CN102737742A - 一种核电站事故工况下进入和退出数字化事故规程的方法 - Google Patents

一种核电站事故工况下进入和退出数字化事故规程的方法 Download PDF

Info

Publication number
CN102737742A
CN102737742A CN2011100840161A CN201110084016A CN102737742A CN 102737742 A CN102737742 A CN 102737742A CN 2011100840161 A CN2011100840161 A CN 2011100840161A CN 201110084016 A CN201110084016 A CN 201110084016A CN 102737742 A CN102737742 A CN 102737742A
Authority
CN
China
Prior art keywords
malfunction protocol
power plant
nuclear power
operation procedure
malfunction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011100840161A
Other languages
English (en)
Other versions
CN102737742B (zh
Inventor
文剑波
史觊
张学刚
罗秦川
王岩
殷中平
苏德颂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China General Nuclear Power Corp
China Nuclear Power Engineering Co Ltd
Original Assignee
China General Nuclear Power Corp
China Nuclear Power Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China General Nuclear Power Corp, China Nuclear Power Engineering Co Ltd filed Critical China General Nuclear Power Corp
Priority to CN201110084016.1A priority Critical patent/CN102737742B/zh
Publication of CN102737742A publication Critical patent/CN102737742A/zh
Application granted granted Critical
Publication of CN102737742B publication Critical patent/CN102737742B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin

Landscapes

  • Testing And Monitoring For Control Systems (AREA)
  • Safety Devices In Control Systems (AREA)

Abstract

本发明涉及核电站事故工况下进入和退出数字化事故规程的方法,其中,进入事故规程的方法包括:A.接收事故规程进入指令;B.进入事故规程;C.触发第二报警信号;退出事故规程的方法包括:D.接收来自手动按钮的事故规程的退出指令;E.退出事故规程;F.关闭第二报警信号。实施本发明的技术方案,当进入数字化事故规程时,能自动触发相应的报警信号,提示操纵员当前已处于事故规程,避免了失误的发生,从而提高了电站事故处理能力和安全水平。

Description

一种核电站事故工况下进入和退出数字化事故规程的方法
技术领域
本发明涉及核电站计算机控制领域,更具体地说,涉及核电站事故工况下进入和退出数字化事故规程的方法。
背景技术
核电站的运行目标包括可用性目标和安全目标,其中,可用性目标是指安全有效发电,安全目标是指保护公众免受辐射危害。
在岭澳二期核电站,引入了DCS (Distributed Control System,分布式控制系统)和数字化SOP(Standard Operation Procedure,标准作业程序/事故规程)的模式。事故工况是指核电站的机组处于一种不正常的运行状态,该状态可能会影响一项机组的可用性目标和安全目标。事故规程是指机组处于事故工况时,通过一系列操作步骤和程序,指导操纵员做出正确的判断和操作,确保机组能在该事故工况下运行目标的实现。在数字化事故规程的执行过程中,可以利用计算机手段辅助操纵员提高对复杂信息判断的速度和精度,因此,事故工况下,获取进入和退出数字化事故规程的信号就显得尤为重要。
获取这个开关量信号后,不仅可以提醒操纵员现在已经开始处于事故规程处理状态,在一些参数的运算当中也需要用到这个信号,例如有安全壳压力要小于1.2Bar、计时器的复位、SOP中手动信号的复位、蒸汽发生器的初始放射性IA计算。以蒸汽发生器初始放射性IA的计算为例,通过计算进入SOP之前24小时放射性的滑动平均值可以获得IA这个参数,进入SOP之前,运算已经在进行,进入SOP之后,当前的计算结果被“冻结”,退出SOP的时候复位,继续动态计算IA的值。
发明内容
本发明要解决的技术问题在于,提供一种核电站事故工况下进入和退出数字化事故规程的方法。
本发明解决其技术问题所采用的技术方案是:构造一种核电站事故工况下进入和退出数字化事故规程的方法,其中, 
进入事故规程的方法包括:
A.接收事故规程进入指令;
B.进入事故规程;
C.触发第二报警信号;
退出事故规程的方法包括:
D.接收来自手动按钮的事故规程的退出指令;
E.并退出事故规程;
F.关闭第二报警信号。
在本发明所述的核电站事故工况下进入和退出数字化事故规程的方法中,在步骤A为:
A1.接收来自手动按钮的事故规程进入指令;或
A2.接收进入事故规程的第一报警信号,所述第一报警信号为自动进入事故规程的条件满足时自动触发。
在本发明所述的核电站事故工况下进入和退出数字化事故规程的方法中,所述第二报警信号为事故规程指示灯的闪烁显示。
在本发明所述的核电站事故工况下进入和退出数字化事故规程的方法中,在进入事故规程后,所述第一报警信号可被置位,且不能被复位。
在本发明所述的核电站事故工况下进入和退出数字化事故规程的方法中,在进入事故规程后,所述第一报警信号触发后继续保持。
在本发明所述的核电站事故工况下进入和退出数字化事故规程的方法中,在测试和维修时,所述第一报警信号的复位优先于置位。
实施本发明的核电站事故工况下进入和退出数字化事故规程的方法,当进入数字化事故规程时,能自动触发相应的报警信号,提示操纵员当前已处于事故规程,且当退出数字化事故规程时,能自动关闭相应的报警信号;
另外,通过手动、自动两种方式进入事故规程,可在最大程度上避免人因失误,极大地方便了操纵员在事故工况下对进入和退出事故规程的操作,从而提高了电站事故处理能力和安全水平。
附图说明
下面将结合附图及实施例对本发明作进一步说明,附图中:
图1是本发明核电站事故工况下进入数字化事故规程的方法实施例一的流程图;
图2是本发明核电站事故工况下退出数字化事故规程的方法实施例一的流程图。
具体实施方式
如图1所示,在本发明的核电站事故工况下进入数字化事故规程的方法实施例一的流程图中,该方法包括以下步骤:
步骤S101.接收来自手动按钮的事故规程进入指令,该步骤是操纵员通过手动确认进入事故规程的按钮来实现的,在该步骤中,第一报警信号并没有被触发;
步骤S102.接收进入事故规程的第一报警信号,该第一报警信号为出现事故工况时自动触发。步骤S102与步骤S101是逻辑或的关系,即出现两者之一时,都可进行步骤S103;
步骤S103.进入事故规程,进入事故规程的开关信号触发运行事故规程,此时,操纵员和机组长进行双重检查。在事故规程的执行期间,若出现第一报警信号消失的情况,如事故工况消失,对于核电站的计算机控制系统,这是很危险的,所以要在第一报警信号触发后保持,直到退出事故规程,这样,即使事故工况消失,第一报警信号也是有效的,也就不能退出事故规程,同时,设置第一报警信号为可被置位,但不能被复位,这样也保证了即使第一报警信号消失,也能通过置位重新触发该第一报警信号。另外,在进行定期测试、维修工作时,也可能会触发第一报警信号,但这时并不一定会运行事故规程的程序,所以要使第一报警信号的复位优先于置位,其中,复位优先于置位可通过S端(复位端)优先的S-R触发器来实现,并且将复位信号接在S端,将置位信号接在R端。
步骤S104.触发第二报警信号,该第二报警信号用于提醒操纵员当前已经进入事故规程,需要特别注意,如果要核电站计算机控制系统执行正常运行,需要退出事故规程,该第二报警信号为事故规程指示灯的重复闪烁显示;
当操纵员和机组长在事故规程中进行的双重检查完毕,需要退出事故规程,继续开始正常的运行,例如,结束蒸汽发生器初始放射性的冻结,继续动态计算初始放射性。图2是本发明核电站事故工况下退出数字化事故规程的方法实施例一的流程图,该方法包括:
步骤S201.接收来自手动按钮的事故规程的退出指令; 
步骤S202.退出事故规程,整个控制系统接收到事故规程退出的开关信号时,进入正常运行;
步骤S203.关闭第二报警信号,结束提醒操纵员。   
以上所述仅为本发明的优选实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的权利要求范围之内。 

Claims (6)

1.一种核电站事故工况下进入和退出数字化事故规程的方法,其特征在于, 
进入事故规程的方法包括:
A.接收事故规程进入指令;
B.进入事故规程;
C.触发第二报警信号;
退出事故规程的方法包括:
D.接收来自手动按钮的事故规程的退出指令;
E.退出事故规程;
F.关闭第二报警信号。
2.根据权利要求1所述的核电站事故工况下进入和退出数字化事故规程的方法,其特征在于,在步骤A为:
A1.接收来自手动按钮的事故规程进入指令;或
A2.接收进入事故规程的第一报警信号,所述第一报警信号为自动进入事故规程的条件满足时自动触发。
3.根据权利要求1所述的核电站事故工况下进入和退出数字化事故规程的方法,其特征在于,所述第二报警信号为事故规程指示灯的闪烁显示。
4.根据权利要求1所述的核电站事故工况下进入和退出数字化事故规程的方法,其特征在于,在进入事故规程后,所述第一报警信号可被置位,且不能被复位。
5.根据权利要求1所述的核电站事故工况下进入和退出数字化事故规程的方法,其特征在于,在进入事故规程后,所述第一报警信号触发后继续保持。
6.根据权利要求1-5任一项所述的核电站事故工况下进入和退出数字化事故规程的方法,其特征在于,在测试和维修时,所述第一报警信号的复位优先于置位。
CN201110084016.1A 2011-04-02 2011-04-02 一种核电站事故工况下进入和退出数字化事故规程的方法 Active CN102737742B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110084016.1A CN102737742B (zh) 2011-04-02 2011-04-02 一种核电站事故工况下进入和退出数字化事故规程的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110084016.1A CN102737742B (zh) 2011-04-02 2011-04-02 一种核电站事故工况下进入和退出数字化事故规程的方法

Publications (2)

Publication Number Publication Date
CN102737742A true CN102737742A (zh) 2012-10-17
CN102737742B CN102737742B (zh) 2015-08-05

Family

ID=46993065

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110084016.1A Active CN102737742B (zh) 2011-04-02 2011-04-02 一种核电站事故工况下进入和退出数字化事故规程的方法

Country Status (1)

Country Link
CN (1) CN102737742B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104299661A (zh) * 2014-10-11 2015-01-21 中广核工程有限公司 一种核电站调试启动过程中的瞬态试验控制方法及系统
CN105023624A (zh) * 2015-06-09 2015-11-04 中广核(北京)仿真技术有限公司 核电厂严重事故缓解方法及系统
CN112488640A (zh) * 2020-11-16 2021-03-12 中广核工程有限公司 一种核电厂虚拟操作员系统及操作方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58172701A (ja) * 1982-04-02 1983-10-11 Hitachi Ltd プラントの運転ガイダンス方法
EP0280553A2 (en) * 1987-02-27 1988-08-31 Westinghouse Electric Corporation Computer assisted execution of process operating procedures
US4803039A (en) * 1986-02-03 1989-02-07 Westinghouse Electric Corp. On line interactive monitoring of the execution of process operating procedures
US5859885A (en) * 1996-11-27 1999-01-12 Westinghouse Electric Coporation Information display system
CN101447240A (zh) * 2008-12-22 2009-06-03 中国广东核电集团有限公司 一种核电机组的事故监控系统及其监控方法
CN101840694A (zh) * 2009-09-15 2010-09-22 中广核工程有限公司 核电厂数字化规程人机界面的显示装置及其显示控制方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58172701A (ja) * 1982-04-02 1983-10-11 Hitachi Ltd プラントの運転ガイダンス方法
US4803039A (en) * 1986-02-03 1989-02-07 Westinghouse Electric Corp. On line interactive monitoring of the execution of process operating procedures
EP0280553A2 (en) * 1987-02-27 1988-08-31 Westinghouse Electric Corporation Computer assisted execution of process operating procedures
US5859885A (en) * 1996-11-27 1999-01-12 Westinghouse Electric Coporation Information display system
CN101447240A (zh) * 2008-12-22 2009-06-03 中国广东核电集团有限公司 一种核电机组的事故监控系统及其监控方法
CN101840694A (zh) * 2009-09-15 2010-09-22 中广核工程有限公司 核电厂数字化规程人机界面的显示装置及其显示控制方法

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
YUJI NIWA等: "Integrated computerisation of operating procedures", 《NUCLEAR ENGINEERING AND DESIGN》 *
刘飞: "核电厂计算机化操作规程系统研究", 《中国博士论文全文数据库》 *
刘飞等: "核电厂计算计划规程系统开发", 《核动力工程》 *
叶奇蓁: "《中国电气工程大典第6卷核能发电工程》", 31 July 2009 *
张禄庆: "核电厂以及操作规程的现状及发展趋势", 《核动力工程》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104299661A (zh) * 2014-10-11 2015-01-21 中广核工程有限公司 一种核电站调试启动过程中的瞬态试验控制方法及系统
CN105023624A (zh) * 2015-06-09 2015-11-04 中广核(北京)仿真技术有限公司 核电厂严重事故缓解方法及系统
CN105023624B (zh) * 2015-06-09 2017-06-16 中广核(北京)仿真技术有限公司 核电厂严重事故缓解方法及系统
CN112488640A (zh) * 2020-11-16 2021-03-12 中广核工程有限公司 一种核电厂虚拟操作员系统及操作方法

Also Published As

Publication number Publication date
CN102737742B (zh) 2015-08-05

Similar Documents

Publication Publication Date Title
CN105575448B (zh) 核电站反应堆保护系统及其中的安全控制方法
CN104852469B (zh) 基于设备实时状态的智能变电站软压板远程防误操作方法
CN104282349B (zh) 一种火灾情况下将核电厂引导至安全状态的方法
CN105448368A (zh) 一种核电站多样性驱动系统及方法和多样性保护系统
CN104483567B (zh) 500kV线路继电保护装置检测方法和系统
CN105470935B (zh) 一种智能变电站继电保护设备缺陷安全隔离辅助决策方法
CN102737742A (zh) 一种核电站事故工况下进入和退出数字化事故规程的方法
CN103474116A (zh) 一种采用数字化人机接口核电厂事故状态下运行控制的功能分析方法
CN101661283B (zh) 智能化一键操作完成顺序控制的系统
CN103763127A (zh) 一种设备状态告警监控方法及系统
CN103888236A (zh) 一种适用于智能变电站中时钟同步的监测方法
CN104332207B (zh) 一种反应堆冷却剂丧失事故工况下自动停运冷却剂泵方法
CN110038232B (zh) 基于不同操作模式下的质子治疗安全联锁系统工作方法
CN103700411A (zh) 核电站冷却剂失流事故的处理方法和系统
CN103701207A (zh) 一种防止有流间隔sv软压板误操作的方法
CN106683727A (zh) 一种事故处理中的故障监测方法
CN102866687A (zh) 一种高水头电站水头值处理方法
CN105281429A (zh) 一种实现调度遥控防误操作的方法
KR101608646B1 (ko) 원자력 발전소의 발전소보호계통의 운전 시스템과 이를 이용한 운전방법
CN201392993Y (zh) 核电工程变压器dcs控制模块
CN105139903B (zh) 核级dcs的维护方法、装置及系统
CN204243431U (zh) 接地线的操作装置
CN103198612A (zh) 窨井盖移动智能监控报警装置及其预警方法
CN104347130B (zh) 核电站辐射的报警抑制方法、设备及系统
CN203232544U (zh) 窨井盖移动智能监控报警装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 518023 No. 69 Shennan Middle Road, Shenzhen, Guangdong, Futian District

Co-patentee after: CHINA GENERAL NUCLEAR POWER Corp.

Patentee after: CHINA NUCLEAR POWER ENGINEERING Co.,Ltd.

Address before: 518023 No. 69 Shennan Middle Road, Shenzhen, Guangdong, Futian District

Co-patentee before: CHINA GUANGDONG NUCLEAR POWER GROUP Co.,Ltd.

Patentee before: CHINA NUCLEAR POWER ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder