CN102723776A - Virtual debugging system with transformer substation protection measurement and control device - Google Patents

Virtual debugging system with transformer substation protection measurement and control device Download PDF

Info

Publication number
CN102723776A
CN102723776A CN2012101591476A CN201210159147A CN102723776A CN 102723776 A CN102723776 A CN 102723776A CN 2012101591476 A CN2012101591476 A CN 2012101591476A CN 201210159147 A CN201210159147 A CN 201210159147A CN 102723776 A CN102723776 A CN 102723776A
Authority
CN
China
Prior art keywords
transformer substation
communication server
virtual
test platform
control device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012101591476A
Other languages
Chinese (zh)
Other versions
CN102723776B (en
Inventor
蒋彪
张澄
李祥明
何菲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Taizhou Power Supply Co of Jiangsu Electric Power Co
Original Assignee
Taizhou Power Supply Co of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taizhou Power Supply Co of Jiangsu Electric Power Co filed Critical Taizhou Power Supply Co of Jiangsu Electric Power Co
Priority to CN201210159147.6A priority Critical patent/CN102723776B/en
Publication of CN102723776A publication Critical patent/CN102723776A/en
Application granted granted Critical
Publication of CN102723776B publication Critical patent/CN102723776B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Testing And Monitoring For Control Systems (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a virtual debugging system with a transformer substation protection measurement and control device. The transformer substation protection measurement and control device is connected with a signal input end of a transformer substation communication server; a signal output end of the transformer substation communication server is connected with a virtual test platform; a control port of the virtual test platform is connected with a virtual machine; a switching value, a protection signal and an alternating current amount signal are uploaded to a background of the transformer substation communication server by the transformer substation protection measurement and control device and transmitted to an input end of the transformer substation communication server through the background; the transformer substation communication server performs analysis and transmission according to the switching value, the protection signal and the alternating current amount signal and transmits data to the virtual test platform; and the virtual machine provides the operating environment of device software for the virtual test platform and reflects a result.

Description

The virtual debug system of a kind of transforming plant protecting measure and control device
Technical field
The invention provides the virtual debug system of a kind of transforming plant protecting measure and control device.
Background technology
Dispatch automated system is maked rapid progress; It is comparatively frequent to upgrade upgrading, and each change just need be carried out the checking of transformer station's four remote sensing informations, and remote measurement, remote signalling, remote control, the remote regulating test of one or two equipment of transformer station under running status has a lot of limitation; Particularly intelligence or digital transformer substation; Can not check information comprehensively, therefore can not react the state of electrical network one secondary device comprehensively, need to combine the debugging that has a power failure.And regulation and controlling of information can not in time be verified as the operator on duty work such as the effective monitoring of grid equipment, accident treatment are hidden some dangers for.And when inconsistent,, carry out the actual information compare of analysis with field device information when the regulation and control client information occurring, need equally to combine power failure, influence troubleshooting speed greatly for must on transforming plant apparatus, testing of inspection problem.Protective device, measure and control device are when operation; How to guarantee to send the information on regulation and control and backstage consistent with of ac, switching value, the remote state of protection measure and control device; How to verify simultaneously the correspondence with foreign country process of protection observing and controlling logic and device, be the problem that the operating maintenance personnel are concerned about always.Traditional test mode is that a secondary device is being had a power failure, item by item test in debug process or maintenance process.Accomplish such test process not only manpower and the time of labor, more crucial is to need primary equipment to have a power failure, and influences the reliability index of equipment.
Summary of the invention
The invention provides the virtual debug system of a kind of transforming plant protecting measure and control device, it can replace the secondary device of operation under the situation that a secondary device does not have a power failure, thereby can reduce the workload of field adjustable, increases work efficiency and the power devices reliability.
The present invention has adopted following technical scheme: the virtual debug system of a kind of transforming plant protecting measure and control device; It is characterized in that it comprises protection and testing apparatus, transformer substation communication server, virtual test platform and the virtual machine of transformer station; Transforming plant protecting is connected through the signal input part with the transformer substation communication server with measure and control device; The signal output part of transformer substation communication server is connected with the virtual test platform; Control port at the virtual test platform is connected with virtual machine; The protection of transformer station and testing apparatus upload to the backstage of transformer substation communication server with switching value, guard signal and of ac signal and are sent to the input of transformer substation communication server through the backstage; The transformer substation communication server is analyzed according to switching value, guard signal and of ac signal and is transmitted and to virtual test platform transmission data, virtual machine is to the running environment of virtual test platform generator software, with embedded c lingware code operation; And obtain data, and the result is reflected from the virtual test platform.
Described transforming plant protecting and measure and control device through and the signal input part of transformer substation communication server between transmit through IEC61850 communication protocol.
The present invention has following beneficial effect: after having adopted above technical scheme, the present invention not only builds the unified virtual test platform of striding producer, multi-protocols, formulates interface specification, and user's man-machine interface is provided.On man-machine interface, select producer, unit type, device version etc., guarantee that the bottom program of calling is consistent with field apparatus, the information exchange of realization and backstage, the communication server.And the bottom of virtual test system is virtual machine, is the program implementation platform.The present invention can replace the protection, the measure and control device that move through this system, can on send relevant remote signalling, remote measurement amount, can verify remote control, remote regulating order that upper system is sent again, have protection, observing and controlling logic testing function simultaneously concurrently.The present invention can send the information on regulation and control and backstage consistent with of ac, switching value, the remote state of protection measure and control device under transformer station's one secondary device running status in the assurance, possess the correspondence with foreign country process of checking protection observing and controlling logic and device simultaneously.Its realization; Not only can solve the change of regulation and control main website, background system brings " four is distant " information to check the outstanding problem that does not comprehensively cause regulation and control, O&M potential safety hazard at all; And can when defect processing, need not wait power failure in time to carry out device information and logic checking; Can also reduce simultaneously the cost of repair and maintenance (it is scarce to rush to repair, disappear) widely, the more important thing is and to reduce the equipment interruption duration, avoid unnecessary power failure.Aspect maintenance, operational management meaning, it will become the effectively perfect of existing examination, detection means and replenish, and possess actual dissemination.Therefore through the application of this patent, reach a secondary device all under running status, safety, verify the accuracy of regulation and control and background information and protection measure and control device software logic function comprehensively, effectively, efficiently.
Description of drawings
Fig. 1 is a structured flowchart of the present invention
Embodiment
In Fig. 1; The invention provides the virtual debug system of a kind of transforming plant protecting measure and control device; It comprises protection and testing apparatus, transformer substation communication server, virtual test platform and the virtual machine of transformer station; Transforming plant protecting is connected through the signal input part with the transformer substation communication server with measure and control device; Transforming plant protecting and measure and control device through and the signal input part of transformer substation communication server between transmit through IEC61850 communication protocol, the signal output part of transformer substation communication server is connected with the virtual test platform, is connected with virtual machine at the control port of virtual test platform; The protection of transformer station and testing apparatus upload to the backstage of transformer substation communication server with switching value, guard signal and of ac signal and are sent to the input of transformer substation communication server through the backstage; The transformer substation communication server is analyzed according to switching value, guard signal and of ac signal and is transmitted and to virtual test platform transmission data, virtual machine moves embedded c lingware code the running environment of virtual test platform generator software on PC; And obtain data, and the result is reflected from the virtual test platform.The present invention is the integrated software system that runs on PC; Can replace the protection, the measure and control device that move through this system; Can on send relevant remote signalling, remote measurement amount, can verify remote control, remote regulating order that upper system sends again, have protection, observing and controlling logic testing function simultaneously concurrently.

Claims (2)

1. virtual debug system of transforming plant protecting measure and control device; It is characterized in that it comprises protection and testing apparatus, transformer substation communication server, virtual test platform and the virtual machine of transformer station; Transforming plant protecting is connected through the signal input part with the transformer substation communication server with measure and control device; The signal output part of transformer substation communication server is connected with the virtual test platform; Control port at the virtual test platform is connected with virtual machine, and the protection of transformer station and testing apparatus upload to switching value, guard signal and of ac signal the backstage of transformer substation communication server and are sent to the input of transformer substation communication server through the backstage, and the transformer substation communication server is analyzed according to switching value, guard signal and of ac signal and transmitted and to virtual test platform transmission data; Virtual machine is to the running environment of virtual test platform generator software; Embedded c lingware code is moved, and obtain data, and the result is reflected from the virtual test platform.
2. the virtual debug system of transforming plant protecting measure and control device according to claim 1, it is characterized in that described transforming plant protecting and measure and control device through and the signal input part of transformer substation communication server between transmit through IEC61850 communication protocol.
CN201210159147.6A 2012-05-22 2012-05-22 A kind of transforming plant protecting measure and control device Virtual Debugging system Active CN102723776B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210159147.6A CN102723776B (en) 2012-05-22 2012-05-22 A kind of transforming plant protecting measure and control device Virtual Debugging system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210159147.6A CN102723776B (en) 2012-05-22 2012-05-22 A kind of transforming plant protecting measure and control device Virtual Debugging system

Publications (2)

Publication Number Publication Date
CN102723776A true CN102723776A (en) 2012-10-10
CN102723776B CN102723776B (en) 2015-08-12

Family

ID=46949473

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210159147.6A Active CN102723776B (en) 2012-05-22 2012-05-22 A kind of transforming plant protecting measure and control device Virtual Debugging system

Country Status (1)

Country Link
CN (1) CN102723776B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104574204A (en) * 2014-12-16 2015-04-29 国家电网公司 Automatic identification system and method for ICD model of intelligent measurement and control device
CN106597182A (en) * 2017-02-15 2017-04-26 国网安徽省电力公司宣城供电公司 Substation protection and measurement and control device virtual debugging system
CN106646071A (en) * 2017-02-15 2017-05-10 国网安徽省电力公司宣城供电公司 Virtual test system for line protection, maintenance and replacement
CN106646070A (en) * 2017-02-15 2017-05-10 国网安徽省电力公司宣城供电公司 Virtual machine-based small-sized test system for intelligent transformer substation
CN106712302A (en) * 2017-02-15 2017-05-24 国网安徽省电力公司宣城供电公司 Offline test system for expansion and maintenance equipment in substation
CN106842986A (en) * 2017-02-15 2017-06-13 国网安徽省电力公司宣城供电公司 A kind of minimum virtual test system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2935584Y (en) * 2006-08-09 2007-08-15 李东波 Automatic system analog simulation test apparatus of power distribution network
CN101158847A (en) * 2007-08-23 2008-04-09 济南钢铁集团总公司 Electric power substation software emulation platform building method and no power off upgrading improved method
CN100470976C (en) * 2005-09-07 2009-03-18 上海东捷建设(集团)有限公司 Integrated automation converting station debugging apparatus
CN102014127A (en) * 2010-10-28 2011-04-13 北京四方继保自动化股份有限公司 IEC61850 object-oriented online communication system and legacy system migration method
CN102033798B (en) * 2010-10-20 2012-12-05 国电南瑞科技股份有限公司 Method for simulating intelligent electronic device IEC61850/MMS (Microsoft media server) server

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100470976C (en) * 2005-09-07 2009-03-18 上海东捷建设(集团)有限公司 Integrated automation converting station debugging apparatus
CN2935584Y (en) * 2006-08-09 2007-08-15 李东波 Automatic system analog simulation test apparatus of power distribution network
CN101158847A (en) * 2007-08-23 2008-04-09 济南钢铁集团总公司 Electric power substation software emulation platform building method and no power off upgrading improved method
CN102033798B (en) * 2010-10-20 2012-12-05 国电南瑞科技股份有限公司 Method for simulating intelligent electronic device IEC61850/MMS (Microsoft media server) server
CN102014127A (en) * 2010-10-28 2011-04-13 北京四方继保自动化股份有限公司 IEC61850 object-oriented online communication system and legacy system migration method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104574204A (en) * 2014-12-16 2015-04-29 国家电网公司 Automatic identification system and method for ICD model of intelligent measurement and control device
CN104574204B (en) * 2014-12-16 2018-06-19 国家电网公司 Intelligent measuring and control device ICD models automatic identification system and method
CN106597182A (en) * 2017-02-15 2017-04-26 国网安徽省电力公司宣城供电公司 Substation protection and measurement and control device virtual debugging system
CN106646071A (en) * 2017-02-15 2017-05-10 国网安徽省电力公司宣城供电公司 Virtual test system for line protection, maintenance and replacement
CN106646070A (en) * 2017-02-15 2017-05-10 国网安徽省电力公司宣城供电公司 Virtual machine-based small-sized test system for intelligent transformer substation
CN106712302A (en) * 2017-02-15 2017-05-24 国网安徽省电力公司宣城供电公司 Offline test system for expansion and maintenance equipment in substation
CN106842986A (en) * 2017-02-15 2017-06-13 国网安徽省电力公司宣城供电公司 A kind of minimum virtual test system

Also Published As

Publication number Publication date
CN102723776B (en) 2015-08-12

Similar Documents

Publication Publication Date Title
CN102723776B (en) A kind of transforming plant protecting measure and control device Virtual Debugging system
CN102663530B (en) HVDC (High Voltage Direct Current) transmission system safe early warning and evaluating system
CN104037937B (en) A kind of analog simulation intelligent substation measure and control device
CN104569688A (en) Automatic testing system and method for power distribution terminal
CN104539051B (en) A kind of secondary equipment of intelligent converting station online evaluation system
CN103454516A (en) Intelligent transformer substation secondary equipment health state diagnosis method
CN102354918A (en) Method and device for maintaining power transmission and transformation equipment
CN103559648A (en) Grid equipment state inspection and evaluation training system
CN102331534A (en) Power distribution terminal detecting system and method
CN104578408A (en) State monitoring and tendency estimation device for secondary equipment of intelligent substation
CN105069587A (en) Mobile Internet-based relay protection verification device
WO2015149595A1 (en) Iec61850-based communication simulation method for insulation on-line monitoring device
CN105447657A (en) Risk-based operation and maintenance management system of 750KV power equipment
CN202524167U (en) A state detection and intelligent control device for high-voltage circuit breaker
CN110611312B (en) On-line simulation system and method for panoramic data of substation bay level
CN103630781A (en) Composite energy supply non-contact on-line monitoring system for active electronic current transformer
CN104359668A (en) Testing device for detecting key characteristics of valve executing mechanism of steam turbine on site and operating method
CN204374731U (en) Based on high voltage electric equipment information acquisition and the evaluation system of EMS-API
CN104916336A (en) Reactor protection command logical processing module testing apparatus
CN103530824A (en) Method for producing knowledge base of intelligent warning system of transformer substation based on template base
CN109193616A (en) A kind of substation's telecontrol information distribution acceptance method and system
CN104502748A (en) Transformer station integrated automatic test system
CN201994728U (en) Remote constant value modification and remote maintenance system for protecting device of converting station
CN203350429U (en) On-line real-time error monitoring system for alternating current sampling measurement apparatus
CN103499763A (en) Real-time on-line remote monitoring transformer iron core current device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: TAIZHOU POWER SUPPLY CO. OF JIANGSU ELECTRIC POWER CO.

Effective date: 20121119

Owner name: JIANGSU ELECTRIC POWER COMPANY TAIZHOU POWER SUPPL

Effective date: 20121119

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 225300 TAIZHOU, JIANGSU PROVINCE TO: 100031 XICHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20121119

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: Jiangsu Electric Power Company

Applicant after: Taizhou Power Supply Co. of Jiangsu Electric Power Co.

Address before: 225300 Phoenix West Road, Jiangsu, Taizhou, No. 2

Applicant before: Taizhou Power Supply Co. of Jiangsu Electric Power Co.

C14 Grant of patent or utility model
GR01 Patent grant