CN102704408A - Primary truss for triangle hanging basket - Google Patents

Primary truss for triangle hanging basket Download PDF

Info

Publication number
CN102704408A
CN102704408A CN2012102178724A CN201210217872A CN102704408A CN 102704408 A CN102704408 A CN 102704408A CN 2012102178724 A CN2012102178724 A CN 2012102178724A CN 201210217872 A CN201210217872 A CN 201210217872A CN 102704408 A CN102704408 A CN 102704408A
Authority
CN
China
Prior art keywords
hanging basket
girder
main beam
twisted steel
fining twisted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012102178724A
Other languages
Chinese (zh)
Inventor
王成双
沙权贤
高学文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd
Original Assignee
First Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd filed Critical First Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd
Priority to CN2012102178724A priority Critical patent/CN102704408A/en
Publication of CN102704408A publication Critical patent/CN102704408A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a primary truss for a triangle hanging basket. The primary truss comprises a main beam (1) of which one end is anchored by an embedded threaded part and the other end is suspended, wherein the lower end of the middle of the main beam (1) is provided with a slide block (2), and an upright post (3) perpendicular to the main beam (1) is arranged above the middle of the main beam (1). The primary truss is characterized in that two ends of the main beam (1) are respectively connected with the upper end of the upright post (3) through finish rolling deformed steel bars (4); inclined cushion blocks (5) are arranged among the finish rolling deformed steel bars (4), the main beam (1) and the upright post (3); and the inclined cushion block (5) can guarantee that a nut (6) connected to each finish rolling deformed steel bars (4) is perpendicular to the axis of each finish rolling deformed steel bar (4). The primary truss for the triangle hanging basket is simple in structure, ingenious in design and reasonable in layout, the material consumption is reduced on the basis that the bearing conditions are met, and the cost is effectively controlled.

Description

The triangle hanging basket main couple
Technical field
The present invention relates to a kind of bridge construction load-carrying members, particularly a kind of triangle hanging basket main couple.
Background technology
In the work progress of continuous girder bridge; Need to adopt the mode of occupation of Hanging Basket cantilever, triangle hanging basket is one of form of Hanging Basket cantilever, and traditional triangle hanging basket main couple adopts parts such as shaped steel, i iron to build mostly; This structure is owing to receive the restriction of shaped steel material; Its deadweight is bigger, and the main couple after building is because materials used is more, so cost is high.Therefore need a kind of novel Hanging Basket trussed construction that can address the above problem now.
Summary of the invention
The present invention is in order to solve the above-mentioned deficiency of existing in prior technology, proposes a kind of simple in structurely, designs ingeniously, rationally distributed, on the basis of satisfying the load-bearing condition, reduces consumption of materials, the triangle hanging basket main couple of effectively controlling cost.
Technical solution of the present invention is: a kind of triangle hanging basket main couple; Comprise that an end utilizes pre-buried screw element anchoring, the unsettled girder 1 of the other end; The lower end, middle part of girder 1 is provided with slide block 2; Above the middle part of girder 1, also be provided with column 3 orthogonal with it; It is characterized in that: the two ends of described girder 1 are connected through fining twisted steel 4 respectively with the upper end of column 3, between fining twisted steel 4 and girder 1, column 3, are provided with inclination cushion block 5, and the nut 6 that inclination cushion block 5 can guarantee to be connected on the fining twisted steel 4 is perpendicular with the axis of fining twisted steel 4.
The present invention compares with prior art, has following advantage:
The triangle hanging basket main couple of this kind of form of structure, it is simple in structure, designs ingenious; It adopts shaped steel to build to traditional Hanging Basket cantilever construction; More because of materials used, cause defectives such as its deadweight is bigger, with high costs, design and utilize the special construction of fining twisted steel as oblique triangular draw bar; And correspondingly design the inclination cushion block for the link head part of fining twisted steel, good to guarantee its stressed effect.The manufacture craft of this triangle hanging basket main couple is simple, and is cheap for manufacturing cost, we can say that it has possessed multiple advantage, and its market prospects are very wide.
Description of drawings
Fig. 1 is the structural representation of the embodiment of the invention.
The specific embodiment
Below with the accompanying drawings specific embodiment of the present invention.As shown in Figure 1: a kind of triangle hanging basket main couple, comprise a girder 1 as the basis, an end of this girder 1 utilizes pre-buried screw element anchoring, the then unsettled setting of the other end; Lower end, middle part at girder 1 is provided with slide block 2, and the effect of slide block 2 is to support girder 1, and it is fixing with girder 1 jointly with the end through pre-buried screw element anchoring.Above girder 1 middle part, also be provided with and girder 1 orthogonal column 3; In the two ends of girder 1 and the upper end of column 3; Connect through fining twisted steel 4 respectively; Fining twisted steel 4 is as tiltedly triangular draw bar use; Junction point, fining twisted steel 4 at fining twisted steel 4 and girder 1 all are provided with inclination cushion block 5 with the junction point of column 3, a face tilt certain angle of inclination cushion block 5, and its effect is that the nut 6 that guarantees to be connected on the fining twisted steel 4 is vertical each other with axially remaining of fining twisted steel 4.
The course of work of the triangle hanging basket main couple of the embodiment of the invention is following: at first the end with girder 1 utilizes pre-buried screw element anchoring, and other end cantilever is provided with, and is used for load-bearing; And between the upper end of the two ends of girder 1 and column 3 cross-under fining twisted steel 4, the weight of fining twisted steel 4 is lighter, but intensity is enough to meet design requirement compared to traditional structure; And for the fining twisted steel 4 that tilts can successfully be installed on girder 1 and the column 3, the binding site place at them also is provided with inclination cushion block 5, and inclination cushion block 5 can guarantee that the nut 6 of fastening fining twisted steel 4 keeps vertical with fining twisted steel 4.

Claims (1)

1. triangle hanging basket main couple; Comprise that an end utilizes pre-buried screw element anchoring, the unsettled girder (1) of the other end; The lower end, middle part of girder (1) is provided with slide block (2); Top, middle part at girder (1) also is provided with column orthogonal with it (3); It is characterized in that: the two ends of described girder (1) are connected through fining twisted steel (4) respectively with the upper end of column (3), between fining twisted steel (4) and girder (1), column (3), are provided with inclination cushion block (5), and the nut (6) that inclination cushion block (5) can guarantee to be connected on the fining twisted steel (4) is perpendicular with the axis of fining twisted steel (4).
CN2012102178724A 2012-06-28 2012-06-28 Primary truss for triangle hanging basket Pending CN102704408A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012102178724A CN102704408A (en) 2012-06-28 2012-06-28 Primary truss for triangle hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012102178724A CN102704408A (en) 2012-06-28 2012-06-28 Primary truss for triangle hanging basket

Publications (1)

Publication Number Publication Date
CN102704408A true CN102704408A (en) 2012-10-03

Family

ID=46897440

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012102178724A Pending CN102704408A (en) 2012-06-28 2012-06-28 Primary truss for triangle hanging basket

Country Status (1)

Country Link
CN (1) CN102704408A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2306258Y (en) * 1997-09-17 1999-02-03 铁道部大桥工程局第五桥梁工程处 Bottom running type construction basket
CN201473889U (en) * 2009-06-12 2010-05-19 中铁二十二局集团第一工程有限公司 Aslant-stayed three-cornered hanging basket
CN201560400U (en) * 2009-09-17 2010-08-25 南昌市创新钢结构有限公司 Stayed-cable hanging basket
CN202073046U (en) * 2011-05-13 2011-12-14 湖南中铁五新钢模有限责任公司 Main truss system of downward hanging basket
CN202744966U (en) * 2012-06-28 2013-02-20 中铁十三局集团第一工程有限公司 Main truss for triangular hanging baskets

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2306258Y (en) * 1997-09-17 1999-02-03 铁道部大桥工程局第五桥梁工程处 Bottom running type construction basket
CN201473889U (en) * 2009-06-12 2010-05-19 中铁二十二局集团第一工程有限公司 Aslant-stayed three-cornered hanging basket
CN201560400U (en) * 2009-09-17 2010-08-25 南昌市创新钢结构有限公司 Stayed-cable hanging basket
CN202073046U (en) * 2011-05-13 2011-12-14 湖南中铁五新钢模有限责任公司 Main truss system of downward hanging basket
CN202744966U (en) * 2012-06-28 2013-02-20 中铁十三局集团第一工程有限公司 Main truss for triangular hanging baskets

Similar Documents

Publication Publication Date Title
CN101852019B (en) Lifting mounting method for inclined steel roof
CN101597918B (en) Prestressed giant brace-frame structure
CN201326226Y (en) Hexagonal honeycomb aseismic building frame structure
CN210002946U (en) Inclination type building floor support frame
CN112982655A (en) Spatial steel structure combined by triangular truss and single-layer latticed shell
CN203320737U (en) X-type shear wall structure
CN105507127A (en) Arch rib face internal multi-point restrained and distributed tied-arch bridge
CN202787047U (en) Deck type triangular steel truss composite beam
CN102330470B (en) Single-layer prestressing frame structure
CN102002912A (en) Simultaneous construction type wide-flanged guyed traveler
CN202744966U (en) Main truss for triangular hanging baskets
CN203866711U (en) Large span cable-stayed bridge tower beam three-way temporary consolidation structure
CN203546599U (en) Pier-side bracket
CN204644869U (en) Drag-line bridge tower anchoring structure
CN102704408A (en) Primary truss for triangle hanging basket
CN201671067U (en) Trapezoidal main truss of bridge suspended cast truss type suspension basket
CN102140775A (en) Girder string continuous cable stayed bridge
CN205839601U (en) A kind of inverted U template of pier column of bridge
CN203896253U (en) High-strength single-column photovoltaic support
CN109763416B (en) Novel double-arch bridge
CN104532732B (en) The self-anchored suspension bridge of fish spine structure
CN210636293U (en) Vertical steel arch cable-stayed bridge
CN203066357U (en) Large-span arch-shaped steel truss structure
CN105155406A (en) Hollow thin-wall pier frame bearing platform and bridge
CN113622308A (en) Bottle pier shaft and bent cap integration construction formwork

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C05 Deemed withdrawal (patent law before 1993)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20121003