CN102661012A CN2012101751969A CN201210175196A CN102661012A CN 102661012 A CN102661012 A CN 102661012A CN 2012101751969 A CN2012101751969 A CN 2012101751969A CN 201210175196 A CN201210175196 A CN 201210175196A CN 102661012 A CN102661012 A CN 102661012A
Authority
CN
China
Prior art keywords
shear wall
edge member
rectangular enclosure
wall slab
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101751969A
Other languages
Chinese (zh)
Inventor
郭正兴
刘家彬
朱张峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN2012101751969A priority Critical patent/CN102661012A/en
Publication of CN102661012A publication Critical patent/CN102661012A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention provides an edge member connecting structure of an assembly type concrete shear wall, wherein vertical reinforcing steel bars with upset heads are utilized and are lapped in a rectangular hollow cavity pipe, continuous rectangular helical stirrups are arranged on the outer side lapped with the vertical reinforcing steel bars in the rectangular hollow cavity pipe, and fine aggregate concrete (or size) is filled in the rectangular hollow cavity pipe to realize the reliable connection of the edge member. The edge member connecting structure provided by the invention realizes the stress continuity of the vertical reinforcing steel bars, and also greatly reinforces the constrain performance of the concrete and guarantees the strength and deformation capability of the edge member so as to provide enough bearing capacity and ductile ability to the shear wall.

Description

A kind of assembly concrete shear wall edge member joint construction
Technical field
The present invention relates to a kind of assembly concrete shear wall edge member rectangle bellows bar splicing joint construction in the hole of boxing out, belong to construction work assembly concrete shear wall structure technical field.
Background technology
It is prefabricated that the assembly concrete shear wall is generally pressed the floor layering, through certain joint construction the prefabricated shear wall slab of upper and lower layer is linked to be integral body.The edge member at shear wall wall limb two ends is its important stressed and deformation places, relies on edge member that main bearing capacity of shear wall and ductility are provided.Therefore, the connection reliability problem of solution assembling shear wall edge member is to realize the key of assembling shear wall globality.
The joint construction of assembly concrete shear wall edge member should be guaranteed the stressed continuity of vertical reinforcement; With giving full play to of guaranteed strength; Simultaneously, what is more important solves the rational setting problem of restriction hoop, to guarantee the concrete operative constraint of edge member; Improve the concrete deformability in this position, thereby improve the ductility and the shock resistance of shear wall.Known joint construction; Main through starching the connectivity problem that connection of anchor overlap joint or slurry anchor sleeve connect the solution vertical reinforcement; And fail to solve well concrete operative constraint problem; Be reflected in the relevant anti-seismic performance test, the destruction of assembling shear wall test specimen generally shows the concrete conquassation early of edge member, and makes its ductile performance and deformability on the low side than cast-in-place shear wall.
Owing to there is above-mentioned various problems, the shock resistance of assembly concrete shear wall still is under suspicion, and its range of application also is restricted, and has hindered applying fast of assembly concrete shear wall structure.
Summary of the invention
The object of the present invention is to provide a kind of assembly concrete shear wall edge member joint construction; Under not changing the existing cast-in-place shear wall structure condition that the arrangement of reinforcement pattern in the member and reinforcing bar distributed structure require on the edge of basically; Be power transmission continuity and the concrete operative constraint problem that solves assembly concrete shear wall edge member vertical reinforcement simultaneously, guarantee giving full play to of assembly concrete shear wall supporting capacity and ductile performance.
The technical scheme that the present invention adopts is: a kind of assembly concrete shear wall edge member joint construction; Comprise the prefabricated shear wall slab edge member of lower floor, the prefabricated shear wall slab edge member in upper strata, rectangular enclosure pipe, band heading vertical reinforcement, rectangular spiral hoop, prefabricated shear wall slab horizontal reinforcement, shutoff end plate, back filling pea gravel concreten or grouting material, horizontal gib head lacing wire continuously, sit slurry layer, charging aperture and discharging opening; Be provided with prefabricated shear wall slab horizontal reinforcement in the prefabricated shear wall slab edge member in said upper strata; Prefabricated shear wall slab edge member lower end, upper strata is provided with a plurality of rectangular enclosure pipes; Horizontal gib head lacing wire is set between the rectangular enclosure pipe; The upper end of rectangular enclosure pipe is provided with the shutoff end plate; The lower end side of rectangular enclosure pipe is provided with charging aperture, and the shutoff end plate is provided with discharging opening, and the prefabricated shear wall slab edge member of said lower floor is provided with the band heading vertical reinforcement that stretches out its end face; Band heading vertical reinforcement is located in the rectangular enclosure pipe; Band heading vertical reinforcement periphery is provided with continuous rectangular spiral hoop, and said rectangular enclosure pipe inside is provided with the back and irritates pea gravel concreten or grouting material, is provided with between the prefabricated shear wall slab edge member of prefabricated shear wall slab edge member of said lower floor and upper strata and sits the slurry layer.
As preferably, said rectangular enclosure pipe is expanded metal lath cavity pipe or wire gauze cavity pipe.
The present invention utilizes the overlap joint of band pier nose vertical reinforcement certain-length, realizes the power transmission continuity of shear wall edge member vertical reinforcement, guarantees the supporting capacity of shear wall; Through surrounding expanded metal lath cavity pipe or wire gauze cavity pipe, continuous rectangular spiral hoop and prefabricated shear wall slab horizontal reinforcement; The edge concrete members is formed multiple constraint; Significantly improve concrete deformability; Guarantee the ductile performance of shear wall, and can further improve the overlap joint switching performance of band heading vertical reinforcement.
Adopt band heading vertical reinforcement in the shear wall edge member scope of the present invention, can improve its anchoring property, and can reduce overlap joint connection length, irritate pea gravel concreten (or grouting is expected) thereby reduce the back.
When wallboard of the present invention is prefabricated; Horizontal gib head lacing wire is set between the rectangular enclosure pipe; And with the reliable drawknot of shear wall horizontal reinforcement, realize edge member and the prefabricated overall operation of setting up wallboard, and avoid the edge member precast concrete prefabricated and afterwards concrete placing build the damage in the process.
As preferably, according to the shape and size of shear wall edge member, a plurality of rectangle steel expanded metals cavity pipes or wire gauze cavity pipe can be set flexibly, and fillet be set in rectangular enclosure limb portion, be convenient to the concrete trickling and build.
As preferably, the installation that bends inwards of the band heading vertical reinforcement of the prefabricated shear wall slab edge member of said lower floor has avoided the vertical reinforcement dislocation of prefabricated shear wall slab to arrange, simplifies precasting process.
Assembly concrete shear wall edge member joint construction of the present invention; Prefabricated shear wall slab layering is prefabricated, and prefabricated shear wall slab edge member adopts band heading vertical reinforcement, simultaneously; The top vertical reinforcement of prefabricated panel edge member stretches out certain-length; With the vertical reinforcement overlap joint of its prefabricated panel edge member bottom, upper strata, adopt a plurality of rectangle steel expanded metals cavity pipes or wire gauze cavity pipe to box out in the overlap joint scope, back perfusion pea gravel concreten (or contraction-free grouting concrete) with flexible size.Through reinforcing bar heading and certain lap length, satisfy the lapping and anchoring requirement of vertical reinforcement, realize the continuous power transmission of vertical reinforcement; In rectangle steel expanded metals cavity pipe or wire gauze cavity pipe, overlap joint vertical reinforcement arranged outside continuous rectangular spiral hoop; Expanded metal lath through surrounding the rectangular enclosure pipe or wire gauze, the multiple constraint of rectangular spiral hoop, prefabricated shear wall slab horizontal reinforcement and horizontal lacing wire continuously strengthen the concrete restraint performance of edge member.
Beneficial effect:(1) upper and lower layer prefabricated panel edge member vertical reinforcement of the present invention is through reinforcing bar heading and certain lap length; Realize the continuous force request of edge member vertical reinforcement; The reinforcing bar heading can effectively reduce lap length; Irritate pea gravel concreten amount (or irritating amount of slurry) thereby reduce the back, improve speed of application; (2) in expanded metal lath cavity pipe or the wire gauze cavity pipe, the continuous rectangular spiral hoop of overlap joint vertical reinforcement arranged outside; Expanded metal lath or wire gauze with the rectangular enclosure pipe; Back concrete placing to edge member provides strong constraint; When improving the deformability of irritating pea gravel concreten in the back, can further improve the overlap joint switching performance of vertical reinforcement; (3) according to the shape of edge member; The size and the number of rectangle steel expanded metals cavity pipe or wire gauze cavity pipe can be set flexibly; Roughness that the mesh of dependence expanded metal lath or wire gauze forms and wallboard are arranged at the wallboard horizontal reinforcement and the horizontal lacing wire of cavity pipe outer wall when prefabricated, guarantee the stressed jointly of each cavity pipe of its edge member, edge member and shear wall general place; (4) the prefabricated thin-wall plate between the rectangular metal mesh is provided with horizontal gib head lacing wire and strengthens, and avoids prefabricated and builds the concrete damage of process hollow lumen outer wall; (5) the edge member vertical reinforcement need not to shift to install, and after bending inwards through lower floor's prefabricated panel edge member vertical reinforcement, inserts in the metal bellows, with topmost edge member vertical reinforcement overlap joint, thereby simplifies precasting process.
Description of drawings
Fig. 1 is used for the floor map of sleeper for joint construction of the present invention;
Fig. 2 is the 1-1 sectional drawing of Fig. 1;
Fig. 3 is the 2-2 sectional drawing of Fig. 1.
The specific embodiment
Below in conjunction with the accompanying drawing and the specific embodiment the present invention is described further:
Like Fig. 1,2, shown in 3: a kind of assembly concrete shear wall edge member joint construction; Comprise the prefabricated shear wall slab edge member of lower floor 1, prefabricated shear wall slab edge, upper strata structure 2; Be provided with prefabricated shear wall slab horizontal reinforcement 6 in the prefabricated shear wall slab edge member 2 in said upper strata, in assembly concrete shear wall edge member scope, adopt band heading vertical reinforcement 4, and according to the edge member size and dimension; Pre-buried a plurality of rectangular enclosure pipe 3; Rectangular enclosure pipe 3 is expanded metal lath cavity pipe or wire gauze cavity pipe, and rectangular enclosure pipe 3 bights are provided with fillet, and horizontal gib head lacing wire 9 is set between the rectangular enclosure pipe 3; Rectangular enclosure pipe 3 lower side are provided with charging aperture 11; Rectangular enclosure pipe 3 tops are provided with shutoff end plate 7 and discharging opening 12, and are in rectangular enclosure pipe 3, band heading vertical reinforcement 4 outsides are inserted in continuous rectangular spiral hoop 5, last and shear wall slab is integral prefabricated.The band heading vertical reinforcement 4 of the prefabricated shear wall slab edge member 1 of lower floor is bent inwards; Be provided with and sat behind the slurry layer 10 prefabricated shear wall slab edge member 2 installation in position in upper strata; Behind charging aperture 11 pressure injections, irritate pea gravel concreten 8; Treat that discharging opening 12 emits slurry, and stop perfusion after voltage stabilizing a period of time, finally accomplish the connection construction of assembling shear wall edge member.
Should be pointed out that for those skilled in the art, under the prerequisite that does not break away from the principle of the invention, can also make some improvement and retouching, these improvement and retouching also should be regarded as protection scope of the present invention.The all available prior art of each ingredient not clear and definite in the present embodiment realizes.

Claims (4)

1. assembly concrete shear wall edge member joint construction; It is characterized in that: comprise the prefabricated shear wall slab edge member of lower floor, the prefabricated shear wall slab edge member in upper strata, rectangular enclosure pipe, band heading vertical reinforcement, rectangular spiral hoop, prefabricated shear wall slab horizontal reinforcement, shutoff end plate, back filling pea gravel concreten or grouting material, horizontal gib head lacing wire continuously, sit slurry layer, charging aperture and discharging opening; Be provided with prefabricated shear wall slab horizontal reinforcement in the prefabricated shear wall slab edge member in said upper strata; Prefabricated shear wall slab edge member lower end, upper strata is provided with a plurality of rectangular enclosure pipes; Horizontal gib head lacing wire is set between the rectangular enclosure pipe; The upper end of rectangular enclosure pipe is provided with the shutoff end plate; The lower end side of rectangular enclosure pipe is provided with charging aperture, and the shutoff end plate is provided with discharging opening, and the prefabricated shear wall slab edge member of said lower floor is provided with the band heading vertical reinforcement that stretches out its end face; Band heading vertical reinforcement is located in the rectangular enclosure pipe; Band heading vertical reinforcement periphery is provided with continuous rectangular spiral hoop, and said rectangular enclosure pipe inside is provided with the back and irritates pea gravel concreten or grouting material, is provided with between the prefabricated shear wall slab edge member of prefabricated shear wall slab edge member of said lower floor and upper strata and sits the slurry layer.
2. a kind of assembly concrete shear wall edge member joint construction according to claim 1 is characterized in that: said rectangular enclosure pipe is expanded metal lath cavity pipe or wire gauze cavity pipe.
3. a kind of assembly concrete shear wall edge member joint construction according to claim 1 and 2 is characterized in that: said rectangular enclosure limb portion is provided with fillet.
4. a kind of assembly concrete shear wall edge member joint construction according to claim 1 is characterized in that: said band heading vertical reinforcement adopts the mounting structure that bends inwards.
CN2012101751969A 2012-05-31 2012-05-31 Edge member connecting structure of assembly type concrete shear wall Pending CN102661012A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101751969A CN102661012A (en) 2012-05-31 2012-05-31 Edge member connecting structure of assembly type concrete shear wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101751969A CN102661012A (en) 2012-05-31 2012-05-31 Edge member connecting structure of assembly type concrete shear wall

Publications (1)

Publication Number Publication Date
CN102661012A true CN102661012A (en) 2012-09-12

Family

ID=46770580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101751969A Pending CN102661012A (en) 2012-05-31 2012-05-31 Edge member connecting structure of assembly type concrete shear wall

Country Status (1)

Country Link
CN (1) CN102661012A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102926483A (en) * 2012-11-16 2013-02-13 南京工业大学 Mixed assembled concrete shear wall capable of recovering automatically, consuming energy and being repaired easily
CN102936929A (en) * 2012-11-29 2013-02-20 东南大学 Prefabricated assembling whole type shear wall connected with staggered-height vertical steel bar
CN102943538A (en) * 2012-11-29 2013-02-27 东南大学 Prefabricated assembly integral shear wall capable of reducing crack widths
CN104929279A (en) * 2015-06-26 2015-09-23 东南大学 Pre-cast shear wall vertical rebar centralized restraint lap joint construction
CN105133735A (en) * 2015-08-31 2015-12-09 西安建筑科技大学 Plugging method for precast concrete shear wall and floor joint grouting
CN105256922A (en) * 2014-07-16 2016-01-20 中铁建工集团有限公司 Mounting method of light-weight wall boards
CN107355010A (en) * 2017-08-21 2017-11-17 南京工业大学 A kind of precast concrete shear wall profile steel joint attachment structure

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06280315A (en) * 1993-03-31 1994-10-04 Penta Ocean Constr Co Ltd Joint of precast concrete member and its joint member
JPH0726556A (en) * 1993-07-09 1995-01-27 Kajima Corp Joint structure for underground continuous wall
JP2007146439A (en) * 2005-11-25 2007-06-14 Taisei Corp Precast member
CN201217847Y (en) * 2008-06-05 2009-04-08 黑龙江宇辉新型建筑材料有限公司 Plug-in type preformed hole grouting reinforcement lapping connection component
CN101818527A (en) * 2010-06-04 2010-09-01 北京万科企业有限公司 Assembled integral shear wall structure system and construction method thereof
JP2011063984A (en) * 2009-09-17 2011-03-31 Toda Constr Co Ltd Concrete joint structure
CN201962822U (en) * 2010-12-29 2011-09-07 中国建筑东北设计研究院有限公司 Shear wall of high-rise building
CN102425310A (en) * 2011-12-15 2012-04-25 中国二十二冶集团有限公司 Assembly-type residential shear wall structural wall body vertical connection construction method
CN102433945A (en) * 2011-08-30 2012-05-02 东南大学 Vertical mixed connection structure and method of prefabricated internal wallboards for assembling shear wall structure
CN202627249U (en) * 2012-05-31 2012-12-26 东南大学 Connecting structure for edge members of prefabricated concrete shear wall

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06280315A (en) * 1993-03-31 1994-10-04 Penta Ocean Constr Co Ltd Joint of precast concrete member and its joint member
JPH0726556A (en) * 1993-07-09 1995-01-27 Kajima Corp Joint structure for underground continuous wall
JP2007146439A (en) * 2005-11-25 2007-06-14 Taisei Corp Precast member
CN201217847Y (en) * 2008-06-05 2009-04-08 黑龙江宇辉新型建筑材料有限公司 Plug-in type preformed hole grouting reinforcement lapping connection component
JP2011063984A (en) * 2009-09-17 2011-03-31 Toda Constr Co Ltd Concrete joint structure
CN101818527A (en) * 2010-06-04 2010-09-01 北京万科企业有限公司 Assembled integral shear wall structure system and construction method thereof
CN201962822U (en) * 2010-12-29 2011-09-07 中国建筑东北设计研究院有限公司 Shear wall of high-rise building
CN102433945A (en) * 2011-08-30 2012-05-02 东南大学 Vertical mixed connection structure and method of prefabricated internal wallboards for assembling shear wall structure
CN102425310A (en) * 2011-12-15 2012-04-25 中国二十二冶集团有限公司 Assembly-type residential shear wall structural wall body vertical connection construction method
CN202627249U (en) * 2012-05-31 2012-12-26 东南大学 Connecting structure for edge members of prefabricated concrete shear wall

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102926483A (en) * 2012-11-16 2013-02-13 南京工业大学 Mixed assembled concrete shear wall capable of recovering automatically, consuming energy and being repaired easily
CN102936929A (en) * 2012-11-29 2013-02-20 东南大学 Prefabricated assembling whole type shear wall connected with staggered-height vertical steel bar
CN102943538A (en) * 2012-11-29 2013-02-27 东南大学 Prefabricated assembly integral shear wall capable of reducing crack widths
CN105256922A (en) * 2014-07-16 2016-01-20 中铁建工集团有限公司 Mounting method of light-weight wall boards
CN104929279A (en) * 2015-06-26 2015-09-23 东南大学 Pre-cast shear wall vertical rebar centralized restraint lap joint construction
CN104929279B (en) * 2015-06-26 2017-05-24 东南大学 Pre-cast shear wall vertical rebar centralized restraint lap joint construction
CN105133735A (en) * 2015-08-31 2015-12-09 西安建筑科技大学 Plugging method for precast concrete shear wall and floor joint grouting
CN105133735B (en) * 2015-08-31 2017-09-01 西安建筑科技大学 The method for blocking that a kind of precast concrete shear wall is in the milk with floor seam crossing
CN107355010A (en) * 2017-08-21 2017-11-17 南京工业大学 A kind of precast concrete shear wall profile steel joint attachment structure

Similar Documents

Publication Publication Date Title
CN102661012A (en) Edge member connecting structure of assembly type concrete shear wall
CN102691365B (en) Connecting structure for assembly type concrete shear wall edge member
CN105735351B (en) Piping lane installation foundation structure, pipe gallery and construction method of installation
CN104453015A (en) Reinforcing bar splicing connection component comprising thin-wall sleeves constrained by spiral bars
CN102418401B (en) Pretensioning prestressed reinforced concrete precast beam
JP6219644B2 (en) Seismic reinforcement method for abutments by reducing earth pressure
KR101262889B1 (en) Temporary retaining wall construction method using double wale with tendon
CN202611012U (en) Assembly type concrete shear wall edge member connection structure
CN107355010A (en) A kind of precast concrete shear wall profile steel joint attachment structure
CN105369987A (en) Steel bar lap joint structure containing FRP constraint ring
JP2007277880A (en) Fill structure and its construction method
KR101264396B1 (en) Method for Reinforcing Earthquake-Resistant of Bridge Pier
CN203487664U (en) Prefabricated concrete filled wall suspension type flexible connection
CN108678225A (en) The built-in steel plate combined shear wall of built-in presstressed reinforcing steel steel pipe concrete frame and the practice
CN202627249U (en) Connecting structure for edge members of prefabricated concrete shear wall
CN104831727B (en) The anchor pier structure of a kind of lining cutting built-in type prestress anchorage cable and construction method thereof
CN104727307B (en) For the non-uniform pile column construction method of underground
CN213572819U (en) First floor terrace structure is pour after frame construction reserves reinforcing bar
JP2008303581A (en) Reinforcing structure of banking support ground
CN208430398U (en) A kind of prestressing force is to pull-type Reinforced Embankment structure
CN206529778U (en) Customized type prestress anchorage cable reaction beam mounting structure
JP5509380B1 (en) Seismic reinforcement method and structure for existing buildings
JP2730705B2 (en) Improvement method for soft ground
CN211312620U (en) Raft-pile connecting node with vibration reduction base plate laid at bottom
CN110805060B (en) Base structure for stay wire of stay wire tower and stay wire fixing method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120912