CN102660965A - 简支全封闭板撑结构沉降后浇带施工方法 - Google Patents

简支全封闭板撑结构沉降后浇带施工方法 Download PDF

Info

Publication number
CN102660965A
CN102660965A CN2012101721342A CN201210172134A CN102660965A CN 102660965 A CN102660965 A CN 102660965A CN 2012101721342 A CN2012101721342 A CN 2012101721342A CN 201210172134 A CN201210172134 A CN 201210172134A CN 102660965 A CN102660965 A CN 102660965A
Authority
CN
China
Prior art keywords
totally
freely
supported
enclosed plate
plate support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012101721342A
Other languages
English (en)
Other versions
CN102660965B (zh
Inventor
龚剑
朱毅敏
高振锋
周虹
许铭
薛永申
孙晓鸣
赵兴波
顾黎骏
谢麟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai First Construction Co Ltd
Shanghai Construction Group Co Ltd
Original Assignee
Shanghai First Construction Co Ltd
Shanghai Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai First Construction Co Ltd, Shanghai Construction Group Co Ltd filed Critical Shanghai First Construction Co Ltd
Priority to CN201210172134.2A priority Critical patent/CN102660965B/zh
Publication of CN102660965A publication Critical patent/CN102660965A/zh
Application granted granted Critical
Publication of CN102660965B publication Critical patent/CN102660965B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了一种简支全封闭板撑结构沉降后浇带施工方法,其特征在于,在主楼和裙房侧均设置楔口梁,待两侧环梁浇筑完成后,在主楼结构板和裙房结构板的楔口梁之间设置简支全封闭板撑结构作为后浇带支撑。本发明使得整个后浇带区域不存在洞口、楼板缺失的情况,从而有效解决了首层板止水问题,使得地下结构的施工不受首层板漏水影响,同时也消除了上部结构施工的高空坠落危险源。

Description

简支全封闭板撑结构沉降后浇带施工方法
技术领域
本发明属于地下建筑工程施工技术领域,涉及一种沉降后浇带施工方法,特别是一种简支全封闭板撑结构沉降后浇带施工方法。
背景技术
后浇带是在建筑施工中为防止现浇钢筋混凝土结构由于温度、收缩不均可能产生的有害裂缝,按照设计或施工规范要求,在基础底板、墙、梁相应位置留设临时施工缝,将结构暂时划分为若干部分,经过构件内部收缩,在若干时间后再浇捣该施工缝混凝土,将结构连成整体。为解决高层建筑主楼与裙房的沉降差而设置的后浇施工带称为沉降后浇带。
在建筑地下工程施工中,当前的沉降后浇带施工方法一般采取临时钢管支撑或混砼形式,支撑住后浇带两侧结构。支撑梁或钢管按一定间距布置,梁(钢管)与梁(钢管)之间的楼板是缺失的,该后浇带支撑形式仅解决了后浇带间水平传力及竖向自由沉降问题。但对于基坑较深、基坑安全要求较高的地下建筑,后浇带面积及影响范围较大的基坑,后浇带两侧结构间的水平运输问题、首层雨水漏水问题以及高空坠物危险等均无法满足,可能需要采用其他附加措施来处理解决。
发明内容
本发明所要解决的技术问题是提供一种简支全封闭板撑结构沉降后浇带施工方法,以解决在沉降后浇带区域封闭之前,满足沉降后浇带水平传力及竖向自由沉降问题的前提下,沉降后浇带位置的止水作用、沉降后浇带两侧结构间的水平运输以及防止竖向高空坠物。
本发明解决技术问题的技术方案如下:
一种简支全封闭板撑结构沉降后浇带施工方法,其特征在于,首先在主楼和裙房侧均设置楔口梁,待两侧环梁浇筑完成后,在主楼结构板和裙房结构板的楔口梁之间设置简支全封闭板撑结构作为后浇带支撑,最后浇筑后浇带支撑。
由以上公开的技术方案可知,本发明有益效果如下:
1、通过简支全封闭板撑结构,使得整个后浇带区域不存在洞口、楼板缺失的情况,从而有效解决了首层板止水问题,使得地下结构的施工不受首层板漏水影响,同时也消除了上部结构施工的高空坠落危险源。
2、通过简支全封闭板撑结构沉降后浇带,将地下室主楼和裙房区域各楼层连成一个整体,有效解决了裙房与主楼间的水平运输问题。
3、简支全封闭板撑结构既可以解决后浇带水平传力的问题,又可满足后浇带两侧主楼跟裙房的自由沉降。
附图说明
图1为本发明沉降后浇带板撑节点结构示意图;
附图标记如下:
1、主楼结构板   2、裙房结构板   3、简支全封闭板撑结构
4、后浇带边界
具体实施方式
下面结合附图及实施例对本发明作进一步详述。
如图1所示,本发明简支全封闭板撑结构沉降后浇带施工方法,首先在主楼和裙房侧均设置楔口梁,待两侧环梁浇筑完成后,在主楼结构板和裙房结构板的楔口梁之间设置简支全封闭板撑结构作为后浇带支撑,最后浇筑后浇带支撑。
实施例,在上海中心大厦裙房地下室施工中,由于裙房采用逆作法施工,由B0层到B5层逐层进行施工,整个后浇带近350m长,面积达1000m2左右,在逆作过程中,为解决裙房与主楼间的水平运输问题以及竖向高空坠物危险源,采用本发明简支全封闭板撑结构沉降后浇带施工方法进行施工。具体施工方法如下:
(1)在主楼结构施工时,在主楼结构板1外边缘留设一圈楔口式环梁;
(2)在裙房施工时,根据结构分块,分别形成裙房侧的后浇带换撑楔口梁;
(3)待裙房侧后浇带换撑楔口梁形成后,在主楼结构板1与裙房结构板2的楔口梁之间设置简支全封闭板撑结构3,采用薄膜使主楼及裙房侧的楔口梁混凝土结构与简支全封闭板撑结构隔离开,及时浇筑该区段的主楼与裙房间简支全封闭板撑结构沉降后浇带;
(4)待主楼沉降趋于稳定后,凿除后浇带简支全封闭板撑结构,接通原预留钢筋,浇筑永久结构梁板。
以上所述仅为本发明的较佳实施方式,并非用来限制本发明的保护范围,凡是依照本发明权利要求所做的同等变换,均在本发明的保护范围之内。

Claims (3)

1.一种简支全封闭板撑结构沉降后浇带施工方法,其特征在于,首先在主楼和裙房侧均设置楔口梁,待两侧环梁浇筑完成后,在主楼结构板和裙房结构板的楔口梁之间设置简支全封闭板撑结构作为后浇带支撑,最后浇筑后浇带支撑。
2.根据权利要求1所述的简支全封闭板撑结构沉降后浇带施工方法,其特征在于,具体包括如下步骤:
(1)在主楼结构施工时,在楼板外边缘留设一圈楔口式环梁;
(2)在裙房施工时,根据结构分块,分别形成裙房侧的后浇带换撑楔口梁;
(3)待裙房侧后浇带换撑楔口梁形成后,在主楼结构板与裙房结构板的楔口梁之间设置简支全封闭板撑结构,及时浇筑该区段的主楼与裙房间简支全封闭板撑结构沉降后浇带;
(4)待主楼沉降趋于稳定后,凿除后浇带简支全封闭板撑结构,接通原预留钢筋,浇筑永久结构梁板。
3.根据权利要求2所述的简支全封闭板撑结构沉降后浇带施工方法,其特征在于,所说的步骤(2)还包括在简支全封闭板撑结构浇筑前采用薄膜使主楼及裙房侧的楔口梁混凝土结构与简支全封闭板撑结构隔离开。
CN201210172134.2A 2012-05-29 2012-05-29 简支全封闭板撑结构沉降后浇带施工方法 Active CN102660965B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210172134.2A CN102660965B (zh) 2012-05-29 2012-05-29 简支全封闭板撑结构沉降后浇带施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210172134.2A CN102660965B (zh) 2012-05-29 2012-05-29 简支全封闭板撑结构沉降后浇带施工方法

Publications (2)

Publication Number Publication Date
CN102660965A true CN102660965A (zh) 2012-09-12
CN102660965B CN102660965B (zh) 2014-08-27

Family

ID=46770533

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210172134.2A Active CN102660965B (zh) 2012-05-29 2012-05-29 简支全封闭板撑结构沉降后浇带施工方法

Country Status (1)

Country Link
CN (1) CN102660965B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104328793A (zh) * 2014-10-10 2015-02-04 成都聚智工业设计有限公司 筏板结构
CN106436930A (zh) * 2016-09-29 2017-02-22 中建二局第三建筑工程有限公司 一种地上超限沉降后浇带结构体系及施工方法
CN114519228A (zh) * 2022-02-24 2022-05-20 四川省建筑设计研究院有限公司 一种大高宽比双塔结构裙房楼板抗倾覆受力快速计算方法
CN114775700A (zh) * 2022-04-29 2022-07-22 山东电力工程咨询院有限公司 垃圾池底板与卸料平台框架柱基础沉降差处理系统及方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2895571Y (zh) * 2005-06-07 2007-05-02 刘相雷 一种建筑工程用伸缩缝盖板
CN201212157Y (zh) * 2008-07-01 2009-03-25 朱邃科 地下室工程外墙及顶板防水型后浇带及变形缝结构
CN101666125A (zh) * 2009-09-15 2010-03-10 中建四局第三建筑工程有限公司 一种地下室后浇带的封闭方法及结构
CN201738338U (zh) * 2010-08-10 2011-02-09 朱奎 一种地下室后浇带构造
JP4696709B2 (ja) * 2005-06-14 2011-06-08 株式会社大林組 壁パネル接合構造、地中連続壁の構築方法、及び地中連続壁
CN202181561U (zh) * 2011-07-08 2012-04-04 中建五局第三建设有限公司 阶梯形后浇带支撑

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2895571Y (zh) * 2005-06-07 2007-05-02 刘相雷 一种建筑工程用伸缩缝盖板
JP4696709B2 (ja) * 2005-06-14 2011-06-08 株式会社大林組 壁パネル接合構造、地中連続壁の構築方法、及び地中連続壁
CN201212157Y (zh) * 2008-07-01 2009-03-25 朱邃科 地下室工程外墙及顶板防水型后浇带及变形缝结构
CN101666125A (zh) * 2009-09-15 2010-03-10 中建四局第三建筑工程有限公司 一种地下室后浇带的封闭方法及结构
CN201738338U (zh) * 2010-08-10 2011-02-09 朱奎 一种地下室后浇带构造
CN202181561U (zh) * 2011-07-08 2012-04-04 中建五局第三建设有限公司 阶梯形后浇带支撑

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104328793A (zh) * 2014-10-10 2015-02-04 成都聚智工业设计有限公司 筏板结构
CN106436930A (zh) * 2016-09-29 2017-02-22 中建二局第三建筑工程有限公司 一种地上超限沉降后浇带结构体系及施工方法
CN106436930B (zh) * 2016-09-29 2019-06-14 中建二局第三建筑工程有限公司 一种地上超限沉降后浇带结构体系及施工方法
CN114519228A (zh) * 2022-02-24 2022-05-20 四川省建筑设计研究院有限公司 一种大高宽比双塔结构裙房楼板抗倾覆受力快速计算方法
CN114519228B (zh) * 2022-02-24 2023-09-22 四川省建筑设计研究院有限公司 一种大高宽比双塔结构裙房楼板抗倾覆受力快速计算方法
CN114775700A (zh) * 2022-04-29 2022-07-22 山东电力工程咨询院有限公司 垃圾池底板与卸料平台框架柱基础沉降差处理系统及方法

Also Published As

Publication number Publication date
CN102660965B (zh) 2014-08-27

Similar Documents

Publication Publication Date Title
US11384501B2 (en) Method for sealing post-cast strip in foundation with no gap
CN103590404B (zh) 一种紧邻已建地下结构的基坑支撑方法
CN103437300A (zh) 墩顶钢梁无墩旁托架架设双悬臂的施工方法
CN102561690A (zh) 一种以砖柱支顶后浇带两侧结构的施工方法
CN102587659A (zh) 一种以混凝土柱支顶后浇带两侧结构的施工方法
CN101235649A (zh) 一种盖挖基坑系统
CN102587663A (zh) 一种超高层建筑钢管柱混凝土施工工艺
CN102660965A (zh) 简支全封闭板撑结构沉降后浇带施工方法
CN208844417U (zh) 一种用于桥墩柱的外预制结构及其外预制内现浇桥墩柱
CN106049289A (zh) 贝雷梁临时便桥改造为钢混组合永久桥的施工方法
CN106284645A (zh) 一种地铁车站预制侧墙与底部基础灌浆连接施工方法
CN104652444A (zh) 超大型深基坑中心岛式交替土方开挖的整体逆作施工方法
CN103469732A (zh) 一种桥梁支座地脚螺栓预留孔的施工方法
CN106032704A (zh) 一种以混凝土柱支顶后浇带两侧结构的施工方法
CN105401580A (zh) 地下通廊混凝土浇筑施工方法
CN103758347B (zh) 大跨度钢筋混凝土梁板结构后浇带支撑托换施工方法
CN107575025B (zh) 一种地下室狭窄空间外墙施工结构及其施工方法
CN105888281A (zh) 一种利用顶升增层技术提升小区整体功能的方法
CN205990921U (zh) 双层衬砌特殊类圆形断面矿山法隧道结构
CN105781159B (zh) 一种电厂主厂房钢筋混凝土煤漏斗施工工艺
CN203977840U (zh) 一种高空大跨度劲性混凝土连廊支撑结构
CN104563163A (zh) 用于地下室外墙的诱导缝
CN205024719U (zh) 桩基础与地下连续墙一体化的逆作法施工竖向支撑体系
CN208734343U (zh) 一种带有临时中隔柱支撑的车站隧道开挖结构
CN205712111U (zh) 一种适用于狭小空间下地铁施工移动式砼布料机

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 200080 No. 666 East Daming Road, Shanghai, Hongkou District

Applicant after: Shanghai Construction Group Co., Ltd.

Applicant after: Shanghai Construction No.1 (Group) Co., Ltd.

Address before: 200080 No. 666 East Daming Road, Shanghai, Hongkou District

Applicant before: Shanghai Construction Group Co., Ltd.

Applicant before: Shanghai First Construction Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant