CN102636853A - 绝缘光纤复合架空相线的中间接头装置 - Google Patents

绝缘光纤复合架空相线的中间接头装置 Download PDF

Info

Publication number
CN102636853A
CN102636853A CN2012100952547A CN201210095254A CN102636853A CN 102636853 A CN102636853 A CN 102636853A CN 2012100952547 A CN2012100952547 A CN 2012100952547A CN 201210095254 A CN201210095254 A CN 201210095254A CN 102636853 A CN102636853 A CN 102636853A
Authority
CN
China
Prior art keywords
optical fiber
box body
phase line
continues
head device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100952547A
Other languages
English (en)
Inventor
陆正嘉
张庆
谢书鸿
何仓平
路浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI ELECTRIC POWER COMMUNICATION CO Ltd
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Zhongtian Hitachi Cable Co Ltd
Original Assignee
Shanghai Jiulong Electric Power Technology Co Ltd
Shanghai Municipal Electric Power Co
Zhongtian Hitachi Cable Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiulong Electric Power Technology Co Ltd, Shanghai Municipal Electric Power Co, Zhongtian Hitachi Cable Co Ltd filed Critical Shanghai Jiulong Electric Power Technology Co Ltd
Priority to CN2012100952547A priority Critical patent/CN102636853A/zh
Publication of CN102636853A publication Critical patent/CN102636853A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Light Guides In General And Applications Therefor (AREA)

Abstract

本发明提供一种绝缘光纤复合架空相线的中间接头装置,其包含:接续盒体;固定夹具,其分别设置在所述接续盒体的两端,所述两个固定夹具分别引入OPPC光缆中的光纤至接续盒体内进行接续;绝缘子,其一端与所述接续盒体的底部连接。本发明结构简单,用来接续OPPC光缆操作方便,同时具有密封功能,对OPPC光缆能够起到较好的保护效果,有效提高光缆的接续性。

Description

绝缘光纤复合架空相线的中间接头装置
技术领域
本发明涉及一种光缆的中间接头装置,尤其是指一种绝缘光纤复合架空相线(OPPC光缆)的中间接头装置,属于光缆通信的技术领域。
背景技术
所述OPPC光缆的全称为“绝缘光纤复合架空相线”,其是将光单元复合在相线中的一种新型电力绝缘特种光缆,具有输送电流和通信的双重功能。
OPPC光缆是由光单元和导线单元组成。其中,光单元由多根光纤和不锈钢保护管组成,光纤收容保护在不锈钢松套管中,管内填充特种油膏,以起到防水、防潮或其他有害气体、隔热的作用。导线单元是传输电能的关键部件,一般由铝包钢芯绞线和铝线绞合构成,一方面导线截面选择要合理,以保证线路有良好的电压传输质量和电流承载性能;另一方面,它又起到承力作用,还要具备足够的机械强度,使OPPC受到外力作用时光单元的传输性能不受影响。
OPPC光缆在铺设过程中涉及到较多的安装注意事项,其中OPPC光缆接续是整个铺设工程中最为重要的部分。OPPC光缆接续涉及到光纤接续和光电分离技术,这对接续及高压绝缘都有非常严格的要求。因此,OPPC光缆的中间接头装置的性能和结构就显得尤为重要。
发明内容
本发明提供的一种绝缘光纤复合架空相线的中间接头装置,结构简单,用来接续OPPC光缆操作方便,同时具有密封功能。
为了达到上述目的,本发明提供一种绝缘光纤复合架空相线的中间接头装置,其包含:接续盒体;固定夹具,其分别设置在所述接续盒体的两端,所述两个固定夹具分别引入OPPC光缆中的光纤至接续盒体内进行接续;绝缘子,其一端与所述接续盒体的底部连接。
所述接续盒体包含设置在其内部的盘纤板以及与其相配的盘纤板盖;该盘纤板用于引导盘放OPPC光缆中的光纤,并且在两侧光纤熔接接续后安放光纤接头;所述盘纤板盖覆盖在所述盘纤板上。
所述接续盒体还包含与其相配的接续盒盖,在所述接续盒盖和盘纤板盖之间,还设置有密封垫。
所述固定夹具包含固定设置在接续盒体侧面的密封座体,在所述密封座体和接续盒体的侧面上分别设置有相对应的通孔,穿过OPPC光缆中的光纤并将其引入接续盒体内的盘纤板。
所述固定夹具还包含旋紧螺母,其套设在OPPC光缆中的光纤上;所述旋紧螺母与所述密封座体以及接续盒体侧面上的通孔相匹配,将OPPC光缆中的光纤旋进密封座体和接续盒体。
所述固定夹具还包含光缆固定支架,以及套设在该光缆固定支架和密封座体外部的护罩。
所述的绝缘光纤复合架空相线的中间接头装置还包含连接法兰,其设置在绝缘子的另一端,通过所述连接法兰将所述中间接头装置固定在安装支架上。
本发明所提供的绝缘光纤复合架空相线的中间接头装置,结构简单,用来接续OPPC光缆操作方便,并且同时具有密封功能,对OPPC光缆能够起到较好的保护效果,有效提高光缆的接续性。
附图说明
图1是本发明的绝缘光纤复合架空相线的中间接头装置的结构示意图。
具体实施方式
以下根据图1,具体说明本发明的较佳实施例。
如图1所示,为本发明所提供的绝缘光纤复合架空相线的中间接头装置的结构示意图。其包含:接续盒体1;固定夹具2,其分别设置在所述接续盒体1的两端,所述两个固定夹具2分别引入OPPC光缆中的光纤至接续盒体1内进行接续;绝缘子3,其一端与所述接续盒体1的底部连接。
所述接续盒体1包含设置在其内部的盘纤板以及与其相配的盘纤板盖;该盘纤板用于引导盘放OPPC光缆中的光纤,并且在两侧光纤熔接接续后安放光纤接头,同时利用盘纤板盖覆盖所述盘纤板,从而实现固定及保护光纤和光纤接头的目的。
所述接续盒体1还包含与其相配的接续盒盖,在所述接续盒盖和盘纤板盖之间,还设置有密封垫,用于密封保护设置在接续盒体1内部的盘纤板和盘纤板盖。
所述固定夹具2包含固定设置在接续盒体1侧面的密封座体,在所述密封座体和接续盒体1的侧面上分别设置有相对应的通孔,用于穿过OPPC光缆中的光纤并将其引入接续盒体1内的盘纤板。
所述固定夹具2还包含旋紧螺母,其套设在OPPC光缆中的光纤上;所述旋紧螺母与所述密封座体以及接续盒体1侧面上的通孔相匹配,用于将OPPC光缆中的光纤旋进密封座体和接续盒体1。
所述固定夹具2还包含光缆固定支架,以及套设在该光缆固定支架和密封座体外部的铝护罩,用于固定OPPC光缆。
所述的绝缘光纤复合架空相线的中间接头装置还包含连接法兰4,其设置在绝缘子3的另一端,通过所述连接法兰4使得中间接头装置固定在安装支架上。
本发明所提供的绝缘光纤复合架空相线的中间接头装置,结构简单,用来接续OPPC光缆操作方便,并且同时具有密封功能,对OPPC光缆能够起到较好的保护效果,有效提高光缆的接续性。
尽管本发明的内容已经通过上述优选实施例作了详细介绍,但应当认识到上述的描述不应被认为是对本发明的限制。在本领域技术人员阅读了上述内容后,对于本发明的多种修改和替代都将是显而易见的。因此,本发明的保护范围应由所附的权利要求来限定。

Claims (8)

1.一种绝缘光纤复合架空相线的中间接头装置,其特征在于,包含:
接续盒体(1);
固定夹具(2),其分别设置在所述接续盒体(1)的两端;所述两个固定夹具(2)分别引入绝缘光纤复合架空相线中的光纤至接续盒体(1)内进行接续;
绝缘子(3),其一端与所述接续盒体(1)的底部连接。
2.如权利要求1所述的绝缘光纤复合架空相线的中间接头装置,其特征在于,所述接续盒体(1)包含设置在其内部的盘纤板以及与其相配的盘纤板盖;
所述盘纤板引导盘放绝缘光纤复合架空相线中的光纤,并且在两侧光纤熔接接续后安放光纤接头;
所述盘纤板盖覆盖在所述盘纤板上。
3.如权利要求2所述的绝缘光纤复合架空相线的中间接头装置,其特征在于,所述接续盒体(1)还包含与其相配的接续盒盖。
4.如权利要求3所述的绝缘光纤复合架空相线的中间接头装置,其特征在于,在所述接续盒盖和盘纤板盖之间,还设置有密封垫。
5.如权利要求2所述的绝缘光纤复合架空相线的中间接头装置,其特征在于,所述固定夹具(2)包含固定设置在接续盒体(1)侧面的密封座体,在所述密封座体和接续盒体(1)的侧面上分别设置有相对应的通孔,用于穿过绝缘光纤复合架空相线中的光纤并将其引入接续盒体(1)内的盘纤板。
6.如权利要求5所述的绝缘光纤复合架空相线的中间接头装置,其特征在于,所述固定夹具(2)还包含旋紧螺母,其套设在绝缘光纤复合架空相线中的光纤上;所述旋紧螺母与所述密封座体以及接续盒体(1)侧面上的通孔相匹配,将绝缘光纤复合架空相线中的光纤旋进密封座体和接续盒体(1)。
7.如权利要求5所述的绝缘光纤复合架空相线的中间接头装置,其特征在于,所述固定夹具(2)还包含光缆固定支架,以及套设在该光缆固定支架和密封座体外部的护罩。
8.如权利要求1所述的绝缘光纤复合架空相线的中间接头装置,其特征在于,所述的绝缘光纤复合架空相线的中间接头装置还包含连接法兰(4),其设置在绝缘子(3)的另一端,通过所述连接法兰(4)将所述中间接头装置固定在安装支架上。
CN2012100952547A 2012-03-31 2012-03-31 绝缘光纤复合架空相线的中间接头装置 Pending CN102636853A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100952547A CN102636853A (zh) 2012-03-31 2012-03-31 绝缘光纤复合架空相线的中间接头装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100952547A CN102636853A (zh) 2012-03-31 2012-03-31 绝缘光纤复合架空相线的中间接头装置

Publications (1)

Publication Number Publication Date
CN102636853A true CN102636853A (zh) 2012-08-15

Family

ID=46621308

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100952547A Pending CN102636853A (zh) 2012-03-31 2012-03-31 绝缘光纤复合架空相线的中间接头装置

Country Status (1)

Country Link
CN (1) CN102636853A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108152904A (zh) * 2018-01-19 2018-06-12 国家电网公司 光纤复合架空地线绝缘接续盒
CN110488442A (zh) * 2019-09-05 2019-11-22 国网湖北省电力有限公司孝感供电公司 一种用于高压电网相线复合光缆的接续装置及方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2864718Y (zh) * 2005-12-08 2007-01-31 陈广生 光纤复合相线中间接头盒
CN201021947Y (zh) * 2007-02-14 2008-02-13 陈嘉麟 光纤复合相线中间接头盒
CN101227073A (zh) * 2007-11-05 2008-07-23 高爱荣 高压光电缆光电绝缘分路器
CN201397411Y (zh) * 2009-04-28 2010-02-03 江苏中天科技股份有限公司 光纤复合相线终端接头盒
CN202614997U (zh) * 2012-03-31 2012-12-19 上海市电力公司 绝缘光纤复合架空相线的中间接头装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2864718Y (zh) * 2005-12-08 2007-01-31 陈广生 光纤复合相线中间接头盒
CN201021947Y (zh) * 2007-02-14 2008-02-13 陈嘉麟 光纤复合相线中间接头盒
CN101227073A (zh) * 2007-11-05 2008-07-23 高爱荣 高压光电缆光电绝缘分路器
CN201397411Y (zh) * 2009-04-28 2010-02-03 江苏中天科技股份有限公司 光纤复合相线终端接头盒
CN202614997U (zh) * 2012-03-31 2012-12-19 上海市电力公司 绝缘光纤复合架空相线的中间接头装置

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108152904A (zh) * 2018-01-19 2018-06-12 国家电网公司 光纤复合架空地线绝缘接续盒
CN110488442A (zh) * 2019-09-05 2019-11-22 国网湖北省电力有限公司孝感供电公司 一种用于高压电网相线复合光缆的接续装置及方法

Similar Documents

Publication Publication Date Title
CN101174010A (zh) 光纤复合相线接头盒及其连接工艺
CN210744716U (zh) 单芯电缆接地箱
CN102636853A (zh) 绝缘光纤复合架空相线的中间接头装置
CN202614997U (zh) 绝缘光纤复合架空相线的中间接头装置
CN202614995U (zh) 绝缘光纤复合架空相线的杆用中间接头装置
CN208522093U (zh) 高性能带屏蔽网络数据线
CN102636850A (zh) 绝缘光纤复合架空相线的杆用中间接头装置
CN102565974B (zh) 地线融冰光缆绝缘接续盒
CN202676956U (zh) 一种绝缘光纤复合架空相线的终端接头装置
CN202676957U (zh) 一种绝缘光纤复合架空相线的杆用终端接头装置
CN102157239B (zh) 复合型单芯电力电缆
CN216412740U (zh) 节能型中强度铝合金导体架空绝缘电缆
CN203722193U (zh) 光电复合缆接头的密封结构
CN202614996U (zh) 绝缘光纤复合架空相线的t型余缆架
CN215118351U (zh) 预制分支电缆
CN203103897U (zh) 一种冷缩中间接头
CN202453560U (zh) 地线融冰光缆绝缘接续盒
CN104893016A (zh) 一种绝缘防水塑料
CN201122190Y (zh) 光纤复合相线接头盒
CN201107440Y (zh) 可带电操作的光纤复合相线光电隔离接续装置
CN102636851A (zh) 绝缘光纤复合架空相线的t型余缆架
CN102645713A (zh) 一种绝缘光纤复合架空相线的终端接头装置
CN102636852A (zh) 一种绝缘光纤复合架空相线的杆用终端接头装置
CN206696475U (zh) 一种绝缘光纤复合架空相线的杆用终端接头装置
CN202258497U (zh) 一种带圆环便于固定的电线

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: SHANGHAI ELECTRIC COMMUNICATION CO., LTD. ZHONGTIA

Free format text: FORMER OWNER: SHANGHAI JIULONG ELECTRIC POWER TECHNOLOGY CO., LTD. ZHONGTIAN HITACHI CABLE CO., LTD.

Effective date: 20120709

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20120709

Address after: 200002 Nanjing East Road, Shanghai, No. 181, No.

Applicant after: Shanghai Electric Power Corporation

Co-applicant after: Shanghai Electric Power Communication Co., Ltd.

Co-applicant after: Zhongtian Hitachi Fiber Optic Cable Co., Ltd.

Address before: 200002 Nanjing East Road, Shanghai, No. 181, No.

Applicant before: Shanghai Electric Power Corporation

Co-applicant before: Shanghai Jiulong Electric Power Co., Ltd.

Co-applicant before: Zhongtian Hitachi Fiber Optic Cable Co., Ltd.

ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA SHANGHAI ELECTRIC

Free format text: FORMER OWNER: SHANGHAI ELECTRIC POWER COMMUNICATION CO., LTD. ZHONGTIAN HITACHI FIBER OPTIC CABLE CO., LTD.

Effective date: 20121203

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121203

Address after: 200002 Nanjing East Road, Shanghai, No. 181, No.

Applicant after: Shanghai Electric Power Corporation

Applicant after: State Grid Corporation of China

Applicant after: Shanghai Electric Power Communication Co., Ltd.

Applicant after: Zhongtian Hitachi Fiber Optic Cable Co., Ltd.

Address before: 200002 Nanjing East Road, Shanghai, No. 181, No.

Applicant before: Shanghai Electric Power Corporation

Applicant before: Shanghai Electric Power Communication Co., Ltd.

Applicant before: Zhongtian Hitachi Fiber Optic Cable Co., Ltd.

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120815