CN102635783B - Safe energy-saving LNG (Liquefied Natural Gas) skid-mounted filling station - Google Patents

Safe energy-saving LNG (Liquefied Natural Gas) skid-mounted filling station Download PDF

Info

Publication number
CN102635783B
CN102635783B CN201210104497.2A CN201210104497A CN102635783B CN 102635783 B CN102635783 B CN 102635783B CN 201210104497 A CN201210104497 A CN 201210104497A CN 102635783 B CN102635783 B CN 102635783B
Authority
CN
China
Prior art keywords
lng
storage tank
immersed pump
valve
low temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210104497.2A
Other languages
Chinese (zh)
Other versions
CN102635783A (en
Inventor
傅斌
刘辉
王忠林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING JUCHUANG METERING EQUIPMENT CO LTD
Original Assignee
CHONGQING JUCHUANG METERING EQUIPMENT CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING JUCHUANG METERING EQUIPMENT CO LTD filed Critical CHONGQING JUCHUANG METERING EQUIPMENT CO LTD
Priority to CN201210104497.2A priority Critical patent/CN102635783B/en
Publication of CN102635783A publication Critical patent/CN102635783A/en
Application granted granted Critical
Publication of CN102635783B publication Critical patent/CN102635783B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention discloses a safe energy-saving LNG (Liquefied Natural Gas) skid-mounted filling station, which comprises an LNG technical pry, an LNG tank car and an LNG storage tank, wherein the LNG technical pry comprises an LNG low-temperature immersed pump and an LNG filling machine; a liquid outlet of the LNG tank car is connected with the LNG low-temperature immersed pump via a pipeline and a valve; a liquid outlet of the LNG low-temperature immersed pump is connected with the LNG storage tank and the LNG filling machine via a pipeline and a valve; meanwhile, a liquid outlet of the LNG storage tank is connected back to the low-temperature immersed pump via a pipeline and a valve; and a liquid outlet of the LNG filling machine is connected back to the LNG storage tank via a pipeline and a valve. The safe energy-saving LNG skid-mounted filling station has the advantages of reasonable and simple design, advanced control, low energy consumption and high safety. Meanwhile, the defect that the LNG tank car is metered by a platform scale after being unloaded can be avoided, and the unloading metering accuracy is improved.

Description

A kind of safety and energy-saving LNG skid filling station
Technical field
The present invention relates to a kind of LNG filling station, particularly relate to a kind of LNG skid filling station.
Background technique
LNG gas station is the basic premise that ensures the normal operation of LNG automobile, particularly for single fuel LNG automobile, more needs the gas station of supporting synchronized development.For accelerating the construction of gas station and the reduction cost of building a station, just wideling popularize both at home and abroad and building Mobile skid-mounted LNG gas station, it is to adopt skid-mounted integrated technology that the storage device of gas station, loading system and control system etc. are all integrated in to the integral device that forms a closed loop control on a skid base.Skid-mounted LNG gas station does not rely on that gas distributing system and source of the gas, little, the integrated degree of floor space are high, advanced technology, safe and reliable, invest little, the cycle of building a station is short, easy to operate and resettlement, maneuverability, the advantage that integrates convenience that skid moves and LNG transport and use, this gas station must not build a station separately simultaneously, can be located in existing gas station or CNG gas station, can form rapidly aerating network with less investment in the short period of time, be particularly suitable for building and promoting in city.
Because skid-mounted LNG gas station has particular/special requirement to safety and energy consumption, therefore how improving Security and reducing energy consumption becomes the technical barrier of development skid-mounted LNG gas station.
Summary of the invention
The object of the present invention is to provide a kind of safer, more energy-conservation LNG skid filling station.
Technological scheme of the present invention is as follows: a kind of safety and energy-saving LNG skid filling station, comprise LNG technique sled, LNG tank car, LNG storage tank, described LNG technique sled comprises LNG low temperature immersed pump, LNG filling device, the liquid outlet of LNG tank car is connected LNG low temperature immersed pump with valve by pipeline, the liquid outlet of LNG low temperature immersed pump is connected LNG storage tank and a LNG filling device with valve by pipeline, on a described LNG filling device, be also parallel with the 2nd LNG filling device, the liquid outlet of LNG storage tank takes back LNG low temperature immersed pump by pipeline and valve simultaneously, and the liquid outlet of two LNG filling devices takes back LNG storage tank by pipeline and valve, on two filling devices, be provided with flowmeter and control system.
In technique scheme, the liquid outlet of LNG tank car is connected LNG low temperature immersed pump with valve by pipeline, if open respective valves, LNG liquid flows into LNG low temperature immersed pump by LNG tank car; The liquid outlet of LNG low temperature immersed pump is connected LNG storage tank and LNG filling device with valve by pipeline, if open respective valves, LNG low temperature immersed pump is transported to LNG storage tank by LNG liquid after to the supercharging of LNG liquid, complete LNG liquid by LNG tank car the process of unloading to LNG storage tank; The liquid outlet of LNG storage tank takes back LNG low temperature immersed pump by pipeline and valve simultaneously, before liquid feeding, LNG liquid is by the LNG storage tank LNG low temperature immersed pump of flowing through, after the supercharging of LNG low temperature immersed pump, flow to LNG filling device, because the liquid outlet of LNG filling device takes back LNG storage tank by pipeline and valve, LNG liquid flows back to LNG storage tank through LNG filling device, form major cycle, complete the precooling to LNG filling device, after precooling fully, automatically get back to holding state; In the time that vehicle is annotated, start the filling button on LNG filling device, LNG liquid by LNG storage tank after LNG low temperature immersed pump, LNG filling device to automobile steel cylinder liquid feeding, after having annotated, get back to holding state.
If switch respective valves in the time unloading, make LNG liquid flow to two LNG filling devices by LNG tank car through LNG low temperature immersed pump, then flow back to LNG storage tank, in the time unloading, can complete the metering of unloading by the flowmeter of two LNG filling devices and control system, the drawback of having avoided LNG tank car to measure by platform scale after unloading, has improved the accuracy of metering.
Further, on the stroke of valve, be embedded with spacing feedback switch.Do not need personnel manually to control in order to reach valve safety, therefore can on the stroke of each valve, embed spacing feedback switch, whether open completely or close for detection of valve, then signal feed back is processed to upper-position unit.
Further, the gas phase mouth of LNG tank car is communicated with the gas phase pipe of LNG storage tank, and the BOG gas while unloading in LNG storage tank is filled with LNG tank car by gas phase pipe.Because the gas phase mouth of LNG tank car and the gas phase pipe of LNG storage tank are communicated with, BOG gas while unloading in LNG storage tank is filled with LNG tank car by gas phase pipe, solve on the one hand the gaseous pressure reduction that LNG tank car causes because liquid reduces, solved on the other hand the gaseous pressure rising that LNG storage tank causes because liquid increases.That is to say, unload in process whole, do not need the pressure release of LNG storage tank, the operation of can directly unloading, greatly reduces the energy waste causing while unloading.
Further again, LNG filling station comprises supercharging vaporizer, and the import of supercharging vaporizer connects respectively the liquid outlet of LNG storage tank and LNG low temperature immersed pump, and the outlet of supercharging vaporizer communicates with the inner chamber gas phase of LNG storage tank by gas phase pipe.First LNG liquid is gasified by the liquid outlet inflow supercharging vaporizer of LNG storage tank, and the gas producing after gasification is back to the gas-phase space of LNG storage tank inner chamber through the gas phase pipe of LNG storage tank, for adjusting LNG storage tank inner chamber gaseous pressure; LNG liquid also can flow into LNG low temperature immersed pump by the liquid outlet of LNG storage tank simultaneously, gasify by flowing into supercharging vaporizer after the supercharging of LNG low temperature immersed pump, the gas producing after gasification is back to LNG storage tank inner chamber through the gas phase pipe of LNG storage tank, adjusts the gaseous pressure of LNG storage tank inner chamber.That is to say, the present invention supports from supercharging pressure regulation and two kinds of modes of immersed pump pressure regulation, break down or in when maintenance, can be that the supercharging of LNG storage tank realizes filled function by supercharging vaporizer at LNG low temperature immersed pump, the normal business of filling station when the equipment that ensured breaks down or overhauls.
In sum, remarkable result of the present invention is: (1) is reasonable in design, simple, controls advanced, safe; (2) drawback of avoiding LNG tank car to measure by platform scale after unloading, has improved the metering accuracy of unloading; (3) unload in process and do not need, to the pressure release of LNG storage tank, to greatly reduce energy consumption; (4) support from supercharging and two kinds of voltage regulating modes of immersed pump, break down or in when maintenance, can be that the supercharging of LNG storage tank realizes filled function by supercharging vaporizer at LNG low temperature immersed pump, improved the reliability of LNG skid filling station.
Brief description of the drawings
Fig. 1 is the principle schematic of LNG skid filling station.
Embodiment
Below in conjunction with concrete drawings and embodiments, the present invention is further illustrated.
Referring to Fig. 1, a kind of safety and energy-saving LNG skid filling station, comprise LNG technique sled, LNG tank car 1, LNG storage tank 2, LNG technique sled comprises LNG low temperature immersed pump 3, LNG filling device, the liquid outlet of LNG tank car 1 is connected LNG low temperature immersed pump 3 with valve by pipeline, the liquid outlet of LNG low temperature immersed pump 3 is connected LNG storage tank 2 and LNG filling device with valve by pipeline, the liquid outlet of LNG storage tank 2 takes back LNG low temperature immersed pump 3 by pipeline and valve simultaneously, and the liquid outlet of LNG filling device takes back LNG storage tank 2 by pipeline and valve.
In the present embodiment, open pneumatic valve VQD101, LNG liquid flows into LNG low temperature immersed pump 3 by LNG tank car 1, open stop valve VJ114 and VQD103, LNG low temperature immersed pump 3 is transported to LNG storage tank 2 by LNG liquid after to the supercharging of LNG liquid, in the time that LNG storage tank 2 liquid reach 80%, sends level alarm, automatically close LNG low temperature immersed pump 3 and pneumatic valve VQD103, complete the process of unloading of LNG liquid by LNG tank car 1 to LNG storage tank 2.If in the time that LNG tank car arrives, in unloading deck connecting hose, open pneumatic valve VQD103, LNG liquid is by the pneumatic valve VQD101 LNG low temperature immersed pump 3 of flowing through, if now close stop valve VJ114, open stop valve VJ109, VJ110, VJ111, VJ112, VJ113, LNG liquid flows to LNG filling device 4a by stop valve VJ111 after 3 superchargings of LNG low temperature immersed pump, flow to LNG filling device 4b by stop valve VJ113, then LNG liquid flows to stop valve VJ109 by stop valve VJ110 and stop valve VJ112 respectively, flow back to LNG storage tank 2 by pneumatic valve VQD103 again, realize the unload function of metering of the flowmeter of LNG liquid by LNG filling device and control system, the drawback of having avoided LNG tank car to measure by platform scale after unloading, improve the accuracy of metering.
Under normal circumstances, close pneumatic valve VQD101, VQD102, VQD103, open pneumatic valve VQD104 and stop valve VJ108, LNG liquid flows to LNG low temperature immersed pump 3 by LNG storage tank 2, LNG low temperature immersed pump 3 is to the supercharging of LNG liquid, then by stop valve VJ111, the VJ113 LNG filling device of flowing through, in the time there is no vehicle filling, LNG liquid is by stop valve VJ110, VJ112 flows back to LNG storage tank, form major cycle, complete the precooling to LNG filling device, after precooling fully, filling device is got back to holding state automatically, in the time that vehicle is annotated, directly start the filling button on LNG filling device, LNG filling device starts automobile steel cylinder liquid feeding, after completing, liquid feeding gets back to holding state.
In the present embodiment, the gas phase mouth of LNG tank car 1 is communicated with the gas phase pipe 10 of LNG storage tank 2, and the BOG gas while unloading in LNG storage tank 2 is filled with LNG tank car 1 by gas phase pipe 10.Because the gas phase mouth of LNG tank car 1 and the gas phase pipe 10 of LNG storage tank 2 are communicated with, BOG gas while unloading in LNG storage tank 2 is filled with LNG tank car 1 by gas phase pipe 10, solve on the one hand the gaseous pressure reduction that LNG tank car 1 causes because liquid reduces, solved on the other hand the gaseous pressure rising that LNG storage tank 2 causes because liquid increases.That is to say, unload in process whole, do not need 2 pressure releases of LNG storage tank, the operation of can directly unloading, has not only improved the efficiency of unloading, and greatly reduces the energy waste causing while unloading.
LNG skid filling station of the present invention also comprises supercharging vaporizer 5, and the import of supercharging vaporizer 5 connects respectively the liquid outlet of LNG storage tank 2 and LNG low temperature immersed pump 3, and the outlet of supercharging vaporizer 5 communicates with the inner chamber gas phase of LNG storage tank 2 by gas phase pipe 10.When LNG storage tank 2 is in negative pressure or when continuously fluid is slower after liquid feeding, can open pneumatic valve VQD102, VQD104, VQD105, LNG liquid relies on potential difference stream to flow into supercharging vaporizer 5, supercharging vaporizer 5 carries out supercharging to LNG storage tank 2 after LNG liquid gasification is heated up, in the time that LNG storage tank inner chamber gaseous pressure is greater than setting value, automatically close pneumatic valve VQD102; LNG liquid also can flow into LNG low temperature immersed pump 3 by VQD104 and stop valve VJ108 simultaneously, LNG low temperature immersed pump 3 flows into supercharging vaporizer 5 by stop valve VJ107 after to the supercharging of LNG liquid, supercharging vaporizer 5 flows back to LNG storage tank 2 inner chambers by pneumatic valve VQD105 after LNG liquid gasification is heated up, and increases LNG storage tank inner chamber gaseous pressure.
That is to say, the present invention supports two kinds of voltage regulating modes, breaks down or in when maintenance, can be directly that the 2 superchargings realizations of LNG storage tank are annotated by supercharging vaporizer 5, the normal business of filling station when the equipment that ensured breaks down or overhauls at LNG low temperature immersed pump 3.
The foregoing is only preferred embodiment of the present invention, in order to limit the present invention, within the spirit and principles in the present invention not all, any amendment of doing, be equal to replacement, improvement etc., within all should being included in protection scope of the present invention.

Claims (4)

1. a safety and energy-saving LNG skid filling station, comprise LNG technique sled, LNG tank car, LNG storage tank, it is characterized in that: described LNG technique sled comprises LNG low temperature immersed pump, LNG filling device, the liquid outlet of LNG tank car is connected LNG low temperature immersed pump with valve by pipeline, the liquid outlet of LNG low temperature immersed pump is connected LNG storage tank and a LNG filling device with valve by pipeline, on a described LNG filling device, be also parallel with the 2nd LNG filling device, the liquid outlet of LNG storage tank takes back LNG low temperature immersed pump by pipeline and valve simultaneously, and the liquid outlet of two LNG filling devices takes back LNG storage tank by pipeline and valve, on two filling devices, be provided with flowmeter and control system, while unloading, switch respective valves, make LNG liquid flow to two LNG filling devices by LNG tank car through LNG low temperature immersed pump, then flow back to LNG storage tank, in the time unloading, can complete the metering of unloading by the flowmeter of two LNG filling devices and control system, the drawback of avoiding LNG tank car to measure by platform scale after unloading.
2. safety and energy-saving LNG skid filling station according to claim 1, is characterized in that: on the stroke of described valve, be embedded with spacing feedback switch.
3. safety and energy-saving LNG skid filling station according to claim 1, is characterized in that: the gas phase mouth of described LNG tank car is communicated with the gas phase pipe of LNG storage tank, and the BOG gas while unloading in LNG storage tank is filled with LNG tank car by gas phase pipe.
4. safety and energy-saving LNG skid filling station according to claim 1, it is characterized in that: also comprise supercharging vaporizer, the import of supercharging vaporizer connects respectively the liquid outlet of LNG storage tank and LNG low temperature immersed pump, and the outlet of supercharging vaporizer communicates with the inner chamber gas phase of LNG storage tank by gas phase pipe.
CN201210104497.2A 2012-04-11 2012-04-11 Safe energy-saving LNG (Liquefied Natural Gas) skid-mounted filling station Active CN102635783B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210104497.2A CN102635783B (en) 2012-04-11 2012-04-11 Safe energy-saving LNG (Liquefied Natural Gas) skid-mounted filling station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210104497.2A CN102635783B (en) 2012-04-11 2012-04-11 Safe energy-saving LNG (Liquefied Natural Gas) skid-mounted filling station

Publications (2)

Publication Number Publication Date
CN102635783A CN102635783A (en) 2012-08-15
CN102635783B true CN102635783B (en) 2014-10-08

Family

ID=46620294

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210104497.2A Active CN102635783B (en) 2012-04-11 2012-04-11 Safe energy-saving LNG (Liquefied Natural Gas) skid-mounted filling station

Country Status (1)

Country Link
CN (1) CN102635783B (en)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103032674B (en) * 2012-12-27 2015-04-01 青岛捷能高新技术有限责任公司 Free-lifting skid-mounted LNG filling station
CN103292152B (en) * 2013-05-16 2014-12-17 沈军 Integral LNG (liquefied natural gas) filling station
CN104514980B (en) * 2013-09-29 2017-05-24 宁波绿源液化天然气发展有限公司 Liquefied natural gas unloading booster skid
CN104006289B (en) * 2013-10-09 2015-12-23 山东宏达科技集团有限公司 Skidization fully integrated LNG and LCNG telemonitoring unmanned filling station
CN104390127B (en) * 2014-09-24 2016-04-13 中国石油集团渤海石油装备制造有限公司 A kind of filling technique of LNG skid filling station
CN104633440A (en) * 2015-01-30 2015-05-20 沈军 LNG refueling station composed of one pump band and multiple gas dispersers
CN104747903B (en) * 2015-04-09 2017-01-11 普力恒升(北京)深冷设备有限公司 Air entrapping method and air entrapping device of LNG (Liquefied Natural Gas) station
CN107065764B (en) * 2017-06-20 2023-09-22 成都华气厚普机电设备股份有限公司 Intelligent control system and control method for LNG (liquefied Natural gas) station
CN107940231A (en) * 2017-12-22 2018-04-20 北京石油化工学院 A kind of low cold damage running gear of liquefied natural gas filling station
CN108361547B (en) * 2018-02-02 2023-12-15 重庆耐德能源装备集成有限公司 Novel LNG (liquefied Natural gas) filling station and working method thereof
CN108426166A (en) * 2018-05-15 2018-08-21 张家港艾普能源装备有限公司 Automatic Regulation LNG liquid addition system
CN109707999B (en) * 2019-01-31 2023-10-31 陕西融科低温设备有限公司 Multi-arm intelligent ultralow-temperature liquid unloading device and unloading process
CN109654371B (en) * 2019-01-31 2023-06-16 陕西融科低温设备有限公司 Intelligent ultralow-temperature liquid unloading device and unloading process
CN110332459B (en) * 2019-07-31 2024-02-06 新地能源工程技术有限公司 Automatic filling device and method for ultralow-temperature liquid
CN111365610B (en) * 2020-04-01 2024-04-26 江苏国富氢能技术装备股份有限公司 Discharging pressure regulating system applied to hydrogen storage type hydrogenation station
CN112963730B (en) * 2021-03-25 2022-09-30 厚普清洁能源(集团)股份有限公司 Pressure-stabilizing constant-flow control system and method for LNG multi-immersed pump marine filling sledge

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102200220A (en) * 2011-04-22 2011-09-28 张家港富瑞特种装备股份有限公司 Liquefied natural gas (LNG) filling station and gas filling method of LNG
CN102207244A (en) * 2011-05-13 2011-10-05 天津华迈燃气装备股份有限公司 Skid-mounted-type liquefied natural gas filling device for automobiles
CN102230569A (en) * 2011-04-29 2011-11-02 张家港富瑞特种装备股份有限公司 Liquefied natural gas storage system, gas filling device and gas supply device for engine
CN202056514U (en) * 2011-05-20 2011-11-30 成都深冷科技有限公司 Liquefied natural gas (LNG) filling station with multifunctional air temperature type heating device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003232498A (en) * 2002-02-12 2003-08-22 Tokyo Gas Co Ltd Vent gas treating method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102200220A (en) * 2011-04-22 2011-09-28 张家港富瑞特种装备股份有限公司 Liquefied natural gas (LNG) filling station and gas filling method of LNG
CN102230569A (en) * 2011-04-29 2011-11-02 张家港富瑞特种装备股份有限公司 Liquefied natural gas storage system, gas filling device and gas supply device for engine
CN102207244A (en) * 2011-05-13 2011-10-05 天津华迈燃气装备股份有限公司 Skid-mounted-type liquefied natural gas filling device for automobiles
CN202056514U (en) * 2011-05-20 2011-11-30 成都深冷科技有限公司 Liquefied natural gas (LNG) filling station with multifunctional air temperature type heating device

Also Published As

Publication number Publication date
CN102635783A (en) 2012-08-15

Similar Documents

Publication Publication Date Title
CN102635783B (en) Safe energy-saving LNG (Liquefied Natural Gas) skid-mounted filling station
CN101520128B (en) Movable type method and device for supplying liquid phase natural gas and gas phase natural gas
CN203082530U (en) L-CNG (liquefied-compressed natural gas) station
CN201057357Y (en) Mobile liquefied natural gas gasifying and supplying plant
CN101813237B (en) Hydraulic CNG (Compressed Natural Gas) gas filling substation and pipeline system, control system and control method thereof
CN201184495Y (en) Combined natural gas dispensing system charging CNG and LNG for natural gas automobile
CN206386680U (en) From the LNG fluid reservoir control pressure systems of supercharging
CN102537659B (en) Self-supercharging LNG (liquefied natural gas) movable filling device and filling method thereof
CN102230569B (en) Liquefied natural gas storage system, and gas filling device
CN203363653U (en) Unpowered skid-mounted liquefied natural gas filling device
CN206478448U (en) A kind of hydrogen supply system
CN204534105U (en) A kind of carbon dioxide fills reflux
CN204647843U (en) LNGV (liquefied natural gas vehicle) liquid-adding device
CN104165266B (en) A kind of pressure reduction formula liquefied natural gas filling station adds injection system and method thereof
WO2019227328A1 (en) Household alcohol-based fuel supply system
CN204114557U (en) The LNG filling machine control system improved
CN204387673U (en) LNG skid gas station
CN206247018U (en) LNG gasification air supply system
CN105927846B (en) LNG field station loading and unloading integrated system and loading and unloading method using same
CN205173973U (en) Air can not have pump filling system by low temperature liquefied gas
CN205191228U (en) Device for preventing LNG sample gasifies in advance
CN218119395U (en) Natural gas hydrogen-doped gas station system
CN102095071A (en) Method and device for supplying multifunctional mobile liquid-phase natural gas and gas-phase natural gas
CN206669338U (en) Hydrogen conveyor
CN103411129A (en) Method for implementing self-pressurization of unpowered power supply at LNG (liquefied natural gas) skid-mounted station

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: 401329 Chongqing Jiulongpo Baishiyi town Hailong Village 8

Applicant after: Chongqing Juchuang Metering Equipment Co.,Ltd.

Address before: 401120, No. 9, Yubei District Airport Industrial Park, Chongqing

Applicant before: Chongqing Juchuang Metering Equipment Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant