CN102691271B - Sealing structure for gaps between steel plate and concrete in pouring-type steel bonding construction - Google Patents

Sealing structure for gaps between steel plate and concrete in pouring-type steel bonding construction Download PDF

Info

Publication number
CN102691271B
CN102691271B CN201210207055.0A CN201210207055A CN102691271B CN 102691271 B CN102691271 B CN 102691271B CN 201210207055 A CN201210207055 A CN 201210207055A CN 102691271 B CN102691271 B CN 102691271B
Authority
CN
China
Prior art keywords
steel plate
glue
concrete
steel
pouring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210207055.0A
Other languages
Chinese (zh)
Other versions
CN102691271A (en
Inventor
战昂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Consultants Co Ltd
China Road and Bridge Corp
Original Assignee
CCCC First Highway Consultants Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Consultants Co Ltd filed Critical CCCC First Highway Consultants Co Ltd
Priority to CN201210207055.0A priority Critical patent/CN102691271B/en
Publication of CN102691271A publication Critical patent/CN102691271A/en
Application granted granted Critical
Publication of CN102691271B publication Critical patent/CN102691271B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to a sealing structure for gaps between a steel plate and concrete in pouring-type steel bonding construction, and the sealing structure can be used for solving the problems that the existing gap sealing glue is wasted seriously, the construction period is long, the effective bonding area of the steel plate is small, the dense degree for pouring of pouring-type steel bonding glue is very difficult to control, and the detection accuracy on the effective bonding area of the steel plate is low. The sealing structure is provided with the steel plate, a concrete plate is arranged on the steel plate, a transparent sealing strip with the L-shaped section is bonded on the side surface of the edge of the steel plate, the top end of the sealing strip is bonded with the concrete plate, and a cavity the area of which is larger than that of the steel plate is formed between the steel plate and the concrete plate and is filled with structural glue. According to the sealing structure, the consumption and waste of liquid glue are less; the sealing construction time is shortened by virtue of colloid with high curing speed; and the pouring condition of the glue liquid in the gap between the steel plate and the concrete can be watched in a pouring construction project, thereby improving the controllability on the pouring of the structural glue.

Description

The hermetically-sealed construction in perfusion steel bonding construction light plate and concrete gap
Technical field
the present invention relates to the strengthening construction field of highway bridge, be specifically related to a kind of hermetically-sealed construction that pours into steel bonding construction light plate and concrete gap.
Background technology
Cohesive-Steeled Reinforcement Technique is to using structure glue as bonding adhesive, and steel plate or the section bar of reinforcing use are bonded on reinforced concrete structure securely, makes the common stressed reinforcing technique of steel plate or section bar and reinforced concrete structure.This technology has simply, fast, does not affect construction profile and usage space, and the construction period is short, and therefore the advantage such as can not get angry during construction is used widely in bridge strengthening field.
Steel-bonded reinforcement construction technology is divided into being coated with scrapes method steel bonding and perfusion steel bonding: being coated with and scraping method steel bonding is to scrape paste structure glue at strengthening steel slab and concrete surface painting, before structure glue sclerosis, steel plate and concrete conglutination is fixed; Perfusion steel bonding is first strengthening steel slab to be fixed on concrete, by after steel plate and concrete clearance seal, then to pressure injection flow-like structure glue in steel plate and concrete gap.Perfusion steel bonding working procedure is more, still, when strengthening steel slab thickness surpasses in 5mm or the larger situation of monolithic strengthening steel slab area, must adopt perfusion steel bonding guarantee steel bonding effect.
Perfusion steel bonding construction need to seal steel plate and concrete gap, and the conventional method adopting is to take and allocate sealing compound in recommending to join glue ratio, then uses spatula that steel plate periphery gap, expansion bolt and adhesive pouring nozzle gap is around sealed with sealing compound.There is following problem in conventional steel plate and concrete clearance seal method: (1) adopts in the construction of spatula blade coating joint seal glue, and the loss of joint seal glue is larger, wastes more serious; (2) the joint seal adhesive curing time longer, extended the seal construction time, increased the construction period; (3), while adopting joint seal rubber seal to close steel plate periphery gap, part joint seal glue enters steel plate and concrete gap, has reduced the effective bonding area of steel plate; (4), owing to adopting joint seal rubber seal to close steel plate and concrete gap, in perfusion steel bonding work progress, cannot observe the closely knit situation of perfusion of the inner pouring type steel bonding of steel plate and concrete gap glue; (5) after perfusion steel bonding has been constructed, the mode that need to adopt hand hammer to knock is checked effective bonding area of steel plate, method of inspection trouble, and be difficult to accurately effective bonding area of estimation steel plate.
Summary of the invention
The object of this invention is to provide a kind of hermetically-sealed construction that pours into steel bonding construction light plate and concrete gap, to overcome, the waste of prior art joint seal glue is serious, the construction period is long, the effective bonding area of steel plate is little, the closely knit control difficulty of the perfusion of pouring type steel bonding glue large and the low defect of effective bonding area check degree of accuracy of steel plate.
The technical solution adopted in the present invention is:
The hermetically-sealed construction in perfusion steel bonding construction light plate and concrete gap, is provided with steel plate and concrete structure, it is characterized in that:
Described side, edges of plate by the 502 gluing cross sections that are connected to for the transparent sealing bar of " L " shape, weather strip top is mutually bonding with concrete structure by 502 glue, between steel plate and concrete structure, form the cavity that area is greater than steel plate, interstitital texture glue in cavity.
Between the weather strip of described " L " shape, by AB is gluing, connect.
The end face of two bossings of the weather strip of described " L " shape is inclined-plane.
The present invention has the following advantages:
1, the present invention adopts 502 glue and two kinds of colloid sealing off gap of AB glue and space, and consumption glue quantity is few, and waste is few.
2, the present invention adopts the fast colloid of curing rate, has reduced the seal construction time, has shortened the construction period.
3, the present invention adopts L-type transparent sealing bar, can observe glue in steel plate and concrete gap perfusion situation in pouring construction process, has improved the controllability of structure glue perfusion.
4, the present invention adopts L-type transparent sealing bar, and in structure glue filling process, it is inner that structure glue flows into L-type transparent sealing bar, significantly improves effective bonding area of steel plate.
5, the present invention adopts L-type transparent sealing bar, and the rear removal L-type transparent sealing bar of having constructed, can judge structure glue perfusion effect according to the full degree of steel plate marginal texture colloid, has improved the testability of perfusion steel bonding construction effect.
Accompanying drawing explanation
Fig. 1 is constructional drawing of the present invention;
Fig. 2 is the profile of L-type transparent sealing bar;
Fig. 3 is the installation drawing of L-type transparent sealing bar;
Fig. 4 is the constructional drawing of L-type transparent sealing bar staggered place;
Fig. 5 is installation drawing of the present invention.
In figure, 1-steel plate, 2-structure glue, 3-transparent sealing bar, 4-AB glue, 5-concrete structure, 6-502 glue, 7-steel sticking water booster system.
The specific embodiment
Below in conjunction with the specific embodiment, the present invention will be described in detail.
The hermetically-sealed construction in perfusion steel bonding construction light plate of the present invention and concrete gap, be provided with steel plate 1, above steel plate 1, be provided with concrete structure 5, the side, edge of steel plate 1 is bonded with by 502 glue 6 the transparent sealing bar 3 that cross section is " L " shape, weather strip 3 tops are mutually bonding with concrete structure 5 by 502 glue 6, between steel plate 1 and concrete slab 2, form the cavity that area is greater than steel plate 1, interstitital texture glue 2 in cavity.The height of the transparent sealing bar 3 of " L " shape is structure glue 2 bondline thickness and steel plate 1 thickness sum.Bonding by AB glue 4 between the transparent sealing bar 3 of " L " shape.The end face of 3 two bossings of transparent sealing bar of " L " shape is inclined-plane, when bonding for viscose glue provides space.
Installation steps are as follows:
(1) adopt 502 glue 6 to paste transparent sealing bar 3 in steel plate 1 side, edge;
(2) at concrete slab 5 soffits, steel sticking water booster system 7 is installed, steel sticking water booster system 7 is " a kind of little case beam steel sticking water booster system " of application number for mentioning in " 201220214112.3 ";
(3) steel plate 1 of pasting transparent sealing bar 3 is positioned on steel sticking water booster system 7;
(4) adjust the height of steel sticking water booster system 7, make transparent sealing bar 3 upper limbs and concrete structure 5 surfaces closely connected;
(5) adopt the gap between 502 glue 6 sealing transparent sealing bar 3 upper limbs and concrete structure 5 surfaces, for staggered place hole between transparent sealing bar 3, adopt AB glue 4 to seal;
(6) at sealing off gap and hole place, brush suds, seal whole adhesive pouring nozzles, then open one of them adhesive pouring nozzle, between steel plate 1 and coagulation structure 5, be pressed into air, whether direct vision port and hole place there is gas leak phenomenon, if find to exist gas leak phenomenon, adopt 502 glue to re-start sealing;
(7), in reperfusion structure glue process, by observing transparent sealing bar 3 internal construction glue 2, whether be full of judgement structure glue 2 perfusion situations;
(8), after structure glue completion of cure, removal transparent sealing bar 3, if transparent sealing bar 3 internal construction glue are full, can confirm that structure glue perfusion effect is good.

Claims (3)

1. the hermetically-sealed construction in perfusion steel bonding construction light plate and concrete gap, is provided with steel plate (1) and concrete structure (5), it is characterized in that:
The side, edge of described steel plate (1) is bonded with by 502 glue (6) the transparent sealing bar (3) that cross section is " L " shape, weather strip (3) top is mutually bonding with concrete structure (5) by 502 glue (6), between steel plate (1) and concrete structure (5), form the cavity that area is greater than steel plate (1), interstitital texture glue (2) in cavity.
2. the hermetically-sealed construction in perfusion steel bonding according to claim 1 construction light plate and concrete gap, is characterized in that:
Between the weather strip (3) of described " L " shape, staggered place hole adopts AB glue (4) to seal.
3. the hermetically-sealed construction in perfusion steel bonding according to claim 1 construction light plate and concrete gap, is characterized in that:
The end face of two bossings of the weather strip (3) of described " L " shape is inclined-plane.
CN201210207055.0A 2012-06-21 2012-06-21 Sealing structure for gaps between steel plate and concrete in pouring-type steel bonding construction Active CN102691271B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210207055.0A CN102691271B (en) 2012-06-21 2012-06-21 Sealing structure for gaps between steel plate and concrete in pouring-type steel bonding construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210207055.0A CN102691271B (en) 2012-06-21 2012-06-21 Sealing structure for gaps between steel plate and concrete in pouring-type steel bonding construction

Publications (2)

Publication Number Publication Date
CN102691271A CN102691271A (en) 2012-09-26
CN102691271B true CN102691271B (en) 2014-04-09

Family

ID=46856997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210207055.0A Active CN102691271B (en) 2012-06-21 2012-06-21 Sealing structure for gaps between steel plate and concrete in pouring-type steel bonding construction

Country Status (1)

Country Link
CN (1) CN102691271B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08218324A (en) * 1995-02-16 1996-08-27 Mitsubishi Heavy Ind Ltd Bonding method of concrete surface and steel girder
JP2000096832A (en) * 1998-09-24 2000-04-04 Sho Bond Constr Co Ltd Plate installation method on existing member
JP2000204769A (en) * 1999-01-07 2000-07-25 Sekisui Chem Co Ltd Reinforcing method for concrete
JP2004116216A (en) * 2002-09-27 2004-04-15 Oriental Construction Co Ltd Reinforcement structure of existing floor slab by metal fiber contained high strength concrete pc board
KR20050053409A (en) * 2003-12-02 2005-06-08 주식회사 우지스 The steel plate adhesion concrete structure and it's construction method to which synthetic high polymer inorganic ceramic infiller on the surface of concrete structure, and a steel plate is made to adhere
KR20100034640A (en) * 2008-09-24 2010-04-01 권기혁 Reinforced concrete beam strengthened with slit type steel plate
CN101749033A (en) * 2008-12-08 2010-06-23 国网新源控股有限公司回龙分公司 Reinforcement technology of reinforced concrete tunnel lining steel plate
CN202688905U (en) * 2012-06-21 2013-01-23 中交第一公路勘察设计研究院有限公司 Seal structure of gap between steel sheet and concrete in bonding steel pouring construction

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08218324A (en) * 1995-02-16 1996-08-27 Mitsubishi Heavy Ind Ltd Bonding method of concrete surface and steel girder
JP2000096832A (en) * 1998-09-24 2000-04-04 Sho Bond Constr Co Ltd Plate installation method on existing member
JP2000204769A (en) * 1999-01-07 2000-07-25 Sekisui Chem Co Ltd Reinforcing method for concrete
JP2004116216A (en) * 2002-09-27 2004-04-15 Oriental Construction Co Ltd Reinforcement structure of existing floor slab by metal fiber contained high strength concrete pc board
KR20050053409A (en) * 2003-12-02 2005-06-08 주식회사 우지스 The steel plate adhesion concrete structure and it's construction method to which synthetic high polymer inorganic ceramic infiller on the surface of concrete structure, and a steel plate is made to adhere
KR20100034640A (en) * 2008-09-24 2010-04-01 권기혁 Reinforced concrete beam strengthened with slit type steel plate
CN101749033A (en) * 2008-12-08 2010-06-23 国网新源控股有限公司回龙分公司 Reinforcement technology of reinforced concrete tunnel lining steel plate
CN202688905U (en) * 2012-06-21 2013-01-23 中交第一公路勘察设计研究院有限公司 Seal structure of gap between steel sheet and concrete in bonding steel pouring construction

Also Published As

Publication number Publication date
CN102691271A (en) 2012-09-26

Similar Documents

Publication Publication Date Title
CN103669292A (en) Concrete joint water stop structure and construction method thereof
CN203684167U (en) Concrete joint waterstop device
CN106958716B (en) A kind of PCCP pipe joint caulking joint construction method
CN109958146A (en) A kind of assembled underground structure prefabricated components seam crossing hermetic seal bar capsule
CN107345406B (en) waterproof sealing method for deformation joint of pipe gallery
CN202688905U (en) Seal structure of gap between steel sheet and concrete in bonding steel pouring construction
CN102691271B (en) Sealing structure for gaps between steel plate and concrete in pouring-type steel bonding construction
CN103452081A (en) Construction method for flexible composite impermeable layer of upstream face of high arch dam
CN204919376U (en) Assembled beam bridge board embedment seam glues steel sheet reinforced structure
CN102704404B (en) Vacuum assisted pressing injection technology for anchorage zone and device using technology
CN115782276B (en) Construction method of blade leading edge protection system
CN102966049B (en) Method for treating vertical crack of reinforced concrete bridge abutment
CN203960811U (en) Concrete for hydraulic structure member expansion joint waterstop syndeton
CN207760744U (en) A kind of road and bridge crack reinforcing and repairing structure
CN103630677B (en) Experimental device and method for testing grouting speed and filling degree of open joint repairing material
CN104929379A (en) Reinforcing method for reinforced concrete beam board
CN208587651U (en) A kind of pipeline of oil production sealing shroud
CN203742035U (en) Waterproof structure of unit-type curtain wall
CN112695905B (en) Replaceable rail pressing type water stop structure and construction method thereof
CN109281292B (en) Method for repairing detachment crack of deep water concrete panel of reservoir
CN205776820U (en) A kind of sealing structure irrigating steel bonding construction light plate and concrete gap
CN203307771U (en) Horizontal seam sealing structure of concrete-faced rockfill dam panel
CN220318392U (en) Bridge vertical crack repair structure
CN207211089U (en) A kind of sluice with hydraulic lock
CN202683421U (en) Adhesive injection pressure tank for perfusion pasting steel plate construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA ROAD AND BRIDGE CORPORATION

Effective date: 20150104

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150104

Address after: 710075 Xi'an hi tech Development Zone, Shaanxi science and technology No. two road, No. 63

Patentee after: CCCC First Highway Consultants Co., Ltd.

Patentee after: China Road & Bridge Corporation

Address before: 710075 Xi'an hi tech Development Zone, Shaanxi science and technology No. two road, No. 63

Patentee before: CCCC First Highway Consultants Co., Ltd.