CN102678126A - Method for excavating mountain tunnels in weak surrounding rock-fractured zones or shallow covered slope sections - Google Patents

Method for excavating mountain tunnels in weak surrounding rock-fractured zones or shallow covered slope sections Download PDF

Info

Publication number
CN102678126A
CN102678126A CN201210151408XA CN201210151408A CN102678126A CN 102678126 A CN102678126 A CN 102678126A CN 201210151408X A CN201210151408X A CN 201210151408XA CN 201210151408 A CN201210151408 A CN 201210151408A CN 102678126 A CN102678126 A CN 102678126A
Authority
CN
China
Prior art keywords
section
arch
tunnel
carried out
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210151408XA
Other languages
Chinese (zh)
Inventor
白俊涛
任富芝
徐利
魏家富
巩汉波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201210151408XA priority Critical patent/CN102678126A/en
Publication of CN102678126A publication Critical patent/CN102678126A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a method for excavating mountain tunnels in weak surrounding rock-fractured zones or shallow covered slope sections, which includes the following steps: (1) cover arch and forepoling; (2) tunnel cutting, including the following steps: (a) the annular part of the upper cross section of the portal of the buried tunnel is first cut, a core soil part is formed on the upper cross section, and an arch is formed; (b) combined bolting and shotcrete is carried out on the arch; (c) the core soil part is cut; (d) the lower cross section of the portal of the buried tunnel is cut; (e) first shotcrete and combined bolting and shotcrete are carried out on the left and the right sidewalls; (f) an inverted arch is lined and backfilled; (g) secondary lining is carried out; (3) step 2 is repeated until the leading pipe shed construction of the next tunnel section is carried out; (4) step 3 is repeated until the tunnel runs through the weak surrounding rock-fractured zone of a mountain. The construction space is large, multi-working face parallel operation can be carried out, and the working efficiency is high; and since the core soil is reserved on the upper cross section and the left and the right cross sections on the lower cross section are staggerly cut forward, the cut working face can be kept stable.

Description

The excavation method in mountain tunnel weak surrounding rock zone of fracture or shallow embedding bias voltage location
Technical field
The present invention relates to the mountain tunnel technical field of construction, the excavation method in particularly a kind of mountain tunnel weak surrounding rock zone of fracture and shallow embedding bias voltage location.
Background technology
In recent years, the construction of tunnel construction day by day increases, and its excavation method more and more receives people's attention.In mountain tunnel weak surrounding rock zone of fracture and shallow embedding bias voltage location work progress, adopt side heading method to carry out excavation construction more.Side heading method excavation face is little, and is little to the country rock disturbance, tunnel open-assembly time weak point, construction safety.But this method working space is narrow and small, and speed of application is slower, and cost is higher.
Summary of the invention
The present invention provides the excavation method in a kind of mountain tunnel weak surrounding rock zone of fracture and shallow embedding bias voltage location for solving the technical problem that exists in the known technology, and this method construction space is big, is convenient to rapid construction, and efficient is high, and cost is low.
The technical scheme that the present invention takes for the technical problem that exists in the solution known technology is: the excavation method in a kind of mountain tunnel weak surrounding rock zone of fracture and shallow embedding bias voltage location may further comprise the steps:
One) cover arch and advance support may further comprise the steps:
1) slope excavation moulding is faced upward on limit, the mountain ridge, hole: after the position of tunnel portal was confirmed, open cut operations for forming platform manifested hole, dark hole, tunnel;
2) cover arch construction: when open cut tunnel mouth earthwork evacuation to position, boundary, light and shade hole, suspend earthwork evacuation, emit the dark openings position in tunnel, and on job platform, perform the cover arch by measurement and positioning;
3) construction advance pipe canopy;
Two) barrel excavation may further comprise the steps:
1) section annular section on the dark hole of tunneling in advance forms core soil part, and forms the arch on the section on this, just spray the arch with levelling sealing country rock scar, slags tap then;
2) combined bolting and shotcrete is carried out in the arch;
3) excavation core soil part keeps the section of core soil part to lag behind annular section all the time, and leads over down section;
4) section under the dark hole of tunneling, formation left and right sides abutment wall, section lags behind the section of core soil part all the time under in the digging process of this time section, keeping, and the construction of staggering before and after the section of the following section employing left and right sides;
5) left and right sides abutment wall is carried out just slagging tap after the spray, combined bolting and shotcrete is carried out to left and right sides abutment wall in the back of slagging tap;
6) to carrying out spray just at the bottom of the hole, just carry out the lining cutting and the backfill of inverted arch after the spray;
7) left and right sides abutment wall and arch are carried out secondary lining;
Three) repeating step two), when the face of annular section is a preseting length apart from the front end face of advance pipe canopy 9, carry out the leading pipe roof construction of next hole section again;
Four) repeating step three), pass the weak surrounding rock zone of fracture on the mountain ridge until barrel.
In said step 2) in adopt drilling and blasting method to excavate, the drilling depth of each explosion is controlled at 0.5~0.7m.
In said step 1) 2) in, in cover arch, establish the guide pipe of pipe boron steel pipe, guide pipe is fixed on the main muscle of cover arch.
Advantage and good effect that the present invention has are:
1) construction speed is fast: because the construction section is big, but the construction multiple spot carry out simultaneously, do not receive spatial constraints, construction speed is accelerated; And the construction section is big, helps heavy mechanical equipment and slags tap, gets rid of the danger and preliminary bracing.
2) construction costs is low: need not to carry out temporary lining, save material, and degree of progress speed, construction cost reduces.
3) working security is good: the top excavation carries out under the protection of advance support, and core soil and bottom excavation carry out under the protection of arch preliminary bracing, adopt short drilling depth simultaneously; Strong supporting; And the utilization of equipment makes the excavation degree of progress speed, country rock open-assembly time weak point, and loose deformation energy is controlled; Reserve core soil and can stablize face, prevent to cave in.
4) difficulty of construction is little: operation is simple, and each position excavation and preliminary bracing are easier to control, no temporary lining.
In sum, construction space of the present invention is big, can the parallel operations of many scope of operations, and work efficiency is higher; When geological conditions changes, be convenient to flexibly, in time change other job practices; Reserve core soil on the epimere face, keep section front and back dislocation excavation in the left and right sides on the following section, it is stable to help excavated surface; When surrouding rock deformation is big, guaranteeing safety and satisfying under the prerequisite of headroom section, can adjust closing time as early as possible.
Description of drawings
Fig. 1 is a construction flow chart of the present invention;
Fig. 2 is a constructing structure sketch map of the present invention;
Fig. 3 is the cross-sectional drawing of Fig. 2;
Fig. 4 is the skiagraph of Fig. 2.
Among the figure: 1, annular section, 2, the arch, 3, core soil part, 4, section down, 5, abutment wall, 6, inverted arch, 7, secondary lining, 8, guide pipe, 9, Guan Peng.
The specific embodiment
For further understanding summary of the invention of the present invention, characteristics and effect, the following examples of giving an example now, and conjunction with figs. specifies as follows:
See also Fig. 1~Fig. 4, the excavation method in a kind of mountain tunnel weak surrounding rock zone of fracture and shallow embedding bias voltage location may further comprise the steps:
One) cover arch and advance support may further comprise the steps:
1) slope excavation moulding is faced upward on limit, the mountain ridge, hole: after the position of tunnel portal was confirmed, open cut operations for forming platform manifested hole, dark hole, tunnel;
2) cover arch construction:
When open cut tunnel mouth earthwork evacuation to position, boundary, light and shade hole, suspend earthwork evacuation, emit the dark openings position in tunnel by measurement and positioning, and on job platform, perform the cover arch.In the cover arch, establish the guide pipe 8 of pipe boron steel pipe, guide pipe 8 is fixed on the main muscle of cover arch.
3) construction of advance pipe canopy 9: in the present embodiment, the tunnel is imported and exported and to be the completely decomposed layer, and belongs to shallow embedding bias voltage landform, the hole section pay in advance protect very important.In the present embodiment, adopt external diameter 108mm, wall thickness 6mm hot rolled seamless steel tube, the steel pipe front end is coniform; The mud jacking hole of boring 8mm around the tube wall, afterbody 1.5m does not establish the mud jacking hole, and steel pipe is squeezed into country rock with 1 ° of camber angle through guide pipe; Circumferential distance 40cm, totally 36, the welding junction on the adjacent steel pipe staggers; The radial error of all steel pipes is not more than 20cm, and injecting paste material is a cement mortar.Injecting paste material should use the water glass slurry when country rock is moisture.During slip casting, pneumatic mortar machine pressure is controlled to be 0.5-1MPa, and adopts quantitative filling method control grouting amount,, can not finish slip casting when having the orifice of leakage when grouting amount reaches the 75%-85% of design load.
Two) barrel excavation may further comprise the steps:
1) section annular section 1 on the dark hole of tunneling in advance forms core soil part 3, and forms arch 2 on the section on this, just spray arch 2 with levelling sealing country rock scar, slags tap then;
2) combined bolting and shotcrete is carried out in arch 2;
3) excavation core soil part 3 keeps the section of core soil part 3 to lag behind annular section 1 one setpoint distances all the time, and leads over down section, on the bottom surface of last section part, forms step surface.In the present embodiment, this setpoint distance is 10m;
4) section 4 under the dark hole of tunneling forms left and right sides abutment wall 5, and section 5 lags behind the section of core soil part 3 all the time under in the digging process of this time section 5, keeping, and the construction of staggering before and after the following section 5 employing left and right sides sections;
5) left and right sides abutment wall 5 is carried out just slagging tap after the spray, combined bolting and shotcrete is carried out to left and right sides abutment wall 5 in the back of slagging tap;
6) to carrying out spray just at the bottom of the hole, just carry out the lining cutting and the backfill of inverted arch 6 after the spray;
7) left and right sides abutment wall 5 and arch 2 are carried out secondary lining;
Three) repeating step two), when the face of annular section 1 is a preseting length apart from the front end face of advance pipe canopy 9, carry out the leading pipe roof construction of next hole section again, the same step 1 of method) in 3); In the present embodiment, this preseting length is 2m;
Four) repeating step three), pass the weak surrounding rock zone of fracture on the mountain ridge until barrel.
Above-mentioned barrel excavation uses the pusher leg drill jewel hole in strict accordance with " New Austrian Tunneling Method " principle organizing construction, and manual charging and connection are detonated; The network implementation smooth blasting; Must follow short drilling depth in the blasting process, the principle of weak explosion, the drilling depth of each explosion is controlled at 0.5~0.7m.Loader dress slag, large-scale dump truck transportation is appeared.Excavation adopts drilling and blasting method to carry out, and the dress quarrel all adopts machineries to carry out because the construction section is big, but the construction multiple spot carry out simultaneously, do not receive spatial constraints, construction speed is accelerated.
Although combine accompanying drawing that the preferred embodiments of the present invention are described above; But the present invention is not limited to the above-mentioned specific embodiment, and the above-mentioned specific embodiment only is schematically, is not restrictive; Those of ordinary skill in the art is under enlightenment of the present invention; Not breaking away under the scope situation that aim of the present invention and claim protect, can also make a lot of forms, these all belong within protection scope of the present invention.

Claims (3)

1. the excavation method in mountain tunnel weak surrounding rock zone of fracture and shallow embedding bias voltage location is characterized in that, may further comprise the steps:
One) cover arch and advance support may further comprise the steps:
1) slope excavation moulding is faced upward on limit, the mountain ridge, hole: after the position of tunnel portal was confirmed, open cut operations for forming platform manifested hole, dark hole, tunnel;
2) cover arch construction: when open cut tunnel mouth earthwork evacuation to position, boundary, light and shade hole, suspend earthwork evacuation, emit the dark openings position in tunnel, and on job platform, perform the cover arch by measurement and positioning;
3) construction advance pipe canopy;
Two) barrel excavation may further comprise the steps:
1) section annular section on the dark hole of tunneling in advance forms core soil part, and forms the arch on the section on this, just spray the arch with levelling sealing country rock scar, slags tap then;
2) combined bolting and shotcrete is carried out in the arch;
3) excavation core soil part keeps the section of core soil part to lag behind annular section all the time, and leads over down section;
4) section under the dark hole of tunneling, formation left and right sides abutment wall, section lags behind the section of core soil part all the time under in the digging process of this time section, keeping, and the construction of staggering before and after the section of the following section employing left and right sides;
5) left and right sides abutment wall is carried out just slagging tap after the spray, combined bolting and shotcrete is carried out to left and right sides abutment wall in the back of slagging tap;
6) to carrying out spray just at the bottom of the hole, just carry out the lining cutting and the backfill of inverted arch after the spray;
7) left and right sides abutment wall and arch are carried out secondary lining;
Three) repeating step two), when the face of annular section is a preseting length apart from the front end face of advance pipe canopy 9, carry out the leading pipe roof construction of next hole section again;
Four) repeating step three), pass the weak surrounding rock zone of fracture on the mountain ridge until barrel.
2. the excavation method in mountain tunnel weak surrounding rock zone of fracture according to claim 1 and shallow embedding bias voltage location is characterized in that, in said step 2) in adopt drilling and blasting method to excavate, the drilling depth of each explosion is controlled at 0.5~0.7m.
3. the excavation method in mountain tunnel weak surrounding rock zone of fracture according to claim 1 and shallow embedding bias voltage location is characterized in that, in said step 1) 2) in, in cover arch, establish the guide pipe of pipe boron steel pipe, guide pipe is fixed on the main muscle of cover arch.
CN201210151408XA 2012-05-15 2012-05-15 Method for excavating mountain tunnels in weak surrounding rock-fractured zones or shallow covered slope sections Pending CN102678126A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210151408XA CN102678126A (en) 2012-05-15 2012-05-15 Method for excavating mountain tunnels in weak surrounding rock-fractured zones or shallow covered slope sections

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210151408XA CN102678126A (en) 2012-05-15 2012-05-15 Method for excavating mountain tunnels in weak surrounding rock-fractured zones or shallow covered slope sections

Publications (1)

Publication Number Publication Date
CN102678126A true CN102678126A (en) 2012-09-19

Family

ID=46810627

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210151408XA Pending CN102678126A (en) 2012-05-15 2012-05-15 Method for excavating mountain tunnels in weak surrounding rock-fractured zones or shallow covered slope sections

Country Status (1)

Country Link
CN (1) CN102678126A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103206219A (en) * 2013-05-06 2013-07-17 浙江省宏途交通建设有限公司 Holed excavation supporting structure for light and dark junction section of tunnel in bias pressure state and construction method
CN103244133A (en) * 2013-05-17 2013-08-14 贵州省公路工程集团有限公司 Coal measure strata tunnel milling digging and blasting combined construction method
CN103362523A (en) * 2013-07-22 2013-10-23 重庆千牛建设工程有限公司 Suspended formwork lining method for cover arch outside tunnel portal with weak surrounding rocks
CN103603371A (en) * 2013-11-19 2014-02-26 厦门水务集团有限公司 Submarine pipe jacking engineering pre-wrecking backfill jacking construction method
CN104500079A (en) * 2014-11-26 2015-04-08 中国电建集团成都勘测设计研究院有限公司 Tunnel excavation method in shallow-buried bias-pressure toppling-deformation bulk solid and strong-unloading rock structure
CN104612719A (en) * 2014-12-15 2015-05-13 中铁二十局集团有限公司 Collapse prevention processing method for soft rock tunnel portal
CN104818991A (en) * 2015-03-30 2015-08-05 中铁二十四局集团福建铁路建设有限公司 Construction method of residual slope wash tunnel with shallow cover and unsymmetrical pressure
CN106499413A (en) * 2016-11-19 2017-03-15 中铁十二局集团有限公司 A kind of Shallow-buried section tunnel stratum consolidation construction method
CN108005660A (en) * 2017-11-16 2018-05-08 党文华 A kind of Optimization of Expressway Tunnel Construction method
CN110230496A (en) * 2019-06-14 2019-09-13 中国铁建大桥工程局集团有限公司 A kind of three step of big cross section soft stratum tunnel, four step is interlocked construction method
CN110685714A (en) * 2019-08-30 2020-01-14 中铁十四局集团第四工程有限公司 Micro-step reserved core soil construction structure and method for shallow-buried bias tunnel under phyllite geology

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06129181A (en) * 1992-10-16 1994-05-10 Mitsui Constr Co Ltd Tunnel boring construction method and tunnel construction support device
CN101260806A (en) * 2008-04-24 2008-09-10 重庆交通科研设计院 Preposition type opening construction method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06129181A (en) * 1992-10-16 1994-05-10 Mitsui Constr Co Ltd Tunnel boring construction method and tunnel construction support device
CN101260806A (en) * 2008-04-24 2008-09-10 重庆交通科研设计院 Preposition type opening construction method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张道鹏: "津洞隧道洞口偏压段软弱围岩施工技术", 《山西建筑》 *
胡古月: "大跨度公路隧道软弱围岩浅埋偏压段施工技术", 《湖南交通科技》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103206219A (en) * 2013-05-06 2013-07-17 浙江省宏途交通建设有限公司 Holed excavation supporting structure for light and dark junction section of tunnel in bias pressure state and construction method
CN103244133B (en) * 2013-05-17 2016-01-20 贵州省公路工程集团有限公司 The milling of coal measure strata tunnel is dug and is combined construction with explosion
CN103244133A (en) * 2013-05-17 2013-08-14 贵州省公路工程集团有限公司 Coal measure strata tunnel milling digging and blasting combined construction method
CN103362523A (en) * 2013-07-22 2013-10-23 重庆千牛建设工程有限公司 Suspended formwork lining method for cover arch outside tunnel portal with weak surrounding rocks
CN103603371A (en) * 2013-11-19 2014-02-26 厦门水务集团有限公司 Submarine pipe jacking engineering pre-wrecking backfill jacking construction method
CN103603371B (en) * 2013-11-19 2015-12-02 厦门水务集团有限公司 Environments such as subsea pipe-jacking project is removed obstacles backfill jacking construction method in advance
CN104500079A (en) * 2014-11-26 2015-04-08 中国电建集团成都勘测设计研究院有限公司 Tunnel excavation method in shallow-buried bias-pressure toppling-deformation bulk solid and strong-unloading rock structure
CN104612719A (en) * 2014-12-15 2015-05-13 中铁二十局集团有限公司 Collapse prevention processing method for soft rock tunnel portal
CN104818991A (en) * 2015-03-30 2015-08-05 中铁二十四局集团福建铁路建设有限公司 Construction method of residual slope wash tunnel with shallow cover and unsymmetrical pressure
CN106499413A (en) * 2016-11-19 2017-03-15 中铁十二局集团有限公司 A kind of Shallow-buried section tunnel stratum consolidation construction method
CN108005660A (en) * 2017-11-16 2018-05-08 党文华 A kind of Optimization of Expressway Tunnel Construction method
CN110230496A (en) * 2019-06-14 2019-09-13 中国铁建大桥工程局集团有限公司 A kind of three step of big cross section soft stratum tunnel, four step is interlocked construction method
CN110685714A (en) * 2019-08-30 2020-01-14 中铁十四局集团第四工程有限公司 Micro-step reserved core soil construction structure and method for shallow-buried bias tunnel under phyllite geology
CN110685714B (en) * 2019-08-30 2021-05-14 中铁十四局集团第四工程有限公司 Micro-step reserved core soil construction structure and method for shallow-buried bias tunnel under phyllite geology

Similar Documents

Publication Publication Date Title
CN102678126A (en) Method for excavating mountain tunnels in weak surrounding rock-fractured zones or shallow covered slope sections
CN101408106B (en) Small tube shed pre-grouting method
CN103993892B (en) A kind of supporting method for weak broken uneven strata constructing tunnel
CN102182472B (en) Backfill repairing method for tunnel collapse cavity
CN103470267A (en) Long tunnel fast construction process
CN103306687A (en) Construction method for deformation control via horizontal whirling jet grouting of long cantilever in soft-rock tunnel
CN109736827B (en) Method for excavating urban subway hard rock stratum communication channel by high-pressure gas expansion fracturing
CN105605996A (en) Method for carrying out bench cut method construction in IV-grade surrounding rocks by using three-arm drill jumbo
CN108005660A (en) A kind of Optimization of Expressway Tunnel Construction method
CN105781573A (en) Railway down-traversing highway tunnel double-layer casing pipe reinforcement double-pipe shed follow-pipe drilling construction method
CN107762533A (en) A kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel
CN102606168B (en) Construction method for preventing settlement and deformation of shallow-buried-excavation tunnel in excavation
CN103835729A (en) Ground pre-grouting strengthening technology for deep long-distance roadway surrounding rock
CN103628885A (en) Tunnel exit cover-excavation construction method of Ultra-shadow buried tunnel
CN105863651A (en) Tunnel construction method with shield methodand new Austrian tunneling method being combined
CN103835723A (en) Comprehensive pretreatment method for shaft penetration in mined-out area stratum
CN107503755A (en) A kind of construction method for exempting from button arch flat-top cavern-pile method construction subway station
CN109763821A (en) A kind of compound shield lane method of dynamic pressure exploiting field main entry
CN109356593A (en) A kind of headrace tunnel excavation construction method
CN110905536A (en) Construction method for receiving complex stratum earth pressure shield in underground excavation tunnel
CN103510572A (en) Construction method of water getting vertical shaft under complex geological condition
CN107035376A (en) One kind common law in huge thick bedrock aquifer digs shaft construction method
CN104141500A (en) Hardened sand gravel stratum cavern construction method
CN109209443A (en) A kind of construction method of breaking surrounding rock tunnel structure
CN103939115B (en) A kind of method of half shallow mining method hangar tunnel and structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120919