CN102758598B - 一种精确定量注入验封一体管柱及其验封方法 - Google Patents

一种精确定量注入验封一体管柱及其验封方法 Download PDF

Info

Publication number
CN102758598B
CN102758598B CN201210274797.5A CN201210274797A CN102758598B CN 102758598 B CN102758598 B CN 102758598B CN 201210274797 A CN201210274797 A CN 201210274797A CN 102758598 B CN102758598 B CN 102758598B
Authority
CN
China
Prior art keywords
ball seat
acp
ball
inflatable packer
screen casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210274797.5A
Other languages
English (en)
Other versions
CN102758598A (zh
Inventor
谢玉洪
颜明
于志刚
廖云虎
贾辉
梁玉凯
谢思宇
曾玉斌
吴绍伟
彭建峰
穆永威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
CNOOC China Ltd Zhanjiang Branch
Original Assignee
China National Offshore Oil Corp CNOOC
CNOOC China Ltd Zhanjiang Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, CNOOC China Ltd Zhanjiang Branch filed Critical China National Offshore Oil Corp CNOOC
Priority to CN201210274797.5A priority Critical patent/CN102758598B/zh
Publication of CN102758598A publication Critical patent/CN102758598A/zh
Application granted granted Critical
Publication of CN102758598B publication Critical patent/CN102758598B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了一种精确定量注入验封一体管柱及其验封方法,所述管柱从下到上依次设置有通孔圆头管鞋(1)、第一球座(2)、第一膨胀式封隔器(4)、节流接头(5)、第二膨胀式封隔器(7)、第二球座(8)、第三球座(9)、第三膨胀式封隔器(11),其中,所述通孔圆头管鞋、节流接头连通管柱内部和管柱外部,所述第一球座、第二球座、第三球座的直径依次增大。通过投球,1.25″球座可以实现筛管内ACP材料和第一段筛管外ACP材料的连续注入;1.5″球座可以实现第一段ACP材料精确定量注入,1.65″球座实现第二段ACP材料精确定量注入,防止过顶替或者油管内ACP材料剩余过量。本发明不仅能够精确定量注入ACP材料,而且能够减少一趟起下钻作业,提高作业效率。

Description

一种精确定量注入验封一体管柱及其验封方法
技术领域
本发明属于油气开采的技术领域,具体是指一种精确定量注入验封一体管柱及其验封方法。
背景技术
目前,在石油开采领域,水平井增加了井眼在产层中的长度以及产层的泄油面积,可在低压差下开发油藏,提高储层、裂缝钻遇率。
筛管完井水平井由于筛管与井壁间存在环空,水平井含水上升后,控水稳油各种措施难以实施。环空化学封隔器(ACP)技术是实现水平井管外分段的有效途径。该技术利用管内跨式封隔器,向管外环空注入特殊流体,使其在局部环空形成高强不渗透的固体阻流环,即管外环空化学封隔器,从而辅助水平井分段开采或者地层堵剂定向注入出水部位,实现控水增产。
现有的ACP注入工艺是借助油管和跨式封隔器,在筛管与井壁地层之间的环空放置可固化形成化学封隔层的ACP材料。顶替液注入量根据注入泵累积排量控制,存在误差,为防止过顶替,通常在油管内预留一段ACP材料。筛管内外ACP段塞需要分别下入管柱建立,一趟注入管柱先建立筛管外环空化学封隔器,另一趟注入管柱再向筛管内注入ACP段塞。
因此,为了提高作业效率,精确控制ACP材料注入量,需要改进注入验封管柱设计,以节约作业成本。
上述论述内容目的在于向读者介绍可能与下面将被描述和/或主张的本发明的各个方面相关的技术的各个方面,相信该论述内容有助于为读者提供背景信息,以有利于更好地理解本发明的各个方面,因此,应了解是以这个角度来阅读这些论述,而不是承认现有技术。
发明内容
本发明的目的在于避免现有技术中的不足而提供一种精确定量注入验封一体管柱及其验封方法,其解决现有的ACP材料注入工艺不能精确定量注入的问题和一趟注入管柱不能同时建立筛管内外两段段塞的问题。
本发明的目的通过以下技术方案实现:
提供一种精确定量注入验封一体管柱,所述管柱从下到上依次设置有通孔圆头管鞋、第一球座、第一膨胀式封隔器、节流接头、第二膨胀式封隔器、第二球座、第三球座、第三膨胀式封隔器,其中,所述通孔圆头管鞋、节流接头连通管柱内部和管柱外部,所述第一球座、第二球座、第三球座的直径依次增大。
其中,所述第一膨胀式封隔器、第二膨胀式封隔器、第三膨胀式封隔器为K344膨胀式封隔器。
其中,所述第一球座为1.25″球座。
其中,所述第二球座为1.5″球座。
其中,所述第三球座为1.65″球座。
一种使用如上所述的精确定量注入验封一体管柱进行验封的方法,包括如下步骤:
1)、启泵注入后,按照注入要求投入小球至管柱内,各个膨胀式封隔器膨胀卡封在筛管内或套管内,ACP材料由通孔圆头管鞋注入到筛管内;
2)、1.25″球到达1.25″球座后,ACP材料由节流接头流出通过筛管筛网进入筛管外的环空形成ACP段塞;
3)、1.5″球到达1.5″球座泵压上升,打掉1.5″球后停泵,完成第一段ACP材料精确定量注入,缓慢上提注入管柱候凝,完成第一段ACP建立;
4)、上提注入管柱至第二段ACP建立位置,启泵注入后,按照注入要求投入小球,各个膨胀式封隔器膨胀卡封在筛管内或套管内,ACP材料由节流接头流出通过筛管筛网进入筛管外的环空形成ACP段塞;
5)、1.65″球到达1.65″球座泵压上升,打掉1.65″球后停泵,完成第二段ACP材料精确定量注入,缓慢上提注入管柱候凝,完成第二段ACP建立;
6)、将管柱分别下入正对筛管外两段ACP位置,打压2MPa,稳压5分钟,完成验封。
本发明的有益效果:由于采用了上述的结构,通过投球,1.25″球座可以实现筛管内ACP材料和第一段筛管外ACP材料的连续注入;1.5″球座可以实现第一段ACP材料精确定量注入,1.65″球座实现第二段ACP材料精确定量注入,防止过顶替或者油管内ACP材料剩余过量。本发明不仅能够精确定量注入ACP材料,而且能够减少一趟起下钻作业,提高作业效率。
附图说明
利用附图对本发明作进一步说明,但附图中的实施例不构成对本发明的任何限制,对于本领域的普通技术人员,在不付出创造性劳动的前提下,还可以根据以下附图获得其它的附图。
图1是一种精确定量注入验封一体管柱的剖视图。
在图1中包括有:1——通孔圆头管鞋、2——第一球座、3——扶正器、4——第一膨胀式封隔器、5——节流接头、6——扶正器、7——第二膨胀式封隔器、8——第二球座、9——第三球座、10——扶正器、11——第三膨胀式封隔器。
具体实施方式
为了使本领域的技术人员更好地理解本发明的技术方案,下面结合附图和具体实施例对本发明作进一步详细的描述,需要说明的是,在不冲突的情况下,本申请的实施例及实施例中的特征可以相互组合。
本发明的核心在于提供一种精确定量注入验封一体管柱及其验封方法,不仅可实现精确定量注入ACP材料,而且能够减少一趟起下钻作业,提高作业效率。
如图1所示,本发明所述的一种精确定量注入验封一体管柱,所述管柱从下到上依次设置有通孔圆头管鞋1、第一球座2、第一膨胀式封隔器4、节流接头5、第二膨胀式封隔器7、第二球座8、第三球座9、第三膨胀式封隔器11。其中,所述第一膨胀式封隔器4、第二膨胀式封隔器7、第三膨胀式封隔器11为K344膨胀式封隔器。所述通孔圆头管鞋1、节流接头5连通管柱内部和管柱外部,所述第一球座2、第二球座8、第三球座9的直径依次增大。其中,所述第一球座2为1.25″球座,所述第二球座8为1.5″球座,所述第三球座9为1.65″球座。管柱可根据实际情况配适量油管短节和扶正器3、6、10,通过油管或者钻杆下入预定位置。
本发明的使用方法如下:
启泵注入后,按照注入要求投入小球,K344膨胀式封隔器膨胀卡封在筛管内或套管内,ACP材料由通孔圆头管鞋注入到筛管内,1.25″球到达1.25″球座后,ACP材料由节流接头流出通过筛管筛网进入筛管外的环空形成ACP段塞,1.5″球到达1.5″球座泵压上升,打掉1.5″球后停泵,完成第一段ACP材料精确定量注入,缓慢上提注入管柱候凝,完成第一段ACP建立;上提注入管柱至第二段ACP建立位置,启泵注入后,按照注入要求投入小球,K344膨胀式封隔器膨胀卡封在筛管内或套管内,ACP材料由节流接头流出通过筛管筛网进入筛管外的环空形成ACP段塞,1.65″球到达1.65″球座泵压上升,打掉1.65″球后停泵,完成第二段ACP材料精确定量注入,缓慢上提注入管柱候凝,完成第二段ACP建立;将管柱分别下入正对筛管外两段ACP位置,打压2MPa,稳压5分钟,完成验封。
在本发明中,除非另有明确的规定和限定,术语“安装”、“连接”、“相连”、“固定”等术语应做广义理解,例如,可以固定连接,也可以是可拆卸连接,或一体地连接,可以是直接相连,也可以通过中间媒介间接相连,还可以指两个元件的内部连通,对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本发明中的具体含义。
上面的描述中阐述了很多具体细节以便于充分理解本发明,但是,本发明还可以采用其他不同于在此描述的其他方式来实施,因此,不能理解为对本发明保护范围的限制。
总之,本发明虽然例举了上述优选实施方式,但是应该说明,虽然本领域的技术人员可以进行各种变化和改型,除非这样的变化和改型偏离了本发明的范围,否则都应该包括在本发明的保护范围内。

Claims (1)

1.一种精确定量注入验封一体管柱,其特征在于:所述管柱从下到上依次设置有通孔圆头管鞋(1)、第一球座(2)、第一膨胀式封隔器(4)、节流接头(5)、第二膨胀式封隔器(7)、第二球座(8)、第三球座(9)、第三膨胀式封隔器(11),其中,所述通孔圆头管鞋(1)、节流接头(5)连通管柱内部和管柱外部,所述第一球座(2)、第二球座(8)、第三球座(9)的直径依次增大;
所述第一膨胀式封隔器(4)、第二膨胀式封隔器(7)、第三膨胀式封隔器(11)为K344膨胀式封隔器;
所述第一球座(2)为1.25″球座;
所述第二球座(8)为1.5″球座;
所述第三球座(9)为1.65″球座;
其验封的方法包括如下步骤:
1)、启泵注入后,按照注入要求投入小球至管柱内,各个膨胀式封隔器膨胀卡封在筛管内或套管内,ACP材料由通孔圆头管鞋注入到筛管内;
2)、1.25″球到达1.25″球座后,ACP材料由节流接头流出通过筛管筛网进入筛管外的环空形成ACP段塞;
3)、1.5″球到达1.5″球座泵压上升,打掉1.5″球后停泵,完成第一段ACP材料精确定量注入,缓慢上提注入管柱候凝,完成第一段ACP建立;
4)、上提注入管柱至第二段ACP建立位置,启泵注入后,按照注入要求投入小球,各个膨胀式封隔器膨胀卡封在筛管内或套管内,ACP材料由节流接头流出通过筛管筛网进入筛管外的环空形成ACP段塞;
5)、1.65″球到达1.65″球座泵压上升,打掉1.65″球后停泵,完成第二段ACP材料精确定量注入,缓慢上提注入管柱候凝,完成第二段ACP建立;
6)、将管柱分别下入正对筛管外两段ACP位置,打压2MPa,稳压5分钟,完成验封。
CN201210274797.5A 2012-08-03 2012-08-03 一种精确定量注入验封一体管柱及其验封方法 Expired - Fee Related CN102758598B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210274797.5A CN102758598B (zh) 2012-08-03 2012-08-03 一种精确定量注入验封一体管柱及其验封方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210274797.5A CN102758598B (zh) 2012-08-03 2012-08-03 一种精确定量注入验封一体管柱及其验封方法

Publications (2)

Publication Number Publication Date
CN102758598A CN102758598A (zh) 2012-10-31
CN102758598B true CN102758598B (zh) 2015-04-22

Family

ID=47053223

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210274797.5A Expired - Fee Related CN102758598B (zh) 2012-08-03 2012-08-03 一种精确定量注入验封一体管柱及其验封方法

Country Status (1)

Country Link
CN (1) CN102758598B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108204217B (zh) * 2016-12-20 2023-09-01 中国石油化工股份有限公司 一种筛管完井水平井电加热化学封隔器及使用方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NO309907B1 (no) * 1994-01-26 2001-04-17 Baker Hughes Inc Kjøreverktøy til bruk ved komplettering av en forgreningsbrønn
CN2861480Y (zh) * 2006-01-19 2007-01-24 大庆油田有限责任公司 水平井小直径分段酸化工具串
CN201593405U (zh) * 2009-11-27 2010-09-29 中国石油集团长城钻探工程有限公司 水平井完井压裂生产一体化管柱
CN202157793U (zh) * 2011-07-08 2012-03-07 中国石油天然气股份有限公司 压裂酸化用水力喷射管柱
CN202215200U (zh) * 2011-08-31 2012-05-09 石云夫 流体定量注入控制管柱
CN202718655U (zh) * 2012-08-03 2013-02-06 中国海洋石油总公司 一种精确定量注入验封一体管柱

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NO309907B1 (no) * 1994-01-26 2001-04-17 Baker Hughes Inc Kjøreverktøy til bruk ved komplettering av en forgreningsbrønn
CN2861480Y (zh) * 2006-01-19 2007-01-24 大庆油田有限责任公司 水平井小直径分段酸化工具串
CN201593405U (zh) * 2009-11-27 2010-09-29 中国石油集团长城钻探工程有限公司 水平井完井压裂生产一体化管柱
CN202157793U (zh) * 2011-07-08 2012-03-07 中国石油天然气股份有限公司 压裂酸化用水力喷射管柱
CN202215200U (zh) * 2011-08-31 2012-05-09 石云夫 流体定量注入控制管柱
CN202718655U (zh) * 2012-08-03 2013-02-06 中国海洋石油总公司 一种精确定量注入验封一体管柱

Also Published As

Publication number Publication date
CN102758598A (zh) 2012-10-31

Similar Documents

Publication Publication Date Title
CN103075179B (zh) 本煤层瓦斯抽采钻孔双管抽采方法
CN201273188Y (zh) 套管完井水平井一体化找水管柱
CN109653707B (zh) 一种裂缝性油气藏油气井充填封隔体颗粒降水增油方法
CN101975041B (zh) 绕煤层固井方法及装置
CN105952378A (zh) 一种树状结构井的钻完井和增产方法
CN202596684U (zh) 一种套管完井水平井多级分段求产、找水测试工艺管柱
CN105134141A (zh) 一种工艺管柱
CN201810286U (zh) 适用于两层开采的分采混抽管柱
CN102454381B (zh) 一种油气藏裸眼井固井完井方法及装置
CN204532234U (zh) 套管滑套和水力桥塞组合式完井管柱
CN110295879A (zh) 一种分段压裂水平井分段周期注采双管柱
CN111577257B (zh) 一种水平井分段坐封式流量计量找水管柱及其找水方法
CN201738822U (zh) 水平井上部固井下部筛管砾石充填完井管柱
CN205858307U (zh) 一种分段压裂完井管柱
CN202718655U (zh) 一种精确定量注入验封一体管柱
CN203239303U (zh) 用于同井注采的开采装置
CN204212753U (zh) 上层分层注聚下层笼统注水工艺管柱
CN102758598B (zh) 一种精确定量注入验封一体管柱及其验封方法
CN107461151B (zh) 羽状分支井的静压侧钻装置及改造方法
CN204941345U (zh) 一种带有封隔功能的径向井转向装置
CN104948147B (zh) 分流装置、稠油降粘开采系统及其采出方法
CN100412313C (zh) 一种无塞注水泥固井方法
CN1456785A (zh) 选择性内管多级注水泥工艺及其注水泥管柱
CN202628032U (zh) 油套环空注入阀
CN201843565U (zh) 一种带泵式多功能堵水管柱

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Xie Yuhong

Inventor after: Peng Jianfeng

Inventor after: Mu Yongwei

Inventor after: Yan Ming

Inventor after: Yu Zhigang

Inventor after: Liao Yunhu

Inventor after: Jia Hui

Inventor after: Liang Yukai

Inventor after: Xie Siyu

Inventor after: Zeng Yubin

Inventor after: Wu Shaowei

Inventor before: Tian Yi

Inventor before: Liang Yukai

Inventor before: Xie Siyu

Inventor before: Zeng Yubin

Inventor before: Jia Hui

Inventor before: Peng Jianfeng

Inventor before: Mu Yongwei

Inventor before: Li Lei

Inventor before: Zhang Chao

Inventor before: Lu Chuanshi

Inventor before: Wu Jiang

Inventor before: Huang Kaiwen

Inventor before: Xu Yilong

Inventor before: Liang Jiwen

Inventor before: Zeng Chunmin

Inventor before: Zhang Chong

Inventor before: Huang Liang

Inventor before: Yu Yi

Inventor before: Ouyang Tiebing

Inventor before: Yan Ming

Inventor before: Chen Yan

Inventor before: Liao Yunhu

Inventor before: Yu Dong

Inventor before: Yu Zhigang

Inventor before: Yang Bo

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: TIAN YI HUANG KAIWEN OUYANG TIEBING YAN MING CHEN YAN LIAO YUNHU YU DONG YU ZHIGANG YANG BO LIANG YUKAI XIE SIYU CENG YUBIN JIA HUI PENG JIANFENG MU YONGWEI LI LEI ZHANG CHAO LU CHUANSHI WU JIANG XU YILONG LIANG JIWEN CENG CHUNMIN ZHANG CHONG HUANG LIANG YU YI TO: XIE YUHONG YAN MING YU ZHIGANG LIAO YUNHU JIA HUI LIANG YUKAI XIE SIYU CENG YUBIN WU SHAOWEI PENG JIANFENG MU YONGWEI

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150422

Termination date: 20180803

CF01 Termination of patent right due to non-payment of annual fee