gravel stratum
CN114183152B (en) Method for controlling shield posture in small-radius multi-curve subway shield construction
Munz et al. Marine Outfalls Project-Issues and Challenges
Wang et al. Research on construction technology for Yangtze-River crossing tunnel project in Wuhan
Prakash et al. Associated Risk and Rectification during TBM Tunnelling [J]

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160108

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Patentee after: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD.

Address before: 610041, No. nine, No. 156, building B, high building, Xing Xing Road, Chengdu hi tech Zone, Sichuan

Patentee before: China Railway Erju Co., Ltd.

CP01 Change in the name or title of a patent holder

Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Patentee after: China Railway No. 2 Engineering Group Co., Ltd.

Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD.

CP01 Change in the name or title of a patent holder