CN102733817A - 一种确定隧道洞室施工尺寸的方法 - Google Patents
一种确定隧道洞室施工尺寸的方法 Download PDFInfo
- Publication number
- CN102733817A CN102733817A CN2012101997441A CN201210199744A CN102733817A CN 102733817 A CN102733817 A CN 102733817A CN 2012101997441 A CN2012101997441 A CN 2012101997441A CN 201210199744 A CN201210199744 A CN 201210199744A CN 102733817 A CN102733817 A CN 102733817A
- Authority
- CN
- China
- Prior art keywords
- tunnel
- construction
- stress
- size
- rock
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 63
- 238000000034 method Methods 0.000 title claims abstract description 53
- 239000011435 rock Substances 0.000 claims abstract description 64
- 238000013461 design Methods 0.000 claims abstract description 18
- 230000008569 process Effects 0.000 claims abstract description 10
- 230000000149 penetrating effect Effects 0.000 claims description 6
- 238000011161 development Methods 0.000 claims description 4
- 230000007115 recruitment Effects 0.000 claims description 4
- 238000004364 calculation method Methods 0.000 claims description 3
- 238000013507 mapping Methods 0.000 claims description 3
- 239000000523 sample Substances 0.000 claims description 3
- 238000012360 testing method Methods 0.000 claims description 3
- 238000003325 tomography Methods 0.000 claims description 3
- 239000011800 void material Substances 0.000 claims description 3
- 238000009412 basement excavation Methods 0.000 abstract description 10
- 230000005484 gravity Effects 0.000 abstract 1
- 230000005641 tunneling Effects 0.000 description 6
- 238000005259 measurement Methods 0.000 description 4
- 238000013459 approach Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000012544 monitoring process Methods 0.000 description 3
- 241001269238 Data Species 0.000 description 2
- 230000006378 damage Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000004836 empirical method Methods 0.000 description 2
- 230000007246 mechanism Effects 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210199744.1A CN102733817B (zh) | 2012-06-18 | 2012-06-18 | 一种确定隧道洞室施工尺寸的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210199744.1A CN102733817B (zh) | 2012-06-18 | 2012-06-18 | 一种确定隧道洞室施工尺寸的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102733817A true CN102733817A (zh) | 2012-10-17 |
CN102733817B CN102733817B (zh) | 2015-04-22 |
Family
ID=46990036
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210199744.1A Expired - Fee Related CN102733817B (zh) | 2012-06-18 | 2012-06-18 | 一种确定隧道洞室施工尺寸的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102733817B (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103291316A (zh) * | 2013-06-14 | 2013-09-11 | 中国水电顾问集团成都勘测设计研究院 | 大型地下洞室群布置设计方法 |
CN103291332A (zh) * | 2013-06-14 | 2013-09-11 | 中国水电顾问集团成都勘测设计研究院 | 大型地下洞室群布置方法 |
CN104329101A (zh) * | 2014-11-05 | 2015-02-04 | 甘肃路桥第四公路工程有限责任公司 | 准确控制隧道边墙与仰拱间小半径变曲率段曲率和厚度的装置 |
CN105956941A (zh) * | 2016-05-11 | 2016-09-21 | 交通运输部公路科学研究所 | 隧道分步施工判断方法 |
CN110005430A (zh) * | 2019-04-09 | 2019-07-12 | 天地科技股份有限公司 | 一种等效断面支护方法及装置 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101182773A (zh) * | 2007-12-20 | 2008-05-21 | 中铁十二局集团有限公司 | 铁路大断面隧道椭圆台面帽檐斜切式洞门施工方法 |
CN101435333A (zh) * | 2008-11-19 | 2009-05-20 | 兰州南特数码科技股份有限公司 | 隧道与地下拱室优化拱形快速确定方法 |
CN102071689A (zh) * | 2011-01-26 | 2011-05-25 | 上海交通大学 | 既有隧道近旁静压桩的优化施工方法 |
ES2376724T3 (es) * | 2009-11-03 | 2012-03-16 | Silvino Pompeu Santos | Túnel multiplanta. |
-
2012
- 2012-06-18 CN CN201210199744.1A patent/CN102733817B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101182773A (zh) * | 2007-12-20 | 2008-05-21 | 中铁十二局集团有限公司 | 铁路大断面隧道椭圆台面帽檐斜切式洞门施工方法 |
CN101435333A (zh) * | 2008-11-19 | 2009-05-20 | 兰州南特数码科技股份有限公司 | 隧道与地下拱室优化拱形快速确定方法 |
ES2376724T3 (es) * | 2009-11-03 | 2012-03-16 | Silvino Pompeu Santos | Túnel multiplanta. |
CN102071689A (zh) * | 2011-01-26 | 2011-05-25 | 上海交通大学 | 既有隧道近旁静压桩的优化施工方法 |
Non-Patent Citations (1)
Title |
---|
冯强等: "公路隧道断面轮廓尺寸量测计算", 《公路交通科技(应用技术版)》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103291316A (zh) * | 2013-06-14 | 2013-09-11 | 中国水电顾问集团成都勘测设计研究院 | 大型地下洞室群布置设计方法 |
CN103291332A (zh) * | 2013-06-14 | 2013-09-11 | 中国水电顾问集团成都勘测设计研究院 | 大型地下洞室群布置方法 |
CN103291316B (zh) * | 2013-06-14 | 2015-12-09 | 中国电建集团成都勘测设计研究院有限公司 | 大型地下洞室群布置设计方法 |
CN104329101A (zh) * | 2014-11-05 | 2015-02-04 | 甘肃路桥第四公路工程有限责任公司 | 准确控制隧道边墙与仰拱间小半径变曲率段曲率和厚度的装置 |
CN105956941A (zh) * | 2016-05-11 | 2016-09-21 | 交通运输部公路科学研究所 | 隧道分步施工判断方法 |
CN105956941B (zh) * | 2016-05-11 | 2019-08-09 | 交通运输部公路科学研究所 | 隧道分步施工判断方法 |
CN110005430A (zh) * | 2019-04-09 | 2019-07-12 | 天地科技股份有限公司 | 一种等效断面支护方法及装置 |
Also Published As
Publication number | Publication date |
---|---|
CN102733817B (zh) | 2015-04-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Zhao et al. | Mechanism analysis and control technology of surrounding rock failure in deep soft rock roadway | |
Zhang et al. | Influence of fault on the surrounding rock stability of a tunnel: Location and thickness | |
Bernier et al. | Twenty-five years' geotechnical observation and testing in the Tertiary Boom Clay formation | |
CN103293560B (zh) | 一种采动三向应力场的测试方法 | |
Li et al. | Ground movements caused by deep underground mining in Guan-Zhuang iron mine, Luzhong, China | |
CN102733817A (zh) | 一种确定隧道洞室施工尺寸的方法 | |
Luo et al. | Mechanical responses of surrounding rock mass and tunnel linings in large-span triple-arch tunnel | |
Yang et al. | Failure mechanism and bulking characteristic of goaf roof in no-pillar mining by roof cutting technology | |
Zheng et al. | A novel sequential excavation method for constructing large-cross-section tunnels in soft ground: Practice and theory | |
Zhou et al. | Stability predictions for excavations of mountain tunnels based on [BQ] method and its field verification | |
CN111680896B (zh) | 一种煤矿地下水库安全距离确定方法 | |
Shi et al. | Analysis on deformation and stress characteristics of a multibraced pit-in-pit excavation in a subway transfer station | |
Ma et al. | Construction stability and reinforcement technology for the super-large rectangular pipe-jacking tunnel passing beneath the operational high-speed railway in composite stratum | |
Gao et al. | Research on prediction model of prestress loss of anchor cable in soil-rock dual-structure slope | |
Khadka | Tunnel Closure Analysis of Hydropower Tunnels in Lesser Himalayan Region of Nepal through Case Studies | |
Yang et al. | Sensitivity analysis of rock mechanics parameters in stability of tunnel surrounding rock | |
Hongtao et al. | Study on failure characteristics of surrounding rock of benching excavation in loess overburden soil-rock contact zone | |
Liu et al. | Numerical analysis and field monitoring tests on shallow tunnels under weak surrounding rock | |
Hongtao et al. | The technology research about hidden danger identification of tunnel roof fall | |
Fu et al. | Optimization of Barrier Pillar Design in Longwall Mining with Top Coal Caving in Spontaneous Combustion Coal Seam | |
Zhao et al. | Research on failure mechanism and support technology of fractured rock mass in an undersea gold mine | |
Ren et al. | Assessment of Fractures in Excavation Damaged Zone around Roadways of an Iron Mine Using Optical Televiewer Detecting Method | |
Lin et al. | Tunnel Monitoring and measurement case study in Qiyueshan Tunnel | |
Xu et al. | Study on the rapid construction method of large section vertical well in thick alluvium | |
Wang | Geological conditions and key rock mechanics issues in the Western Route of South-to-North Water Transfer Project |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C53 | Correction of patent of invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Xiong Weishi Inventor after: Shen Xiaojun Inventor after: Xu Jili Inventor after: Gao Fei Inventor after: Huang Mingkui Inventor after: Liu Jian Inventor after: Yang Fan Inventor after: Zhang Chang Inventor after: Zhang Baoyu Inventor before: Xiong Weishi Inventor before: Shen Xiaojun Inventor before: Xu Jili Inventor before: Gao Fei Inventor before: Huang Mingkui Inventor before: Liu Jian Inventor before: Yang Fan Inventor before: Zhang Chang Inventor before: Zhang Baoyu |
|
DD01 | Delivery of document by public notice |
Addressee: Chongqing Traffic Building (Group) Co., Ltd. Document name: Notification to Pay the Fees |
|
DD01 | Delivery of document by public notice |
Addressee: Chongqing Traffic Building (Group) Co., Ltd. Document name: Notification of Termination of Patent Right |
|
DD01 | Delivery of document by public notice | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150422 Termination date: 20160618 |