CN102644465B - Backfill construction method for vertical shaft cave - Google Patents

Backfill construction method for vertical shaft cave Download PDF

Info

Publication number
CN102644465B
CN102644465B CN201210146894.6A CN201210146894A CN102644465B CN 102644465 B CN102644465 B CN 102644465B CN 201210146894 A CN201210146894 A CN 201210146894A CN 102644465 B CN102644465 B CN 102644465B
Authority
CN
China
Prior art keywords
vertical shaft
concrete
layer
backfill
karst
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210146894.6A
Other languages
Chinese (zh)
Other versions
CN102644465A (en
Inventor
侯靖
吴旭敏
潘益斌
陈念辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hydrochina East China Engineering Corp
Original Assignee
Hydrochina East China Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina East China Engineering Corp filed Critical Hydrochina East China Engineering Corp
Priority to CN201210146894.6A priority Critical patent/CN102644465B/en
Publication of CN102644465A publication Critical patent/CN102644465A/en
Application granted granted Critical
Publication of CN102644465B publication Critical patent/CN102644465B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a backfill construction method for a vertical shaft cave. The invention aims at providing a backfill construction method for the vertical shaft cave to reduce the construction difficulty and improve the engineering safety. The technical scheme adopted by the invention is that the method comprises the steps of: a, excavating a first layer of a vertical shaft on a selected position; b, punching a circle of a pipe roof to a karst cavity of the wall on a position of the bottom part of the first layer vertical shaft; c, clearing deposits inside the karst cavity of the first layer, and backfilling the karst cavity after being cleared with concrete by adopting the pipe roof as a bottom template; d, continuing to excavate the vertical shaft after completing the concrete backfilling to reach the stadium of the concrete, carrying out the construction for the karst cavity disclosed by a second layer according to the steps b and c after reaching the position of the bottom part of the second layer vertical shaft, and backfilling and grouting the top part of the lower concrete layer by utilizing an upper layer pipe roof; and e, repeating the step d until reaching the requirement of the vertical shaft depth. The backfill construction method is applicable to hydraulic and hydro-power engineering and is particularly applicable to the excavation of the vertical shaft in karst regions.

Description

Construction method is processed in the backfill of a kind of vertical shaft solution cavity
Technical field
The present invention relates to a kind of vertical shaft solution cavity backfill and process construction method.Be applicable to Hydraulic and Hydro-Power Engineering, be particularly useful for can lava the excavation of area vertical shaft.
Background technology
For can lava the water conservancy project vertical shaft arranged of area, in the process of digging, run into unavoidably the Karst Features of vertically growing along hoistway wall under vertical shaft, this Karst Features is likely vertically grown and is reached tens meters of rice even up to a hundred along shaft wall.And water conservancy project vertical shaft has the hydraulic tunnel of pressure often, generally adopt steel concrete or steel pipe as lining cutting, this just requires to grow and must adopt concrete backfill closely knit at the karst cavity of the borehole wall.
But above-mentioned Karst Features has caused larger constructional difficulties to backfilling working, especially filling or half filling-type Karst cave, anti-in order to obtain enough country rock bullets, the charges in karst cavity must be cleaned out, adopt concrete replacement.The backfill processing of karst has become comparatively crucial problem opportunity, if process the difficulty of construction of the Lingao borehole wall of meeting after karst is disclosed completely again; If shaft excavation one deck karst cavity that this layer of backfill exposed immediately,, along with vertical shaft digs under further, karst also further discloses, when lower floor's Karst Features is carried out to deposit cleaning, can cause coming to nothing of last layer fill concrete basis, thereby cause unstability to cause accident.
Summary of the invention
The technical problem to be solved in the present invention is: for the problem of above-mentioned existence, provide the low vertical shaft solution cavity backfill of a kind of easy construction, engineering cost to process construction method, reduce difficulty of construction, improve engineering safety.
The technical solution adopted in the present invention is: one can the vertical shaft solution cavity backfill of lava area be processed construction method, it is characterized in that comprising the following steps:
A, at the first floor of select location excavating shaft;
B, in first floor silo bottom position, enclose pipe canopy toward the karst cavity injection one of the borehole wall, pipe canopy is until in country rock, the steel pipe close-packed arrays of pipe canopy, has the place concrete in space or cement mortar to stop up;
Deposit in c, cleaning first floor karst cavity, and using pipe canopy as bottom template, adopt from the bottom up concrete to carry out backfill to the karst cavity after clearing up;
D, complete and reach after the age of concrete when concrete backfill, continue excavating shaft, arrive second layer silo bottom position, the karst cavity that the second layer is disclosed is constructed by step b, c, then utilizes the pipe canopy on upper strata to carry out backfill grouting to lower-layer concrete top;
E, repeating step d, until the vertical shaft degree of depth meets the demands.
The backfill of described concrete individual layer is highly not more than 3m.
Arrange that in pipe canopy bottom transverse anchor pole is as support.
The invention has the beneficial effects as follows: can facilitate, the karst cavity to the karst of vertically growing along shaft wall of safety carries out backfill processing, reduce karst has all been disclosed to the difficulty of construction that processing processes again, avoided carrying out without bottom template the construction risk of karst cavity backfill.Later-stage utilization pipe canopy carries out backfill grouting and has ensured the sold stowing in levels fill concrete gap.
Brief description of the drawings
Fig. 1 is construction schematic diagram of the present invention.
Detailed description of the invention
As shown in Figure 1, the present embodiment has excavation at vertical shaft 1 that can lava area, this vertical shaft is that stage excavation forms, the cutting depth of every layer is 3~5m, in the karst cavity 2 of every layer of bottom position, be furnished with a comb canopy 3, between the steel pipe of requirement pipe canopy 3, be closely connected (as there being space can adopt concrete or cement mortar to stop up between pipe canopy), taking pipe canopy 3 as bottom template, in karst cavity, back-filling in layers has concrete.
The detailed description of the invention of the present embodiment is as follows:
A, can lava the first floor of area select location excavating shaft 1;
B, dig in process for 1 time at vertical shaft, the karst cavity 2 of the borehole wall also ceaselessly discloses thereupon, when disclosing to (3~5m) after certain height, arranges a comb canopy 3 in karst cavity 2 bottoms of having exposed, and pipe canopy is until in country rock;
C, cleaning have disclosed to obtain the deposit in karst cavity 2, and pipe canopy 3 is as the bottom template of karst cavity backfill displacement, the concrete backfill of the employing from the bottom up karst cavity of layering;
D, concrete backfill complete and reach after the age of concrete, continue excavating shaft 1 second layer, the karst cavity 2 of exposure is carried out to construction processing by step b, c mode, utilize the pipe canopy 3 on upper strata to carry out backfill grouting to lower-layer concrete top, the space between the upper and lower both sides of filling concrete that can be closely knit.
E, repeating step d, until vertical shaft 1 degree of depth meets the demands, can be easily to the Karst Features backfill processing of vertically growing along vertical shaft 1 borehole wall.
Verifying after the roughly situation of vertical shaft 1 borehole wall karst growth, according to pipe canopy 3 load bearing requirements and the overall individual layer backfill height of considering to determine vertical shaft karst cavity of construction condition, if individual layer backfill highly should not be greater than 3m(pipe canopy, 3 loads are larger, can arrange that anchor pole is as supporting in pipe canopy 3 bottom transverse).

Claims (3)

1. can the vertical shaft solution cavity backfill of lava area process a construction method, it is characterized in that comprising the following steps:
A, at the first floor of select location excavating shaft (1);
B, in first floor silo bottom position, enclose pipe canopy (3) toward karst cavity (2) injection one of the borehole wall, pipe canopy is until in country rock, the steel pipe close-packed arrays of pipe canopy, has the place concrete in space or cement mortar to stop up;
Deposit in c, cleaning first floor karst cavity (2), and using pipe canopy (3) as bottom template, adopt from the bottom up concrete to carry out backfill to the karst cavity (2) after clearing up;
D, complete and reach after the age of concrete when concrete backfill, continue excavating shaft (1), arrive second layer silo bottom position, the karst cavity (2) that the second layer is disclosed is constructed by step b, c, then utilizes the pipe canopy (3) on upper strata to carry out backfill grouting to lower-layer concrete top;
E, repeating step d, until vertical shaft (1) degree of depth meets the demands.
2. construction method according to claim 1, is characterized in that: the backfill of described concrete individual layer is highly not more than 3m.
3. construction method according to claim 1, is characterized in that: arrange that in Guan Peng (3) bottom transverse anchor pole is as support.
CN201210146894.6A 2012-05-14 2012-05-14 Backfill construction method for vertical shaft cave Active CN102644465B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210146894.6A CN102644465B (en) 2012-05-14 2012-05-14 Backfill construction method for vertical shaft cave

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210146894.6A CN102644465B (en) 2012-05-14 2012-05-14 Backfill construction method for vertical shaft cave

Publications (2)

Publication Number Publication Date
CN102644465A CN102644465A (en) 2012-08-22
CN102644465B true CN102644465B (en) 2014-06-25

Family

ID=46657520

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210146894.6A Active CN102644465B (en) 2012-05-14 2012-05-14 Backfill construction method for vertical shaft cave

Country Status (1)

Country Link
CN (1) CN102644465B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102877850B (en) * 2012-10-17 2014-12-10 中国水电顾问集团华东勘测设计研究院 Construction method of weak structural surface displacement of grotto surrounding rocks of underground power plant
CN106368709B (en) * 2016-09-30 2019-04-23 首钢集团有限公司 A kind of construction method of vertical
CN109882205B (en) * 2019-03-28 2024-01-19 中铁二院工程集团有限责任公司 Suspension backfill structure penetrating through large filling-free karst cave tunnel and construction method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101397909B (en) * 2008-09-17 2011-04-20 中冶集团武勘岩土基础工程公司 Artificial digging repair novel construction method for collapse ultra-deep shaft
CN102305075A (en) * 2011-06-28 2012-01-04 中国水利水电第五工程局有限公司 Vertical shaft construction method under unfavorable geological condition

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4452170B2 (en) * 2004-12-17 2010-04-21 株式会社ピーエス三菱 Construction method of shaft

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101397909B (en) * 2008-09-17 2011-04-20 中冶集团武勘岩土基础工程公司 Artificial digging repair novel construction method for collapse ultra-deep shaft
CN102305075A (en) * 2011-06-28 2012-01-04 中国水利水电第五工程局有限公司 Vertical shaft construction method under unfavorable geological condition

Non-Patent Citations (8)

* Cited by examiner, † Cited by third party
Title
大董岭隧道洞内特大溶洞回填方案探讨;钟云建等;《公路交通技术》;20100630(第3期);108-111 *
张景华.牛角坪隧道左线溶洞处理施工.《铁道建筑技术》.2009,(第11期),86-88.
水下深孔爆扩挤压回填混凝土;田应坤;《防渗技术》;19981231;第4卷(第4期);23-26 *
溶洞地质条件下钻孔灌注桩的施工技术;高成民;《铁道建筑》;20030220(第2期);11-12 *
牛角坪隧道左线溶洞处理施工;张景华;《铁道建筑技术》;20091120(第11期);86-88 *
田应坤.水下深孔爆扩挤压回填混凝土.《防渗技术》.1998,第4卷(第4期),23-26.
钟云建等.大董岭隧道洞内特大溶洞回填方案探讨.《公路交通技术》.2010,(第3期),108-111.
高成民.溶洞地质条件下钻孔灌注桩的施工技术.《铁道建筑》.2003,(第2期),11-12.

Also Published As

Publication number Publication date
CN102644465A (en) 2012-08-22

Similar Documents

Publication Publication Date Title
CN103452121A (en) Long pile and short pile combined single-row pile and horizontal internal support pile supporting structure and construction method thereof
CN102535474B (en) A kind of construction method of deep-foundation pit excavation
CN103321230A (en) Excavation method for deep and big foundation pit in long-distance crossing field for shallow-buried subway
CN102505704A (en) Large open caisson construction method in soft geological shaft
CN207003499U (en) A kind of anti-floating lifting device of underground tunnel upper excavation of foundation pit
CN103775110A (en) Underground excavation construction method for multilayer underground space of soft soil area
CN102536273A (en) 26-meter large-span space one-step forming construction method
CN107794946B (en) Underground comprehensive pipe rack structure deeply buried in soft soil and construction method thereof
CN103195076A (en) Method for constructing silt deep foundation pit tower crane foundation
CN210598987U (en) Subway station based on single-layer four-guide-hole and middle-guide-hole inner pile foundation
CN110512593A (en) Reclaimation area ultra-deep ground-connecting-wall structure and its construction method
CN105201001A (en) Composite seepage preventing structure for large karst cave in karst region and construction method thereof
CN203514345U (en) Connection type precast concrete retaining wall
CN108532586A (en) A kind of construction method of garage parking diaphram wall
CN108952766A (en) The construction method of Tunnel Passing karst location punishment
CN103422510A (en) Steel pipe frame type cofferdam structure and construction method
CN105569051A (en) Foundation pit support system of sandy pebble boulder geological stratification and construction method
CN102644465B (en) Backfill construction method for vertical shaft cave
CN110889163A (en) Method for treating coal mining collapse wide and large cracks in loess hilly area
CN105064381A (en) High-low cutting edge double-wall steel cofferdam reinforced concrete once bottom sealing construction method
CN110080169A (en) A kind of construction method reclaimed fields from the sea utilized based on basement
CN105156123B (en) A kind of open type shield excavation machine and its application method
CN108755698A (en) A kind of big inclined rock base foundation construction method of abrupt slope incompact-deposit bodies
CN105089023A (en) Improving method for concrete floor of hydropower house and structure of concrete floor
CN112112657B (en) New construction method for digging and building inclined shaft of coal mine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant