一种输电线路塔位地形测量的数据处理及成图方法 Download PDFInfo
- Publication number
- CN102750413B CN102750413B CN201210203243.6A CN201210203243A CN102750413B CN 102750413 B CN102750413 B CN 102750413B CN 201210203243 A CN201210203243 A CN 201210203243A CN 102750413 B CN102750413 B CN 102750413B
- Authority
- CN
- China
- Prior art keywords
- data
- engineering
- point
- topographic
- tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210203243.6A CN102750413B (zh) | 2012-06-19 | 2012-06-19 | 一种输电线路塔位地形测量的数据处理及成图方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210203243.6A CN102750413B (zh) | 2012-06-19 | 2012-06-19 | 一种输电线路塔位地形测量的数据处理及成图方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102750413A CN102750413A (zh) | 2012-10-24 |
CN102750413B true CN102750413B (zh) | 2014-11-05 |
Family
ID=47030595
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210203243.6A Active CN102750413B (zh) | 2012-06-19 | 2012-06-19 | 一种输电线路塔位地形测量的数据处理及成图方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102750413B (zh) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103884319B (zh) * | 2014-03-13 | 2016-10-12 | 内蒙古电力勘测设计院有限责任公司 | 免全站仪的塔基断面图测量方法和设备 |
CN104091005B (zh) * | 2014-06-30 | 2017-10-27 | 中国能源建设集团浙江省电力设计院有限公司 | 一种架空送电线路工程测量内外业一体化系统 |
CN104406582B (zh) * | 2014-11-28 | 2017-02-22 | 中国石油天然气集团公司 | 一种基于测井信息建立的平面井位导航系统及方法 |
CN104899371B (zh) * | 2015-06-03 | 2018-03-23 | 国核电力规划设计研究院 | 输电线路勘测方法及装置 |
CN106557600A (zh) * | 2015-09-30 | 2017-04-05 | 中国电力科学研究院 | 一种输电塔长短腿及基础的仿真方法 |
CN105466391B (zh) * | 2015-11-18 | 2017-12-15 | 中国能源建设集团江苏省电力设计院有限公司 | 利用数字高程模型与外业数据修正生成塔基断面的方法 |
CN105590006A (zh) * | 2016-01-28 | 2016-05-18 | 北京恒华伟业科技股份有限公司 | 一种线路测量数据的处理方法和装置 |
CN106126806B (zh) * | 2016-06-22 | 2019-07-30 | 宁夏回族自治区电力设计院 | 一种输电线路基础配置中塔基成图方法 |
CN108650242B (zh) * | 2018-04-23 | 2020-07-10 | 中国石油天然气集团有限公司 | 一种保密地形图传输方法、系统及系统使用方法 |
CN111611664B (zh) * | 2020-04-28 | 2024-03-15 | 山东电力工程咨询院有限公司 | 一种输电线路路径选择方法及系统 |
CN112381934B (zh) * | 2020-09-28 | 2023-08-15 | 中国电建集团河北省电力勘测设计研究院有限公司 | 一种基于激光点云的线路塔基地形自动提取与成图方法 |
CN113642953B (zh) * | 2021-07-21 | 2023-10-24 | 中国电力工程顾问集团中南电力设计院有限公司 | 一种输电线路物料运输设计方法及系统 |
CN113642058A (zh) * | 2021-08-05 | 2021-11-12 | 国核电力规划设计研究院重庆有限公司 | 一种输电线路铁塔塔基断面图自动绘制方法 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101178310A (zh) * | 2007-12-12 | 2008-05-14 | 河北省电力勘测设计研究院 | 利用全数字化摄影测量技术进行输电线路勘测设计内外业一体化的方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100521593B1 (ko) * | 2002-07-09 | 2005-10-12 | 현대자동차주식회사 | 분체 성형용 열가소성 엘라스토머 조성물 |
-
2012
- 2012-06-19 CN CN201210203243.6A patent/CN102750413B/zh active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101178310A (zh) * | 2007-12-12 | 2008-05-14 | 河北省电力勘测设计研究院 | 利用全数字化摄影测量技术进行输电线路勘测设计内外业一体化的方法 |
Non-Patent Citations (2)
Title |
---|
"提高输电线路终勘测量工作效率的方法";仲锋等;《现代测绘》;20100731;第33卷(第4期);33-34、37 * |
仲锋等."提高输电线路终勘测量工作效率的方法".《现代测绘》.2010,第33卷(第4期),33-34、37. * |
Also Published As
Publication number | Publication date |
---|---|
CN102750413A (zh) | 2012-10-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102750413B (zh) | 一种输电线路塔位地形测量的数据处理及成图方法 | |
CN102434210B (zh) | 地下工程画像信息与监测信息安全监控的方法与系统 | |
CN110030972A (zh) | 基于ExcelVBA的隧道超欠挖检测方法 | |
CN101964009B (zh) | 一种基于insar制作3d产品的系统及方法 | |
CN111191307B (zh) | 一种基于bim+gis技术的土方工程虚拟施工方法 | |
CN113360587B (zh) | 一种基于gis技术的土地测绘设备及测绘方法 | |
CN105930865B (zh) | 城市建设用地分类提取及评估方法 | |
Cintra et al. | New method for positional cartographic quality control in digital mapping | |
Drobnjak et al. | Central geospatial database analysis of the quality of road infrastructure data | |
CN104462649B (zh) | 一种矿体块段模型储量的自动更新方法 | |
Antoljak | Geotechnical BIM in 2020 | |
Guo-an et al. | Evaluation on the accuracy of digital elevation models | |
CN102467573B (zh) | 数字测图简拼编码法和内部排序法为辅的最短距离排序法 | |
Mason et al. | An analysis of a methodology for generating watershed parameters using GIS | |
CN115100373A (zh) | 地表与地下环境三维一体化表征方法、装置、介质及设备 | |
Gopalan | WRAPHydro data model: finding input parameters for the water rights analysis package | |
Johnston et al. | Evaluation of catchment delineation methods for the medium-resolution National Hydrography Dataset | |
CN113449362A (zh) | 基于5g移动网络的道路勘察设计方法及系统 | |
CN113344866A (zh) | 一种点云综合精度评价方法 | |
CN111858808A (zh) | 基于海量实测点的地形图特征地物精度自动评价方法 | |
Musungu | Assessing spatial data quality of participatory GIS studies: A case study in Cape Town | |
CN104134158A (zh) | 一种核电厂景观干扰分析方法 | |
CN114970361B (zh) | 一种三维流体场建模及矿石资源量预测方法及系统 | |
CN114820238B (zh) | 一种农民建房选址野外实时分析方法 | |
CN112114201B (zh) | 强电磁场环境下提高变电站沉降监测精度的方法及系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Xin Inventor after: Chen Zhengyu Inventor after: Qin Zhen Inventor after: Xu Junmin Inventor after: Wang Cong Inventor after: Jing Shaoping Inventor after: Zhu Jian Inventor after: Zhu Haodong Inventor after: Mao Aiming Inventor after: Hu Liangming Inventor after: Zhong Juncheng Inventor before: Li Xin Inventor before: Xu Junmin Inventor before: Chen Zhengyu Inventor before: Zhu Haodong |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: LI XIN XU JUNMIN CHEN ZHENGYU ZHU HAODONG TO: LI XIN XU JUNMIN WANG CONG JING SHAOPING ZHU JIAN ZHU HAODONG MAO AIMING HU LIANGMING ZHONG JUNCHENG CHEN ZHENGYU QIN ZHEN |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: CHINA ENERGY ENGINEERING GROUP JIANGSU ELECTRIC PO Free format text: FORMER NAME: JIANGSU ELECTRIC POWER DESIGNING INST. |
|
CP01 | Change in the name or title of a patent holder |
Address after: 210009 Gulou District, Jiangsu, Nanjing new model road, No. 5 Patentee after: Chinese energy construction group Jiangsu Prov. Power Design Inst Co., Ltd Address before: 210009 Gulou District, Jiangsu, Nanjing new model road, No. 5 Patentee before: Jiangsu Electric Power Designing Institute |