CN102661741A - Method for monitoring topography and erosion amount of head of small-sized gully - Google Patents

Method for monitoring topography and erosion amount of head of small-sized gully Download PDF

Info

Publication number
CN102661741A
CN102661741A CN201210127520XA CN201210127520A CN102661741A CN 102661741 A CN102661741 A CN 102661741A CN 201210127520X A CN201210127520X A CN 201210127520XA CN 201210127520 A CN201210127520 A CN 201210127520A CN 102661741 A CN102661741 A CN 102661741A
Authority
CN
China
Prior art keywords
microtopography
grid
measurement frame
head
measurement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210127520XA
Other languages
Chinese (zh)
Other versions
CN102661741B (en
Inventor
熊东红
苏正安
翟娟
董一帆
李佳佳
杨丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN JINYUAN ENGINEERING SURVEY AND DESIGN CO., LTD.
Original Assignee
Institute of Mountain Hazards and Environment IMHE of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute of Mountain Hazards and Environment IMHE of CAS filed Critical Institute of Mountain Hazards and Environment IMHE of CAS
Priority to CN201210127520.XA priority Critical patent/CN102661741B/en
Publication of CN102661741A publication Critical patent/CN102661741A/en
Application granted granted Critical
Publication of CN102661741B publication Critical patent/CN102661741B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

The invention relates to a method for monitoring a topography and the erosion amount of a head of a small-sized gully. The method comprises the following steps of: I, respectively driving two erosion piles into parts at both sides of a catchment area of the head of the gully, which cannot be eroded by runoff so as to ensure the top ends of the erosion piles to be located on the same horizontal plane; II, horizontally putting a microtopography measurement frame; III, measuring microtopography data of the head of the gully; and IV, measuring the microtopography data of the head of the gully to obtain the elevation distance between a microtopography measurement plane and the microtopography measurement frame; measuring out the topography of the head of the gully; and working out the erosion amount and the variation condition of the topography of the head of the gully in the time quantum by utilizing measured data of two different times. By applying the method disclosed by the invention, the topography of the head of the gully can be very conveniently monitored, and moreover, a measurement result is accurate. The microtopography measurement frame adopted by the method disclosed by the invention is simple in structure and is stronger in popularization and application value. The method for monitoring the topography and the erosion amount of the head of the small-sized gully is suitable for monitoring the topography of the head of the outdoor or indoor simulated small-sized gully and calculating the erosion amount of soil.

Description

The monitoring method of a kind of small-sized coombe ditch head morphology and erosion amount
Technical field
The present invention relates to a kind of measuring method of ditch head morphology, be specifically related to the method for the monitoring of a kind of small-sized coombe ditch head morphology and erosion amount.
Background technology
China loess plateau, northeast black soil region, Jinsha jiang River dry-hot valley are distributed with the vast coombe of area; The ravinement amount is big, cutting speed is fast; Not only nibble the arable land; Also damage road, quicken the land deterioration process, ravinement research is of far-reaching significance to rivers Sediment Control and local economy sustainable development.
The Erosion and Sediment Production effect is key one ring of ravinement research, and present stage research generally adopts the method for small watershed silt monitoring to carry out, but how quantitatively the sediment production of domatic, the furrow bank of identification, ditch bed does not still have simple, reliable way at present.As Ding Wenfeng etc. " application of landform chaining pin plate in slope soil erosion research " " delivered (Chinese water and soil conservation; 2006 (1): 49-51) use the landform chaining pin in the literary composition and harden and close related software and make the 3 dimensional drawing before and after the erosion caused by sloping surfaces; reflected the erosion amount size at position, domatic variant space more intuitively; but, can't be applied in the runoff plots soil erosion experimental study of field than large scale because the limitation of landform chaining pin plate itself (specification little, can only be used for the indoor water tank experiment of width) less than 50cm; " the high-precision GPS that Zhang Peng etc. are delivering; The comparative study of three kinds of measuring techniques of 3 D laser scanning and chaining pin plate monitoring rill erosion process " in the literary composition, applying three-dimensional laser scanning method monitoring slope rill erosion growth course, the result shows; Laser scanner can be monitored the rill erosion evolution process well; And higher, but, limit its widespread use because three-dimensional laser scanner costs an arm and a leg, inconvenience is carried in survey crew technical requirement height, field to the erosion amount estimation precision.
Summary of the invention
One of the object of the invention be to provide a kind of simple, measure the monitoring method of coombe ditch head morphology and erosion amount accurately.
The present invention is achieved in that
The monitoring method of a kind of coombe ditch head morphology and erosion amount comprises the steps:
Step 1, in both sides, coombe ditch head gathering ground runoff corrode less than the place respectively squeeze into two and corrode stake, guarantee to corrode the stake top on same surface level;
Step 2, the microtopography measurement frame is carried out level put, concrete arrangement method is:
At first, the microtopography measurement frame is put two corrode between the stake, and guarantee that the microtopography measurement frame can cover the main erosion areas of ditch bed;
Secondly, the corrosion resistant plate of a bar shaped surface smoothing, wide about 5cm is put into two corrodes in the stake, as two straight lines that corrode in the surface level that stake fixes;
Once more, rise with an amount of brick and eggshell china brick four drift angle pads with the microtopography measurement frame, adjacent till the corrosion resistant plate up to microtopography measurement frame upper surface;
At last, the microtopography measurement frame is carried out leveling, up to four limits of microtopography measurement frame all till the level with surveyor's staff;
Wherein, Described microtopography measurement frame is made up of the grid surface that two-layer secured in parallel is arranged, the number of grid of two-grid face size and each grid surface is identical; And two grids on the same tested point on the face of two-grid up and down of correspondence, its vertical projection can overlap fully.Between the two-grid face through be positioned on the grid surface limit with the angle on support column be fixedly connected; Said grid surface is iron grid surface, and grid is made up of iron wire; Vertical range between the said two-grid face is 15cm to 25cm; Said grid surface is the rectangle grid surface, and the grid surface specification is 2m * 1m; The mid point on each limit of said grid surface is fixedly connected with the steel bar of two right-angled intersections; Steel bar is held grid, is out of shape in long-term use to prevent grid; Said grid is a square net, and the sizing grid specification is 2.5cm * 2.5cm;
Step 3, carry out the measurement of ditch head microtopography data
Steel ruler is vertically inserted in the double layer grid of microtopography measurement frame; Steel ruler all is close to the same angle in the grid during each the measurement; Measure the distance of coombe ditch head (gathering ground, furrow bank or the ditch bed) face of land and microtopography measurement frame upper strata frame respectively, be designated as the Z value of this net point;
Each microtopography is measured in the planar survey process; The microtopography measurement frame coordinate on following an of left side is decided to be (0,0, Z); By that analogy, according to getting a characteristic (surveying 1 point) in each grid interval distance and the measuring process, obtain the coordinate (X, Y, Z) of each net point at a distance from several grids;
Step 4, through after the above-mentioned measurement; Just can access the elevation distance between the coombe ditch head face of land and the microtopography measurement frame; Utilize these measurement data just can calculate the form of coombe ditch head; Utilize the measurement data of two different times, just can calculate the erosion amount and the landforms situation of change of this coombe ditch head in this time period.
Scheme further is: in order to ensure corroding the stake top on same surface level; Adopt following method: fixing earlier one corrodes stake; Squeeze into another at opposite side again and corrode stake, in the process of squeezing into, need be put into two to wide 5cm, corrosion resistant plate that length is enough and corrode on the stake tops; Carry out leveling with surveyor's staff; Till the level angle at each position of corrosion resistant plate is zero degree, can confirm two tops of corroding stake on same surface level, the reference planes that the microtopography measurement frame was put when this plane conduct was measured at every turn.
Scheme further is: in the step 2; After fixing the microtopography measurement frame for the first time; The mark and the data of record fixed position comprise: microtopography measurement frame upper surface mark its with the position of corrosion resistant plate coboundary contact point, and measure these two marks to a distance that corrodes; According to the position of these two marks and the fixing each test of range data back measurement frame, guarantee each measure regional identical.
Scheme further is: the concrete grammar of the form of said measuring and calculating coombe ditch head is:
In
Figure 197062DEST_PATH_IMAGE001
each terrain data input Excel form of measuring; According to getting a characteristic (surveying 1 point) in microtopography measurement frame grid order and the measuring process measurement grid (X is set at a distance from several grids; Y, Z) value;
The calculating of monitoring period gathering ground, furrow bank, ditch bed soil erosion amount, the spatial volume during with monitoring period starting point between the ditch bed face of land and the microtopography measurement frame upper epidermis is calculated as example:
Figure 152566DEST_PATH_IMAGE003
; Arcgis9.3 → Tools → Add XY Data chooses the Excel data that will handle;
Figure 695543DEST_PATH_IMAGE004
; Export Data generates the .shp data;
Figure 987984DEST_PATH_IMAGE005
; 3D Analyst → Create/Modify Tin → Create Tin From Features, the .shp data that the step generates in the utilization generate the TIN that has altitude figures;
Figure 845081DEST_PATH_IMAGE006
; 3D Analyst → Surface Analyst → Area and Volume ..., calculate the spatial volume between the ditch bed face of land and the microtopography measurement frame upper surface.
Same quadrat method, the spatial volume of the segment endpoint ditch bed face of land and microtopography measurement frame upper epidermis when obtaining monitoring, the difference of two volumes is the soil erosion amount of monitoring ditch bed in this time monitoring period.
Use method of the present invention, can carry out the monitoring of small-sized coombe ditch head morphology very easily, and measurement result is accurate, the microtopography measurement frame that the present invention adopts is simple in structure, has stronger application value.The form monitoring and the soil erosion amount that are suitable for the small-sized coombe ditch head of field or lab simulation calculate.Especially utilize the microtopography measurement frame; Because the microtopography measurement frame is provided with up and down the corresponding mesh overlay alignment on a determining deviation, two grid surfaces between the grid surface, what guarantee that in measuring process steel ruler is contacted with vertically that the face of land to be measured and different time measure is same location point; And can make the coordinate system of measurement data, utilize Arcgis software deal with data easily, obtain test front and back soil erosion amount; Utilize Surfer software to obtain coombe ditch head microtopography exterior view, show that more intuitively microtopography changes.
Description of drawings
Fig. 1: microtopography measurement frame structural representation.
Fig. 2: ditch bed microtopography Excel schematic diagram data.
Fig. 3: the synoptic diagram behind the microtopography Excel data importing Arcgis.
Fig. 4: microtopography Excel data change into the synoptic diagram of the .shp data of Arcgis.
Fig. 5: the synoptic diagram of test anterior canal bed microtopography TIN data.
Fig. 6: the spatial volume inquiry synoptic diagram between test anterior canal bed surface and the microtopography measurement frame.
Fig. 7: the synoptic diagram of test anterior canal bed exterior view.
Fig. 8: the synoptic diagram of test back ditch bed exterior view.
Embodiment
Below in conjunction with accompanying drawing the present invention is done further explanation.
Shown in accompanying drawing 1; A kind of microtopography measurement frame that is used for small-sized coombe ditch head morphology monitoring; Grid surface 1 by two-layer secured in parallel is arranged is formed with grid surface 1 '; The number of grid of two-grid face size and each grid surface is identical, grid surface 1 and grid surface 1 ' through be positioned on the grid surface limit with the angle on support column 2 be fixedly connected.Said grid surface is iron grid surface, and grid is made up of iron wire.Vertical range between the said two-grid face is 15cm to 25cm.Said grid surface is the rectangle grid surface, and the grid surface specification is 2m * 1m.The mid point on each limit of said grid surface is fixedly connected with the steel bar 3 of two right-angled intersections.Steel bar is held grid, is out of shape in long-term use to prevent grid.Said grid is a square net, and the sizing grid specification is 2.5cm * 2.5cm.
The present invention in use at first need fix the position of microtopography measurement frame, the following mode of fixing employing:
In both sides, coombe ditch head gathering ground (runoff corrode less than place) respectively squeeze into two corrode stake (drill rod of certain-length), both sides, the zone of the turnover between furrow bank and ditch bed are respectively squeezed into one and are corroded stake, and guarantee to corrode a top on same surface level.The method that corrodes the stake laying is that fixing earlier one corrodes stake, squeezes into another erosion stake at opposite side again; In the process of squeezing into; Need be put into two to the corrosion resistant plate of a surface smoothing, wide about 5cm and corrode on the stake top, carry out leveling with surveyor's staff, till the level angle at each position of corrosion resistant plate is zero degree; Can confirm two tops of corroding stake on same surface level, the reference planes that the microtopography measurement frame was put when this plane conduct was measured at every turn.
After the erosion stake fixes, carry out putting of microtopography measurement frame.
At first, the microtopography measurement frame is put two corrode between the stake, and guarantee that the microtopography measurement frame can cover the main erosion areas of ditch bed;
Secondly, corrosion resistant plate is put into two corrodes in the stake, regard the straight line in the fixing surface level of two erosion stakes;
Once more, rise with an amount of brick and eggshell china brick four drift angle pads with the microtopography measurement frame, adjacent till the corrosion resistant plate up to microtopography measurement frame upper surface;
At last, with surveyor's staff the microtopography measurement frame is carried out leveling, all till the level, the height of microtopography measurement frame four drift angle places brick and ceramic tile increases as required or reduces in this process up to four limits of microtopography measurement frame.
After for the first time fixing the microtopography measurement frame; The mark and the data of record fixed position; Comprise: in the position of microtopography measurement frame upper surface mark itself and corrosion resistant plate coboundary (or lower limb) contact point; And measure these two marks to the distance that corrodes stake (outward flange or inward flange), according to the position of these two marks and the fixing each test of range data back measurement frame, guarantee each measure regional identical.
After the microtopography measurement frame fixes, carry out the measurement of ditch head microtopography data.
The measurement of coombe ditch head morphology data utilizes steel ruler to carry out.
Steel ruler vertically inserts in the grid of microtopography measurement frame (when guaranteeing that steel ruler is measured all the time perpendicular to surface to be measured; All be close to the same angle in the grid in the time of need steel ruler being measured at every turn); Measure the distance of surface, coombe ditch head gathering ground (furrow bank or ditch bed) and microtopography measurement frame upper strata frame respectively, be designated as the Z value of this net point.
Each microtopography is measured in face (gathering ground, furrow bank or the ditch bed) measuring process; The microtopography measurement frame coordinate on following an of left side is decided to be (0,0, Z); By that analogy; According to getting a characteristic (surveying 1 point) in each grid interval distance and the measuring process, obtain the coordinate (X, Y, Z) of each net point at a distance from several grids.
It should be noted that to guarantee in measuring process that the measuring position of each grid (like the lower left corner or the upper right corner) must be identical.
After above-mentioned measurement; Just can access the elevation distance between the coombe ditch head face of land and the microtopography measurement frame; Utilize these measurement data just can calculate the form of coombe ditch head; Utilize the measurement data of two different times, just can calculate the erosion amount and the landforms situation of change of this coombe ditch head in this time period.
Concrete computation process can be with reference to following mode:
In
Figure 601685DEST_PATH_IMAGE001
each terrain data input Excel form of measuring; According to microtopography measurement frame grid measurement grid (X is set in proper order; Y; Z) value is shown in accompanying drawing 2;
The calculating of
Figure 253246DEST_PATH_IMAGE002
monitoring period ditch head soil erosion amount, the spatial volume during with monitoring period starting point between the ditch bed face of land and the microtopography measurement frame upper epidermis is calculated as example:
Figure 360879DEST_PATH_IMAGE003
; Arcgis9.3 → Tools (toolbar) → Add XY Data; Choose the Excel data that to handle, shown in accompanying drawing 3;
Figure 756088DEST_PATH_IMAGE004
; Export Data (making data become the .shp data) is shown in accompanying drawing 4;
; 3D Analyst (toolbar) → Create/Modify Tin → Create Tin From Features; The .shp data that the step generates in the utilization generate the TIN (TIN) that has altitude figures, shown in accompanying drawing 5;
Figure 455240DEST_PATH_IMAGE006
; 3D Analyst → Surface Analyst → Area and Volume ... Calculate the volume in space between this ditch bed surface distance microtopography measurement frame upper surface, shown in accompanying drawing 6.
Same quadrat method, the spatial volume of the segment endpoint ditch bed face of land and microtopography measurement frame upper epidermis when obtaining monitoring, the difference of two volumes is the soil erosion amount of monitoring ditch bed in this time monitoring period.
In addition, can use Surfer software processes morphological data, generate ditch bed microtopography exterior view, like Fig. 7, shown in Figure 8.From figure, find out that ditch bed changes in surface is more violent, washed away raceway groove by runoff.

Claims (4)

1. the monitoring method of small-sized coombe ditch head morphology and erosion amount is characterized in that comprising the steps:
Step 1, in both sides, coombe ditch head gathering ground runoff corrode less than the place respectively squeeze into two and corrode stake, guarantee to corrode the stake top on same surface level;
Step 2, the microtopography measurement frame is carried out level put, concrete arrangement method is:
At first, the microtopography measurement frame is put two corrode between the stake, and guarantee that the microtopography measurement frame can cover the main erosion areas of ditch bed;
Secondly, corrosion resistant plate is put into two corrodes in the stake, regard the straight line in the fixing surface level of two erosion stakes;
Once more, rise with brick and ceramic tile four drift angle pads with the microtopography measurement frame, adjacent till the corrosion resistant plate up to microtopography measurement frame upper surface;
At last, the microtopography measurement frame is carried out leveling, up to four limits of microtopography measurement frame all till the level with surveyor's staff;
Wherein, Described microtopography measurement frame; Grid surface by two-layer secured in parallel is arranged is formed; The number of grid of two-grid face size and each grid surface is identical, and the vertical projection of corresponding two grids can be overlapping fully on the two-grid face, grid surface and grid surface through be positioned on the grid surface limit with the angle on support column be fixedly connected; Said grid surface is iron grid surface, and grid is made up of iron wire; Vertical range between the said two-grid face is 15cm to 25cm; Said grid surface is the rectangle grid surface, and the grid surface specification is 2m * 1m; Each limit mid point is fixedly connected with the steel bar of two right-angled intersections on the said grid surface; Steel bar is held grid, is out of shape in long-term use to prevent grid; Said grid is a square net, and the sizing grid specification is 2.5cm * 2.5cm;
Step 3, carry out the measurement of ditch head microtopography data
Steel ruler is vertically inserted in the grid of microtopography measurement frame; The same angle of all being close to grid when steel ruler is measured at every turn; Measure the distance between coombe ditch head (gathering ground, furrow bank or the ditch bed) face of land and the microtopography measurement frame upper strata frame respectively, be designated as the Z value of this net point;
Each microtopography is measured in the planar survey process; The coordinate on following an of left side is decided to be (0,0, Z); By that analogy, according to getting a characteristic (surveying 1 point) in each grid interval distance and the measuring process, obtain the coordinate (X, Y, Z) of each net point at a distance from several grids;
In measuring process, the measuring position of each grid is identical;
Step 4, through after the above-mentioned measurement; Just can access the elevation distance between the coombe ditch head face of land and the microtopography measurement frame; Utilize these measurement data just can calculate the form of coombe ditch head; Utilize the measurement data of two different times, just can calculate the erosion amount and the landforms situation of change of this coombe ditch head in this time period.
2. according to the monitoring method of said small-sized coombe ditch head morphology of claim 1 and erosion amount; It is characterized in that: in order to ensure corroding the stake top on same surface level, adopt following method: fixing earlier one corrodes stake, squeezes into another at opposite side again and corrodes stake; In the process of squeezing into; Need be put into two to the corrosion resistant plate of a surface smoothing, wide about 5cm and corrode on the stake top, carry out leveling with surveyor's staff, till the level angle at each position of corrosion resistant plate is zero degree; Can confirm two tops of corroding stake on same surface level, the reference planes that the microtopography measurement frame was put when this plane conduct was measured at every turn.
3. according to the monitoring method of said small-sized coombe ditch head morphology of claim 1 and erosion amount; It is characterized in that: in the step 2, after fixing the microtopography measurement frame for the first time, the mark and the data of record fixed position; Comprise: at the contact point of microtopography measurement frame upper surface mark itself and corrosion resistant plate coboundary; And measure these two marks to the distance that corrodes stake, according to the position of the fixing each test of these two marks and range data back measurement frame, make the regional identical of each measurement.
4. according to the monitoring method of said small-sized coombe ditch head morphology of claim 1 and erosion amount, it is characterized in that: the said computing method that calculate the form of coombe ditch head are:
In
Figure 201210127520X100001DEST_PATH_IMAGE001
each terrain data input Excel form of measuring; According to getting a characteristic (surveying 1 point) in microtopography measurement frame grid order and the measuring process measurement grid (X is set at a distance from several grids; Y, Z) value;
The calculating of monitoring period gathering ground, furrow bank, ditch bed soil erosion amount, the spatial volume during with monitoring period starting point between the ditch bed face of land and the microtopography measurement frame upper surface is calculated as example:
Figure 201210127520X100001DEST_PATH_IMAGE003
; Arcgis9.3 → Tools → Add XY Data chooses the Excel data that will handle;
Figure 151719DEST_PATH_IMAGE004
; Export Data generates the .shp data;
Figure 201210127520X100001DEST_PATH_IMAGE005
; 3D Analyst → Create/Modify Tin → Create Tin From Features, the .shp data that the step generates in the utilization generate the TIN that has altitude figures;
Figure 617335DEST_PATH_IMAGE006
; 3D Analyst → Surface Analyst → Area and Volume ..., calculate the volume between this ditch bed surface distance microtopography measurement frame upper surface;
Same quadrat method, the volume in the space of the segment endpoint ditch bed face of land and microtopography measurement frame upper epidermis when obtaining monitoring, the difference of two volumes is the soil erosion amount of monitoring ditch bed in this time monitoring period.
CN201210127520.XA 2012-04-27 2012-04-27 Method for monitoring topography and erosion amount of head of small-sized gully Expired - Fee Related CN102661741B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210127520.XA CN102661741B (en) 2012-04-27 2012-04-27 Method for monitoring topography and erosion amount of head of small-sized gully

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210127520.XA CN102661741B (en) 2012-04-27 2012-04-27 Method for monitoring topography and erosion amount of head of small-sized gully

Publications (2)

Publication Number Publication Date
CN102661741A true CN102661741A (en) 2012-09-12
CN102661741B CN102661741B (en) 2015-03-11

Family

ID=46771276

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210127520.XA Expired - Fee Related CN102661741B (en) 2012-04-27 2012-04-27 Method for monitoring topography and erosion amount of head of small-sized gully

Country Status (1)

Country Link
CN (1) CN102661741B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102968470A (en) * 2012-11-12 2013-03-13 中国科学院水利部成都山地灾害与环境研究所 Method for accurately calculating morphology change of gully head and gully wall of gully with washing hole
CN106092867A (en) * 2016-06-08 2016-11-09 邹维 Wind erosion plate
CN106759062A (en) * 2016-11-25 2017-05-31 华侨大学 A kind of bank erosion amount Forecasting Methodology
CN110081801A (en) * 2019-04-30 2019-08-02 北京师范大学 A kind of tidal creek microrelief develops in-situ monitoring device and method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2255169C1 (en) * 2004-02-16 2005-06-27 ФГОУ ВПО "Чувашская государственная сельскохозяйственная академия" Gully erosion controlling apparatus
CN101718545A (en) * 2009-12-07 2010-06-02 浙江省水利河口研究院 Portable erosion gully measuring instrument
CN101893543A (en) * 2010-06-29 2010-11-24 云南省农业科学院热区生态农业研究所 Method for long-term fixed-position measuring soil erosion in gully

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2255169C1 (en) * 2004-02-16 2005-06-27 ФГОУ ВПО "Чувашская государственная сельскохозяйственная академия" Gully erosion controlling apparatus
CN101718545A (en) * 2009-12-07 2010-06-02 浙江省水利河口研究院 Portable erosion gully measuring instrument
CN101893543A (en) * 2010-06-29 2010-11-24 云南省农业科学院热区生态农业研究所 Method for long-term fixed-position measuring soil erosion in gully

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
翟娟等: "冲沟侵蚀监测方法研究进展", 《世界科技研究与发展》, vol. 33, no. 4, 31 August 2011 (2011-08-31) *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102968470A (en) * 2012-11-12 2013-03-13 中国科学院水利部成都山地灾害与环境研究所 Method for accurately calculating morphology change of gully head and gully wall of gully with washing hole
CN102968470B (en) * 2012-11-12 2016-05-11 中国科学院水利部成都山地灾害与环境研究所 A kind of accurate calculating has the method for the gully head furrow bank metamorphosis of washing hole
CN106092867A (en) * 2016-06-08 2016-11-09 邹维 Wind erosion plate
CN106759062A (en) * 2016-11-25 2017-05-31 华侨大学 A kind of bank erosion amount Forecasting Methodology
CN110081801A (en) * 2019-04-30 2019-08-02 北京师范大学 A kind of tidal creek microrelief develops in-situ monitoring device and method

Also Published As

Publication number Publication date
CN102661741B (en) 2015-03-11

Similar Documents

Publication Publication Date Title
CN109060056B (en) A kind of river cross-section method of calculating flux of contactless radar flow measurement
CN102855806B (en) System and method for quickly building physical model
Schäppi et al. Integrating river cross section measurements with digital terrain models for improved flow modelling applications
CN103954741B (en) Portable soil corrodes observation device
CN104652347B (en) Mountain area non-static water body water level affects population assessed in relation method with flooding
CN106446411A (en) Method for measuring viscous mud-flow internal flow velocity and impact force spatial distributions
CN105808862B (en) A kind of Displacement Analysis method of determining side slope critical slip surface
CN102661741B (en) Method for monitoring topography and erosion amount of head of small-sized gully
CN103526783B (en) A kind of method measuring building foundation pit horizontal movement
CN105423993A (en) Deformation monitoring coordinate reference establishment method and device based on three dimensional laser scanning
CN103293285A (en) Method for determining soil erosion on drainage basin or regional scale
CN105180811A (en) Laser scanner calibration method, based on ground objects with characteristics of the same name, for mobile measuring system
CN106680454A (en) Method for calculating soil erosion modulus of governed collapse mound with sand-blocking dam
CN108427741A (en) A kind of DEM relative error evaluation methods based on a large amount of high-precision control points
CN102042822B (en) Tunnel section measurement method
CN109631786B (en) three-dimensional laser scanning underground engineering similar material simulation test surface layer deformation method
CN105606049A (en) Paddy-field agricultural equipment work attitude measurement method of relative water surface
CN105887941A (en) Pile foundation pile length measuring and calculating method
CN104123454A (en) Method for predicating ground surface settlement caused by underground excavation of single-joint hard rock
CN202692984U (en) Microrelief measuring frame for monitoring small gully head form
CN102589497A (en) Method for measuring and calculating length of gold tailing pond dry beach in real time
CN105866386A (en) Method for measuring soil loss amount through military map
CN109724570B (en) Method for calculating drop amount, drop width and water layer thickness on ridge of underground drop
CN105445177B (en) The monitoring method of bank erosion amount and erosion rate
CN105182441A (en) Three-dimensional projection method for surveyed stratigraphic section drawing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Xiong Donghong

Inventor after: Chen Yang

Inventor after: Su Zhengan

Inventor after: Di Juan

Inventor after: Dong Yifan

Inventor after: Li Jiajia

Inventor after: Yang Dan

Inventor after: Chen Wenxian

Inventor after: Chen Rongxian

Inventor after: Li Xia

Inventor before: Xiong Donghong

Inventor before: Su Zhengan

Inventor before: Di Juan

Inventor before: Dong Yifan

Inventor before: Li Jiajia

Inventor before: Yang Dan

COR Change of bibliographic data
TR01 Transfer of patent right

Effective date of registration: 20151026

Address after: 610041, Chengdu high tech Zone, Sichuan Province, and 113 Road, road, 1

Patentee after: SICHUAN JINYUAN ENGINEERING SURVEY AND DESIGN CO., LTD.

Address before: 610041 Chengdu South Road, Sichuan, No. four, No. nine

Patentee before: Chengdu Institute of Mountain Disaster and Environment, Ministry of Water Resources, Chinese Academy of Sciences

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150311

Termination date: 20180427