CN102733817A - 一种确定隧道洞室施工尺寸的方法 - Google Patents

一种确定隧道洞室施工尺寸的方法 Download PDF

Info

Publication number
CN102733817A
CN102733817A CN2012101997441A CN201210199744A CN102733817A CN 102733817 A CN102733817 A CN 102733817A CN 2012101997441 A CN2012101997441 A CN 2012101997441A CN 201210199744 A CN201210199744 A CN 201210199744A CN 102733817 A CN102733817 A CN 102733817A
Authority
CN
China
Prior art keywords
tunnel
construction
stress
size
rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012101997441A
Other languages
English (en)
Other versions
CN102733817B (zh
Inventor
熊卫士
沈小俊
徐基立
高飞
黄明奎
刘建
杨凡
张昶
张宝玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING TRAFFIC BUILDING (GROUP) Co Ltd
Chongqing Communications Construction Group Co Ltd
Original Assignee
CHONGQING TRAFFIC BUILDING (GROUP) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING TRAFFIC BUILDING (GROUP) Co Ltd filed Critical CHONGQING TRAFFIC BUILDING (GROUP) Co Ltd
Priority to CN201210199744.1A priority Critical patent/CN102733817B/zh
Publication of CN102733817A publication Critical patent/CN102733817A/zh
Application granted granted Critical
Publication of CN102733817B publication Critical patent/CN102733817B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种确定隧道洞室施工尺寸的方法,首先确定隧道所处位置的岩体天然水平应力σhav及铅垂应力σh,确定天然应力比值系数;确定隧道所处位置的岩体天然水平应力σhav及铅垂应力σh,确定天然应力比值系数μ=σhavh;查隧道施工尺寸包络线曲线图,获得施工尺寸比值η范围;初步确定施工隧洞的竖直向半轴尺寸n;计算施工隧洞水平向半轴尺寸m。本发明所获得的隧道洞室施工尺寸,能使围岩结构最大限度的适应由于地下洞室开挖造成的天然应力重分布变化,使围岩结构在重分布过程中受力合理,积极发挥围岩自身的承载能力。该方法简单、经济、实用,在体现围岩结构受力特性理论依据的同时,也大大降低了对设计、施工人员素质的要求,并且能大大的降低隧道洞室开挖支护成本。

Description

一种确定隧道洞室施工尺寸的方法
技术领域
本发明属于隧道施工技术领域,尤其涉及一种确定隧道洞室施工尺寸的方法。
背景技术
随着我国公路隧道、铁路隧道建设事业的发展,新奥法建设隧道的理念已越来越被隧道设计和施工技术人员所接受。其精髓是要合理利用围岩的自承载能力,利用监控量测,进行适时支护,以节省造价。大家知道,隧道及地下洞室施工的核心技术可以归结在开挖和支护两个关键工序,即如何开挖,才能更有利于洞室的稳定;如何支护才能更有效的保证洞室稳定和便于下一步开挖。然而,现有隧道施工虽然在思想上在贯彻新奥法的精髓,但在实际操作上并没有根据实际围岩的特点来进行,如针对不同的地质条件,隧道洞室施工尺寸确定的随意性、支护结构的过于保守,出于安全角度,有时完全忽略了围岩的承载能力,虽表面遵从新奥法理念,但实际上与新奥法理念相背离,造成了人力和财力的浪费。因此,针对不同的地质条件,理清围岩在不同洞形条件下的受力破坏机理,采取不同措施,确定洞室的施工尺寸,合理利用围岩结构的承载能力,是当前隧道建设与科研工作者急需解决的问题。
发明内容
本发明针对现有技术中存在的缺少一种方法来针对不同的地质条件,理清围岩在不同洞形条件下的受力破坏机理,采取不同措施,确定洞室的施工尺寸,合理利用围岩结构的承载能力等缺点,提出一种确定隧道洞室施工尺寸的实用方法。
本发明实施例是这样实现的,一种确定隧道洞室施工尺寸的方法,该方法包括以下步骤:
采用空芯包体三轴地应力计测量天然应力,确定隧道所穿越地层的岩体天然水平应力σhav及铅垂应力σh,按公式μ=σhavh计算天然应力比值系数;
结合天然应力比值系数,查阅天然应力比值系数与地下洞室轴比的关系曲线,即隧道施工尺寸包络线曲线图(详见图2),获得施工尺寸比值η范围;
结合隧道所在位置处围岩的质量、隧道设计断面的净空、隧道施工所用工法以及所用的装渣机械,初步确定施工隧洞的竖直向半轴尺寸n;
根据施工隧洞竖直向半轴尺寸,按下列方式计算施工隧洞水平向半轴尺寸m。
进一步,采用空芯包体三轴地应力计测量天然应力首先是测点布置问题:(1)尽量选择在完整或较完整的岩体内,远离断层、破碎带以及裂隙发育带;(2)远离或避免布置在采空区大空洞位置处;(3)尽量避免布置在岩体受到扰动的区域,即应力集中区或应力释放区。
进一步,采用空芯包体三轴地应力计测量天然应力的测试过程:(1)在岩体中打打孔至待测区,然后在大孔孔底中心钻一同轴小孔;(2)在小孔中安装空芯包体三轴地应力计;(3)用岩石套钻套取岩芯,记录应力计探头读数;(4)取出岩芯测取岩石弹性模量和泊松比;(5)将测点位置参数,钻孔方位、泊松比、弹性模量输入地应力计算软件,计算天然应力的大小和方向。
进一步,通过隧道施工尺寸包络线图确定的隧道施工尺寸,使得围岩在应力重分布过程中始终处于一个合理的受力状态,即围岩不受或少受拉力和弯矩,充分利用围岩的承载力。
进一步,按下式计算施工隧洞水平向半轴尺寸m:
m = k&eta;n &mu; > 1 n &mu; = 1 &eta;n / k &mu; < 1
式中k为考虑隧道所处位置初始应力状态分布及岩体质量好坏的一个量,可取1.05~1.5,岩体质量好时可取低值,差时可取高值。
进一步,据地质勘察资料及现场天然应力量测,可确定隧道所处的天然应力比值系数μ。
进一步,结合隧道所在位置处围岩的质量、隧道设计断面的净空、隧道施工所用工法以及所用的装渣机械,初步确定施工隧洞的竖直向半轴尺寸n具体实现步骤为:
(1)对于采用台阶法施工的隧道,上台阶施工的高度不小于其跨度的0.3倍,其竖直向半轴尺寸n可取2.5~4.5m,其中,围岩好时取大值,围岩差时取低值;(2)对于单侧壁导坑法施工的隧道,侧壁导坑初步尺寸确定原则:高度以设计断面到边墙起拱线为宜,宽度不超过0.5倍的隧洞设计宽度;(3)对于双侧壁导坑法,两侧导坑尺寸确定原则:高度以设计断面到边墙起拱线为宜,宽度不超过0.4倍的隧洞设计宽度。
本发明提供的确定隧道洞室施工尺寸的实用方法,针对当前隧道设计、施工存在的问题,基于快速、安全、经济的理念,结合现有大量隧道监控量测数据库资料,利用经典力学理论及大型有限元对不同地质条件下隧道围岩力学性质进行研究分析的基础上提出针对我国不同的天然应力状态及不同地质条件下隧道洞室施工尺寸的图表曲线法。用本发明所获得的隧道洞室施工尺寸,能使围岩结构最大限度的适应由于地下洞室开挖造成的天然应力重分布变化,使围岩结构在重分布过程中受力合理,积极发挥围岩自身的承载能力,减少人为支护,降低施工成本,也充分体现了新奥法理念的精髓。本发明因其简单、经济、实用,与当前实际工程中确定尺寸的经验法相比,在体现围岩结构受力特性理论依据的同时,也大大降低了对设计、施工人员素质的要求,并且能大大的降低隧道洞室开挖支护成本。
附图说明
图1是本发明实施例提供的确定隧道洞室施工尺寸的方法的实现流程图;
图2是本发明实施例提供的隧道洞室施工尺寸比值的包络线曲线图。
具体实施方式
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。
图1示出了本发明实施例提供的确定隧道洞室施工尺寸的方法的实现流程。该方法步骤如下:
S101:采用空芯包体三轴地应力计测量天然应力,确定隧道所穿越地层的岩体天然水平应力σhav及铅垂应力σh;按公式μ=σhavh计算隧道穿越地层的天然应力比值系数;
现场天然应力的测量可采用空芯包体三轴地应力计进行测量。
此方法的特点首先是测点布置问题:(1)尽量选择在完整或较完整的岩体内,远离断层、破碎带以及裂隙发育带;(2)远离或避免布置在采空区大空洞位置处;(3)尽量避免布置在岩体受到扰动的区域,即应力集中区或应力释放区。
其次是测试过程:(1)在岩体中打打孔至待测区,然后在大孔孔底中心钻一同轴小孔;(2)在小孔中安装空芯包体三轴地应力计;(3)用岩石套钻套取岩芯,记录应力计探头读数;(4)取出岩芯测取岩石弹性模量和泊松比;(5)将测点位置参数,钻孔方位、泊松比、弹性模量输入地应力计算软件,计算天然应力的大小和方向、
S102:查隧道施工尺寸包络线曲线图,获得施工尺寸比值η范围;
通过隧道施工尺寸包络线图确定的隧道施工尺寸,使得围岩在应力重分布过程中始终处于一个合理的受力状态,即围岩不受或少受拉力和弯矩,充分利用围岩的承载力。
图2为隧道洞室施工尺寸比值的包络线曲线,其中1——围岩结构中不出现拉应力时的曲线,2——围岩结构中不出现弯矩时的曲线。
S103:初步确定施工隧洞的竖直向半轴尺寸n;
S104:按下式计算施工隧洞水平向半轴尺寸m:
m = k&eta;n &mu; > 1 n &mu; = 1 &eta;n / k &mu; < 1 - - - ( 1 )
式中:k为考虑隧道所处位置初始应力状态分布及岩体质量好坏的一个量,可取1.05~1.5,岩体质量好时可取低值,差时可取高值。
在本发明实施例中,以目前隧道工程施工中比较常用的台阶法施工为例来说明本发明实施例提供的方法。
第一步、据地质勘察资料及现场天然应力量测,可确定隧道所处的天然应力比值系数μ,例如:μ=1.25。
第二步、查隧道施工尺寸包络线曲线图(图2)获得施工尺寸比值η范围,即1.118≤η≤1.25。
根据隧道地质勘察资料,隧道所在位置处围岩为IV级围岩,隧道为三车道公路隧道,其跨度为16.46m,高度为11.68m,采用上下台阶法开挖。
第三步、采用上下台阶进行施工,确定上台阶施工高度为6.0m,则其施工洞室的竖向半轴为n=3.0m。
第四步、由隧道所在地围岩为IV级围岩,相对较差,故初步取k=1.15,由此根据式(1)可确定上台阶开挖洞室水平半轴范围3.86≤m≤4.31,即水平向可开挖的合理跨度范围为7.72m~8.62m,这时开挖洞室围岩受力比较合理,可在很大程度上充分利用围岩自身的承载能力,减少人为支护,降低施工成本。
本发明提供的确定隧道洞室施工尺寸的实用方法,针对当前隧道设计、施工存在的问题,基于快速、安全、经济的理念,结合现有大量隧道监控量测数据库资料,利用经典力学理论及大型有限元对不同地质条件下隧道围岩力学性质进行研究分析的基础上提出针对我国不同的天然应力状态及不同地质条件下隧道洞室施工尺寸的图表曲线法。用本发明所获得的隧道洞室施工尺寸,能使围岩结构最大限度的适应由于地下洞室开挖造成的天然应力重分布变化,使围岩结构在重分布过程中受力合理,积极发挥围岩自身的承载能力,减少人为支护,降低施工成本,也充分体现了新奥法理念的精髓。本发明因其简单、经济、实用,与当前实际工程中确定尺寸的经验法相比,在体现围岩结构受力特性理论依据的同时,也大大降低了对设计、施工人员素质的要求,并且能大大的降低隧道洞室开挖支护成本。
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。

Claims (7)

1.一种确定隧道洞室施工尺寸的方法,其特征在于,该方法包括以下步骤:
采用空芯包体三轴地应力计测量天然应力,确定隧道所穿越地层的岩体天然水平应力σhav及铅垂应力σh,按公式μ=σhav/σh计算隧道穿越地层的天然应力比值系数;
结合天然应力比值系数,查阅天然应力比值系数与地下洞室轴比的关系曲线,即隧道施工尺寸包络线曲线图,获得施工尺寸比值η范围;
结合隧道所在位置处围岩的质量、隧道设计断面的净空、隧道施工所用工法以及所用的装渣机械,初步确定施工隧洞的竖直向半轴尺寸n;
初步确定的施工隧洞竖直向半轴尺寸n,计算施工隧洞水平向半轴尺寸m,确定施工断面的合理尺寸。
2.如权利要求1所述的方法,其特征在于,采用空芯包体三轴地应力计测量天然应力首先是测点布置问题:(1)尽量选择在完整或较完整的岩体内,远离断层、破碎带以及裂隙发育带;(2)远离或避免布置在采空区大空洞位置处;(3)尽量避免布置在岩体受到扰动的区域,即应力集中区或应力释放区。
3.如权利要求1所述的方法,其特征在于,采用空芯包体三轴地应力计测量天然应力的测试过程:(1)在岩体中打打孔至待测区,然后在大孔孔底中心钻一同轴小孔;(2)在小孔中安装空芯包体三轴地应力计;(3)用岩石套钻套取岩芯,记录应力计探头读数;(4)取出岩芯测取岩石弹性模量和泊松比;(5)将测点位置参数,钻孔方位、泊松比、弹性模量输入地应力计算软件,计算天然应力的大小和方向。
4.如权利要求1所述的方法,其特征在于,通过隧道施工尺寸包络线图确定的隧道施工尺寸,使得围岩在应力重分布过程中始终处于一个合理的受力状态,即围岩不受或少受拉力和弯矩,充分利用围岩的承载力。
5.如权利要求1所述的方法,其特征在于,按下式计算施工隧洞水平向半轴尺寸m:
m = k&eta;n &mu; > 1 n &mu; = 1 &eta;n / k &mu; < 1
式中k为考虑隧道所处位置初始应力状态分布及岩体质量好坏的一个量,可取1.05~1.5,岩体质量好时可取低值,差时可取高值。
6.如权利要求1所述的方法,其特征在于,据地质勘察资料及现场天然应力量测,可确定隧道所穿越地层的天然应力比值系数μ。
7.如权利要求1所述的方法,其特征在于,结合隧道所在位置处围岩的质量、隧道设计断面的净空、隧道施工所用工法以及所用的装渣机械,初步确定施工隧洞的竖直向半轴尺寸n具体实现步骤为:
(1)对于采用台阶法施工的隧道,上台阶施工的高度不小于其跨度的0.3倍,其竖直向半轴尺寸n可取2.5~4.5m,其中,围岩好时取大值,围岩差时取低值;(2)对于单侧壁导坑法施工的隧道,侧壁导坑初步尺寸确定原则:高度以设计断面到边墙起拱线为宜,宽度不超过0.5倍的隧洞设计宽度;(3)对于双侧壁导坑法,两侧导坑尺寸确定原则:高度以设计断面到边墙起拱线为宜,宽度不超过0.4倍的隧洞设计宽度。
CN201210199744.1A 2012-06-18 2012-06-18 一种确定隧道洞室施工尺寸的方法 Expired - Fee Related CN102733817B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210199744.1A CN102733817B (zh) 2012-06-18 2012-06-18 一种确定隧道洞室施工尺寸的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210199744.1A CN102733817B (zh) 2012-06-18 2012-06-18 一种确定隧道洞室施工尺寸的方法

Publications (2)

Publication Number Publication Date
CN102733817A true CN102733817A (zh) 2012-10-17
CN102733817B CN102733817B (zh) 2015-04-22

Family

ID=46990036

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210199744.1A Expired - Fee Related CN102733817B (zh) 2012-06-18 2012-06-18 一种确定隧道洞室施工尺寸的方法

Country Status (1)

Country Link
CN (1) CN102733817B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103291316A (zh) * 2013-06-14 2013-09-11 中国水电顾问集团成都勘测设计研究院 大型地下洞室群布置设计方法
CN103291332A (zh) * 2013-06-14 2013-09-11 中国水电顾问集团成都勘测设计研究院 大型地下洞室群布置方法
CN104329101A (zh) * 2014-11-05 2015-02-04 甘肃路桥第四公路工程有限责任公司 准确控制隧道边墙与仰拱间小半径变曲率段曲率和厚度的装置
CN105956941A (zh) * 2016-05-11 2016-09-21 交通运输部公路科学研究所 隧道分步施工判断方法
CN110005430A (zh) * 2019-04-09 2019-07-12 天地科技股份有限公司 一种等效断面支护方法及装置

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101182773A (zh) * 2007-12-20 2008-05-21 中铁十二局集团有限公司 铁路大断面隧道椭圆台面帽檐斜切式洞门施工方法
CN101435333A (zh) * 2008-11-19 2009-05-20 兰州南特数码科技股份有限公司 隧道与地下拱室优化拱形快速确定方法
CN102071689A (zh) * 2011-01-26 2011-05-25 上海交通大学 既有隧道近旁静压桩的优化施工方法
ES2376724T3 (es) * 2009-11-03 2012-03-16 Silvino Pompeu Santos Túnel multiplanta.

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101182773A (zh) * 2007-12-20 2008-05-21 中铁十二局集团有限公司 铁路大断面隧道椭圆台面帽檐斜切式洞门施工方法
CN101435333A (zh) * 2008-11-19 2009-05-20 兰州南特数码科技股份有限公司 隧道与地下拱室优化拱形快速确定方法
ES2376724T3 (es) * 2009-11-03 2012-03-16 Silvino Pompeu Santos Túnel multiplanta.
CN102071689A (zh) * 2011-01-26 2011-05-25 上海交通大学 既有隧道近旁静压桩的优化施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
冯强等: "公路隧道断面轮廓尺寸量测计算", 《公路交通科技(应用技术版)》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103291316A (zh) * 2013-06-14 2013-09-11 中国水电顾问集团成都勘测设计研究院 大型地下洞室群布置设计方法
CN103291332A (zh) * 2013-06-14 2013-09-11 中国水电顾问集团成都勘测设计研究院 大型地下洞室群布置方法
CN103291316B (zh) * 2013-06-14 2015-12-09 中国电建集团成都勘测设计研究院有限公司 大型地下洞室群布置设计方法
CN104329101A (zh) * 2014-11-05 2015-02-04 甘肃路桥第四公路工程有限责任公司 准确控制隧道边墙与仰拱间小半径变曲率段曲率和厚度的装置
CN105956941A (zh) * 2016-05-11 2016-09-21 交通运输部公路科学研究所 隧道分步施工判断方法
CN105956941B (zh) * 2016-05-11 2019-08-09 交通运输部公路科学研究所 隧道分步施工判断方法
CN110005430A (zh) * 2019-04-09 2019-07-12 天地科技股份有限公司 一种等效断面支护方法及装置

Also Published As

Publication number Publication date
CN102733817B (zh) 2015-04-22

Similar Documents

Publication Publication Date Title
Zhao et al. Mechanism analysis and control technology of surrounding rock failure in deep soft rock roadway
Zhang et al. Influence of fault on the surrounding rock stability of a tunnel: Location and thickness
Bernier et al. Twenty-five years' geotechnical observation and testing in the Tertiary Boom Clay formation
CN103293560B (zh) 一种采动三向应力场的测试方法
Li et al. Ground movements caused by deep underground mining in Guan-Zhuang iron mine, Luzhong, China
CN102733817A (zh) 一种确定隧道洞室施工尺寸的方法
Luo et al. Mechanical responses of surrounding rock mass and tunnel linings in large-span triple-arch tunnel
Yang et al. Failure mechanism and bulking characteristic of goaf roof in no-pillar mining by roof cutting technology
Zheng et al. A novel sequential excavation method for constructing large-cross-section tunnels in soft ground: Practice and theory
Zhou et al. Stability predictions for excavations of mountain tunnels based on [BQ] method and its field verification
CN111680896B (zh) 一种煤矿地下水库安全距离确定方法
Shi et al. Analysis on deformation and stress characteristics of a multibraced pit-in-pit excavation in a subway transfer station
Ma et al. Construction stability and reinforcement technology for the super-large rectangular pipe-jacking tunnel passing beneath the operational high-speed railway in composite stratum
Gao et al. Research on prediction model of prestress loss of anchor cable in soil-rock dual-structure slope
Khadka Tunnel Closure Analysis of Hydropower Tunnels in Lesser Himalayan Region of Nepal through Case Studies
Yang et al. Sensitivity analysis of rock mechanics parameters in stability of tunnel surrounding rock
Hongtao et al. Study on failure characteristics of surrounding rock of benching excavation in loess overburden soil-rock contact zone
Liu et al. Numerical analysis and field monitoring tests on shallow tunnels under weak surrounding rock
Hongtao et al. The technology research about hidden danger identification of tunnel roof fall
Fu et al. Optimization of Barrier Pillar Design in Longwall Mining with Top Coal Caving in Spontaneous Combustion Coal Seam
Zhao et al. Research on failure mechanism and support technology of fractured rock mass in an undersea gold mine
Ren et al. Assessment of Fractures in Excavation Damaged Zone around Roadways of an Iron Mine Using Optical Televiewer Detecting Method
Lin et al. Tunnel Monitoring and measurement case study in Qiyueshan Tunnel
Xu et al. Study on the rapid construction method of large section vertical well in thick alluvium
Wang Geological conditions and key rock mechanics issues in the Western Route of South-to-North Water Transfer Project

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Xiong Weishi

Inventor after: Shen Xiaojun

Inventor after: Xu Jili

Inventor after: Gao Fei

Inventor after: Huang Mingkui

Inventor after: Liu Jian

Inventor after: Yang Fan

Inventor after: Zhang Chang

Inventor after: Zhang Baoyu

Inventor before: Xiong Weishi

Inventor before: Shen Xiaojun

Inventor before: Xu Jili

Inventor before: Gao Fei

Inventor before: Huang Mingkui

Inventor before: Liu Jian

Inventor before: Yang Fan

Inventor before: Zhang Chang

Inventor before: Zhang Baoyu

DD01 Delivery of document by public notice

Addressee: Chongqing Traffic Building (Group) Co., Ltd.

Document name: Notification to Pay the Fees

DD01 Delivery of document by public notice

Addressee: Chongqing Traffic Building (Group) Co., Ltd.

Document name: Notification of Termination of Patent Right

DD01 Delivery of document by public notice
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150422

Termination date: 20160618