CN102692921B - Line control vehicle-mounted integrated testing system and method based on object signal - Google Patents

Line control vehicle-mounted integrated testing system and method based on object signal Download PDF

Info

Publication number
CN102692921B
CN102692921B CN201210202104.1A CN201210202104A CN102692921B CN 102692921 B CN102692921 B CN 102692921B CN 201210202104 A CN201210202104 A CN 201210202104A CN 102692921 B CN102692921 B CN 102692921B
Authority
CN
China
Prior art keywords
module
signal
ground signal
test
control subsystem
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210202104.1A
Other languages
Chinese (zh)
Other versions
CN102692921A (en
Inventor
王志伟
苏军贵
曾垂周
戴毅欣
邓俊彦
申竹林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuzhou CRRC Times Electric Co Ltd
Hunan CRRC Times Signal and Communication Co Ltd
Original Assignee
Zhuzhou CSR Times Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuzhou CSR Times Electric Co Ltd filed Critical Zhuzhou CSR Times Electric Co Ltd
Priority to CN201210202104.1A priority Critical patent/CN102692921B/en
Publication of CN102692921A publication Critical patent/CN102692921A/en
Application granted granted Critical
Publication of CN102692921B publication Critical patent/CN102692921B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a line control vehicle-mounted integrated testing system and method based on an object signal. The line control vehicle-mounted integrated testing system comprises a testing main control subsystem and a ground signal control subsystem, wherein the testing main control subsystem is used for testing a human-machine interface, loading ground signal key point data, carrying out running position calculation, acquiring an output of a tested device and sending a signal of controlling a speed and pressure generation device; and the ground signal control subsystem is used for receiving a running position, sending a command of controlling a ground signal device so as to load a message of a point transponder, synchronously computing a running position and a key point, coding a track circuit, controlling a point transponder control device, controlling a track circuit code sending device and carrying out network communication. The method is applied to the integrated testing system, and all functions are executed on the testing main control subsystem and the ground signal control subsystem. According to the invention, all object condition signal generation devices can be centrally controlled and a complete actual condition signal is provided for device experiments and tests, and the actuality and effectiveness of testing and experimenting conditions are improved.

Description

Train control on board equipment integrated test system and method based on signal in kind
Technical field
The present invention is mainly concerned with the field tests of Train Operation Control System Onboard equipment, refers in particular to a kind of train control on board equipment integrated test system and method based on signal in kind.
Background technology
The initial conditions signal that " Train Operation Control System Onboard equipment " is in operation mainly comprises traveling speed, train tube pressure (common locomotive also comprises equalizing reservoir pressure), brake-cylinder pressure, driver controller handle position, track circuit information, dot-mode transponder information etc., in to Train Operation Control System Onboard testing equipment and proof procedure, need to, for it provides above-mentioned conditioned signal, form basic experimental situation.
At present, in the test and experiment of train control on board equipment, these conditioned signals all provide by signal imitation instrument or equipment, but various test macro of the prior art has the following disadvantages:
(1) the simulation locomotive conditions that prior art provides is the simulated conditions electric signal generating by signal modulation circuit, as velocity pulse, train line pressure magnitude of voltage, brake-cylinder pressure magnitude of voltage etc., signal is pure, cannot simulate the marginal testing environment such as clutter, interference.
(2) only to take the main control system of CTCS-0 level train control on board equipment be target and tested object to prior art, the simulated conditions signal providing is only the required pacing items signal of CTCS-0 level train control on board equipment main control system, reckon without other peripheral mobile unit, also do not meet test and the checking requirement of high-level Train Operation Control System Onboard equipment.
(3) in prior art, each equipment configuration in kind disperses, function singleness, and control man-machine interface without integrated test, operating process is complicated.
Summary of the invention
The technical problem to be solved in the present invention is just: the technical matters existing for prior art, the invention provides a kind of can be by various conditioned signal generation equipment centralized control in kind and for equipment experiment and test provide train control on board equipment integrated test system and the method based on signal in kind of comprehensive full-scale condition signal, in order to improve authenticity and the validity of test and experiment condition.
For solving the problems of the technologies described above, the present invention by the following technical solutions:
A train control on board equipment integrated test system based on signal in kind, is characterized in that, comprising:
Test master control subsystem, for the signal of testing man-machine interface, loading ground signal key point data, carry out run location calculating, gather equipment under test output and send control rate and pressure-generating device; Described test master control subsystem comprises test master controller and the test human-computer interface module, ground signal key point position data load-on module, run location computing module, speed generating means control module, pressure-generating device control module, digital signal acquiring module and the vehicle-mounted end network communication module that are connected with test master controller;
Ground signal control subsystem, for receiving run location, sending the order of controlling trackside signal facility, to realize the loading of dot-mode transponder message, run location and to cross the synchronous computing of key point, track circuit code, the control of dot-mode transponder control device, track circuit signaling device (track circuit loop wire signaling case) control, network service; Described ground signal control subsystem comprises ground signal master controller and the dot-mode transponder packet storage being connected with ground signal master controller and load-on module, clocked flip-flop module, track circuit code module, dot-mode transponder control device control module, track circuit signaling device control module and ground surface end network communication module;
Described test master control subsystem is connected by communication network with ground signal control subsystem.
As a further improvement on the present invention:
Described test master controller and ground signal master controller all adopt industrial computer.
The present invention further provides a kind of method of testing that is applied to above-mentioned integrated test system, it is carried out flow process and comprises:
1. data in the data load-on module loading position file of ground signal key point position, described data comprise ground signal type, spacing distance, key point numbering, track circuitsystem, track circuit carrier frequency, track circuit low frequency code;
2. the speed drive run location computing module by the input of test human-computer interface module calculates in real time, and result of calculation sends to ground signal control subsystem by vehicle-mounted end network communication module;
3. by speed generating means control module, the velocity amplitude of test human-computer interface module input is sent to speed generating means equipment, the feedback data of acquisition speed generating means equipment is also being tested man-machine interface module;
4. by pressure-generating device control module, the force value of test human-computer interface module input is sent to pressure-generating device equipment, obtain the feedback data of pressure-generating device equipment and testing man-machine interface module;
5. by digital signal acquiring module, the handle operating mode instruction of test human-computer interface module input is sent to signal regulating panel, and gather from signal regulating panel the control signal that equipment under test sends, and in test man-machine interface module;
6. ground signal control subsystem receives after train real time execution information and ground signal supplemental characteristic by ground surface end network communication module, and after track circuit code module coding, generates trigger event and be stored in clocked flip-flop module;
7. by clocked flip-flop module, accurately judge the ground signal key point moment, if ground signal is track circuit, by track circuit signaling device control module, sent the order of track circuit signaling; If ground signal is dot-mode transponder, by dot-mode transponder control device control module, sends dot-mode transponder message and write order and activation command.
Compared with prior art, the invention has the advantages that:
1, method of testing of the present invention and system are the designs based on signal in kind, be about to various conditioned signal generation equipment centralized control in kind, for equipment experiment and test provide comprehensive full-scale condition signal, thereby authenticity and the validity of test and experiment condition have been improved.
2, the present invention is by the driving equipment in kind of being correlated with, and flexible configuration associated signal parameter, provides operation required full-scale condition signal environment to tested train control on board equipment.
3, the present invention can test needs according to reality, by controlling vehicle-mounted interface matter emulation equipment and ground signal matter emulation equipment, to whole row control vehicle-mounted system, provide true controlled condition signal manually or automatically, provide high-level Train Operation Control System Onboard equipment required actual signal interface simultaneously.
4, the present invention is by the integrated man-machine interface of each test condition signal controlling is provided, simple to operate, friendly interface, and possess automatic test function to a certain degree.
Accompanying drawing explanation
Fig. 1 is the composition framework schematic diagram of test macro of the present invention.
Fig. 2 is the principle of work schematic diagram of testing master control subsystem in the present embodiment.
Fig. 3 is the principle of work schematic diagram of ground signal control subsystem in the present embodiment.
Embodiment
Below with reference to Figure of description and specific embodiment, the present invention is described in further details.
As shown in Figure 1, the train control on board equipment integrated test system based on signal in kind of the present invention, comprising:
Test master control subsystem, for the signal of testing man-machine interface, loading ground signal key point data, carry out run location calculating, gather equipment under test output and send control rate and pressure-generating device; It can be switched in automatic operation and manually between control, be switched by test pattern;
Ground signal control subsystem, for receiving run location, sending the order of controlling trackside signal facility, to realize the loading of dot-mode transponder message, run location and to cross the synchronous computing of key point, track circuit code, the control of dot-mode transponder control device, track circuit signaling device (track circuit loop wire signaling case) control, network service.
Test master control subsystem is connected by Ethernet with ground signal control subsystem.In the present embodiment, test master control subsystem and ground signal control subsystem all can adopt industrial computer.
In the present embodiment, test master control subsystem comprises:
Test human-computer interface module, is used to provide test man-machine interface;
Ground signal key point position data load-on module, for loading the data of describing ground signal position;
Run location computing module, for calculating the position relationship of virtual train and ground signal key point;
Speed generating means control module, is used for sending speed command and then control rate generating means;
Pressure-generating device control module, for sending cylinder pressure order and then controlled pressure generating means;
Digital signal acquiring module, provides train operating mode level information, obtains equipment under test output for the input and output of control level signal and then to equipment under test;
Vehicle-mounted end network communication module, for sending virtual train real time execution information and ground signal supplemental characteristic.
Shown in Figure 2, the course of work of test master control subsystem is:
1) test man-machine interface
Test man-machine interface is arranged by speed input field, speed generating means and is monitored that district, pressure input field, pressure-generating device monitor that district, handle operating mode input field, equipment under test output display area, viewing area, ground signal key point position, parameter configuration district (comprising that communication port setting and wheel footpath arrange), control knob district form.
2) ground signal key point position loads
Ground signal key point information refers to teleseme and dot-mode transponder position and the correlation parameter information on one section of circuit, comprise ground signal type, spacing distance, key point numbering, track circuitsystem, track circuit carrier frequency, track circuit low frequency code, ground signal key point information adopts the storage of xml formatted file.
3) run location computing
Run location computing is to calculate the kinematic calculation of train on above-mentioned circuit, calculate the relative position with ground signal key point, the positional information of calculating is in real time sent to ground signal control subsystem by network, by it, synchronously judged key point, and accurately trigger equipment in kind and send ground signal.
4) speed generating means is controlled
Test master control subsystem is by RS485 control rate generating means.
After being connected with speed generating means, according to man-machine interface input speed, pre-set the theoretical rotational speed that wheel footpath, each axle velocity shifts are calculated respectively 4 axles, and send and drive each axle to rotate to it, each axle rotating speed of inbound pacing generating means feedback shows in real time after calculating simultaneously; When stopping, reverse direction operation, pressure send reset command to speed generating means.
5) pressure-generating device is controlled
Test master control subsystem is by RS485 controlled pressure generating means
After being connected with pressure-generating device, according to man-machine interface, input each cylinder goal pressure, goal pressure transformation period, to it, send pressure adjustment order, circulation sends pressure querying command, and shows in real time according to each cylinder pressure of its feedback.
6) digital signal acquiring
Test master control subsystem connects signal regulating panel by pci data analog input card, to its input handle operating mode 5V level signal and standby level signal, and gathers tested train control on board equipment outputs level signals and shows in man-machine interface from signal regulating panel.
7) vehicle-mounted end network service
Test master control subsystem is controlled ground signal control subsystem by network service and is sent track circuit frequency signal, and activates dot-mode transponder message.
Adopt TCP/IP network communication protocol, test master control subsystem is server end, ground signal control subsystem is client, and the packet of network interaction comprises: network state is controlled bag, operation information packet, track circuit packet, dot-mode transponder packet, response packet.
Network state is controlled package informatin and is comprised: data head, the state of shaking hands, connection status, off-state;
Operation information packet information comprises: data head, transponder exist sign, travelling speed, front signal machine numbering, current track circuitsystem, current track circuit carrier frequency, lower subregion track circuitsystem, lower subregion track circuit carrier frequency, apart from front signal machine distance, the place ahead transponder numbering, apart from the place ahead transponder distance;
Track circuit packet information comprises: data head, sending mode (transmission immediately, lower subregion send), track circuit low-frequency information code;
Dot-mode transponder packet information comprises: data head, active dot-mode transponder numbering, active dot-mode transponder message user profile code;
Response packet information comprises: data head, response packet type.
Data unpack and adopt anti-sticky bag design.
In the present embodiment, ground signal control subsystem comprises:
Dot-mode transponder packet storage and load-on module, for storage and loading transponder message user profile, this transponder message user profile comprises transponder spacing distance, transponder message user profile code in transponder numbering, transponder types, group;
Clocked flip-flop module, for carrying out the synchronous computing of key point, accurately sending ground signal steering order;
Track circuit code module, for generating correct low-frequency information;
Dot-mode transponder control device control module, for sending dot-mode transponder control device activation command and message data;
Track circuit signaling device control module, for sending the order of track circuit signaling;
Ground surface end network communication module, for receiving train real time execution information and ground signal supplemental characteristic.
Shown in Figure 3, the course of work of ground signal control subsystem is:
1) dot-mode transponder message loads
Dot-mode transponder message data information comprises the interior transponder spacing distance of transponder numbering, transponder types, group, the transponder message user profile code of passive balise, adopts xml form or the storage of txt formatted file.
Before test assignment, dot-mode transponder message data file is loaded into internal memory chained list, for test process, retrieve and call.
2) run location and the excessively synchronous computing of key point
Ground signal control subsystem is according to the key point information of obtaining from test master control subsystem (track circuit frequency information, transponder numbering and message etc.), deposit self-defining clocked flip-flop in, process in real time the speed that receives from test master control subsystem, apart from information such as key point (track circuit signaling point, cross transponder point) distances, refresh timing trigger trigger event, realized the accurate control triggering of key point in real time.
3) track circuit code
Ground signal control subsystem is according to track circuitsystem, carrier frequency value, the low-frequency information code search condition obtained from test master control subsystem, in " track signal low-frequency information allocation table ", search corresponding low frequency value, and search frequency deviation, equipment and show modulation code information, and deposit above-mentioned clocked flip-flop in, as track circuit signaling device, control.
4) dot-mode transponder message coding
Ground signal control subsystem is compiled as according to compiling standard the message that finally writes transponder by the passive balise message " user profile code " of the active balise message obtaining from test master control subsystem and bootstrap loading.
5) dot-mode transponder control device is controlled
Ground signal control subsystem is communicated by letter with dot-mode transponder control device by RS422.
When ground signal control subsystem gets a new dot-mode transponder numbering from test master control subsystem, through above-mentioned dot-mode transponder message coding, generate respectively and write trigger event and activate trigger event (write the time interval that trigger event activates trigger event in advance can customize) and deposit above-mentioned clocked flip-flop in.
In meeting while writing trigger condition dot-mode transponder group, all transponder messages write dot-mode transponder control device with message frame form, and content comprises: spacing distance, each transponder message, CRC32 check code between transponder number, each transponder numbering, each transponder in data head, group.
When meet activating trigger condition, activation command is sent to dot-mode transponder control device with active control frame form, content comprises: each transponder numbering and check code in first transponder distance, group in data head, activation marker, transponder number, travelling speed, distance group.
6) track circuit signaling device is controlled
Ground signal control subsystem is communicated by letter with track circuit signaling device by RS485.
When ground signal control subsystem gets new track circuit frequency information from test master control subsystem, after above-mentioned track circuit code, generator orbital circuit signaling trigger event, and deposit above-mentioned clocked flip-flop in.
When meeting track circuit signaling trigger condition, the track circuit frequency information of storing in trigger is issued to track circuit signaling device with command frame form, and content comprises: data head, device numbering, standard, carrier frequency, frequency deviation, demonstration modulation code, electric current and check code.
Track circuit signaling device returns to implementation status to this program with loopback frames form after fill order, and content comprises: data head, device numbering, order reception result, loop wire state and check code.
7) ground surface end network service
Ground signal control subsystem receives by network service running state information and the control command that test master control subsystem issues.
Adopt TCP/IP network communication protocol, this program is client, and test master control subsystem is server end.
In ground signal control subsystem, from test master control subsystem, get dot-mode transponder packet, the active dot-mode transponder numbering being subject to and the renewal of message user profile code are write to the described internal memory chained list of above-mentioned dot-mode transponder message loading, handle together with passive balise information.
Data unpack and adopt anti-sticky bag design.
The present invention further provides a kind of method of testing that is applied to above-mentioned integrated test system, the method comprises:
1. data in the data load-on module loading position file of ground signal key point position, described data comprise ground signal type, spacing distance, key point numbering, track circuitsystem, track circuit carrier frequency, track circuit low frequency code;
2. the speed drive run location computing module by the input of test human-computer interface module calculates in real time, and result of calculation sends to ground signal control subsystem by vehicle-mounted end network communication module;
3. by speed generating means control module, the velocity amplitude of test human-computer interface module input is sent to speed generating means equipment, the feedback data of acquisition speed generating means equipment is also being tested man-machine interface module;
4. by pressure-generating device control module, the force value of test human-computer interface module input is sent to pressure-generating device equipment, obtain the feedback data of pressure-generating device equipment and testing man-machine interface module;
5. by digital signal acquiring module, the handle operating mode instruction of test human-computer interface module input is sent to signal regulating panel, and gather from signal regulating panel the control signal that equipment under test sends, and in test man-machine interface module;
6. ground signal control subsystem receives after train real time execution information and ground signal supplemental characteristic by ground surface end network communication module, and after track circuit code module coding, generates trigger event and be stored in clocked flip-flop module;
7. by clocked flip-flop module, accurately judge the ground signal key point moment, if ground signal is track circuit, by track circuit signaling device control module, sent the order of track circuit signaling; If ground signal is dot-mode transponder, by dot-mode transponder control device control module, sends dot-mode transponder message and write order and activation command.
Below be only the preferred embodiment of the present invention, protection scope of the present invention is also not only confined to above-described embodiment, and all technical schemes belonging under thinking of the present invention all belong to protection scope of the present invention.It should be pointed out that for those skilled in the art, some improvements and modifications without departing from the principles of the present invention, should be considered as protection scope of the present invention.

Claims (3)

1. the train control on board equipment integrated test system based on signal in kind, is characterized in that, comprising:
Test master control subsystem, for the signal of testing man-machine interface, loading ground signal key point data, carry out run location calculating, gather equipment under test output and send control rate and pressure-generating device; Described test master control subsystem comprises test master controller and the test human-computer interface module, ground signal key point position data load-on module, run location computing module, speed generating means control module, pressure-generating device control module, digital signal acquiring module and the vehicle-mounted end network communication module that are connected with test master controller;
Ground signal control subsystem, for receiving run location, send the order of controlling trackside signal facility, ground signal control subsystem by receiving run location, send the order of controlling trackside signal facility to realize the loading of dot-mode transponder message, run location and to cross that the synchronous computing of key point, track circuit code, dot-mode transponder control device are controlled, track circuit signaling device is controlled, network service; Described ground signal control subsystem comprises ground signal master controller and the dot-mode transponder packet storage being connected with ground signal master controller and load-on module, clocked flip-flop module, track circuit code module, dot-mode transponder control device control module, track circuit signaling device control module and ground surface end network communication module;
Described test master control subsystem is connected by communication network with ground signal control subsystem.
2. the train control on board equipment integrated test system based on signal in kind according to claim 1, is characterized in that, described test master controller and ground signal master controller all adopt industrial computer.
3. be applied in claim 1~2 method of testing for integrated test system described in any one, it is characterized in that, carry out flow process and comprise:
Figure 405499DEST_PATH_IMAGE001
data in the data load-on module loading position file of ground signal key point position, described data comprise ground signal type, spacing distance, key point numbering, track circuitsystem, track circuit carrier frequency, track circuit low frequency code;
Figure 322639DEST_PATH_IMAGE002
speed drive run location computing module by the input of test human-computer interface module calculates in real time, and result of calculation sends to ground signal control subsystem by vehicle-mounted end network communication module;
by speed generating means control module, the velocity amplitude of test human-computer interface module input is sent to speed generating means equipment, the feedback data of acquisition speed generating means equipment is also being tested man-machine interface module;
Figure 559902DEST_PATH_IMAGE004
by pressure-generating device control module, the force value of test human-computer interface module input is sent to pressure-generating device equipment, obtain the feedback data of pressure-generating device equipment and testing man-machine interface module;
Figure 374275DEST_PATH_IMAGE005
by digital signal acquiring module, the handle operating mode instruction of test human-computer interface module input is sent to signal regulating panel, and gather from signal regulating panel the control signal that equipment under test sends, and in test man-machine interface module;
Figure 514181DEST_PATH_IMAGE006
ground signal control subsystem receives after train real time execution information and ground signal supplemental characteristic by ground surface end network communication module, and after track circuit code module coding, generates trigger event and be stored in clocked flip-flop module;
Figure 843531DEST_PATH_IMAGE007
by clocked flip-flop module, accurately judge the ground signal key point moment, if ground signal is track circuit, by track circuit signaling device control module, sent the order of track circuit signaling; If ground signal is dot-mode transponder, by dot-mode transponder control device control module, sends dot-mode transponder message and write order and activation command.
CN201210202104.1A 2012-06-19 2012-06-19 Line control vehicle-mounted integrated testing system and method based on object signal Active CN102692921B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210202104.1A CN102692921B (en) 2012-06-19 2012-06-19 Line control vehicle-mounted integrated testing system and method based on object signal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210202104.1A CN102692921B (en) 2012-06-19 2012-06-19 Line control vehicle-mounted integrated testing system and method based on object signal

Publications (2)

Publication Number Publication Date
CN102692921A CN102692921A (en) 2012-09-26
CN102692921B true CN102692921B (en) 2014-04-16

Family

ID=46858459

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210202104.1A Active CN102692921B (en) 2012-06-19 2012-06-19 Line control vehicle-mounted integrated testing system and method based on object signal

Country Status (1)

Country Link
CN (1) CN102692921B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104460581B (en) * 2014-09-29 2017-06-09 株洲南车时代电气股份有限公司 A kind of track signal generating means and method
CN106774275B (en) * 2017-01-16 2019-11-19 湖南中车时代通信信号有限公司 Visualize the test macro and method of the control function of train operation monitoring device
CN107450353A (en) * 2017-09-22 2017-12-08 北京中科智汇科技有限公司 Row control ground installation emulation test system and method
CN108566313A (en) * 2018-01-25 2018-09-21 北京交通大学 Train control on board equipment based on hardware in loop interconnects test interface method
CN108847867B (en) * 2018-06-14 2019-12-17 北京交大思诺科技股份有限公司 Transponder signal simulator
CN110740466B (en) * 2018-07-19 2021-09-21 比亚迪股份有限公司 Wireless network performance test platform and method
CN108803584B (en) * 2018-08-20 2022-03-15 赖明福 Railway line condition simulation method and system
CN111766845B (en) * 2020-05-14 2021-09-07 北京国铁盛阳技术有限公司 Test method, test system and test device for train control system signal equipment
CN117208026B (en) * 2023-09-07 2024-05-03 中铁武汉电气化局集团上海工程建设有限公司 Railway signal intelligent detection track ware system of car rail cloud cooperation

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102004489A (en) * 2010-10-15 2011-04-06 北京交通大学 Test system and method of data-driven vehicle-mounted operation control system
CN102323813A (en) * 2011-05-16 2012-01-18 北京和利时系统工程有限公司 Simulation test system and method based on CTCS (China Train Control System) 2-level train control system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5208089B2 (en) * 2009-11-05 2013-06-12 三菱電機株式会社 On-vehicle test apparatus and on-vehicle test method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102004489A (en) * 2010-10-15 2011-04-06 北京交通大学 Test system and method of data-driven vehicle-mounted operation control system
CN102323813A (en) * 2011-05-16 2012-01-18 北京和利时系统工程有限公司 Simulation test system and method based on CTCS (China Train Control System) 2-level train control system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张维维.CTCS 3级车载设备仿真测试平台的研究.《铁路计算机应用》.2007,第16卷(第1期),第4-7页. *

Also Published As

Publication number Publication date
CN102692921A (en) 2012-09-26

Similar Documents

Publication Publication Date Title
CN102692921B (en) Line control vehicle-mounted integrated testing system and method based on object signal
CN103023588B (en) Transponder simulation system and test system in rail traffic
CN103926843B (en) Realize rail traffic signal system general purpose simulation and analogue system
CN112445149B (en) Semi-physical simulation test system of rail train braking system
CN109491371A (en) A kind of device for On-board ATC system testing
CN100467322C (en) Mobile block signal analogue control method of rail traffic
CN102323813A (en) Simulation test system and method based on CTCS (China Train Control System) 2-level train control system
CN104298122B (en) A kind of hardware-in-the-loop test system and test method for ACC system exploitation
CN109683582B (en) VOBC adaptation system based on FAO and interconnection environment
CN107450354B (en) Interface simulation system of train control vehicle-mounted equipment and train control data testing method
CN111538315A (en) Simulation test system and test method for automatic driving function of whole vehicle
CN109521748A (en) The test method of automatic driving vehicle
CN101430738A (en) Implementing method for signal system traffic simulator suitable for testing environment
CN102589897A (en) Development experimental platform for detecting and controlling automobile tire pressure ABS (Anti Lock Brake System)/ASR (Acceleration Slip Regulation) key part
CN105138455A (en) Testing system and testing method of train control on-board device
CN201051254Y (en) Train environment simulator for city track traffic signal system
CN102436253A (en) Online tester for vehicle-mounted running control equipment
CN102999041A (en) Environmental simulator suitable for automatic train control (ATC)
CN103257352B (en) Method for testing double-satellite GPS closed-loop control
CN105469665A (en) High-speed railway onboard signal simulation training system and method
CN102890451A (en) Semi-physical simulation platform for vehicle-mounted controller test
CN206421735U (en) The integrated rail vehicle transportation sand table comprehensive practical traning equipment of a kind of machine, car, electricity business
CN103738369A (en) ATS device and system based on OPC UA technology
CN102754355B (en) Responder detection method and responder detection system
CN205485611U (en) On -vehicle ATP equipment functional simulation test equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 412001 Hunan Province, Zhuzhou Shifeng District Tian Xin era Road No. 169

Patentee after: ZHUZHOU CRRC TIMES ELECTRIC Co.,Ltd.

Address before: 412001 Hunan Province, Zhuzhou Shifeng District Tian Xin era Road No. 169

Patentee before: ZHUZHOU CSR TIMES ELECTRIC Co.,Ltd.

CP03 Change of name, title or address
TR01 Transfer of patent right

Effective date of registration: 20170620

Address after: 21, building 7, building 189, No. 410100, Renmin East Road, Changsha economic and Technological Development Zone, Hunan, Changsha

Patentee after: HUNAN CRRC TIMES SIGNAL & COMMUNICATION Co.,Ltd.

Address before: 412001 Hunan Province, Zhuzhou Shifeng District Tian Xin era Road No. 169

Patentee before: ZHUZHOU CRRC TIMES ELECTRIC Co.,Ltd.

TR01 Transfer of patent right