CN102689354A - Vertical mould used for prefabricating high speed railway bridge curtain board and curtain board prefabricating method completed by using vertical mould - Google Patents

Vertical mould used for prefabricating high speed railway bridge curtain board and curtain board prefabricating method completed by using vertical mould Download PDF

Info

Publication number
CN102689354A
CN102689354A CN2012102001955A CN201210200195A CN102689354A CN 102689354 A CN102689354 A CN 102689354A CN 2012102001955 A CN2012102001955 A CN 2012102001955A CN 201210200195 A CN201210200195 A CN 201210200195A CN 102689354 A CN102689354 A CN 102689354A
Authority
CN
China
Prior art keywords
side form
curtain board
shield
shape side
die
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012102001955A
Other languages
Chinese (zh)
Other versions
CN102689354B (en
Inventor
刘志如
胡国伟
李建成
于天生
白文选
曹永双
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
China Railway No 3 Engineering Group Co Ltd Guangzhou Branch
Original Assignee
China Railway No 3 Engineering Group Co Ltd
China Railway No 3 Engineering Group Co Ltd Guangzhou Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd, China Railway No 3 Engineering Group Co Ltd Guangzhou Branch filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN201210200195.5A priority Critical patent/CN102689354B/en
Publication of CN102689354A publication Critical patent/CN102689354A/en
Application granted granted Critical
Publication of CN102689354B publication Critical patent/CN102689354B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention belongs to the technical field of bridge ancillary work curtain board construction, and in particular relates to a vertical mould used for prefabricating a high speed railway bridge curtain board and a curtain board prefabricating method completed by using the vertical mould. With the adoption of the curtain board prefabricating method, the problems that chamfer bubbles are easily generated, one-step molding of the curtain board is relatively short and the installation efficiency is relatively low in the conventional bridge curtain board prefabricating method are solved. The vertical mould comprises a moulding board system and bearing systems, wherein the moulding board system comprises an arc-shaped side mould, an L-shaped side mould, a flat mould and a Z-shaped side mould sequentially connected end to end. The curtain board prefabricating method comprises the following steps of: excavating a foundation pit slot and installing the bearing systems; assembling each moulding board on the bearing systems; placing a curtain board reinforcement cage; coating the curtain board reinforcement cage by the arc-shaped side mould; and pouring concrete. With the adoption of the vertical mould and the curtain board prefabricating method, the defects of difficult control of the line shape of the curtain board, low work efficiency indexes, substandard appearance quality of the concrete, and the like of a cast-in-site method are avoided, the generation of the chamfer bubbles of the curtain board is avoided, the density degree of the concrete is ensured, the process is simple, the operation is easy, and the formation of streamlined operation is facilitated.

Description

The high-speed railway bridge shield is prefabricated with vertical die and use the shield method for prefabricating of its completion
Technical field
The invention belongs to the technical field of bridge appurtenant work shield construction, it is prefabricated with vertical die and use the shield method for prefabricating of its completion to be specifically related to a kind of high-speed railway bridge shield.
Background technology
In the high-speed railway bridge appurtenant work, shield is a kind of outer hanging hang structure of bridge flange plate, is connected to form whole steadiness structure through reserving anchor bar and bridge straight wall.Shield belongs to the concrete prefabricated element of bridge both sides of the edge, and as the stressed carrier is carrier of bridge railing and sound barrier, the quality of construction quality is related to the bridge presentation quality.
The bridge curtain board construction has two kinds of methods at present, and a kind of is cast-in-place method, promptly utilizes template to carry out template at the bridge flange plate edge on the spot and sets up, reinforcing bar binding, Template Location, cast-in-place concrete on the spot.This method exists manual work repeatedly to carry out formwork reinforcement, causes template deformation and precision not high easily, and the on-site concrete maintenance is not in place, and it is a lot of that prefabricated shield product poor flatness, color and luster differs, unfilled corner is fallen piece, has a strong impact on the integral bridge quality.A kind of in addition is horizontal shaking platform method, and it is prefabricated promptly to utilize horizontal template of level and vibration pedestal to carry out batch production, on shaking platform top template and paralell is set, and builds then.The method though can guarantee whole most of concrete packing, still can't be avoided the generation of shield upper surface chamfering place concrete great amount of bubbles in horizontal vibration processes; Surface quality is relatively poor, must carry out secondary and repair, and can not well satisfy quality requirement; In addition, this method receives the restriction of shaking platform owing to carry out operation in batch production; The shield one-shot forming is merely the number of shaking platform, has limited the production efficiency of bridge curtain board.
Summary of the invention
Goal of the invention of the present invention: existing bridge curtain board method for prefabricating is prone to produce local chamfering bubble and the shield one-shot forming is short and the lower problem of installation effectiveness in order to solve.
The present invention adopts following technical scheme to realize:
The vertical die that the high-speed railway bridge shield is prefabricated; It is made up of template system and load bearing system; Described template system comprises arc side form, " L " shape side form, flat-die, " Z " shape side form and connector; Arc side form, " L " shape side form, flat-die and " Z " shape side form connect to form shield from beginning to end successively and build cavity body; Described connector comprises and is used between each template interconnected side adpting flange and is used for interconnected bottom adpting flange between each template bottom and the load bearing system; The position welding round steel consistent of the corresponding shield drip of curved side die face plate with the drip diameter; The installation site that the corresponding shield of " Z " shape side form is reserved railing and sound barrier basis is provided with four reservation circular holes, and the position of the pre-buried connecting reinforcement of corresponding shield is provided with slat on the flat-die, and position, slat place is provided with pin plate and bearing pin steel plate fixing, that be used for the shutoff slat;
Described load bearing system comprises supporting frame and bearing plate, and bearing plate is provided with and is used for the screwed hole that is connected with the flange in the bottom of arc side form, " L " shape side form, flat-die and " Z " shape side form.
The panels outside of arc side form is provided with horizontal and vertical ribbed stiffener, and the panels outside of " Z " shape side form, " L " shape side form is provided with transverse stiffener.
High-speed railway bridge shield method for prefabricating uses the high-speed railway bridge shield prefabricated with the vertical die completion, and step is following:
1), the excavation pit groove, the bottom surface of foundation ditch groove is smooth, and the plurality of load bearing system is installed in the foundation ditch groove,
2), in the foundation ditch groove, arc side form, " L " shape side form, flat-die and " Z " shape side form are fitted together, and the bottom is connected with bolt on the bearing plate of load bearing system,
3), shield steel reinforcement cage that produce in factory is accomplished is placed within mounted " Z " shape side form, " L " shape side form and the flat-die,
4), with the arc side form with shield steel reinforcement cage parcel, and the arc side form carried out bolt and is connected with " Z " shape side form, " L " shape side form, the bottom of arc side form is connected with bearing plate,
5), the shield pre-embedded bolt is installed on the circular hole of " Z " shape side form,
6), casting concrete, when carrying out concrete vibrating, inlet gets into vibrating spear from the top of mould,
7), carry out concrete curing and form removal.
The present invention has following advantage:
Shortcomings such as the linear control of the shield of 1, having avoided cast-in-place method to exist is difficult, the work efficiency index is low, Surface Quality of Concrete is not up to standard.
2, adopt vertical die prefabricated, avoided the generation of shield chamfering place bubble, guaranteed concrete packing.
3, operation is simple, processing ease, and bolt connects and can guarantee installation accuracy, is convenient to form the streamlined operation.
Description of drawings
Fig. 1 is the floor map of mold integral structure
Fig. 2 is a curved side mode structure sketch map
Fig. 3 is " Z " shape side form structural representation
Fig. 4 is " L " shape side form structural representation
Fig. 5 is the flat-die structural representation
Fig. 6 is the load bearing system sketch map
Fig. 7 is foundation ditch groove and load bearing system floor plan
Fig. 8 is the elevation of foundation ditch groove and mould
Among the figure: 1-shield, the panel of 2-arc side form, the vertical ribbed stiffener of 3-arc side form, the transverse stiffener of 4-arc side form; The side adpting flange of 5-arc side form, the bottom adpting flange of 6-arc side form, the panel of 7-" L shaped side form ", the side adpting flange of 8-" L shaped side form "; The transverse stiffener of 9-" L shaped side form ", the panel of 10-flat-die, the side adpting flange of 11-flat-die, the pre-buried connecting reinforcement of 12-shield; The steel plate of 13-shutoff slat, 14-bearing pin, 15-pin plate, the panel of 16-" Z-shaped side form "; The transverse stiffener of 17-" Z-shaped side form ", the side adpting flange of 18-" Z-shaped side form ", 19-reserves circular hole, and the 20-shield is reserved railing and sound barrier basis; The 21-drip, 22-round steel, the bottom adpting flange of 23-" Z-shaped side form ", the bottom adpting flange of 24-" L shaped side form "; The 25-slat, the horizontal spandrel girder of 26-supporting frame, the vertical distribution beam of 27-supporting frame, 28-bearing plate; The prepared screw-bolt hole that is connected of 29-bearing plate and template system, 30-load bearing system, 31-foundation ditch groove, 32-vertical die.
The specific embodiment
Be described further in conjunction with the accompanying drawing specific embodiments of the invention.
(1) the present invention is made up of template system and load bearing system; Template system is made up of arc side form, " Z " shape side form, " L " shape side form, flat-die, connector five parts; Connector comprises adpting flange, bolt, and adpting flange comprises and be used between template bottom and the bearing plate interconnected bottom adpting flange and be used for interconnected side adpting flange between the template that the bottom adpting flange is made with steel plate; The side adpting flange of arc side form is made with steel plate; The side adpting flange of " Z " shape side form, " L " shape side form is made with channel-section steel, and horizontal and vertical ribbed stiffener is set on the panel of arc side form, on the panel of " Z " shape side form, " L " shape side form, transverse stiffener is set; Ribbed stiffener utilizes steel plate to make; Load bearing system is made up of supporting frame and bearing plate, and vertical distribution beam that supporting frame is made by the horizontal spandrel girder and the channel-section steel of I-steel making is formed, and each part of the present invention all adopts steel design.Form the cavity body that shield is built by template system, load bearing system bears template system and shield weight.
(2) according to shield profile and the status requirement of reserving member, the welding round steel at curved side die face plate place, the drip diameter and the position consistency of round steel diameter and position and shield; " Z " shape side form is provided with four and reserves the position that circular hole is used as the construction bolt on shield reservation railing and sound barrier basis; Flat-die is provided with some slats, is used to pass the pre-buried connecting reinforcement of shield, treat that the pre-buried connecting reinforcement of shield passes flat-die after, with the slat shutoff, and utilize pin plate and bearing pin on the plane that steel plate is fixed with steel plate.
(3) the installation main points of vertical die according to the invention are following: at first carry out the installation of load bearing system; Load bearing system is installed on the smooth basal plane; Adopt between the supporting frame and be welded to connect; Bearing plate is weldingly fixed on the supporting frame, and prepared screw-bolt hole on the bearing plate is used for fixing with bolt with the bottom adpting flange of arc side form, " Z " shape side form, " L " shape side form; The side adpting flange that is connected through separately of " Z " shape side form and " L " shape side form and arc side form peace mould connects with bolt.
(4) shield method for prefabricating of the present invention; Step is following: 1) the foundation ditch groove of the excavation certain width and the degree of depth; The bottom surface of foundation ditch groove should guarantee smooth, is used to place the load bearing system of this mould, simultaneously; For fear of the collision of form removal lifting to the corresponding shaping shield, load bearing system adopts interlaced arrangement.2) in the foundation ditch groove, " Z " shape side form, " L " shape side form peace module are fitted together, and are fixed by bolts on the bearing plate.3) the shield steel reinforcement cage of produce in factory being accomplished is placed in mounted " Z " shape side form, " L " shape side form and the flat-die.4) with the arc side form shield steel reinforcement cage is wrapped up, and carry out bolt and be connected with " Z " shape side form, " L " shape side form.5) the shield pre-embedded bolt is installed on " Z " shape side form.6) carry out shield concreting, in strict accordance with requiring to carry out concrete vibrating, vibrating spear gets into from the top inlet of this vertical die in work progress.7) carry out concrete curing and form removal.

Claims (3)

1. vertical die that the high-speed railway bridge shield is prefabricated; It is made up of template system and load bearing system; It is characterized in that described template system comprises arc side form, " L " shape side form, flat-die, " Z " shape side form and connector; Arc side form, " L " shape side form, flat-die and " Z " shape side form connect to form shield from beginning to end successively and build cavity body; Described connector comprises and is used between each template interconnected side adpting flange and is used for interconnected bottom adpting flange between each template bottom and the load bearing system; The position welding round steel consistent of the corresponding shield drip of curved side die face plate with the drip diameter; The installation site that the corresponding shield of " Z " shape side form is reserved railing and sound barrier basis is provided with four reservation circular holes, and the position of the pre-buried connecting reinforcement of corresponding shield is provided with slat on the flat-die, and position, slat place is provided with pin plate and bearing pin steel plate fixing, that be used for the shutoff slat;
Described load bearing system comprises supporting frame and bearing plate, and bearing plate is provided with and is used for the screwed hole that is connected with the flange in the bottom of arc side form, " L " shape side form, flat-die and " Z " shape side form.
2. the prefabricated vertical die of high-speed railway bridge shield according to claim 1 is characterized in that the panels outside of arc side form is provided with horizontal and vertical ribbed stiffener, and the panels outside of " Z " shape side form, " L " shape side form is provided with transverse stiffener.
3. high-speed railway bridge shield method for prefabricating is characterized in that step is following:
1), the excavation pit groove, the bottom surface of foundation ditch groove is smooth, and the plurality of load bearing system is installed in the foundation ditch groove,
2), in the foundation ditch groove, arc side form, " L " shape side form, flat-die and " Z " shape side form are fitted together, and the bottom is connected with bolt on the bearing plate of load bearing system,
3), shield steel reinforcement cage that produce in factory is accomplished is placed within mounted " Z " shape side form, " L " shape side form and the flat-die,
4), with the arc side form with shield steel reinforcement cage parcel, and the arc side form carried out bolt and is connected with " Z " shape side form, " L " shape side form, the bottom of arc side form is connected with bearing plate,
5), the shield pre-embedded bolt is installed on the circular hole of " Z " shape side form,
6), casting concrete, when carrying out concrete vibrating, inlet gets into vibrating spear from the top of mould,
7), carry out concrete curing and form removal.
CN201210200195.5A 2012-06-18 2012-06-18 Vertical mould used for prefabricating high speed railway bridge curtain board and curtain board prefabricating method completed by using vertical mould Active CN102689354B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210200195.5A CN102689354B (en) 2012-06-18 2012-06-18 Vertical mould used for prefabricating high speed railway bridge curtain board and curtain board prefabricating method completed by using vertical mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210200195.5A CN102689354B (en) 2012-06-18 2012-06-18 Vertical mould used for prefabricating high speed railway bridge curtain board and curtain board prefabricating method completed by using vertical mould

Publications (2)

Publication Number Publication Date
CN102689354A true CN102689354A (en) 2012-09-26
CN102689354B CN102689354B (en) 2014-10-15

Family

ID=46855169

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210200195.5A Active CN102689354B (en) 2012-06-18 2012-06-18 Vertical mould used for prefabricating high speed railway bridge curtain board and curtain board prefabricating method completed by using vertical mould

Country Status (1)

Country Link
CN (1) CN102689354B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107829373A (en) * 2017-11-30 2018-03-23 中铁八局集团第四工程有限公司 High-speed railway bridge floor shield is without pad prefabricated construction equipment
CN109112958A (en) * 2018-09-06 2019-01-01 山西省交通科学研究院 A kind of bridge drips slot device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07102528A (en) * 1993-10-01 1995-04-18 Yokogawa Koji Kk Precast balustrade, and method for connecting precast balustrade to slab
WO2007066387A1 (en) * 2005-12-06 2007-06-14 Kawada Industries, Inc. Bridge construction method
CN201736316U (en) * 2010-04-12 2011-02-09 中铁八局集团第四工程有限公司 Prefabricated mold of high-speed railway bridge shielding plate component
KR20110048634A (en) * 2009-11-03 2011-05-12 (주)한맥기술 Precast concrete barrier of bridge and method of construction the same
CN202208054U (en) * 2011-08-12 2012-05-02 中国水电建设集团铁路建设有限公司 Concrete spreading and vibrating mechanism of a railroad bridge curtain board

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07102528A (en) * 1993-10-01 1995-04-18 Yokogawa Koji Kk Precast balustrade, and method for connecting precast balustrade to slab
WO2007066387A1 (en) * 2005-12-06 2007-06-14 Kawada Industries, Inc. Bridge construction method
KR20110048634A (en) * 2009-11-03 2011-05-12 (주)한맥기술 Precast concrete barrier of bridge and method of construction the same
CN201736316U (en) * 2010-04-12 2011-02-09 中铁八局集团第四工程有限公司 Prefabricated mold of high-speed railway bridge shielding plate component
CN202208054U (en) * 2011-08-12 2012-05-02 中国水电建设集团铁路建设有限公司 Concrete spreading and vibrating mechanism of a railroad bridge curtain board

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107829373A (en) * 2017-11-30 2018-03-23 中铁八局集团第四工程有限公司 High-speed railway bridge floor shield is without pad prefabricated construction equipment
CN107829373B (en) * 2017-11-30 2024-01-05 中铁八局集团建筑工程有限公司 High-speed railway bridge deck curtain board does not have prefabricated construction equipment of gasket
CN109112958A (en) * 2018-09-06 2019-01-01 山西省交通科学研究院 A kind of bridge drips slot device

Also Published As

Publication number Publication date
CN102689354B (en) 2014-10-15

Similar Documents

Publication Publication Date Title
CN104746435B (en) A kind of construction method of great-angle Y type pier stud
CN102912900A (en) Prefabricated assembled superposed plate type concrete shear wall and construction method thereof
CN106906758A (en) A kind of culvert fluid pressure type entire combination moving die plate
CN201943045U (en) Automatic-moving hydraulic cantilever gantry concrete placement device for wave wall
CN105415489A (en) Prefabricating system and method for vertical column
CN103306483B (en) The industrial construction method of building
CN202925721U (en) Prefabricated superimposed sheet-type concrete shear wall structure
CN212176540U (en) Hydraulic climbing formwork system formwork
CN203863813U (en) Die special for housing industrialization pre-cast concrete component stair
CN102689354B (en) Vertical mould used for prefabricating high speed railway bridge curtain board and curtain board prefabricating method completed by using vertical mould
CN203248170U (en) Lining trolley for secondary lining construction of pedestrian crosswalk
CN102409848A (en) Construction molding methods for light-weight ribbed floorslab and light-weight ribbed floor
CN109112903A (en) Solid concrete roabed trackless construction technology is cheated in a kind of phase library inner column formula inspection
CN203475310U (en) Formwork for concrete slabs of composite steel-concrete box girders
CN103669831B (en) A kind of transformer station's cast-in-situ wall combined steel and construction method thereof
CN102444406A (en) Needle beam type inverted arch lining sliding framework and construction method thereof
CN211666013U (en) Prefabricated hollow superposed shear wall with vertical steel bars penetrating through edge members
CN112012473B (en) Integrated steel formwork for wall body of cantilever rib type of sewage pool
CN113914682A (en) Prefabricated cavity column assembly type column type maintenance pit and construction method thereof
CN211229702U (en) Assembly structure for overhauling stand column and train overhauling platform
CN203684687U (en) Walling device
CN111119378A (en) Prefabricated hollow superposed shear wall with vertical steel bars penetrating through edge members
CN108487295B (en) 4M compressor foundation integral pouring construction method
CN113047417A (en) 3D printing assembly type box structure and connecting method thereof
CN202559291U (en) U-typed aqueduct simulated test device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant