CN102722784A - Method for setting list or quota rapidly - Google Patents
Method for setting list or quota rapidly Download PDFInfo
- Publication number
- CN102722784A CN102722784A CN2012101631721A CN201210163172A CN102722784A CN 102722784 A CN102722784 A CN 102722784A CN 2012101631721 A CN2012101631721 A CN 2012101631721A CN 201210163172 A CN201210163172 A CN 201210163172A CN 102722784 A CN102722784 A CN 102722784A
- Authority
- CN
- China
- Prior art keywords
- quantities
- information
- user
- project name
- bill
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a method for setting a list. The method comprises the following steps of: acquiring an item name input by a user; selecting entry information with the item name from a list library; storing the entry information with the item name in a quantities bill; acquiring the component type input aiming at the item name in the quantities bill by the user; selecting the component name and the quantities information matched with the item name and the component type from a component library, and storing the component name and the quantities information to a database; acquiring the component name input by the user; selecting all quantities information with the same name as the component name input by the user; and summing all quantities information and aggregating the quantities information to the positions corresponding to the item name and the component type in the quantities bill. By using the scheme provided by the invention, a large number of times for inquiring a list library or a quota library can be saved; a large amount of repeated labor is avoided; and the work efficiency is improved.
Description
Technical field
The present invention relates to communication technical field, in particular, relate to the method for quick cover inventory or quota.
Background technology
The cover quota is a technical term in the construction budget.In construction budget, the budget ultimate principle is: calculate quantities, calculate quantities after; According to the differentiation of construction method and technology, can in quota, find corresponding specific item, obtain corresponding comprehensive unit price; Multiply by the quantities that has calculated again, finally draw total price.This process just is " cover quota ".The principle of cover inventory is similar with the cover quota.Inventory is exactly the total price table of different-format with quota in essence.
In the epoch of area of computer aided calculation amount, cost personnel can calculate quickly and accurately and gather quantities.The process of back cover inventory or cover quota is still very complicated but the calculation amount finishes.The current all cover inventories or the method for quota all are from each member, and according to the foundation works amount of member, for example length, surface area or volume etc. are chosen corresponding list item in quota storehouse or inventory storehouse, gather again.Suppose that member adds up to m, the candidate item in quota storehouse or inventory storehouse adds up to n, and then this process need repeats m * n time, and is not only loaded down with trivial details, and has a large amount of duplication of labour.
Therefore, how in the process of cover inventory, to raise the efficiency, become the problem that needs most solution at present.
Summary of the invention
In view of this, purpose of design of the present invention is, the method for a kind of quick cover inventory or quota is provided, and avoiding in the process of cover inventory, duplicating work, thereby raises the efficiency.
The embodiment of the invention is achieved in that
A kind of method of quick cover inventory comprises:
Obtain the project name of user's input;
In the inventory storehouse, select items for information with said project name;
The items for information that will have said project name stores in the bill of quantities;
Obtain the element type that the user imports to the project name in the said bill of quantities;
In component base, select the member title and the quantities information that all are complementary with said project name and said element type, and with said member title and quantities information stores to database;
Obtain the member title of user's input;
In said database, select all identical quantities information of member title with said user's input;
Said all quantities information phase adductions are aggregated in the said bill of quantities position corresponding to said project name and said element type.
A kind of method of quick cover quota comprises:
Obtain the project name of user's input;
In the quota storehouse, select items for information with said project name;
The items for information that will have said project name stores in the bill of quantities;
Obtain the element type that the user imports to the project name in the said bill of quantities;
In component base, select the member title and the quantities information that all are complementary with said project name and said element type, and with said member title and quantities information stores to database;
Obtain the member title of user's input;
In said database, select all identical quantities information of member title with said user's input;
Said all quantities information phase adductions are aggregated in the said bill of quantities position corresponding to said project name and said element type.Compared with prior art, the technical scheme that provides of present embodiment has the following advantages and characteristics:
In scheme provided by the invention, from inventory storehouse or quota storehouse, filter out the project name that needs earlier, form preliminary bill of quantities form, again from bill of quantities, obtain the quantities information in the component base.The present invention is through electing the project name of needs earlier from inventory storehouse or quota storehouse; So just need when gathering the corresponding quantities information of each project name, all not go to search in inventory storehouse or the quota storehouse; So the number of times in prior art inquiry inventory storehouse or quota storehouse is identical with the quantity of project name; And the present invention only need inquire about inventory storehouse at first or the quota storehouse gets final product; So saved the number of times in a large amount of inquiry inventory storehouses or quota storehouse, thereby avoided a large amount of repeated labors, improved work efficiency.
Description of drawings
In order to be illustrated more clearly in the present invention or technical scheme of the prior art; To do to introduce simply to the accompanying drawing of required use in embodiment or the description of the Prior Art below; Obviously, the accompanying drawing in describing below only is some embodiments of the present invention, for those of ordinary skills; Under the prerequisite of not paying creative work, can also obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the process flow diagram of the method for a kind of quick cover inventory provided by the present invention.
Embodiment
To combine the accompanying drawing in the embodiment of the invention below, the technical scheme in the embodiment of the invention is carried out clear, intactly description, obviously, described embodiment only is the present invention's part embodiment, rather than whole embodiment.Based on the embodiment among the present invention, those of ordinary skills are not making the every other embodiment that is obtained under the creative work prerequisite, all belong to the scope of the present invention's protection.
The embodiment of the invention provides a kind of method of quick cover inventory, comprising: the project name that obtains user's input; In the inventory storehouse, select items for information with said project name; The items for information that will have said project name stores in the bill of quantities; Obtain the element type that the user imports to the project name in the said bill of quantities; In component base, select the member title and the quantities information that all are complementary with said project name and said element type, and with said member title and quantities information stores to database; Obtain the member title of user's input; In said database, select all identical quantities information of member title with said user's input; Said all quantities information phase adductions are aggregated in the said bill of quantities position corresponding to said project name and said element type.
Because there is multiple mode in the concrete realization of the method for above-mentioned quick cover inventory, is elaborated through specific embodiment below:
See also shown in Figure 1ly, shown in Figure 1 is a kind of process flow diagram of method of quick cover inventory, comprising:
Step S11, obtain the project name of user input;
Step S12, in the inventory storehouse, select items for information with said project name;
Step S13, the items for information that will have a said project name store in the bill of quantities;
Step S14, obtain the element type that the user imports to the project name in the said bill of quantities;
Step S15, in component base, select the member title and the quantities information that all are complementary with said project name and said element type, and with said member title and quantities information stores to database;
Step S16, obtain the member title of user input;
Step S17, in said database, select all identical quantities information of member title of importing with said user;
Step S18, said all quantities information phase adductions are aggregated in the said bill of quantities position corresponding to said project name and said element type.
In the embodiment shown in fig. 1, because the principle of cover inventory is similar with the cover quota.Inventory and quota are exactly the total price table of different-format in essence, so just repeat no more about the part of cover quota, please direct step and principle referring to the cover inventory get final product.
In the embodiment shown in fig. 1, in scheme provided by the invention, from inventory storehouse or quota storehouse, filter out the project name that needs earlier, form preliminary bill of quantities form,, obtain the quantities information in the component base again from bill of quantities.The present invention is through electing the project name of needs earlier from inventory storehouse or quota storehouse; So just need when gathering the corresponding quantities information of each project name, all not go to search in inventory storehouse or the quota storehouse; So the number of times in prior art inquiry inventory storehouse or quota storehouse is identical with the quantity of project name; And the present invention only need inquire about inventory storehouse at first or the quota storehouse gets final product; So saved the number of times in a large amount of inquiry inventory storehouses or quota storehouse, thereby avoided a large amount of repeated labors, improved work efficiency.
Research and develop in the process of the present invention the inventor, find: what 1) user really needed is final bill of quantities.2) number of components is huge, and clauses and subclauses are also a lot of in inventory (by norm) storehouse, but the clauses and subclauses of bill of quantities are less relatively.3) inventory (by norm) clauses and subclauses and element type have deterministic correlativity, can filter irrelevant member fast in view of the above.
Therefore, the workflow before scheme provided by the invention has reversed, its basic step is following:
The first step is chosen clauses and subclauses from (inventory) quota storehouse, form inventory (by norm) bill of quantities.Note having only table style, concrete value remains to be inserted.
In second step,, gather and calculate its corresponding whole project for each clauses and subclauses in inventory (by norm) bill of quantities.Its specific practice is at first to choose the associated components type.The element type that Automatic Program is chosen according to the user filters out candidate's member, and to the component classification management, makes things convenient for the user to select in batches.
In the 3rd step, on this basis, the user chooses the member that needs, and specifies the foundation works amount of counterpart member.
In the 4th step, inspection audit summarized results is confirmed to obtain final bill of quantities after errorless.Corresponding print result, next step all derives budget risk controls etc. on the basis of this bill of quantities, and this seldom does and gives unnecessary details again.
Above core thinking is a reverse thinking, and the popular former way of saying is overlapped inventory (by norm) from member; The present invention is from inventory (by norm) table, the quantities of cover member.
For different engineerings; Though its amount that finally goes out varies; But inventory (by norm) summary sheet has very strong correlativity: each clauses and subclauses of inventory (by norm) summary sheet are all from inventory (by norm) storehouse, and the correlativity between each clauses and subclauses and the element type is confirmed simultaneously.Inventory (by norm) summary sheet of different engineerings has certain similarity.With the quota summary sheet is example, and the quota summary sheet list item between the frame structure building is similar, and the quota summary sheet between the brick-and-concrete buildings also is similar.The user is different according to his job category, and handled summary sheet also possesses similarity.Make a budget such as certain client, its summary sheet of doing is because the job specification of budget possesses certain similarity; Another one client does risk control, and its summary sheet of doing is because the job specification of risk control also possesses certain similarity.
Based on this, the present invention has further proposed the notion of template knowledge base.The user can save as template to former ready-made summary sheet, and its form and the correlativity of list item and element type of process analysis adds knowledge base.And program also can define the template (such as framed structure quota summary sheet template, brick mix structure quota summary sheet template or the like) of several criteria in advance.
Had like this under the prerequisite of template knowledge base, user's workflow is following:
1) is written into the summary sheet template, obtains the quantities tableau format.Different if any slightly, the user can manually do some trickle adjustment to form.
2) according to template cover amount automatically.Software can be selected corresponding member automatically according to the knowledge that defines in the template (the particularly correlativity between list item and the member), accomplishes gathering of list item.
3) inspection auditing result is confirmed to obtain final summary sheet after errorless.
The conduct of template knowledge base replenishes standard method, though can't replace standard method, can be applied in the most operative scenario, on the basis of standard method, promotes work efficiency further.For special operative scenario, the user still need finish the work in standard method.
In sum, the topmost difference of the present invention has been to reverse workflow in the past.Be from each member in the past, in inventory (by norm) storehouse, chose corresponding list item, gathered again.The present invention's list item that at first screening needs from inventory (by norm) storehouse forms the quantities tableau format.From bill of quantities, extract the workload of counterpart member again.Because can confirm in advance with the related element type of each inventory (by norm) list item; But Automatic sieve is selected associated components in view of the above; And associated components can be according to type and floor classification, so whole cover amount process efficiency is high, the duplication of labour is few; And can be applied to the summary sheet (divide member such as needs, divide floor to go out the situation of summary sheet) of any form.Can derive more function from new workflow in addition, such as according to summary sheet format module cover amount automatically, such as management function of final summary sheet or the like.These all belong to the content of protection.
Need to prove that embodiment shown in Figure 1 is the preferred embodiment that the present invention introduces, those skilled in the art can design more embodiment on this basis fully, therefore do not give unnecessary details herein.
Multiple modification to these embodiment will be conspicuous concerning those skilled in the art, and defined General Principle can realize under the situation that does not break away from the spirit or scope of the present invention in other embodiments among this paper.Therefore, the present invention will can not be restricted to these embodiment shown in this paper, but will meet and principle disclosed herein and features of novelty the wideest corresponding to scope.
Claims (2)
1. a method of overlapping inventory fast is characterized in that, comprising:
Obtain the project name of user's input;
In the inventory storehouse, select items for information with said project name;
The items for information that will have said project name stores in the bill of quantities;
Obtain the element type that the user imports to the project name in the said bill of quantities;
In component base, select the member title and the quantities information that all are complementary with said project name and said element type, and with said member title and quantities information stores to database;
Obtain the member title of user's input;
In said database, select all identical quantities information of member title with said user's input;
Said all quantities information phase adductions are aggregated in the said bill of quantities position corresponding to said project name and said element type.
2. a method of overlapping quota fast is characterized in that, comprising:
Obtain the project name of user's input;
In the quota storehouse, select items for information with said project name;
The items for information that will have said project name stores in the bill of quantities;
Obtain the element type that the user imports to the project name in the said bill of quantities;
In component base, select the member title and the quantities information that all are complementary with said project name and said element type, and with said member title and quantities information stores to database;
Obtain the member title of user's input;
In said database, select all identical quantities information of member title with said user's input;
Said all quantities information phase adductions are aggregated in the said bill of quantities position corresponding to said project name and said element type.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012101631721A CN102722784A (en) | 2012-05-23 | 2012-05-23 | Method for setting list or quota rapidly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012101631721A CN102722784A (en) | 2012-05-23 | 2012-05-23 | Method for setting list or quota rapidly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102722784A true CN102722784A (en) | 2012-10-10 |
Family
ID=46948532
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012101631721A Pending CN102722784A (en) | 2012-05-23 | 2012-05-23 | Method for setting list or quota rapidly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102722784A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104899702A (en) * | 2015-06-26 | 2015-09-09 | 江苏易合大成网络科技有限公司 | Big data-based decoration budget quota management system and method |
CN105335905A (en) * | 2015-11-24 | 2016-02-17 | 广州拓欧信息技术有限公司 | Building engineering computation and evaluation system and method |
CN106096997A (en) * | 2016-06-01 | 2016-11-09 | 江苏国泰新点软件有限公司 | Inventory composing exes, system and device |
CN107918824A (en) * | 2017-11-02 | 2018-04-17 | 中交第二公路工程局有限公司 | A kind of highway engineering construction Norm Measure method |
CN109409634A (en) * | 2018-08-23 | 2019-03-01 | 国网天津市电力公司 | A method of the metering of Grid Construction Project project amount is carried out based on project management APP |
CN110851462A (en) * | 2019-11-06 | 2020-02-28 | 福建省晨曦信息科技股份有限公司 | One-key pricing method and terminal based on engineering data |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005025495A (en) * | 2003-07-02 | 2005-01-27 | Hitachi Ltd | Design change automation system |
CN101847177A (en) * | 2010-04-09 | 2010-09-29 | 中铁第一勘察设计院集团有限公司 | Method for automatically using rate in budget estimate setting |
CN101847231A (en) * | 2010-04-09 | 2010-09-29 | 中铁第一勘察设计院集团有限公司 | Associating method of rate transformation matrices byfor budget estimate setting |
CN101859344A (en) * | 2010-04-09 | 2010-10-13 | 中铁第一勘察设计院集团有限公司 | Self-adaptive concrete quota applying method |
CN102004828A (en) * | 2010-11-15 | 2011-04-06 | 成都鹏业软件股份有限公司 | Method for computing work amount |
-
2012
- 2012-05-23 CN CN2012101631721A patent/CN102722784A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005025495A (en) * | 2003-07-02 | 2005-01-27 | Hitachi Ltd | Design change automation system |
CN101847177A (en) * | 2010-04-09 | 2010-09-29 | 中铁第一勘察设计院集团有限公司 | Method for automatically using rate in budget estimate setting |
CN101847231A (en) * | 2010-04-09 | 2010-09-29 | 中铁第一勘察设计院集团有限公司 | Associating method of rate transformation matrices byfor budget estimate setting |
CN101859344A (en) * | 2010-04-09 | 2010-10-13 | 中铁第一勘察设计院集团有限公司 | Self-adaptive concrete quota applying method |
CN102004828A (en) * | 2010-11-15 | 2011-04-06 | 成都鹏业软件股份有限公司 | Method for computing work amount |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104899702A (en) * | 2015-06-26 | 2015-09-09 | 江苏易合大成网络科技有限公司 | Big data-based decoration budget quota management system and method |
CN104899702B (en) * | 2015-06-26 | 2018-08-24 | 江苏易合大成网络科技有限公司 | Decoration norm for detailed estimates management system based on big data and management method |
CN105335905A (en) * | 2015-11-24 | 2016-02-17 | 广州拓欧信息技术有限公司 | Building engineering computation and evaluation system and method |
CN105335905B (en) * | 2015-11-24 | 2020-01-21 | 广州拓欧信息技术有限公司 | Building engineering calculation and evaluation system and method |
CN106096997A (en) * | 2016-06-01 | 2016-11-09 | 江苏国泰新点软件有限公司 | Inventory composing exes, system and device |
CN107918824A (en) * | 2017-11-02 | 2018-04-17 | 中交第二公路工程局有限公司 | A kind of highway engineering construction Norm Measure method |
CN107918824B (en) * | 2017-11-02 | 2022-03-08 | 中交第二公路工程局有限公司 | Method for determining construction quota of highway engineering |
CN109409634A (en) * | 2018-08-23 | 2019-03-01 | 国网天津市电力公司 | A method of the metering of Grid Construction Project project amount is carried out based on project management APP |
CN110851462A (en) * | 2019-11-06 | 2020-02-28 | 福建省晨曦信息科技股份有限公司 | One-key pricing method and terminal based on engineering data |
CN110851462B (en) * | 2019-11-06 | 2022-09-16 | 福建晨曦信息科技集团股份有限公司 | One-key pricing method and terminal based on engineering data |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102722784A (en) | Method for setting list or quota rapidly | |
CN105279270A (en) | Patent retrieving apparatus and retrieving method therefor | |
CN107357825A (en) | A kind of project document management system based on database | |
JP5502251B1 (en) | Form data management server and form data management program | |
CN105740368A (en) | Method and device for generating report form | |
CN104471595A (en) | Workflow management device and workflow management method | |
US8589386B2 (en) | Card view for project resource search results | |
CN102436503A (en) | Data condition filtering and screening method and screener | |
CN109165377A (en) | Generate the method and tabulating equipment of form data | |
US10963963B2 (en) | Rule based hierarchical configuration | |
US20130346138A1 (en) | Creation of production process workflow diagrams | |
KR20130124208A (en) | Sewing manufacturing process consulting apparatus and method, and computer-readable recording medium | |
CN104424271A (en) | Method and system for automatically acquiring digital resources of publications | |
CN103119618A (en) | Database, work content data management server and work content data management program | |
CA2522254A1 (en) | Method and system for designing, implementing and documenting olap | |
CN101118536A (en) | Process for decomposing tasks table and device thereof | |
JP2001325413A (en) | Connector oriented workflow managing system and workflow detecting method | |
CN105378709A (en) | Systems and methods for file management by mobile computing devices | |
CN104182433B (en) | The hinge analysis method of use condition group | |
CN101727489A (en) | Method and device for storing base table division code | |
CN112464085B (en) | House source recommendation method and device, electronic equipment and storage medium | |
CN101504640A (en) | Data sheet editing method and apparatus | |
CN101566987A (en) | Secondary information source database system and source processing method thereof | |
CN112948441A (en) | Financial data-oriented multidimensional data aggregation method and equipment | |
CN112069780A (en) | Control method and device for custom billboard data display in third-party platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20121010 |