CN102650365B - Hoisting device - Google Patents

Hoisting device Download PDF

Info

Publication number
CN102650365B
CN102650365B CN201210133457.0A CN201210133457A CN102650365B CN 102650365 B CN102650365 B CN 102650365B CN 201210133457 A CN201210133457 A CN 201210133457A CN 102650365 B CN102650365 B CN 102650365B
Authority
CN
China
Prior art keywords
round steel
link
anchor pole
hole
erecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210133457.0A
Other languages
Chinese (zh)
Other versions
CN102650365A (en
Inventor
刘中路
王文杰
刘少海
孟昭士
洪浩
左廷根
尹磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huainan Mining Group Co Ltd
Original Assignee
Huainan Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huainan Mining Group Co Ltd filed Critical Huainan Mining Group Co Ltd
Priority to CN201210133457.0A priority Critical patent/CN102650365B/en
Publication of CN102650365A publication Critical patent/CN102650365A/en
Application granted granted Critical
Publication of CN102650365B publication Critical patent/CN102650365B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention provides a hoisting device, which comprises first connectors and a second connector, wherein the first connectors are used for being rotationally connected with an anchor rod; a rotary shaft is arranged in the axial direction of the anchor rod; and the second connector is fixed on the first connectors and used for hanging a hand chain hoist. After the hoisting device provided by the technical scheme is used, the anchor rod only bears the acting force in the axial direction of the anchor rod, so that the safety of the hoisting operation is greatly improved; and besides, as the hand chain hoist bears the force in a single direction, the using period of the hand chain hoist is prolonged, and the tool cost is saved.

Description

Erecting by overhang
Technical field
The present invention relates to mechanical structure technology, relate in particular to a kind of erecting by overhang.
Background technique
At present, often need hoisting heavy under coal mine, the lifting of weight adopts chain block to realize.Before lifting, chain block first need to be hung on anchor pole.Between chain block and anchor pole, adopt following Placement: the two ends of wire rope are hung on anchor pole, afterwards chain block is hung on wire rope.Anchor pole has screw thread.
At least there is following problem in prior art: after chain block hangs on wire rope, can swing back and forth, make the direction complexity of the active force that anchor pole is subject to, thereby cause anchor pole easily to come off, make the Security of lifting operation low.
Summary of the invention
The invention provides a kind of erecting by overhang, for increasing the Security of lifting operation.
The invention provides a kind of erecting by overhang, wherein, comprising:
The first link, described the first link is for being rotationally connected with anchor pole, and the direction of rotatingshaft is along the axial direction of described anchor pole;
The second link, is fixed on described the first link, for hanging chain block.
Erecting by overhang as above, preferably,
Described the first link comprises the first round steel, the second round steel and the 3rd round steel, and described the second round steel is U-shaped, and described the first round steel and described the 3rd round steel are separately positioned on the two ends of described the second round steel;
On described the second round steel, offer the perforate of vertical setting, for being rotationally connected with described anchor pole;
On described the first round steel and the 3rd round steel, correspondence offers the first through hole and the second through hole, and described the second link wears by described the first through hole and described the second through hole.
Erecting by overhang as above, preferably,
Described the first round steel and described the 3rd round steel all weld with described the second round steel.
Erecting by overhang as above, preferably,
Described the second link is straight-bar, described straight-bar one end is provided with baffle plate, the other end is provided with screw thread, and on described screw thread, for mounting nuts, described baffle plate and described nut are for limiting the position of described the second link with respect to described the first through hole and described the second through hole.
The erecting by overhang that uses technique scheme to provide, makes originally to need the operation of 2~4 operable hanging chain blocks of people's ability to become simply, only needs now 1 people just can operate safely, greatly reduces human cost.After the erecting by overhang that use technique scheme provides, anchor pole is only subject to along the active force of anchor pole axial direction, has greatly improved the Security of lifting operation.In addition, due to chain block be subject to force direction single, extended the life cycle of chain block, saved instrument cost.
Brief description of the drawings
The schematic diagram of the erecting by overhang that Fig. 1 provides for the embodiment of the present invention;
Fig. 2 is the schematic diagram of the first link in Fig. 1;
Fig. 3 is that the A of Fig. 1 is to view.
Embodiment
Referring to Fig. 1-Fig. 3, the embodiment of the present invention provides a kind of erecting by overhang, wherein, comprises the first link and the second link; The first link is for being rotationally connected with anchor pole 1, and the direction of rotatingshaft is along the axial direction of anchor pole 1; The second link is fixed on the first link, for hanging chain block (scheming not shown).
The first link can adopt steel plate bending to be suitable shape, also can adopt steel pipe to piece together, bend or weld formation.The second link can be steel pipe or wire rope etc.
The first link and anchor pole are rotationally connected, and the active force that the first link applies anchor pole is along the axial direction of anchor pole.When lifting, no matter chain block pulling force that the second link is applied along where to, when this pulling force is passed to anchor pole, it is all the axial direction along anchor pole, so in lifting process, the stability of anchor pole can be guaranteed, the Security of lifting operation is improved.
The erecting by overhang that uses technique scheme to provide, makes originally to need the operation of 2~4 operable hanging chain blocks of people's ability to become simply, only needs now 1 people just can operate safely, greatly reduces human cost.After the erecting by overhang that use technique scheme provides, anchor pole is only subject to along the active force of anchor pole axial direction, has greatly improved the Security of lifting operation.In addition, due to chain block be subject to force direction single, extended the life cycle of chain block, saved instrument cost.
Referring to Fig. 1, further, the first link adopts following preferably implementation.The first link comprises that the first round steel 2, the second round steel 3 and the 3rd round steel 4, the second round steel 3 are U-shaped, and the first round steel 2 and the 3rd round steel 4 are separately positioned on the two ends of the second round steel 3; On the second round steel 3, offer the perforate 31 of vertical setting, for being rotationally connected with anchor pole 1; On the first round steel 2 and the 3rd round steel 4, correspondence offers the first through hole 21 and the second through hole 41, the second links wear by the first through hole 21 and the second through hole 41.
In erecting by overhang, the intensity of all parts can be a little more than anchor rod strength, herein, taking the diameter of the first round steel, the second round steel and the 3rd round steel all as 20mm is as example.The size and shape of the perforate of the second round steel and anchor pole joint is according to the size decision of anchor pole, and the setting position basis of perforate is by Heave Here determining positions.Herein, the first link and anchor pole are rotationally connected, and have eliminated stress and have concentrated the destruction of bringing to device.The second round steel be U-shaped can also be by the stressed component that is divided into equably two equivalent of anchor pole 1, concentration phenomenon eliminates stress.
The whole size of the first link and the second link can specifically be set according to the tonnage of the weight in the tonnage of chain block and lifting.Be understandable that, when above-mentioned erecting by overhang level is installed, can be used for tractive weight.
On chain block with crotch.In technique scheme, the first round steel and the 3rd round steel are used for supporting the second link, and the second link is used for hanging chain block.The first link adopts above-mentioned implementation, and required main material and join material and be mine common used material is sought material easy, and single cost is below 20 yuan.
The erecting by overhang that technique scheme provides, adopts round steel to be welded, and sound construction is not easy to damage, and durable in use, cost drops into low, and reusable.In addition, the reliability of erecting by overhang is strong, easy to use, is easy to the on-the-spot operation of grasping.The erecting by overhang that uses technique scheme to provide, can eliminate the tackles causing because of discontinuity and come off, damage, the lifting such as Heave Here fracture defect.
Further, the first round steel 2 and the 3rd round steel 4 all weld with the second round steel 3, so that the stability of whole erecting by overhang is better, more durable.
Referring to Fig. 1, in the present embodiment, the second link can be straight-bar 5, straight-bar 5 one end are provided with baffle plate 51, the other end is provided with screw thread, and on screw thread, for mounting nuts, baffle plate 51 and nut are for limiting the position of the second link with respect to the first through hole 21 and the second through hole 41.The other end of straight-bar is set to screw thread, is that after completing, the nut of screwing on screw thread, to prevent that straight-bar 5 from having excessive displacement for the ease of straight-bar 5 is passed to the first through hole 21 and the second through hole 41.
Straight-bar is longer than service life of steel wire rope, and can be by Reusability.Adopt the second link of above-mentioned implementation, simple in structure, manufacturing cost is low.
The erecting by overhang that technique scheme provides, easy and simple to handle, when use, only anchor pole need be connected with the first link bolt, then chain block being suspended on to the second link can lift by crane.Because bolt between the first link and anchor pole is connected, the active force that anchor pole is subject to all can be along the axial direction of anchor pole, thereby greatly reduces the possibility that anchor pole comes off, and has also solved the problem that the operation cycle is long, difficulty of construction is large of lifting by crane in prior art.In addition, the safety coefficient of the hoist having hung is increased, the risk that anchor pole is cut off reduces greatly, the lifting Security of chain block is strengthened, extended chain block life cycle, reduced construction cost, reduced labor intensity and human cost.
Finally it should be noted that: above each embodiment, only in order to technological scheme of the present invention to be described, is not intended to limit; Although the present invention is had been described in detail with reference to aforementioned each embodiment, those of ordinary skill in the art is to be understood that: its technological scheme that still can record aforementioned each embodiment is modified, or some or all of technical characteristics is wherein equal to replacement; And these amendments or replacement do not make the essence of appropriate technical solution depart from the scope of various embodiments of the present invention technological scheme.

Claims (2)

1. an erecting by overhang, is characterized in that, comprising:
The first link, described the first link and anchor pole are rotationally connected, and the direction of rotatingshaft is along the axial direction of described anchor pole;
The second link, is fixed on described the first link, for hanging chain block;
Wherein, described the first link comprises the first round steel, the second round steel and the 3rd round steel, and described the second round steel is U-shaped, and described the first round steel and described the 3rd round steel are separately positioned on the two ends of described the second round steel;
On described the second round steel, offer the perforate of vertical setting, for being rotationally connected with described anchor pole;
On described the first round steel and the 3rd round steel, correspondence offers the first through hole and the second through hole, and described the second link wears by described the first through hole and described the second through hole;
Wherein, described the second link is straight-bar, and described straight-bar one end is provided with baffle plate, and the other end is provided with screw thread, on described screw thread, for mounting nuts, described baffle plate and described nut are for limiting the position of described the second link with respect to described the first through hole and described the second through hole.
2. erecting by overhang according to claim 1, is characterized in that,
Described the first round steel and described the 3rd round steel all weld with described the second round steel.
CN201210133457.0A 2012-05-02 2012-05-02 Hoisting device Active CN102650365B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210133457.0A CN102650365B (en) 2012-05-02 2012-05-02 Hoisting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210133457.0A CN102650365B (en) 2012-05-02 2012-05-02 Hoisting device

Publications (2)

Publication Number Publication Date
CN102650365A CN102650365A (en) 2012-08-29
CN102650365B true CN102650365B (en) 2014-10-08

Family

ID=46692446

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210133457.0A Active CN102650365B (en) 2012-05-02 2012-05-02 Hoisting device

Country Status (1)

Country Link
CN (1) CN102650365B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113187521B (en) * 2021-04-07 2023-11-10 淮北市平远软岩支护工程技术有限公司 Steel wire rope net hanging method and auxiliary net hanging equipment based on yielding technology

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102263391A (en) * 2011-07-15 2011-11-30 安徽省电力公司淮北供电公司 Portable overhead grounding-wire raiser

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2633849Y (en) * 2003-07-07 2004-08-18 中国重型汽车集团有限公司 Special lift slings for automobile frame
CN201068363Y (en) * 2007-07-23 2008-06-04 宝山钢铁股份有限公司 Hanger for damageable element and precision equipment swinging
CN201158565Y (en) * 2008-01-25 2008-12-03 赵传军 Lifting appliance
CN201636442U (en) * 2010-04-07 2010-11-17 阳泉市金石矿山设备科技开发有限公司 Mine-used hanging device with adjustable pipeline
CN201952092U (en) * 2011-01-24 2011-08-31 中煤第三建设(集团)有限责任公司三十工程处 Guide rope tensioning device for temporarily changing winch in mine
CN202561404U (en) * 2012-05-02 2012-11-28 淮南矿业(集团)有限责任公司 Hoisting device

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102263391A (en) * 2011-07-15 2011-11-30 安徽省电力公司淮北供电公司 Portable overhead grounding-wire raiser

Also Published As

Publication number Publication date
CN102650365A (en) 2012-08-29

Similar Documents

Publication Publication Date Title
CN204847764U (en) Prefabricated component production is with hoist and mount frame
CN102650365B (en) Hoisting device
CN204454235U (en) A kind of novel many suspension centres equalizing bar device
CN206599392U (en) A kind of prestressing force tower crane attachment
CN212270712U (en) Construction device for mounting and dismounting steel box girder by suspension of bridge girder erection machine
CN202561404U (en) Hoisting device
CN103193148A (en) Railway locomotive roof lifting component and lifting frame
JP2020045689A (en) Steel bar drop prevention jig, steel bar suspension jig, and steel bar drop prevention method
CN104555644A (en) Anti-drop skip tail rope suspension device and anti-drop method for tail rope
CN202214139U (en) Unhooking prevention device
CN203143924U (en) Sling for hoisting steel crane girder
CN204689351U (en) A kind of H profile steel structural elements suspender
CN210528252U (en) Novel crane hook structure
CN203639956U (en) Combined high-strain test hammer
CN201614230U (en) Hoisting device for replacing torch heads
CN206476652U (en) A kind of ballast iron suspender
CN206050732U (en) Link type hangs chain
CN206156604U (en) Portal crane prevent wind fixed connection device
CN204360918U (en) A kind of transformer erecting by overhang
CN204138112U (en) Flat-tail rope elevator apparatus
CN205076669U (en) Screwed pipe safety lifting hook
CN104499644A (en) Crossbeam with lapping bars and triangular rib plates
CN211622526U (en) Attached cantilever beam
CN104176629A (en) Lifting appliance suitable for I-shaped steel
CN202755639U (en) Wheeled-fastener scaffold transverse joint

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant