CN102756444A - Vulcanization process and vulcanization tool of air spring rubber capsule - Google Patents

Vulcanization process and vulcanization tool of air spring rubber capsule Download PDF

Info

Publication number
CN102756444A
CN102756444A CN2011101053356A CN201110105335A CN102756444A CN 102756444 A CN102756444 A CN 102756444A CN 2011101053356 A CN2011101053356 A CN 2011101053356A CN 201110105335 A CN201110105335 A CN 201110105335A CN 102756444 A CN102756444 A CN 102756444A
Authority
CN
China
Prior art keywords
air spring
capsule
spring rubber
rubber utricule
mould
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011101053356A
Other languages
Chinese (zh)
Other versions
CN102756444B (en
Inventor
何锋
杨洪江
曹龙田
王浩宇
赵晶
李�真
冯春亮
何丽华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUIZHOU HONGYANG RUBBER PRODUCTS CO Ltd
Guizhou University
Original Assignee
GUIZHOU HONGYANG RUBBER PRODUCTS CO Ltd
Guizhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUIZHOU HONGYANG RUBBER PRODUCTS CO Ltd, Guizhou University filed Critical GUIZHOU HONGYANG RUBBER PRODUCTS CO Ltd
Priority to CN201110105335.6A priority Critical patent/CN102756444B/en
Priority claimed from CN201110105335.6A external-priority patent/CN102756444B/en
Publication of CN102756444A publication Critical patent/CN102756444A/en
Application granted granted Critical
Publication of CN102756444B publication Critical patent/CN102756444B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Heating, Cooling, Or Curing Plastics Or The Like In General (AREA)

Abstract

The invention discloses a vulcanization process and a vulcanization tool of an air spring rubber capsule. According to the invention, a capsule is arranged in an inner cavity of a vulcanization mold forming mold. An air spring rubber capsule body is placed in the capsule in the vulcanization mold. High-pressure gas is blown into the air spring rubber capsule body through the vulcanization mold, so that the expended air spring rubber capsule body is firmly pressed against the capsule and the capsule is firmly pressed against the forming mold inner cavity wall of the vulcanization mold. The vulcanization mold is heated, and a heating and vulcanization treatment is carried out upon the air spring rubber capsule body through the heated capsule. With the vulcanization process provided by the invention, a finished product qualification rate of processed micro sleeve-type air spring rubber capsules is higher than 99%. The processed micro sleeve-type air spring rubber capsules are advantaged in uniform material quality, no gas bubble, long service life, good air tightness, good comfortableness, and the like.

Description

The sulfuration process of air spring rubber utricule and sulfurizing mould
Technical field
The present invention relates to a kind of sulfuration process and sulfurizing mould of air spring rubber utricule, belong to air spring rubber utricule manufacture technology field.
Background technology
At present, miniature air spring capsule generally adopts hard core vulcanization process to vulcanize processing, and this method is that product directly is fitted on the metal mandrel of high temperature high voltage resistant, and is placed in the mould and directly vulcanizes.Adopt the colloid of the air spring capsule of existing this vulcanization process production to exist the inequality of being heated, the capsule variable thickness causes; Cord distributes and stretches irregular; Problem such as serious wear when the colloid part is easy to generate bubble, depanning; Need process once more, therefore, its product also exists and is prone to aging, technical problems such as lack service life, easy gas leakage.So the vulcanizing treatment mode of existing rubber air spring capsule still is not ideal enough.
 
Summary of the invention
The objective of the invention is: a kind of be heated sulfuration process and sulfurizing mould even, that be difficult for the air spring rubber utricule of generation bubble, yield rate height, long service life are provided, to overcome the deficiency of prior art.
The sulfuration process that is achieved in that a kind of air spring rubber utricule of the present invention of the present invention is when the air spring rubber utricule that adopts sulfurizing mould to not moulding carries out vulcanizing treatment; A capsule is set in the inner chamber of sulfurizing mould shaping mould earlier; Then the air spring rubber utricule is put into the capsule of sulfurizing mould; In the air spring rubber utricule, be blown into gases at high pressure through sulfurizing mould again; The air spring rubber utricule is expanded; Air spring rubber utricule and capsule after the expansion closely fit together, and capsule is closely overlayed on the shaping mould internal chamber wall of sulfurizing mould, and then sulfurizing mould is heated; Through heated capsule the air spring rubber utricule is carried out baking and handle, can make the air spring rubber utricule obtain the uniform heating vulcanizing treatment through the mode of capsule in the baking mould molding mould like this.
The material of above-mentioned capsule is the high-temperature resistant rubber material.
The material of above-mentioned capsule is preferably the high-temperature resistant rubber material identical with the rubber envelop materials of air spring rubber utricule.
When sulfurizing mould is heated, adopt high-temperature high-pressure steam that sulfurizing mould is heated.
The temperature of above-mentioned high-temperature high-pressure steam is that 160 degree~175 degree, pressure are 2.0~2.3Mpa.
Above-mentioned is 10~15 minutes through the capsule in the sulfurizing mould of heating to the time that the air spring rubber utricule carries out vulcanizing treatment.
The pressure of the above-mentioned gases at high pressure that in the air spring rubber utricule, are blown into through sulfurizing mould is 2~3Mpa.
The sulfurizing mould that is used for of the present invention a kind of air spring rubber utricule of said method; Comprise and be used for the top die Connection Block and the dip mold Connection Block that are connected with press; On top die Connection Block and dip mold Connection Block, be fixed with top die and dip mold respectively; On top die and dip mold, be with overcoat respectively, be formed with the high steam cavity volume between its external sleeve and top die and the dip mold, be provided with the bottoming hole that communicates with the high steam cavity volume on the coat; In top die and dip mold, be separately installed with the air spring capsule shaping mould through bolt; In the inner chamber of air spring capsule shaping mould, be provided with capsule, on dip mold, be provided with the air inlet pipe that can be blown into gases at high pressure to the air spring rubber utricule of putting into capsule.
Be installed between the end face of the air spring capsule shaping mould in top die and the dip mold and be lined with sealing ring.
Owing to adopted technique scheme; The present invention comes that through heated capsule the air spring rubber utricule is carried out baking and handles; And, the air spring rubber utricule is expanded through being blown into the mode of gases at high pressure, processed air spring rubber utricule is heated equably; And the present invention is through adopting the mode of elastomeric material heating rubber workpiece; Can guarantee effectively that processed workpiece is heated evenly, and can prevent effectively that processed rubber workpiece from producing phenomenons such as bubble, thereby reach better vulcanizing treatment effect.Through the miniature sleeve formula rubber air spring capsule that sulfuration process of the present invention processed; Its product qualified rate can reach more than 99%, and the miniature sleeve formula rubber air spring capsule that processes have the colloid material evenly, no bubble, long service life, advantages such as air-tightness is good, comfort is good.
Description of drawings
Fig. 1 is the structural representation of sulfurizing mould of the present invention.
Description of reference numerals: 1-top die Connection Block, 2-top die, 3-air spring capsule shaping mould, 4-capsule, 5-bolt; The 6-sealing ring, 7-air spring rubber utricule, 8-air inlet pipe, 9-high steam cavity volume; 10-dip mold Connection Block, 11-overcoat, 12-bottoming hole, 13-dip mold.
The specific embodiment
Below, in conjunction with accompanying drawing and embodiment the present invention is done further detailed description.
Embodiments of the invention: when existing air spring rubber utricule is carried out vulcanizing treatment; Adopt the sulfuration process of a kind of air spring rubber utricule of the present invention to handle; Promptly when the air spring rubber utricule 7 that adopts sulfurizing mould to not moulding carries out vulcanizing treatment; Earlier a capsule 4 is set in the inner chamber of sulfurizing mould shaping mould, then air spring rubber utricule 7 is put into the capsule 4 of sulfurizing mould, in air spring rubber utricule 7, be blown into gases at high pressure through sulfurizing mould again; Air spring rubber utricule 7 is expanded; Air spring rubber utricule 7 after the expansion closely fits together with capsule 4, and capsule 4 is closely overlayed on the shaping mould internal chamber wall of sulfurizing mould, and then sulfurizing mould is heated; Carry out baking through 4 pairs of air spring rubber utricules of heated capsule 7 and handle, can make air spring rubber utricule 7 obtain the uniform heating vulcanizing treatment through the mode of capsule 4 in the baking mould molding mould like this; The material of its capsule 4 can adopt existing high-temperature resistant rubber material, but preferably adopts the identical high-temperature resistant rubber material of rubber envelop materials with processed air spring rubber utricule 7.When sulfurizing mould is heated, preferably adopt high-temperature high-pressure steam that sulfurizing mould is heated, the temperature of its high-temperature high-pressure steam is that 160 degree~175 degree, pressure are 2.0~2.3Mpa; Carry out the scope that time that baking handles was controlled at 10~15 minutes through the 4 pairs of air spring rubber utricules of capsule 7 in the sulfurizing mould of heating; The pressure of the gases at high pressure that in air spring rubber utricule 7, are blown into through sulfurizing mould is 2~3Mpa.
When the sulfuration process of the air spring rubber utricule of embodiment of the present invention; Preferably adopt the sulfurizing mould of a kind of air spring rubber utricule of the present invention; This sulfurizing mould comprises the top die Connection Block 1 and dip mold Connection Block 2 that is used for being connected with press; During making, on top die Connection Block 1 and dip mold Connection Block 2, be fixed with top die 2 and dip mold 13 respectively, on top die 2 and dip mold 13, be with overcoat 11 respectively; Be formed with high steam cavity volume 9 between its external sleeve 11 and top die 2 and the dip mold 13, its external sleeve 11 is provided with the bottoming hole 2 that communicates with high steam cavity volume 9; In top die 2 and dip mold 13, be separately installed with air spring capsule shaping mould 3 through bolt 5; In the inner chamber of air spring capsule shaping mould 3, be provided with capsule 4, on dip mold 13, be provided with the air inlet pipe 8 that can be blown into gases at high pressure to the air spring rubber utricule 7 of putting into capsule 4; When processed workpiece air spring rubber utricule 7 is vulcanized processed, in order to reach better sealing effectiveness, can between the end face of the air spring capsule shaping mould 3 in being installed in top die 2 and dip mold 13, fill up a sealing ring 6.
When using sulfurizing mould of the present invention; Earlier top die Connection Block 1 and press pressure head are fixed; It can be moved up and down with the press pressure head, and dip mold Connection Block 10 is fixed on the workbench of press, add man-hour; First not two air spring rubber utricules 7 that are connected as a single entity of moulding are vertically put into the capsule 4 of the air spring capsule shaping mould 3 of dip mold 13; Open press then pressure head is moved downward, make air spring capsule shaping mould 3 contacts of dip mold, and be closely linked through sealing ring 6; After this in air spring rubber utricule 7, feed gases at high pressure through air inlet pipe 8; Pressure-controlled is at 2~3Mpa in making; In the high steam cavity volume 9 of top die 2, dip mold 13, charge into the high-temperature high-pressure steam medium respectively through bottoming hole 12; Can carry out vulcanizing treatment to air spring rubber utricule 7, capsule 4 like this, its sulfuration activity duration is controlled at 10~15 minutes scope; Through getting rid of gases at high pressure in the air inlet pipe 8, discharge the high-temperature high-pressure steam medium after accomplishing through bottoming hole 12; Start press then; Making pressure head drive top die Connection Block 1 integral body moves upward; Can take out two air spring rubber utricules 7 that are connected as a single entity that vulcanizate like this, it cut from the centre, can obtain two identical air spring rubber utricule 7 finished products with cutter.
When real work, can a plurality of sulfurizing moulds of the present invention be in parallel installed with the sulfuration operation of on press, evolving together, can increase work efficiency like this and energy savings.
When real work,, be preferably in traditional heater of cover on the overcoat 11, to guarantee steam constant temperature, the constant voltage in the high steam cavity volume 9 in order to guarantee steam constant temperature, the constant voltage in the high steam cavity volume 9.

Claims (9)

1. the sulfuration process of an air spring rubber utricule; It is characterized in that: when the air spring rubber utricule (7) that adopts sulfurizing mould to not moulding carries out vulcanizing treatment; A capsule (4) is set in the inner chamber of sulfurizing mould shaping mould earlier; Then air spring rubber utricule (7) is put into the capsule (4) of sulfurizing mould; In air spring rubber utricule (7), be blown into gases at high pressure through sulfurizing mould again, air spring rubber utricule (7) is expanded, the air spring rubber utricule (7) after the expansion closely fits together with capsule (4); And capsule (4) is closely overlayed on the shaping mould internal chamber wall of sulfurizing mould; And then sulfurizing mould heated, through heated capsule (4) air spring rubber utricule (7) is carried out baking and handle, can make air spring rubber utricule (7) obtain the uniform heating vulcanizing treatment through the mode of capsule (4) in the baking mould molding mould like this.
2. the sulfuration process of air spring rubber utricule according to claim 1 is characterized in that: the material of capsule (4) is the high-temperature resistant rubber material.
3. the sulfuration process of air spring rubber utricule according to claim 1 and 2 is characterized in that: the material of capsule (4) is the high-temperature resistant rubber material identical with the rubber envelop materials of air spring rubber utricule (7).
4. the sulfuration process of air spring rubber utricule according to claim 1 is characterized in that: when sulfurizing mould is heated, adopt high-temperature high-pressure steam that sulfurizing mould is heated.
5. the sulfuration process of air spring rubber utricule according to claim 4 is characterized in that: the temperature of described high-temperature high-pressure steam is that 160 degree~175 degree, pressure are 2.0~2.3Mpa.
6. the sulfuration process of air spring rubber utricule according to claim 1 is characterized in that: the capsule (4) through in the sulfurizing mould of heating is 10~15 minutes to the time that air spring rubber utricule (7) carries out vulcanizing treatment.
7. the sulfuration process of air spring rubber utricule according to claim 1 is characterized in that: the pressure of the gases at high pressure that in air spring rubber utricule (7), are blown into through sulfurizing mould is 2~3Mpa.
8. the sulfurizing mould of an air spring rubber utricule; Comprise and be used for the top die Connection Block (1) and the dip mold Connection Block (2) that are connected with press; It is characterized in that: on top die Connection Block (1) and dip mold Connection Block (2), be fixed with top die (2) and dip mold (13) respectively; On top die (2) and dip mold (13), be with overcoat (11) respectively; Be formed with high steam cavity volume (9) between its external sleeve (11) and top die (2) and the dip mold (13), its external sleeve (11) is provided with the bottoming hole (2) that communicates with high steam cavity volume (9); In top die (2) and dip mold (13), be separately installed with air spring capsule shaping mould (3) through bolt (5); In the inner chamber of air spring capsule shaping mould (3), be provided with capsule (4), on dip mold (13), be provided with the air inlet pipe (8) that can be blown into gases at high pressure to the air spring rubber utricule (7) of putting into capsule (4).
9. the sulfurizing mould of air spring rubber utricule according to claim 6 is characterized in that: be installed between the end face of the air spring capsule shaping mould (3) in top die (2) and the dip mold (13) and be lined with sealing ring (6).
CN201110105335.6A 2011-04-26 The sulfuration process of air spring rubber utricule and sulfurizing mould Expired - Fee Related CN102756444B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110105335.6A CN102756444B (en) 2011-04-26 The sulfuration process of air spring rubber utricule and sulfurizing mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110105335.6A CN102756444B (en) 2011-04-26 The sulfuration process of air spring rubber utricule and sulfurizing mould

Publications (2)

Publication Number Publication Date
CN102756444A true CN102756444A (en) 2012-10-31
CN102756444B CN102756444B (en) 2016-12-14

Family

ID=

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103277444A (en) * 2013-06-05 2013-09-04 优必胜(福建)机械工业有限公司 Buffer structure and machining process thereof
CN103817838A (en) * 2014-03-04 2014-05-28 青岛四方车辆研究所有限公司 Shaping device and shaping method for sulphuretted tyre germ of air spring
CN104416695A (en) * 2013-08-19 2015-03-18 青岛豪迈宏毅模具有限公司 Steam-type air spring capsule die
CN111572076A (en) * 2020-05-28 2020-08-25 中国人民解放军海军工程大学 Air spring forming method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1496804A (en) * 2002-10-10 2004-05-19 �����ؿ˿�������ϵͳ�������ι�˾ Forming of tabular diaphragm folding air bag and mounted in air spring of vehicle
DE10302884A1 (en) * 2003-01-25 2006-10-05 Contitech Luftfedersysteme Gmbh Curved tubular product, in particular a vehicle air spring, manufacture, involves pressure forming of tube with hot fluid against vulcanization tool wall
CN101549537A (en) * 2009-05-15 2009-10-07 周波 An air spring vulcanizing device
CN101612798A (en) * 2008-12-12 2009-12-30 青岛四方车辆研究所有限公司 The manufacture method of air spring capsule of belt type
JP2010058396A (en) * 2008-09-04 2010-03-18 Bridgestone Corp Method of manufacturing diaphragm for air spring and diaphragm for air spring
CN201573304U (en) * 2009-11-16 2010-09-08 青岛四方车辆研究所有限公司 Vulcanization mold for air spring rubber bag
CN202011100U (en) * 2011-04-26 2011-10-19 贵州大学 Vulcanization mold for rubber air spring capsule bodies

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1496804A (en) * 2002-10-10 2004-05-19 �����ؿ˿�������ϵͳ�������ι�˾ Forming of tabular diaphragm folding air bag and mounted in air spring of vehicle
DE10302884A1 (en) * 2003-01-25 2006-10-05 Contitech Luftfedersysteme Gmbh Curved tubular product, in particular a vehicle air spring, manufacture, involves pressure forming of tube with hot fluid against vulcanization tool wall
JP2010058396A (en) * 2008-09-04 2010-03-18 Bridgestone Corp Method of manufacturing diaphragm for air spring and diaphragm for air spring
CN101612798A (en) * 2008-12-12 2009-12-30 青岛四方车辆研究所有限公司 The manufacture method of air spring capsule of belt type
CN101549537A (en) * 2009-05-15 2009-10-07 周波 An air spring vulcanizing device
CN201573304U (en) * 2009-11-16 2010-09-08 青岛四方车辆研究所有限公司 Vulcanization mold for air spring rubber bag
CN202011100U (en) * 2011-04-26 2011-10-19 贵州大学 Vulcanization mold for rubber air spring capsule bodies

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103277444A (en) * 2013-06-05 2013-09-04 优必胜(福建)机械工业有限公司 Buffer structure and machining process thereof
CN104416695A (en) * 2013-08-19 2015-03-18 青岛豪迈宏毅模具有限公司 Steam-type air spring capsule die
CN103817838A (en) * 2014-03-04 2014-05-28 青岛四方车辆研究所有限公司 Shaping device and shaping method for sulphuretted tyre germ of air spring
CN111572076A (en) * 2020-05-28 2020-08-25 中国人民解放军海军工程大学 Air spring forming method

Similar Documents

Publication Publication Date Title
CN103481422B (en) A kind of energy-saving tire vulcanizer and tyre vulcanizing
CN209534068U (en) A kind of injection mold
CN101337411B (en) Rubber transmission belt vulcanizing device
CN100581780C (en) Radial tyre injection type vulcanizing capsule mold
CN110355961A (en) A kind of side-blown demoulding mechanism of pin plug
CN206926198U (en) A kind of automotive upholstery production injection mould
CN205631139U (en) Improvement formula tire sulfurization capsule
CN202011100U (en) Vulcanization mold for rubber air spring capsule bodies
CN201931571U (en) Rubber tire vulcanizing mould
CN102756444A (en) Vulcanization process and vulcanization tool of air spring rubber capsule
CN209409084U (en) A kind of fluid pressure type rubber air spring capsule-free vulcanization machine
CN207915930U (en) A kind of production mould of rubber product
CN102756444B (en) The sulfuration process of air spring rubber utricule and sulfurizing mould
CN217257710U (en) Tire vulcanization capsule for promoting drainage of condensed water
CN203427243U (en) Joint vulcanizing device of seabed cable factory
CN202517705U (en) Material compression gas supply system for forming mechanism of sheet forming machine
CN108481768A (en) Machine and mold integrated vulcanizing machine and its method
CN103192469B (en) A kind of tyre tube vulcanizer technique
CN205997285U (en) A kind of die venting structure
CN201231551Y (en) Vulcanizing plant of rubber transmission belt
CN204844675U (en) Structure is prevented vulcanizing by injection mold feeding piece
CN115246184A (en) Central vulcanizing chamber structure of hollow tire vulcanizing machine and using method thereof
CN204149376U (en) A kind of miniature sleeve formula air spring leather bag sulfurizing mould
CN113084083A (en) Integrated lost foam mold
CN212498800U (en) Quick demoulding structure of injection molding

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161214

Termination date: 20190426