CN102682474A - 水电行业中建筑的三维建模方法 - Google Patents

水电行业中建筑的三维建模方法 Download PDF

Info

Publication number
CN102682474A
CN102682474A CN2012101430116A CN201210143011A CN102682474A CN 102682474 A CN102682474 A CN 102682474A CN 2012101430116 A CN2012101430116 A CN 2012101430116A CN 201210143011 A CN201210143011 A CN 201210143011A CN 102682474 A CN102682474 A CN 102682474A
Authority
CN
China
Prior art keywords
building
dimensional
modeling method
dimensional modeling
hydropower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101430116A
Other languages
English (en)
Inventor
殷奎生
刘超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group
Original Assignee
Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group filed Critical Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group
Priority to CN2012101430116A priority Critical patent/CN102682474A/zh
Publication of CN102682474A publication Critical patent/CN102682474A/zh
Pending legal-status Critical Current

Links

Abstract

本发明涉及水电行业中建筑的三维建模方法,根据机电参数表中的内部尺寸,计算得到建筑的外部尺寸;在建模系统中设置包含X、Y和Z坐标轴的三维坐标系,计算出所述的内部尺寸和外部尺寸在所述三位坐标系中对应的控制点;用直线段或弧线段连接所述的控制点,使之形成控制线和控制面;根据所述的控制线和控制面,通过曲面设计获得建筑的三维模型。本发明水电行业中建筑的三维建模方法,能够针对水电行业的特点对厂房等建筑进行快速的三维建模,明显的提高了建模的精度和效率,通过简单的操作即可形成符合水电行业规范的三维建筑模型,有效的降低了工作量。

Description

水电行业中建筑的三维建模方法
技术领域
本发明涉及建模的方法,具体的讲是水电行业中建筑的三维建模方法。
背景技术
目前水电站厂房前期阶段的三维设计还处于手工或少量模板化状态,三维设计的软件平台主要有:以达索开发的产品CATIA,Bently公司的macrostation,以及Autodesk公司的autoCAD等。其在三维建模、关联设计等方面优缺点各有不同,相比更常用的CATIA,而CATIA产品在土建类特别是水电站厂房的专业化模块没有,仅仅有基础的点线面几何命令的操作按钮。虽然它还提供了可以把一组建模过程打包成模板(UDF,POWERCOPY)的功能,但是要把这种模板的适应性设计良好,要求建模人员具有良好的编程能力,而对于非编程的水利工程专业设计人员来说这无疑是非常困难的工作。
发明内容
针对以上的问题,本发明提供了一种水电行业中建筑的三维建模方法,能够针对水电行业的特点对厂房等建筑进行快速的三维建模,提高建模的精度和效率。
本发明水电行业中建筑的三维建模方法,根据机电参数表中的内部尺寸,计算得到建筑的外部尺寸,在计算时通常还可以依据《水工混凝土结构设计规范》等规程规范要求的建筑物结构尺寸,使设计的建筑尺寸符合相关的规程规范;在建模系统中设置包含X、Y和Z坐标轴的三维坐标系,计算出所述的内部尺寸和外部尺寸在所述三位坐标系中对应的控制点;用直线段或弧线段连接所述的控制点,使之形成控制线和控制面;根据所述的控制线和控制面,通过曲面设计获得建筑的三维模型。建模系统是基于CATIA平台通过C++语言开发的,只需要建模人员对建模系统进行“一键操作”,即可由建模系统自动进行三维建模,由此实现了高效、简便的建模方式。根据不同场合的需求,也可以使用其它编程语言进行开发。可以通过现有的软件,如CATIA的“拉伸”功能进行曲面设计获得三维模型。
具体的,所述的建筑的外部尺寸是通过将所述建筑参数表中的内部尺寸和建筑的常规尺寸相加获得。所述的常规尺寸可以是土建类规程规范尺寸或是工程经验中建筑物或构筑物的结构尺寸。
具体的,以安装高程(标高)的所在平面为XY平面,以安装间端墙所在的平面为ZY平面,以建筑中的机组纵轴线为X轴,设置所述的三维坐标系。
测试得知,本发明水电行业中建筑的三维建模方法,能够针对水电行业的特点对厂房等建筑进行快速的三维建模,明显的提高了建模的精度和效率,通过简单的操作即可形成符合水电行业规范的三维建筑模型,有效的降低了工作量。
以下结合实施例的具体实施方式,对本发明的上述内容再作进一步的详细说明。但不应将此理解为本发明上述主题的范围仅限于以下的实施例。在不脱离本发明上述技术思想情况下,根据本领域普通技术知识和惯用手段做出的各种替换或变更,均应包括在本发明的范围内。
具体实施方式
本发明水电行业中建筑的三维建模方法,在基于CATIA平台上通过C++语言开发建模系统。在建模系统中将建筑参数表中的内部尺寸和建筑的常规尺寸相加,计算得到建筑的外部尺寸;在再建模系统中以安装高程(标高)的所在平面为XY平面,以安装间端墙所在的平面为ZY平面,以建筑中的机组纵轴线为X轴,设置包含X、Y和Z坐标轴的三维坐标系。然后计算出所述的内部尺寸和外部尺寸在所述三位坐标系中对应的控制点;用直线段或弧线段连接所述的控制点,使之形成控制线和控制面;根据所述的控制线和控制面,通过CATIA的“拉伸”功能进行曲面设计,获得三维模型。建模人员只需要对建模系统进行“一键操作”,即可由建模系统自动进行三维建模。测试得知,本发明水电行业中建筑的三维建模方法,能够针对水电行业的特点对厂房等建筑进行快速的三维建模,明显的提高了建模的精度和效率,通过简单的操作即可形成符合水电行业规范的三维建筑模型,有效的降低了工作量。

Claims (3)

1.水电行业中建筑的三维建模方法,其特征为:根据机电参数表中的内部尺寸,计算得到建筑的外部尺寸;在建模系统中设置包含X、Y和Z坐标轴的三维坐标系,计算出所述的内部尺寸和外部尺寸在所述三位坐标系中对应的控制点;用直线段或弧线段连接所述的控制点,使之形成控制线和控制面;根据所述的控制线和控制面,通过曲面设计获得建筑的三维模型。
2.如权利要求1所述的水电行业中建筑的三维建模方法,其特征为:所述的建筑的外部尺寸是通过将所述建筑参数表中的内部尺寸和建筑的常规尺寸相加获得。
3.如权利要求1或2所述的水电行业中建筑的三维建模方法,其特征为:以安装高程的所在平面为XY平面,以安装间端墙所在的平面为ZY平面,以建筑中的机组纵轴线为X轴,设置所述的三维坐标系。
CN2012101430116A 2012-05-10 2012-05-10 水电行业中建筑的三维建模方法 Pending CN102682474A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101430116A CN102682474A (zh) 2012-05-10 2012-05-10 水电行业中建筑的三维建模方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101430116A CN102682474A (zh) 2012-05-10 2012-05-10 水电行业中建筑的三维建模方法

Publications (1)

Publication Number Publication Date
CN102682474A true CN102682474A (zh) 2012-09-19

Family

ID=46814337

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101430116A Pending CN102682474A (zh) 2012-05-10 2012-05-10 水电行业中建筑的三维建模方法

Country Status (1)

Country Link
CN (1) CN102682474A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106021737A (zh) * 2016-05-20 2016-10-12 中国能源建设集团广东省电力设计研究院有限公司 用于计算机辅助设计的建筑模型的检测方法和系统
CN107369372A (zh) * 2017-07-19 2017-11-21 中国电建集团成都勘测设计研究院有限公司 水电站河床式厂房动力分析数值模型设计方法

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101404090A (zh) * 2008-11-18 2009-04-08 上海城市发展信息研究中心 一种用于空间分析的地下构筑物三维数字化模型构建方法

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101404090A (zh) * 2008-11-18 2009-04-08 上海城市发展信息研究中心 一种用于空间分析的地下构筑物三维数字化模型构建方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
钟登华 等: "大型水利水电工程建筑物三维可视化建模技术研究", 《水利水电技术》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106021737A (zh) * 2016-05-20 2016-10-12 中国能源建设集团广东省电力设计研究院有限公司 用于计算机辅助设计的建筑模型的检测方法和系统
CN107369372A (zh) * 2017-07-19 2017-11-21 中国电建集团成都勘测设计研究院有限公司 水电站河床式厂房动力分析数值模型设计方法
CN107369372B (zh) * 2017-07-19 2019-09-24 中国电建集团成都勘测设计研究院有限公司 水电站河床式厂房动力分析数值模型设计方法

Similar Documents

Publication Publication Date Title
CN105488301B (zh) 三维钢筋翻样方法
CN106372293B (zh) 一种基于三维基准线的构筑物bim模型创建方法
CN105781064A (zh) 基于bim的地砖铺设施工方法
CN112257160B (zh) 一种基于bim的垃圾焚烧发电厂标准化正向设计方法
CN105956278A (zh) 一种基于Autodesk Revit的机电工程管线系统深化设计方法
CN105551077B (zh) 钣金加工三维工艺模型的构建方法及装置
CN104750892A (zh) 一种变厚度曲面零件内形面的三维建模方法
CN102495585B (zh) 一种五轴数控机床玻璃磨花加工路径的生成方法
CN102682474A (zh) 水电行业中建筑的三维建模方法
CN107451358A (zh) 一种基于bim的弧形墙体的砌筑方法
CN112765701B (zh) 一种农民新村设计施工一体化建设方法
CN108984876A (zh) 一种基于bim的预埋套管自动化建模方法和系统
CN107657087A (zh) 基于bim技术的管线综合布置方法
CN202008599U (zh) 水泥熟料、余热发电、汽轮机安全保护控制一体化系统
CN101515303B (zh) 利用计算机制作镂空浮雕中空石柱的方法
CN103996218A (zh) 一种建立可变形三维零件模型库的方法
CN101069985A (zh) 大型石材三维穹顶加工工艺
KR102035123B1 (ko) 비정형 패널 제작장치 및 이를 이용한 비정형 패널 생산방법
CN105844016B (zh) 一种基于建筑模型切割的获得拟建建筑工程量的方法
CN206538987U (zh) 一种墙面装饰板定位工具
CN103942364A (zh) 一种飞机制造工装中典型配套结构自动建模技术
CN101748915B (zh) 用于核电站核岛的模块化建造方法
CN102542082B (zh) 空间钢结构施工图深化设计简化方法
CN103197608B (zh) 一种弯扭长桁数模的展开重构方法
CN102495587B (zh) 一种五轴数控机床批花加工路径的生成方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant after: Chengdu Hydroelectric Investigation & Design Institute of SPC

Address before: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant before: Chengdu Hydroelectric Investigation & Design Institute of China Hydropower Consu

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF CHINA HYDROPOWER CONSU TO: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF SPC

C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant after: Co., Ltd of Chengdu survey and design academy of electricity Jian group of China

Address before: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant before: Chengdu Hydroelectric Investigation & Design Institute of SPC

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF SPC TO: CHINA POWER GROUP CHENGDU INVESTIGATION DESIGN + RESEARCH INSTITUTE CO., LTD.

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120919