CN102663541B - 一种配电网故障修复资源调度方法及装置 - Google Patents
一种配电网故障修复资源调度方法及装置 Download PDFInfo
- Publication number
- CN102663541B CN102663541B CN201210075814.2A CN201210075814A CN102663541B CN 102663541 B CN102663541 B CN 102663541B CN 201210075814 A CN201210075814 A CN 201210075814A CN 102663541 B CN102663541 B CN 102663541B
- Authority
- CN
- China
- Prior art keywords
- resource
- sigma
- solution
- trouble spot
- fault
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210075814.2A CN102663541B (zh) | 2012-03-20 | 2012-03-20 | 一种配电网故障修复资源调度方法及装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210075814.2A CN102663541B (zh) | 2012-03-20 | 2012-03-20 | 一种配电网故障修复资源调度方法及装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102663541A CN102663541A (zh) | 2012-09-12 |
CN102663541B true CN102663541B (zh) | 2015-02-11 |
Family
ID=46773021
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210075814.2A Active CN102663541B (zh) | 2012-03-20 | 2012-03-20 | 一种配电网故障修复资源调度方法及装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102663541B (zh) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104573887A (zh) * | 2013-10-14 | 2015-04-29 | 北京电研华源电力技术有限公司 | 用于配电网络故障抢修的资源调配优化方法 |
CN105321014A (zh) * | 2014-07-01 | 2016-02-10 | 国家电网公司 | 一种配网资源、信息抢修优化调度方法 |
CN104156788A (zh) * | 2014-08-20 | 2014-11-19 | 国家电网公司 | 一种基于禁忌搜索算法的配网资源抢修优化调度方法 |
CN106249109B (zh) * | 2016-09-20 | 2019-03-22 | 广西电网有限责任公司钦州供电局 | 配电网故障定位方法及系统 |
CN109190259B (zh) * | 2018-09-07 | 2022-04-29 | 哈尔滨工业大学 | 基于改进Dijkstra算法和IPSO结合的数字微流控芯片故障修复方法 |
CN112884185A (zh) * | 2021-03-25 | 2021-06-01 | 广东科学技术职业学院 | 一种基于禁忌搜索算法的配网资源抢修优化调度方法 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4622968B2 (ja) * | 2006-08-30 | 2011-02-02 | 株式会社明電舎 | 配電自動化システムの電力融通方法 |
CN101145219A (zh) * | 2007-07-20 | 2008-03-19 | 周远成 | 使用遗传算法进行资源配置子系统 |
CN101984412B (zh) * | 2010-10-13 | 2013-01-30 | 北京航空航天大学 | 一种基于分组和禁忌搜索的并行测试任务调度方法 |
-
2012
- 2012-03-20 CN CN201210075814.2A patent/CN102663541B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN102663541A (zh) | 2012-09-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Lumbreras et al. | The new challenges to transmission expansion planning. Survey of recent practice and literature review | |
CN102663541B (zh) | 一种配电网故障修复资源调度方法及装置 | |
Kougias et al. | Sustainable energy modelling of non-interconnected Mediterranean islands | |
Deeba et al. | Evaluation of technical and financial benefits of battery‐based energy storage systems in distribution networks | |
US10289765B2 (en) | Fast model generating and solving method for security-constrained power system operation simulation | |
Martins et al. | Active distribution network integrated planning incorporating distributed generation and load response uncertainties | |
Pippia et al. | A single-level rule-based model predictive control approach for energy management of grid-connected microgrids | |
CN106253335B (zh) | 一种分布式电源容量与接入位置不确定的配电网规划方法 | |
Carr et al. | Energy storage for active network management on electricity distribution networks with wind power | |
Asadamongkol et al. | Transmission expansion planning with AC model based on generalized Benders decomposition | |
Meng et al. | Hierarchical SCOPF considering wind energy integration through multiterminal VSC-HVDC grids | |
Villumsen et al. | Investment in electricity networks with transmission switching | |
US10128658B2 (en) | Autonomous methods, systems, and software for self-adjusting generation, demand, and/or line flows/reactances to ensure feasible AC power flow | |
CN104933481B (zh) | 用于电力系统评估与渐进规划的参考电网模型及求解方法 | |
Khani et al. | Real‐time optimal management of reverse power flow in integrated power and gas distribution grids under large renewable power penetration | |
Zheng et al. | Optimal integration of MBESSs/SBESSs in distribution systems with renewables | |
Yi et al. | Expansion planning of active distribution networks achieving their dispatchability via energy storage systems | |
Maffei et al. | Optimal Power Flow model with energy storage, an extension towards large integration of renewable energy sources. | |
Barrie et al. | Leveraging machine learning to optimize renewable energy integration in developing economies | |
CN110414796B (zh) | 一种交直流混合配电网网架规划方法、装置及存储介质 | |
Bucher et al. | Robust allocation of reserves considering different reserve types and the flexibility from HVDC | |
Mosleuzzaman et al. | Engineering Challenges and Solutions in Smart Grid Integration with Electric Vehicles | |
Mellouk et al. | Overview of mathematical methods for energy management optimization in smart grids | |
CN105631549A (zh) | 主动配电网环境下的虚拟电厂分布式模型预测控制方法 | |
Carvalho et al. | Predispatch of hydroelectric power systems with modifications in network topologies |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Free format text: FORMER OWNER: TAIYUAN POWER SUPPLY COMPANY, SHANXI ELECTRIC POWER COMPANY Effective date: 20150130 |
|
C41 | Transfer of patent application or patent right or utility model | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Shen Haodong Inventor after: Zhou Wei Inventor after: Xu Taifeng Inventor after: Jin Jin Inventor after: Zhang Junliu Inventor after: Zhang Zizhong Inventor after: Wu Lin Inventor after: Han Junyu Inventor after: Zhou Yanghao Inventor after: Tan Yonggui Inventor after: He Anhong Inventor after: Wu Xueqiong Inventor before: Yu Zhenhua Inventor before: Xiong Lijuan Inventor before: Tan Yonggui Inventor before: Fu Wengang Inventor before: Feng Haiyan Inventor before: Xu Taifeng Inventor before: Gu Ran |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: YU ZHENHUA XIONG LIJUAN TAN YONGGUI FU WENGANG FENG HAIYAN XU TAIFENG GU RAN TO: SHEN HAODONG ZHANG JUNLIU ZHANG ZIZHONG WU LIN HAN JUNYU ZHOU YANGHAO TAN YONGGUI HE ANHONG WU XUEQIONG ZHOU WEI XU TAIFENG JIN JIN |
|
TR01 | Transfer of patent right |
Effective date of registration: 20150130 Address after: High road high tech Development Zone Nanjing city Jiangsu province 210061 No. 20 Patentee after: NARI Technology Development Co., Ltd. Address before: High road in Pukou District of Nanjing City, Jiangsu Province, No. 20 210061 Patentee before: NARI Technology Development Co., Ltd. Patentee before: Taiyuan Power Supply Company of Shanxi Electric Power Company |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20160407 Address after: High road high tech Development Zone Nanjing city Jiangsu province 210061 No. 20 Patentee after: NARI Technology Development Co., Ltd. Patentee after: Taiyuan Power Supply Company of Shanxi Electric Power Company Address before: High road high tech Development Zone Nanjing city Jiangsu province 210061 No. 20 Patentee before: NARI Technology Development Co., Ltd. |