Debugging-free composite communication device and method for electric vehicle charging station Download PDFInfo
- Publication number
- CN102752299A CN102752299A CN2012102234230A CN201210223423A CN102752299A CN 102752299 A CN102752299 A CN 102752299A CN 2012102234230 A CN2012102234230 A CN 2012102234230A CN 201210223423 A CN201210223423 A CN 201210223423A CN 102752299 A CN102752299 A CN 102752299A
- Authority
- CN
- China
- Prior art keywords
- processing module
- charging station
- data
- module
- charging device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004891 communication Methods 0.000 title claims abstract description 70
- 238000000034 method Methods 0.000 title abstract description 16
- 239000002131 composite material Substances 0.000 title abstract 5
- 238000012545 processing Methods 0.000 claims abstract description 75
- 238000006243 chemical reaction Methods 0.000 claims abstract description 54
- 238000005259 measurement Methods 0.000 claims abstract description 33
- 239000013307 optical fiber Substances 0.000 claims abstract description 5
- 239000000835 fiber Substances 0.000 claims description 22
- 230000006870 function Effects 0.000 claims description 3
- 238000003860 storage Methods 0.000 claims description 3
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 230000008569 process Effects 0.000 abstract description 2
- 238000013461 design Methods 0.000 description 2
- 230000003993 interaction Effects 0.000 description 2
- 238000007726 management method Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Images
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210223423.0A CN102752299B (en) | 2012-06-29 | 2012-06-29 | Debugging-free composite communication device and method for electric vehicle charging station |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210223423.0A CN102752299B (en) | 2012-06-29 | 2012-06-29 | Debugging-free composite communication device and method for electric vehicle charging station |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102752299A true CN102752299A (en) | 2012-10-24 |
CN102752299B CN102752299B (en) | 2014-12-10 |
Family
ID=47032199
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210223423.0A Active CN102752299B (en) | 2012-06-29 | 2012-06-29 | Debugging-free composite communication device and method for electric vehicle charging station |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102752299B (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104298636A (en) * | 2014-09-28 | 2015-01-21 | 许继电气股份有限公司 | Embedded communication service system |
CN105025056A (en) * | 2014-04-25 | 2015-11-04 | 上海迪爱斯通信设备有限公司 | Internet of Things information collection and monitoring system design method |
CN106505655A (en) * | 2016-09-19 | 2017-03-15 | 上海咔酷咔新能源科技有限公司 | Charging equipment network access device and its network activation method |
CN106920033A (en) * | 2017-01-23 | 2017-07-04 | 北京国网普瑞特高压输电技术有限公司 | Direct-current charging post accesses the system and method for electrically-charging equipment operation management platform |
CN108924248A (en) * | 2018-07-26 | 2018-11-30 | 西亭骏 | A kind of charging pile operating status management method based on artificial intelligence |
CN110149344A (en) * | 2019-06-06 | 2019-08-20 | 郑州天迈科技股份有限公司 | Instrument docks remote configuration system |
CN113352925A (en) * | 2015-07-10 | 2021-09-07 | Lg伊诺特有限公司 | Apparatus and method for charging electric vehicle |
DE102020127626A1 (en) | 2020-10-20 | 2022-04-21 | innogy eMobility Solutions GmbH | Computer-implemented method and device for local load management of charging stations for charging electric vehicles in a charging station system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201726413U (en) * | 2010-07-14 | 2011-01-26 | 天津市双源天瑞科技有限公司 | Communication manager |
US20110238341A1 (en) * | 2010-03-25 | 2011-09-29 | Mehdi Etezadi-Amoli | High Power DC Kilowatt Hour Meter |
CN202141931U (en) * | 2011-07-13 | 2012-02-08 | 山东电力研究院 | Electric automobile charging station intelligent protocol converter based on AT 96 bus architecture |
CN202652259U (en) * | 2012-06-29 | 2013-01-02 | 山东电力集团公司电力科学研究院 | Electric automobile charging station debugging-free compound communication apparatus |
-
2012
- 2012-06-29 CN CN201210223423.0A patent/CN102752299B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110238341A1 (en) * | 2010-03-25 | 2011-09-29 | Mehdi Etezadi-Amoli | High Power DC Kilowatt Hour Meter |
CN201726413U (en) * | 2010-07-14 | 2011-01-26 | 天津市双源天瑞科技有限公司 | Communication manager |
CN202141931U (en) * | 2011-07-13 | 2012-02-08 | 山东电力研究院 | Electric automobile charging station intelligent protocol converter based on AT 96 bus architecture |
CN202652259U (en) * | 2012-06-29 | 2013-01-02 | 山东电力集团公司电力科学研究院 | Electric automobile charging station debugging-free compound communication apparatus |
Non-Patent Citations (1)
Title |
---|
叶剑斌,等: "电动汽车充换电站集中监控系统设计", 《2011电力系统自动化专委会学术交流研讨会论文集》, 1 November 2011 (2011-11-01), pages 1 - 6 * |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105025056A (en) * | 2014-04-25 | 2015-11-04 | 上海迪爱斯通信设备有限公司 | Internet of Things information collection and monitoring system design method |
CN104298636A (en) * | 2014-09-28 | 2015-01-21 | 许继电气股份有限公司 | Embedded communication service system |
CN113352925A (en) * | 2015-07-10 | 2021-09-07 | Lg伊诺特有限公司 | Apparatus and method for charging electric vehicle |
CN106505655A (en) * | 2016-09-19 | 2017-03-15 | 上海咔酷咔新能源科技有限公司 | Charging equipment network access device and its network activation method |
CN106505655B (en) * | 2016-09-19 | 2018-11-27 | 上海咔酷咔新能源科技有限公司 | Charging equipment network access device and its network activation method |
CN106920033A (en) * | 2017-01-23 | 2017-07-04 | 北京国网普瑞特高压输电技术有限公司 | Direct-current charging post accesses the system and method for electrically-charging equipment operation management platform |
CN108924248A (en) * | 2018-07-26 | 2018-11-30 | 西亭骏 | A kind of charging pile operating status management method based on artificial intelligence |
CN110149344A (en) * | 2019-06-06 | 2019-08-20 | 郑州天迈科技股份有限公司 | Instrument docks remote configuration system |
CN110149344B (en) * | 2019-06-06 | 2022-03-22 | 郑州天迈科技股份有限公司 | Instrument docking remote configuration system |
DE102020127626A1 (en) | 2020-10-20 | 2022-04-21 | innogy eMobility Solutions GmbH | Computer-implemented method and device for local load management of charging stations for charging electric vehicles in a charging station system |
Also Published As
Publication number | Publication date |
---|---|
CN102752299B (en) | 2014-12-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102752299A (en) | Debugging-free composite communication device and method for electric vehicle charging station | |
CN106585413B (en) | The method of more direct-current charging post parallel connection automatic chargings | |
CN101465564B (en) | In-situ digitalization method and apparatus for transforming plant primary equipment | |
CN103269125B (en) | Multifunctional integrated configuration platform system of secondary equipment of intelligent substation | |
CN109494418B (en) | Battery core sampling device and method of battery management system | |
CN104300604A (en) | Monitoring system for electric vehicle charging and converting station | |
CN206498431U (en) | Crossover hybrid network based on protocol conversion bridger | |
CN100470976C (en) | Integrated automation converting station debugging apparatus | |
CN102279581B (en) | Integral test device for pico-satellite | |
CN201550111U (en) | Network data converting device based on power line carrier communication | |
CN203849595U (en) | Modularized structure for distributed greenhouse integrated environment intelligent regulation and control system on-site controller | |
CN108011794A (en) | The packet storage and remote measurement method and system to communicate between charger and BMS | |
CN104796356A (en) | Vehicle-mounted Ethernet switch and signal transceiving and train reconnecting method for railway vehicles | |
CN101931434A (en) | Network data conversion device based on power line carrier communication and conversion method thereof | |
CN102084220B (en) | Method for remotely reading electric meters | |
CN204481852U (en) | Vehicle-mounted Ethernet switch used for rail vehicle | |
CN101726708B (en) | Battery voltage data acquisition system | |
CN101311959A (en) | Preposing subsystem of electric power scheduling automatization system | |
CN205239183U (en) | Charging cable | |
CN205377882U (en) | Charging station distribution management system based on 485 difference network | |
CN202652259U (en) | Electric automobile charging station debugging-free compound communication apparatus | |
CN207200769U (en) | A kind of data acquisition device | |
CN201976131U (en) | Multi-interface data communication concentrator of automatic weather station | |
CN103248519A (en) | Fault auxiliary analysis and short message warning system for communication station | |
CN100424965C (en) | The communication method of the distributed PC bus protection without the main station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: STATE GRID CORPORATION OF CHINA Free format text: FORMER OWNER: ELECTRIC POWER RESEARCH INSTITUTE, STATE GRID SHANDONG ELECTRIC POWER COMPANY Effective date: 20141008 Owner name: ELECTRIC POWER RESEARCH INSTITUTE, STATE GRID SHAN Free format text: FORMER OWNER: STATE GRID CORPORATION OF CHINA Effective date: 20141008 |
|
C41 | Transfer of patent application or patent right or utility model | ||
C53 | Correction of patent of invention or patent application | ||
CB02 | Change of applicant information |
Address after: Wang Yue Central Road Ji'nan City, Shandong province 250002 City No. 2000 Applicant after: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER Co. Applicant after: State Grid Corporation of China Address before: 250002, No. 1, South Second Ring Road, Shizhong District, Shandong, Ji'nan Applicant before: ELECTRIC POWER RESEARCH INSTITUTE OF SHANDONG ELECTRIC POWER Corp. Applicant before: State Grid Corporation of China |
|
COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: SHANDONG ELECTRIC POWER SCIENCE AND RESEARCH INSTITUTE, SHANDONG ELECTRIC POWER CORPORATION TO: ELECTRIC POWER RESEARCH INSTITUTE, STATE GRID SHANDONG ELECTRIC POWER COMPANY Free format text: CORRECT: ADDRESS; FROM: 250002 JINAN, SHANDONG PROVINCE TO: 100031 XICHENG, BEIJING |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20141008 Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Applicant after: State Grid Corporation of China Applicant after: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER Co. Applicant after: SHANDONG LUNENG INTELLIGENCE TECHNOLOGY Co.,Ltd. Address before: Wang Yue Central Road Ji'nan City, Shandong province 250002 City No. 2000 Applicant before: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER Co. Applicant before: State Grid Corporation of China |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Co-patentee after: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER Co. Patentee after: STATE GRID CORPORATION OF CHINA Co-patentee after: National Network Intelligent Technology Co.,Ltd. Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Co-patentee before: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER Co. Patentee before: State Grid Corporation of China Co-patentee before: SHANDONG LUNENG INTELLIGENCE TECHNOLOGY Co.,Ltd. |
|
TR01 | Transfer of patent right |
Effective date of registration: 20210302 Address after: 100031 No. 86 West Chang'an Avenue, Beijing, Xicheng District Patentee after: STATE GRID CORPORATION OF CHINA Patentee after: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER Co. Patentee after: Shandong Luneng Software Technology Co.,Ltd. intelligent electrical branch Address before: 100031 No. 86 West Chang'an Avenue, Beijing, Xicheng District Patentee before: STATE GRID CORPORATION OF CHINA Patentee before: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER Co. Patentee before: National Network Intelligent Technology Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100031 No. 86 West Chang'an Avenue, Beijing, Xicheng District Patentee after: STATE GRID CORPORATION OF CHINA Patentee after: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER Co. Patentee after: Shandong luruan Digital Technology Co.,Ltd. smart energy branch Address before: 100031 No. 86 West Chang'an Avenue, Beijing, Xicheng District Patentee before: STATE GRID CORPORATION OF CHINA Patentee before: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER Co. Patentee before: Shandong Luneng Software Technology Co.,Ltd. intelligent electrical branch |
|
CP01 | Change in the name or title of a patent holder |