CN102720125A - Concrete filled steel tube pier having steel tubes with holes - Google Patents

Concrete filled steel tube pier having steel tubes with holes Download PDF

Info

Publication number
CN102720125A
CN102720125A CN201210212841XA CN201210212841A CN102720125A CN 102720125 A CN102720125 A CN 102720125A CN 201210212841X A CN201210212841X A CN 201210212841XA CN 201210212841 A CN201210212841 A CN 201210212841A CN 102720125 A CN102720125 A CN 102720125A
Authority
CN
China
Prior art keywords
steel
concrete
steel pipe
pier
tubes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210212841XA
Other languages
Chinese (zh)
Inventor
李自林
高玉彬
李欢
张锴锋
王帅
连延金
常洁
李明芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Urban Construction College
Original Assignee
Tianjin Urban Construction College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Urban Construction College filed Critical Tianjin Urban Construction College
Priority to CN201210212841XA priority Critical patent/CN102720125A/en
Publication of CN102720125A publication Critical patent/CN102720125A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a concrete filled steel tube pier having steel tubes with holes. The pier comprises steel tubes, concrete cores, a plurality of steel bars and protective layers, wherein a plurality of holes are formed on circumferential surfaces of the steel tubes, the concrete cores are located inside the steel tubes, the plurality of steel bars penetrate through two opposite holes of each of the steel bars, the middle portions of the steel bars are located inside the concrete cores, two ends of the steel bars extend out of the steel tubes, and the protective layers are arranged outside the steel tubes and cover the end portions of the steel bars. According to the concrete filled steel tube pier, relative sliding between the steel bars and the concrete can be prevented effectively, so that the working performance of the concrete filled steel tube pier can be guaranteed on the premise that the bearing force of the pier is not reduced. Besides, cement plaster flows out of the holes can serve as protective layers and can be coated on the surfaces of steel tubes, the corrosion of the steel tubes can be prevented, and the service life of the pier is prolonged. The steel bars extend out of the steel tubes, so that the protective layers can be prevented from peeling off and the service life of the pier is prolonged.

Description

The concrete pier of steel tube that has eyelet on the steel pipe
Technical field
The invention belongs to the bridge technology field, particularly relate to the concrete pier of steel tube that has eyelet on a kind of steel pipe.
Background technology
Concrete filled steel tubular member is a filling concrete and forming in steel pipe.This member can remedy the deficiency of two kinds of materials through steel pipe and the interaction of concrete core in stressed; Give full play to advantage separately; Thereby have plurality of advantages such as bearing capacity height, plasticity and good toughness, therefore in bridge and civilian construction, obtained application more and more widely.
Bonding between steel pipe and the concrete is a kind of complicated interaction the between the two, and through the transmission and the compatible deformation of two kinds of material interface active forces of this interaction realization, this is steel pipe and the cooperative together prerequisite of two kinds of combinations of materials of concrete.Adhesive property all has very big influence for deformation of members and bearing capacity, if relative slippage takes place between steel pipe and the concrete, will influence the deformability and the bearing capacity of concrete filled steel tubular member.And present engineering circle does not also have can effectively prevent to take place between steel pipe and the concrete method of relative slippage.Therefore between steel pipe and the concrete relatively the research of slippage problem just become one of problem that current engineering circle comparatively is concerned about.
In addition, if steel pipe directly is exposed in the air, it is easy to corroded; Therefore, if concrete filled steel tubular member is used as bridge pier, its bearing capacity is reduced; If increase certain thickness concrete cover in steel tube surface; Since between topping and the steel pipe to be connected power poor, therefore this topping is easy to separate with steel pipe under the long term of external force, the result causes topping to peel off.In addition, because the existence of steel pipe is not easy to make the bubble in the concrete core to emerge, causes the concrete core leakiness, thereby seriously influence concrete compressive strength, the result has reduced the actual carrying capacity of reinforced concrete bridge pier.
Summary of the invention
In order to address the above problem, the object of the present invention is to provide and a kind ofly can effectively prevent the relative slippage between concrete filled steel tubular member steel pipe and the concrete, prevent that concrete cover from peeling off, saving material, reduce operating expenses, guaranteeing to have on the steel pipe of bridge pier and bed rearrangement bridge quality the concrete pier of steel tube of eyelet.
In order to achieve the above object, the concrete pier of steel tube that has eyelet on the steel pipe provided by the invention comprises steel pipe, concrete core, many reinforcing bars and topping; Wherein be formed with a plurality of eyelets on the periphery of steel pipe; Concrete core is positioned at the inside of steel pipe; Many reinforcing bars run through two relative on steel pipe eyelets, and the middle part is arranged in concrete core, and the outside of steel pipe is stretched out at two ends; Topping is arranged on the outside of steel pipe, and covers the outer end of reinforcing bar.
The perforation density of two-end part is greater than the perforation density at middle part on the described steel pipe.
Described many reinforcing bars are crisscross arranged in concrete core.
The concrete pier of steel tube that has eyelet on the steel pipe provided by the invention is a plurality of eyelets that on steel pipe, form a certain size and density; In eyelet, insert many middle parts simultaneously and be arranged in concrete core; Two ends are positioned at the outside reinforcing bar of steel pipe; Because the existence of circular hole and reinforcing bar can effectively prevent the relative slippage between steel pipe and the concrete, therefore can under the prerequisite that does not weaken the bridge pier bearing capacity, guarantee the service behaviour of concrete pier of steel tube.In addition, the cement mortar that from eyelet, flows out can be used as the surface that topping is applied in steel pipe, can prevent that steel pipe from being corroded, thereby prolong the application life of bridge pier.In addition, because reinforcing bar stretches out the outside at steel pipe, therefore can effectively prevent peeling off of topping; Prolong the application life of bridge pier; In addition, the bubble in the concrete core can come out through eyelet all around, has increased the compactness of concrete core thus; Thereby strengthened concrete compressive strength, increased the actual carrying capacity of concrete pier of steel tube.This method is easy to realize, and cost is lower, can be applied in the construction control operation of similar concrete filled steel tubular member.
Description of drawings
Fig. 1 is steel pipe side schematic view on the concrete pier of steel tube that has eyelet on the steel pipe provided by the invention.
Fig. 2 is for having the concrete pier of steel tube cross sectional representation of eyelet on the steel pipe provided by the invention.
The specific embodiment
Below in conjunction with accompanying drawing and specific embodiment the concrete pier of steel tube that has eyelet on the steel pipe provided by the invention is elaborated.
Like Fig. 1, shown in Figure 2, the concrete pier of steel tube that has eyelet on the steel pipe provided by the invention comprises steel pipe 1, concrete core 3, many reinforcing bars 5 and topping 4; Wherein be formed with a plurality of eyelets 2 on the periphery of steel pipe 1; Concrete core 3 is positioned at the inside of steel pipe 1; Many reinforcing bars 5 run through two relative on the steel pipe 1 eyelets 2, and the middle part is arranged in concrete core 3, and the outside of steel pipe 1 is stretched out at two ends; Topping 4 is arranged on the outside of steel pipe 1, and covers the outer end of reinforcing bar 5.
Eyelet 2 density of two-end part are greater than eyelet 2 density at middle part on the described steel pipe 1.
Described many reinforcing bars 5 are crisscross arranged in concrete core 3.
Existing the concrete pier of steel tube manufacturing process that has eyelet on the steel pipe provided by the invention is set forth as follows: at first with many reinforcing bars 5 level or oblique passing two corresponding eyelets 2 from steel pipe 1 respectively; And the outside of steel pipe 1 is stretched out at the two ends that make reinforcing bar 5; The concrete perfusion in the inside of steel pipe 1 then; Treat to form concrete core 3 after the concrete setting; Utilize the concrete for making layer protective layer 4 that leaks out from above-mentioned eyelet 2 edges in the outside of steel pipe 1 afterwards, should guarantee that the two ends of reinforcing bar 5 are positioned at topping 4 inside, promptly can be made into the concrete pier of steel tube that has eyelet on the described steel pipe thus.

Claims (3)

1. have the concrete pier of steel tube of eyelet on the steel pipe, it is characterized in that: the concrete pier of steel tube that has eyelet on the described steel pipe comprises steel pipe (1), concrete core (3), many reinforcing bars (5) and topping (4); Wherein be formed with a plurality of eyelets (2) on the periphery of steel pipe (1); Concrete core (3) is positioned at the inside of steel pipe (1); Many reinforcing bars (5) run through steel pipe (1) and go up relative two eyelets (2), and the middle part is arranged in concrete core (3), and the outside of steel pipe (1) is stretched out at two ends; Topping (4) is arranged on the outside of steel pipe (1), and covers the outer end of reinforcing bar (5).
2. have the concrete pier of steel tube of eyelet on the steel pipe according to claim 1, it is characterized in that: described steel pipe (1) is gone up eyelet (2) density of eyelet (2) density of two-end part greater than the middle part.
3. have the concrete pier of steel tube of eyelet on the steel pipe according to claim 1, it is characterized in that: described many reinforcing bars (5) are crisscross arranged in concrete core (3).
CN201210212841XA 2012-06-26 2012-06-26 Concrete filled steel tube pier having steel tubes with holes Pending CN102720125A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210212841XA CN102720125A (en) 2012-06-26 2012-06-26 Concrete filled steel tube pier having steel tubes with holes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210212841XA CN102720125A (en) 2012-06-26 2012-06-26 Concrete filled steel tube pier having steel tubes with holes

Publications (1)

Publication Number Publication Date
CN102720125A true CN102720125A (en) 2012-10-10

Family

ID=46945980

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210212841XA Pending CN102720125A (en) 2012-06-26 2012-06-26 Concrete filled steel tube pier having steel tubes with holes

Country Status (1)

Country Link
CN (1) CN102720125A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735100A (en) * 2016-04-20 2016-07-06 四川省交通运输厅公路规划勘察设计研究院 Full-steel-pipe concrete composite bridge

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60246927A (en) * 1984-05-17 1985-12-06 Sumitomo Metal Ind Ltd Joint between pile head part and concrete member
JPH09291589A (en) * 1996-04-26 1997-11-11 Shimizu Corp Joining structure of filled steel pipe concrete column and beam
US20050050837A1 (en) * 2003-09-08 2005-03-10 Jiaduo Wang Meshed (porous) steel pipe/tube used as concrete reinforcement
KR100570231B1 (en) * 2005-07-09 2006-04-11 우경건설 주식회사 Structure section extension equipment and an extension method of construction using ps steel materials and a steel plate
CN2934432Y (en) * 2006-08-04 2007-08-15 王加多 Reinforced frame for concrete structure
CN201865041U (en) * 2010-11-22 2011-06-15 天津城市建设学院 Concrete filled steel tube pier preventing protective layer from being stripped
CN201883701U (en) * 2010-09-13 2011-06-29 武汉大学 Coated concrete-filled steel tubular concrete column reinforcement structure
CN102373804A (en) * 2011-11-15 2012-03-14 天津大学 Novel precast concrete pipe column structure and construction method thereof
CN102493601A (en) * 2011-11-29 2012-06-13 河海大学 Hole-type steel tube concrete pier stud

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60246927A (en) * 1984-05-17 1985-12-06 Sumitomo Metal Ind Ltd Joint between pile head part and concrete member
JPH09291589A (en) * 1996-04-26 1997-11-11 Shimizu Corp Joining structure of filled steel pipe concrete column and beam
US20050050837A1 (en) * 2003-09-08 2005-03-10 Jiaduo Wang Meshed (porous) steel pipe/tube used as concrete reinforcement
KR100570231B1 (en) * 2005-07-09 2006-04-11 우경건설 주식회사 Structure section extension equipment and an extension method of construction using ps steel materials and a steel plate
CN2934432Y (en) * 2006-08-04 2007-08-15 王加多 Reinforced frame for concrete structure
CN201883701U (en) * 2010-09-13 2011-06-29 武汉大学 Coated concrete-filled steel tubular concrete column reinforcement structure
CN201865041U (en) * 2010-11-22 2011-06-15 天津城市建设学院 Concrete filled steel tube pier preventing protective layer from being stripped
CN102373804A (en) * 2011-11-15 2012-03-14 天津大学 Novel precast concrete pipe column structure and construction method thereof
CN102493601A (en) * 2011-11-29 2012-06-13 河海大学 Hole-type steel tube concrete pier stud

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735100A (en) * 2016-04-20 2016-07-06 四川省交通运输厅公路规划勘察设计研究院 Full-steel-pipe concrete composite bridge

Similar Documents

Publication Publication Date Title
CN202787577U (en) Prefabricating wall outer shell structure of reinforced concrete superimposition shear wall
CN104018724B (en) Connecting device of prestress concrete tower section and steel tower section of combination wind power tower
CN202323683U (en) Steel plate light steel fiber concrete pier provided with hooping and stiffening ribs with holes
CN105971160A (en) Method for preventing 3D printing reinforced masonry shear wall being unshelled
CN104295004B (en) A kind of UHPC-CFST composite column structure and construction method thereof
CN102433962A (en) Square covering square hollow sandwiched carbon fiber steel rib-steel pipe concrete combined column
CN102418424A (en) Method for reinforcing silo in circumferential direction
CN105756365B (en) A kind of method of rapid reinforcement beams of concrete
CN203320812U (en) Concrete anti-crack reinforcing mesh
CN107460995A (en) A kind of anti-buckling thin-wall steel tube steel fiber reinforced concrete coupled column and its construction method
CN104746494A (en) Hollow interlining FRP-steel tube sea sand recycled concrete member
CN202164545U (en) Vertical prestressing pore canal communicating pipes and mud-jacking pipes
CN202090336U (en) Spirally-proceeding type steel tube concrete pile
CN102720125A (en) Concrete filled steel tube pier having steel tubes with holes
CN206267106U (en) A kind of prefabrication and assembly construction concrete flume
CN202371432U (en) Double-layer seamless steel tube
CN204960101U (en) Cavity intermediate layer steel pipe sea sand recycled concrete component
CN103437349B (en) The construction method of steel concrete perfusion shaped pile
CN102277828A (en) Steel and concrete combined box-shaped structured pier
CN201865041U (en) Concrete filled steel tube pier preventing protective layer from being stripped
CN105735564B (en) Combined bearing member capable of being partially disassembled and replaced and manufacturing method
CN205976532U (en) Sleeve grout connection structure and wall body
CN203639900U (en) Hollow pile
CN202492795U (en) Bridge pier structure with square steel tube provided with stiffening ribs with openings and light steel fiber reinforced concrete
CN208670307U (en) A kind of prefabricated high-strength tubulose stiffness body of green

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20121010