CN102747235B - Method for smelting and producing copper by spray gun adhering slag type Ausmelt furnace - Google Patents

Method for smelting and producing copper by spray gun adhering slag type Ausmelt furnace Download PDF

Info

Publication number
CN102747235B
CN102747235B CN201210267250.2A CN201210267250A CN102747235B CN 102747235 B CN102747235 B CN 102747235B CN 201210267250 A CN201210267250 A CN 201210267250A CN 102747235 B CN102747235 B CN 102747235B
Authority
CN
China
Prior art keywords
spray gun
liquid level
seconds
dross
remaining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210267250.2A
Other languages
Chinese (zh)
Other versions
CN102747235A (en
Inventor
骆袆
姜志雄
袁双喜
赵祥林
李立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daye Nonferrous Metals Co Ltd
Original Assignee
Daye Nonferrous Metals Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daye Nonferrous Metals Co Ltd filed Critical Daye Nonferrous Metals Co Ltd
Priority to CN201210267250.2A priority Critical patent/CN102747235B/en
Publication of CN102747235A publication Critical patent/CN102747235A/en
Application granted granted Critical
Publication of CN102747235B publication Critical patent/CN102747235B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manufacture And Refinement Of Metals (AREA)

Abstract

The invention discloses a method for smelting and producing copper by a spray gun adhering slag type Ausmelt furnace. The method comprises the following steps: starting the Ausmelt furnace, gradually feeding and heating to form a molten bath, when the liquid level height of the molten bath is 1.7 m, carrying out spray gun three-step adhering slag, that is to say, a first step: descending a spray gun to be 100 mm above the liquid level, remaining for 60 seconds, descending to be level to the liquid level, remaining for 60-90 seconds, ascending the gun to be 2300 mm above the liquid level and remaining for 60 seconds; second step: descending the spray gun to be 200 mm below the liquid level, remaining for 60 seconds, ascending the gun to be 2300 mm above the liquid level and remaining for 60 seconds; third step: descending the spray gun to be 200 mm below the liquid level, remaining for 60 seconds, adding lump coal to solution for 10 seconds, ascending the gun to be 2300 mm above the liquid level and remaining for 60 seconds. The spray gun is descended to be 300-350 mm below the liquid level, and the material is fed to produce continuously, through the three-step adhering slag, the slag is uniformly attached on the outer wall of the spray gun, so that the spray gun is protected, the fluctuating frequency of the furnace temperature is reduced, the service life of a furnace body is prolonged, and the method is mainly used for smelting copper.

Description

Spray gun dross formula Ausmelt furnace copper melting production method
(i) technical field: the present invention relates to metallurgical industry production technology and improve, especially a kind of spray gun dross formula Ausmelt furnace copper melting production method.
(ii) background technology: Ausmelt furnace smelting bath smelting process is one of current copper main method of smelting, exhaustion along with worldwide Mineral resources, copper mine taste is more and more lower, although technique of preparing is updated, but copper ore concentrates quality still increasingly and under, Ausmelt furnace smelting bath smelting process with it strong adaptability to raw material show one's talent.Ausmelt furnace adopts oxygen-enriched top blowing technology, and wind, oxygen, fine coal are advertised and entered molten bath by spray gun, at gun slot mixing chamber, mixes and vigorous reaction, constantly stirs molten bath, the transmission of acceleransstoff and heat when heat is provided.The production process of existing Ausmelt furnace is: first start Ausmelt furnace, progressively feed intake and add thermosetting molten bath, when bath surface height reaches after 1.7m height, adopt spray gun down to the following 300-350mm of liquid level, feed intake and produce continuously.Lance head is immersed in high-temperature fusant the inside, be subject to the souring of the softening and high-temperature fusant of high temperature, scaling loss very easily, cause spray gun short work-ing life, cause because of the large production cost of lance head again welding frequency high, because furnace temperature fluctuation frequently makes converter life, shorten, the low situations such as production task that affect of rate occur when blowing in.In copper matte smelting process, due to Fe 3o 4existence, the cooling of furnace slag of splash is set in (dross) on spray gun wall spray gun wall and high-temperature fusant is separated, and can protect spray gun not to be subject to washing away of high-temperature fusant, thereby extends the work-ing life of spray gun.Under the little situation in lance head material improvement space, have only by exploring the dross novel technique of spray gun, extend the work-ing life of spray gun.
(iii) summary of the invention: object of the present invention will solve in existing Ausmelt furnace production process exactly, the easy scaling loss of spray gun, work-ing life is short, the large production cost of welding frequency is high again to cause lance head, furnace temperature fluctuation frequently makes converter life shorten, the problems such as while blowing in, rate is low, and turnout is low, provide a kind of spray gun dross formula Ausmelt furnace copper melting production method.
Concrete scheme of the present invention is: spray gun dross formula Ausmelt furnace copper melting production method, first start Ausmelt furnace, progressively feed intake and add thermosetting molten bath, when bath surface height reaches after 1.7m height, adopt spray gun down to the following 300-350mm of liquid level, feed intake and produce continuously, it is characterized in that: at spray gun, down to liquid level, feed intake before production, carry out spray gun " three steps " dross: the first step a: dross, the above 100mm of liquid level will be arrived under spray gun, stop 60 seconds, again by spray gun down to concordant with liquid level, stop 60-90 second, then mention spray gun to liquid level top 2300mm, stop 60 seconds, second step: secondary dross, by arriving the following 200mm of liquid level under spray gun, stop 60 seconds, then mention spray gun to the above 2300mm of liquid level, stop 60 seconds, the 3rd step: thickening dross, by under spray gun to the following 200mm of liquid level, stop 60 seconds, add lump coal to solution 10 seconds, then mention spray gun to the above 2300mm of liquid level, stop 60 seconds, complete spray gun " three steps " dross.
The present invention is before spray gun inserts molten bath work; three step dross have been carried out; can be evenly thereby make Ausmelt furnace spray gun immerse melt section and above heated part thereof, dross effectively; formed protective layer; make spray gun can directly not be subject to washing away of high temperature solution; reduced the heat effect of high temperature to spray gun stainless steel structure simultaneously; greatly extended the work-ing life of spray gun (head); reduced the rehabilitation cost of spray gun; reduced the furnace temperature fluctuation frequency simultaneously; extend converter life, improved rate improving yield while blowing in.
(iv) embodiment:
Application the present invention carries out the melting of Ausmelt furnace copper and produces: first start Ausmelt furnace, progressively feed intake and add thermosetting molten bath, when bath surface height reaches after 1.7m height, carry out spray gun " three steps " dross: the first step: a dross, by arriving the above 100mm of liquid level under spray gun, stops 60 seconds, now from standby burner hole, observe to be interrupted and see flame, coal ash splashes on a small quantity, has nano sized particles to splash, height 3-5m; Again by spray gun down to concordant with liquid level, stop 60-90 second, now from standby burner hole, observe and can't see flame, spray gun sound step-down is heavy; The coal ash rolling of splashing in a large number can be interrupted and see that garnet small-particle melt splashes in the coal ash of rolling, and particle approximately looks like soya bean size, and the height that splashes can reach 15m; Then mention spray gun to liquid level top 2300mm, stops 60 seconds, now away from molten bath, can reduce flame that rifle head sprays and coal ash to the washing away of the slag of firm extension, the slag on rifle wall also has enough cooling times and space.Second step: secondary dross, by arriving the following 200mm of liquid level under spray gun, stop 60 seconds, now from standby burner hole, to observe and can't see flame, the change of spray gun sound adds overcast, and rifle starts to swing; The coal ash rolling of splashing in a large number can be interrupted and see that larger slabbing garnet melt splashes, the about 2-3cm of melt in the coal ash of rolling 3, highly most of 5-8m that splashes, a small amount of less flying to about 10m; Mention again spray gun to the above 2300mm of liquid level, stop 60 seconds, allow the slag cooled and solidified of hanging on rifle wall.The 3rd step: thickening dross, by under spray gun to the following 200mm of liquid level, stop 60 seconds, add lump coal to solution 10 seconds, then mention spray gun to the above 2300mm of liquid level, stop 60 seconds, the slag of again hanging on cooling gun wall, completes spray gun " three steps " dross; Finally adopt spray gun down to the following 300-350mm of liquid level, feed intake and produce continuously.

Claims (1)

1. spray gun dross formula Ausmelt furnace copper melting production method, first start Ausmelt furnace, progressively feed intake and add thermosetting molten bath, when bath surface height reaches after 1.7m height, adopt spray gun down to the following 300-350mm of liquid level, feed intake and produce continuously, it is characterized in that: at spray gun, down to liquid level, feed intake before production, carry out spray gun " three steps " dross: the first step: a dross, by arriving the above 100mm of liquid level under spray gun, stops 60 seconds, again by spray gun down to concordant with liquid level, stop 60-90 second, then mention spray gun to liquid level top 2300mm, stop 60 seconds; Second step: secondary dross, by arriving the following 200mm of liquid level under spray gun, stop 60 seconds, then mention spray gun to the above 2300mm of liquid level, stop 60 seconds; The 3rd step: thickening dross, by under spray gun to the following 200mm of liquid level, stop 60 seconds, add lump coal to solution 10 seconds, then mention spray gun to the above 2300mm of liquid level, stop 60 seconds, complete spray gun " three steps " dross.
CN201210267250.2A 2012-07-31 2012-07-31 Method for smelting and producing copper by spray gun adhering slag type Ausmelt furnace Active CN102747235B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210267250.2A CN102747235B (en) 2012-07-31 2012-07-31 Method for smelting and producing copper by spray gun adhering slag type Ausmelt furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210267250.2A CN102747235B (en) 2012-07-31 2012-07-31 Method for smelting and producing copper by spray gun adhering slag type Ausmelt furnace

Publications (2)

Publication Number Publication Date
CN102747235A CN102747235A (en) 2012-10-24
CN102747235B true CN102747235B (en) 2014-04-02

Family

ID=47027722

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210267250.2A Active CN102747235B (en) 2012-07-31 2012-07-31 Method for smelting and producing copper by spray gun adhering slag type Ausmelt furnace

Country Status (1)

Country Link
CN (1) CN102747235B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104928474B (en) * 2015-07-08 2017-03-01 吉林吉恩镍业股份有限公司 A kind of method extending Ausmelt furnace spray gun service life
CN110564976B (en) * 2019-10-17 2021-05-14 大冶有色金属有限责任公司 Process method for automatically dropping spray gun weight of Ausmelt furnace
CN112430745B (en) * 2020-11-11 2023-01-31 昆明理工大学 Slag adhering method for oxygen-enriched top-blown immersion smelting lead-smelting process spray gun
CN114657395A (en) * 2022-03-17 2022-06-24 云南锡业股份有限公司锡业分公司 Method for prolonging service life of refractory material of tin smelting Osmant furnace

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19737220A1 (en) * 1997-08-27 1999-03-04 Oschatz Gmbh Metallurgical furnace for production of nonferrous metals from a melt by ausmelt technology
CN2854470Y (en) * 2005-12-19 2007-01-03 彭明求 Side-blown submerged bath smelting furnace
CN101487070A (en) * 2009-02-23 2009-07-22 钢铁研究总院 Method for improving combined blown converter campaign length by metal furnace cinder composite mushroom
CN201715872U (en) * 2010-06-28 2011-01-19 绍兴曙光机械有限公司 Copper cooling device of Ausmelt furnace
CN102140585A (en) * 2011-03-11 2011-08-03 吉林吉恩镍业股份有限公司 Method for smelting nickel ore concentrate by using smelting furnace

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19737220A1 (en) * 1997-08-27 1999-03-04 Oschatz Gmbh Metallurgical furnace for production of nonferrous metals from a melt by ausmelt technology
CN2854470Y (en) * 2005-12-19 2007-01-03 彭明求 Side-blown submerged bath smelting furnace
CN101487070A (en) * 2009-02-23 2009-07-22 钢铁研究总院 Method for improving combined blown converter campaign length by metal furnace cinder composite mushroom
CN201715872U (en) * 2010-06-28 2011-01-19 绍兴曙光机械有限公司 Copper cooling device of Ausmelt furnace
CN102140585A (en) * 2011-03-11 2011-08-03 吉林吉恩镍业股份有限公司 Method for smelting nickel ore concentrate by using smelting furnace

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
澳斯麦特镍精矿富氧顶吹熔池熔炼技术与实践;王玮;《有色冶金设计与研究》;20101231;参见全文 *
王玮.澳斯麦特镍精矿富氧顶吹熔池熔炼技术与实践.《有色冶金设计与研究》.2010,
顶吹熔炼炉中喷枪寿命的探讨;魏涛等;《科学技术与工程》;20091031;参见其第5778页右栏第2段,5780页右栏第3段喷枪挂渣操作的因素 *
魏涛等.顶吹熔炼炉中喷枪寿命的探讨.《科学技术与工程》.2009,

Also Published As

Publication number Publication date
CN102747235A (en) 2012-10-24

Similar Documents

Publication Publication Date Title
CN106367605B (en) A kind of production method of side-blown dilution copper smelting slag
CN102747235B (en) Method for smelting and producing copper by spray gun adhering slag type Ausmelt furnace
CN102140585B (en) Method for smelting nickel ore concentrate by using smelting furnace
CN105238938A (en) Three continuous furnace technology for continuous production of anode copper with copper concentrate
CN105525055A (en) Method for controlling splashing in less slag smelting decarbonization period of converter
CN105112594B (en) Tumble the method for stove smelting ferrovanadium
CN103409575B (en) Reducing agent for slag cleaning furnace top-blown immersion blowing reduction
CN105543633A (en) Method for smelting ferrosilicon by utilizing crystalline silicon scraps
CN104988332A (en) One-step copper smelting process and device
CN104131178A (en) Aluminum thermal self-propagating-injection depth reduction based method for preparing metal titanium
CN105063371A (en) Method for reducing copper slags in top-blowing converting furnace
CN109023023A (en) A kind of manufacturing method of rare-earth heat-resistant steel board
CN103937990A (en) Oxygen-rich blowing technology for producing coarse lead and matte from lead matte in top-blowing furnace
CN104762488B (en) A kind of method of direct vanadium alloying in esr process
CN104357650A (en) Method for quickly creating molten bath for bath smelting
WO2009038139A1 (en) Process for producing molten iron
CN102041400B (en) Process and equipment for producing high-content manganese silicon alloy from low-grade ferromanganese ore
CN103160637A (en) Low-phosphorous steel smelting method of mixed blowing of oxygen and nitrogen of top blowing oxygen lance of converter
CN104805300B (en) A kind of method that cold conditions lead-rich slag is handled with warm sludge side-blown reduction stove
CN107779550B (en) The method of molten steel manganeisen additional amount is reduced in a kind of refining process
WO2009038140A1 (en) Process for producing molten iron
CN103937992A (en) Method for recycling copper scum during top-blown furnace smelting lead refining process
CN114293014B (en) Silicon carbide-free thermal reduction magnesium metallurgy device and method
CN104525957A (en) Method for preparing raw material of synthesized nickel carbonyl through residual nickel poles
CN107354314A (en) A kind of complicated copper-lead zinc metallic ore resource high-efficiency melting separator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant