CN102638363A - Power dispatching data network equipment upgrading improvement simulation previewing method based on SP Guru - Google Patents

Power dispatching data network equipment upgrading improvement simulation previewing method based on SP Guru Download PDF

Info

Publication number
CN102638363A
CN102638363A CN2011104426052A CN201110442605A CN102638363A CN 102638363 A CN102638363 A CN 102638363A CN 2011104426052 A CN2011104426052 A CN 2011104426052A CN 201110442605 A CN201110442605 A CN 201110442605A CN 102638363 A CN102638363 A CN 102638363A
Authority
CN
China
Prior art keywords
network
model
upgrading
power dispatch
guru
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011104426052A
Other languages
Chinese (zh)
Inventor
江泽鑫
梁智强
梁志宏
周强峰
胡朝辉
石炜君
梁毅成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of Guangdong Power Grid Co Ltd
Original Assignee
Electric Power Research Institute of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of Guangdong Power Grid Co Ltd filed Critical Electric Power Research Institute of Guangdong Power Grid Co Ltd
Priority to CN2011104426052A priority Critical patent/CN102638363A/en
Publication of CN102638363A publication Critical patent/CN102638363A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a power dispatching data network equipment upgrading improvement simulation previewing method based on SP Guru. The method comprises the following steps of: (1) acquiring configuration information of all sets of network equipment in a power dispatching data network, and establishing a network model of the power dispatching data network through an SP Guru platform; (2) acquiring flow data of the power dispatching data network, and establishing a flow model of the power dispatching data network through the SP Guru platform according to the flow data; (3) performing simulation previewing for upgrading improvement of the network equipment on a dispatching data simulation model consisting of the network model and the flow model; and (4) analyzing the simulation model for upgrading improvement of the network equipment, and acquiring network quality of service parameters and performance parameters of the simulation model of the power dispatching data network after the network equipment is subjected to upgrading improvement. According to the method, simulation previewing for the upgrading improvement of the power dispatching data network equipment is realized.

Description

Emulation preview method is transformed in power dispatch data network device upgrade based on SP Guru
Technical field
The present invention relates to power dispatch data network emulation field, specifically be meant a kind of power dispatch data network device upgrade transformation emulation preview method based on SP Guru.
Background technology
Power dispatch data network (being called for short the data dispatching net) refers to power scheduling wide area IP data network, does not comprise the electrical production private dialup network.The data dispatching network is divided into real-time VPN (RT-VPN) and non real-time VPN (NRT-VPN) altogether.RT-VPN carries dispatching automation, relaying protection management, the download of generating curve, AVC, guarantor's letter etc. and has control command, and to real-time performance and the high business of bandwidth requirement.NRT-VPN carries non-real-time services such as electrical energy metering, failure wave-recording, DTS.Guarantee the safe, stable and reliable of these networks, most important for the production run of electrical network.And along with the operation of power dispatch data network and the growth of electrical network business; The data dispatching net possibly face ageing equipment or equipment performance bottleneck problems; At this moment needs are made the device upgrade modification scheme, the network equipment of on-line operation is carried out upgrading according to the device upgrade modification scheme.And at present the device upgrade modification scheme of power dispatch data network does not still have concrete data and supports, makes the feasibility of device upgrade modification scheme and validity can't obtain analytic demonstration.
In addition, SP Guru is an intelligent network management platform, and it provides the ability of understanding OSI the 2/3rd layer protocol model in depth for the service provider, comprises router, switch, agreement, server and data flow etc.The intelligence simulation technology of SP Guru provides the supplementary means of the multiple decision support that comprises fault eliminating, operation demonstration, the network planning and engineering construction for service provider network.The service provider can utilize SPGuru to realize that it distributes widely, the intelligent management of networks many technology and many equipment suppliers; From such as network architecture and the so strategic decision behavior of overall planning, until comprise the network operation administration behaviour etc. of fault eliminating, configuration verification and traffic engineering etc.
Summary of the invention
The object of the present invention is to provide a kind of power dispatch data network device upgrade to transform emulation preview method based on SP Guru; Realize the emulation preview that the power dispatch data network upgrading network equipment is transformed, the analytic demonstration data of feasibility and validity are provided for the device upgrade modification scheme.
The object of the invention is realized through following technical scheme: emulation preview method is transformed in a kind of power dispatch data network device upgrade based on SP Guru, comprises the steps:
(1) obtains all-network configuration of devices information in the power dispatch data network, set up the network model of power dispatch data network through SP Guru platform according to the configuration information that is obtained; Said configure packet includes network device node information and network link information; Said network model comprises the nodal analysis method and the link model of all-network equipment in the data dispatching net;
(2) obtain the data on flows of power dispatch data network, set up the discharge model of power dispatch data network through SP Guru platform according to said data on flows;
(3) based on the data dispatching network simulation model of said network model and discharge model formation, this simulation model is carried out the emulation preview that upgrading network equipment is transformed;
(4) analysis configuration is crossed the simulation model that upgrading network equipment is transformed, and obtains the network quality-of-service parameters and the performance parameter of power dispatch data network simulation model after the upgrading network equipment transformation.
In the step according to the invention (1),, be used for obtaining data dispatching net all-network configuration of devices information through access network device information collecting server in the data dispatching net.
In the step according to the invention (2),, and this mirror port is connected to the data on flows of obtaining power dispatch data network in a period of time in the computer that packet catcher is installed through the key node configured port mirror image in power dispatch data network.
The emulation preview of upgrading network equipment transformation according to the invention comprises the steps:
(31) simulation model before backup upgrading is transformed;
(32), in simulation model, create the new network device model, and the new network device model is reconfigured according to the upgrading network equipment modification scheme;
(33) the new equipment model that configures is replaced the old network equipment, upgrade simulation model;
(34) simulation model of operation behind upgrading;
(35) network equipments configuration and network equipments configuration upgrading before of contrast behind upgrading.
Compared with prior art, technology of the present invention has the following advantages:
The present invention has set up the simulation model of power dispatch data network; This model can be simulated the various running statuses of power dispatch data network realistically; Based on this network simulation model; Carry out preview, thereby simulation analysis is proved the feasibility and the validity of various device upgrading scheme according to the various network device upgrading of device upgrade modification scheme.Through the power dispatch data network device upgrade being transformed the emulation preview, effectively each performance index behind the artificial network upgrading are assessed optimization to the network upgrade modification scheme.Make have something to base in the process of real network upgrading like this, reduce the risk of upgrading, improve delivery quality and efficient.
Description of drawings
Fig. 1 transforms the sketch map of emulation preview method for power dispatch data network device upgrade of the present invention.
Embodiment
Below in conjunction with specific embodiment the present invention is further set forth.
Emulation preview method is transformed in power dispatch data network device upgrade based on SP Guru as shown in Figure 1, comprises the steps:
(1) through access network device information collecting server in the data dispatching net; Obtain all-network configuration of devices information in the data dispatching net; SP Guru sets up the network model of power dispatch data network according to the acquisition configuration information; Thereby simulate the annexation between the all-network equipment in the true data dispatching net, said configure packet includes network device node information and network link information; Facility information is collected the show/display instruction of the CLI that adopts SP Guru platform when server obtains network equipment information, can not produce any influence to actual power dispatch data network.Particularly; All-network equipment to power dispatch data network carries out Information Statistics; This statistical information comprises device name, equipment vendors and model, management ip address, login mode, port numbers, user name, password, superuser name, franchise password and SNMP community number; Then statistical information is consigned to information collecting server; Information collecting server will be selected suitable instruction to obtain the information of the network equipment according to the manufacturer and the model of concrete equipment, thereby obtain all-network configuration of devices information in the whole power dispatch data network according to login mode (like Telnet or SSH) and management ip address logging in network equipment then automatically; And set up nodal analysis method and the link model (nodal analysis method, link model belong to network topology model) that generates all-network equipment, obtain the annexation of nodal analysis method and link model.
(2) through key node (like core router) the configured port mirror image in power dispatch data network; Dispose the flow collection device; All datas on flows of key node all are mirrored in the flow collection device; And this mirror port is connected to the data on flows of obtaining (like a week, 1 year) power dispatch data network in a period of time in the computer that packet catcher is installed, set up the discharge model of power dispatch data network again according to said data on flows through SP Guru platform.Wherein a period of time refers to the one-period that data on flows changes, and this cycle is confirmed by the purpose of device upgrade modification scheme and emulation.
(3) based on the data dispatching network simulation model of said network model and discharge model formation, this simulation model is carried out the emulation preview that upgrading network equipment is transformed, particularly, the concrete steps of the emulation of upgrading network equipment transformation preview comprise:
(31) simulation model before backup upgrading is transformed;
(32) according to the upgrading network equipment modification scheme; In simulation model, create the new network device model that corresponding scheme requires, requiring the Cisco3560 device upgrade like the upgrading scheme is Cisco7609 equipment, and the new network device model is reconfigured; New demand according to configuration information on the old network equipment and upgrading scheme; New network device model to new establishment is configured, and comprises the configuration of interface, route, IP, VLAN, VPN etc., the model version difference of the new and old network equipment of considered during configuration; Like the switch replacement cisco switch of considered with Huawei or H3C; The compatibility of instructing after the software release upgrade is changed the renewal configuration-direct in layoutprocedure, to realize the complete copy of new network device configuration;
(33) the new equipment model that configures is replaced the old network equipment, upgrade simulation model, with the conveniently contrast and the analysis of the network topology structure of new and old simulation model;
(34) simulation model of operation behind upgrading tested the attributes such as route accessibility, VPN connections of this new simulation model, do not pass through if test, and then revises in this new simulation model configuration of devices and passes through up to test;
(35) network equipments configuration and network equipments configuration upgrading before of contrast behind upgrading.After simulation model normally moves a period of time,, be used to contrast the situation such as route, flow distribution, VPN connection of same time period before the upgrading through the state and the flow of network-management tool or textual form record institute upgrading equipment.If after pressing upgrading network equipment modification scheme deploying new equipment model in the step (32), in the test of (34), do not pass through, the configuration-direct that then test in (34) is passed through feeds back to the upgrading network equipment modification scheme, is used to revise former predetermined upgrading scheme.
(4) analysis configuration is crossed the simulation model that upgrading network equipment is transformed, and obtains the network quality-of-service parameters and the performance parameter of power dispatch data network simulation model after the upgrading network equipment transformation.Can analyze the QoS parameter and the performance parameter of power dispatch data network simulation model, thereby prove the feasibility and the validity of device upgrade modification scheme.If simulation run goes wrong, can revise the configuration-direct of upgrading scheme, import simulation model operation test again, till the normal operation of network.
Execution mode of the present invention is not limited thereto; According to foregoing; Ordinary skill knowledge and customary means according to this area; Do not breaking away under the above-mentioned basic fundamental thought of the present invention prerequisite, the present invention can also make equivalent modifications, replacement or the change of other various ways, all should be interpreted as still to belong to protection scope of the present invention.

Claims (4)

1. emulation preview method is transformed in the power dispatch data network device upgrade based on SP Guru, comprises the steps:
(1) obtains all-network configuration of devices information in the power dispatch data network, set up the network model of power dispatch data network through SP Guru platform according to the configuration information that is obtained; Said configure packet includes network device node information and network link information; Said network model comprises the nodal analysis method and the link model of all-network equipment in the data dispatching net;
(2) obtain the data on flows of power dispatch data network, set up the discharge model of power dispatch data network through SP Guru platform according to said data on flows;
(3) based on the data dispatching network simulation model of said network model and discharge model formation, this simulation model is carried out the emulation preview that upgrading network equipment is transformed;
(4) analysis configuration is crossed the simulation model that upgrading network equipment is transformed, and obtains the network quality-of-service parameters and the performance parameter of power dispatch data network simulation model after the upgrading network equipment transformation.
2. emulation preview method is transformed in the power dispatch data network device upgrade based on SP Guru according to claim 1; It is characterized in that: in the said step (1); Through access network device information collecting server in the data dispatching net, be used for obtaining data dispatching net all-network configuration of devices information.
3. emulation preview method is transformed in the power dispatch data network device upgrade based on SP Guru according to claim 1; It is characterized in that: in the said step (2); Through the key node configured port mirror image in power dispatch data network, and this mirror port is connected to the data on flows of obtaining power dispatch data network in a period of time in the computer that packet catcher is installed.
4. emulation preview method is transformed in the power dispatch data network device upgrade based on SP Guru according to claim 1, it is characterized in that: the emulation preview of said upgrading network equipment transformation comprises the steps:
(31) simulation model before backup upgrading is transformed;
(32), in simulation model, create the new network device model, and the new network device model is reconfigured according to the upgrading network equipment modification scheme;
(33) the new equipment model that configures is replaced the old network equipment, upgrade simulation model;
(34) simulation model of operation behind upgrading;
(35) network equipments configuration and network equipments configuration upgrading before of contrast behind upgrading.
CN2011104426052A 2011-12-23 2011-12-23 Power dispatching data network equipment upgrading improvement simulation previewing method based on SP Guru Pending CN102638363A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011104426052A CN102638363A (en) 2011-12-23 2011-12-23 Power dispatching data network equipment upgrading improvement simulation previewing method based on SP Guru

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011104426052A CN102638363A (en) 2011-12-23 2011-12-23 Power dispatching data network equipment upgrading improvement simulation previewing method based on SP Guru

Publications (1)

Publication Number Publication Date
CN102638363A true CN102638363A (en) 2012-08-15

Family

ID=46622616

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011104426052A Pending CN102638363A (en) 2011-12-23 2011-12-23 Power dispatching data network equipment upgrading improvement simulation previewing method based on SP Guru

Country Status (1)

Country Link
CN (1) CN102638363A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105678416A (en) * 2016-01-05 2016-06-15 中国电力科学研究院 Intelligent decision system for constructing and reconstructing power distribution area
CN109768874A (en) * 2017-11-10 2019-05-17 华为技术有限公司 The method and device of configuration change in a kind of network
CN110519649A (en) * 2018-05-22 2019-11-29 青岛海尔多媒体有限公司 A kind of control method of separate television, device and computer readable storage medium
CN112508347A (en) * 2020-11-17 2021-03-16 广东电网有限责任公司广州供电局 System for automatically performing check on safety and operability of overhaul ticket
CN114553710A (en) * 2020-11-26 2022-05-27 中国南方电网有限责任公司 Transformer substation information transmission network flow simulation method, device, equipment and medium
CN114629767A (en) * 2020-11-26 2022-06-14 中国南方电网有限责任公司 Power dispatching network simulation method and device, computer equipment and storage medium
CN116795406A (en) * 2023-08-28 2023-09-22 北京国电通网络技术有限公司 Terminal equipment software upgrading method, device, equipment and computer readable medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030009580A1 (en) * 2001-04-09 2003-01-09 Chen Xiaobao X. Providing quality of service in a telecommunications system such as a UMTS of other third generation system
CN101369931A (en) * 2008-09-24 2009-02-18 中兴通讯股份有限公司 Method and system for network service quality measurement
CN101447938A (en) * 2008-12-08 2009-06-03 深圳华为通信技术有限公司 Network service quality processing method, device and system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030009580A1 (en) * 2001-04-09 2003-01-09 Chen Xiaobao X. Providing quality of service in a telecommunications system such as a UMTS of other third generation system
CN101369931A (en) * 2008-09-24 2009-02-18 中兴通讯股份有限公司 Method and system for network service quality measurement
CN101447938A (en) * 2008-12-08 2009-06-03 深圳华为通信技术有限公司 Network service quality processing method, device and system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
新加坡经纬线科技公司北京代表处: "OPNET SP Guru解决方案", 《WWW.CIFINET.COM/WLZH/JJFA_SHOW.JSP?ID=20053141128881993WFR》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105678416A (en) * 2016-01-05 2016-06-15 中国电力科学研究院 Intelligent decision system for constructing and reconstructing power distribution area
CN109768874A (en) * 2017-11-10 2019-05-17 华为技术有限公司 The method and device of configuration change in a kind of network
CN109768874B (en) * 2017-11-10 2020-10-16 华为技术有限公司 Method and device for configuration change in network
CN110519649A (en) * 2018-05-22 2019-11-29 青岛海尔多媒体有限公司 A kind of control method of separate television, device and computer readable storage medium
CN112508347A (en) * 2020-11-17 2021-03-16 广东电网有限责任公司广州供电局 System for automatically performing check on safety and operability of overhaul ticket
CN112508347B (en) * 2020-11-17 2023-06-30 广东电网有限责任公司广州供电局 Automatic execution verification system for security and operability of maintenance ticket
CN114553710A (en) * 2020-11-26 2022-05-27 中国南方电网有限责任公司 Transformer substation information transmission network flow simulation method, device, equipment and medium
CN114629767A (en) * 2020-11-26 2022-06-14 中国南方电网有限责任公司 Power dispatching network simulation method and device, computer equipment and storage medium
CN114553710B (en) * 2020-11-26 2023-09-19 中国南方电网有限责任公司 Substation information transmission network flow simulation method, device, equipment and medium
CN116795406A (en) * 2023-08-28 2023-09-22 北京国电通网络技术有限公司 Terminal equipment software upgrading method, device, equipment and computer readable medium
CN116795406B (en) * 2023-08-28 2023-11-24 北京国电通网络技术有限公司 Terminal equipment software upgrading method, device, equipment and computer readable medium

Similar Documents

Publication Publication Date Title
CN102447579B (en) Volume-expansion simulation rehearsal method for electric power dispatching data network based on SP (Service Provider) Guru
CN102638363A (en) Power dispatching data network equipment upgrading improvement simulation previewing method based on SP Guru
CN102546243A (en) Fault simulation analysis method for SP Guru-based electric power dispatching data network
Molina et al. Using software defined networking to manage and control IEC 61850-based systems
US9628339B1 (en) Network testbed creation and validation
Sidhu et al. Modelling and simulation for performance evaluation of IEC61850-based substation communication systems
ITTO20010180A1 (en) PROCEDURE AND SYSTEM FOR THE CONTROL OF THE CONFIGURATION OF THE NODES A TELECOMMUNICATION NETWORK.
CN106374439A (en) Intelligent substation protection control system-based software definition implementation method
CN102571422A (en) SP Gura-based new business roll-out simulation previewing method for power scheduling data network
CN104115445A (en) Validation of a communication network of an industrial automation and control system
Lapeyrade et al. OpenFlow-based migration and management of the TouIX IXP
Klaer et al. Graph-based model of smart grid architectures
CN102970376A (en) Cluster configuration method and device
Monika et al. Performance analysis of software defined network using intent monitor and reroute method on ONOS controller
CN104219100A (en) Information acquiring method and device
Cao et al. Research on comprehensive performance simulation of communication IP network based on OPNET
CN103117880A (en) Web technology based network topological generation method
CN101547112A (en) Network flow sampling method and system
CN103634290B (en) Network (WSN) emulation system
CN108270628B (en) OPNET-based power system SDH communication transmission network simulation modeling method
CN109687985B (en) Automatic configuration method and system for process level network of transformer substation
Ramadona et al. The simulation of SDN network using POX controller: Case in Politeknik Caltex Riau
Naim et al. Analysis of wireless and cable network quality-of-service performance at Telkom University landmark tower using network development life cycle (ndlc) method
CN109728947A (en) A kind of network performance analysis method based on cloud computing in conjunction with network topological diagram
Ruhe et al. Design of a cyber-physical energy laboratory

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120815