CN102635360A - Freezing pipe pulling method in reinforcing process of freezing-method shield end head - Google Patents

Freezing pipe pulling method in reinforcing process of freezing-method shield end head Download PDF

Info

Publication number
CN102635360A
CN102635360A CN2012101197982A CN201210119798A CN102635360A CN 102635360 A CN102635360 A CN 102635360A CN 2012101197982 A CN2012101197982 A CN 2012101197982A CN 201210119798 A CN201210119798 A CN 201210119798A CN 102635360 A CN102635360 A CN 102635360A
Authority
CN
China
Prior art keywords
freezing
freezing pipe
linkage section
end head
shield end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101197982A
Other languages
Chinese (zh)
Inventor
辛振省
张俊兵
徐建中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN2012101197982A priority Critical patent/CN102635360A/en
Publication of CN102635360A publication Critical patent/CN102635360A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention belongs to the technical field of construction of carrying out tunnel construction freezing to reinforce a ground layer and particularly provides a freezing pipe pulling method in a reinforcing process of a freezing-method shield end head. The invention aims to conveniently and rapidly pull out a freezing pipe on the premise that the reinforcing effect of the ground layer is not basically weakened. The method comprises the following steps of: reinforcing and freezing the shield end head and circularly thawing by salt water; fixing and clamping the end head of the freezing pipe by utilizing a pincers clamping plate; symmetrically arranging a plurality of jacks between the pincer clamping plate and a freezing soil layer and relative to the axis center of the freezing pipe, wherein the quantity of the jacks is more than or equal to two; synchronously jacking each jack and granularly and outwardly pulling out the freezing pipe until the whole freezing pipe is wholly pulled out. The freezing pipe pulling method has the beneficial effects that the heat circulation time is effectively reduced, the freezing quality is guaranteed and the use is convenient and fast; auxiliary works such as repeated overlapping of a scaffold are avoided, the requirement of a work space is small and the adaptability is strong, so that the freezing pipe pulling method is convenient to apply and popularize in a large area, and the economic benefits and the social benefits are very obvious.

Description

Freezing pipe plays draw out method in the freezing process shield end reinforcing process
Technical field
The invention belongs to the technical field of constructing tunnel consolidation by freezing stratum construction, be specifically related to that freezing pipe plays draw out method in a kind of freezing process shield end reinforcing process.
Background technology
The removal method of freezing pipe mainly contained after the construction of existing constructing tunnel consolidation by freezing stratum was accomplished:
The method of
Figure 2012101197982100002DEST_PATH_IMAGE001
long-time thermal cycle.This is the method that a kind of freezing pipe at present commonly used is pulled out, that is, frozen construction utilizes hot salt brine in frigo, to circulate after accomplishing, frozen soil around the freezing pipe is fully melted after, the beginning tube drawing.The main drawback of this method is just can tube drawing after the soil layer that freezed around the freezing pipe needs to melt fully in actual mechanical process; Frozen Soil melting layer scope is big like this; Thawing time is long; And heat to melt the time long, will the large tracts of land dissipate heat, make the consolidation by freezing effect of soil layer reduce greatly.Guaranteed not consolidation effect when causing the great amount of cost waste.Cause great potential safety hazard for follow-up construction.
Figure 273739DEST_PATH_IMAGE002
cripple formula.This also is one of method of pulling out of present freezing pipe, after promptly freezing to accomplish, is the freezing efficiency that guarantees the soil body; Avoiding long-time heat to melt causes soil body freezing strength to descend; Slight heat circulates, is used in the freezing pipe periphery that need pull out at once and sets up scaffold, utilizes electric arc furnaces to pull out.Though this job practices can reduce to a certain extent the heat of freezing pipe is melted influence; But need set up scaffold before pulling out freezing pipe; So original heat is melted and is weakened, and adds that the air negative pressure effect causes freezing pipe to be difficult to pull out, and many times need repeat to set up scaffold at the construction field (site); Operation is loaded down with trivial details, and effect is very undesirable.
Summary of the invention
Goal of the invention of the present invention: under the prerequisite of the consolidation effect that does not weaken the stratum basically, pull out freezing pipe quickly and easily, when guaranteeing consolidation effect and workmanship, make convenient and quick construction safety.
The present invention adopts following technical scheme to realize:
Freezing pipe plays draw out method in a kind of freezing process shield end reinforcing process, it is characterized in that step is following: after shield end is reinforced and freezed to accomplish, carry out the salt solution circulation earlier and thawed 5 ~ 10 minutes; Utilize the clamp plate to fix stuck freezing pipe termination then; The clamp plate and freeze between the soil layer and relatively the freezing pipe axle center be symmetrical set some jack, the quantity of jack is more than or equal to two, each jack rises the top synchronously; Progressively outwards extract freezing pipe, all extracted until whole freezing pipe; Described clamp plate comprises the raising plate of two symmetries; The inboard of two raising plates comprises linkage section I, arc gripping section and the linkage section II that links to each other successively; The upper and lower convexity that all is provided with of linkage section I, arc gripping section and the relative raising plate of linkage section II, the linkage section I of two raising plates is connected through hold-down bolt respectively with the linkage section II.
The present invention has following beneficial effect: effectively reduced the thermal cycle time, the heat time of melting reduced to 5 ~ 10 minutes by original 20 ~ 30 minutes, when having improved operating efficiency; Quality is freezed in assurance, has prevented that effectively heat from spreading in freezing body, has effectively guaranteed to freeze the quality of body; The present invention simultaneously is convenient to use, avoids repeating to set up less important works such as scaffold, and working space requires little; Compliance is strong; High efficiency, the side is all over large-area applications and popularization, and economic benefit and social benefit are fairly obvious.
Description of drawings
Fig. 1 is a floor map of the present invention
Fig. 2 is vertical tube drawing operation elevation
The horizontal tube drawing operation of Fig. 3 elevation
Among the figure: the 1-freezing pipe, the 2-jack, the 3-raising plate, the 4-hold-down bolt, 5-linkage section I, 6-arc gripping section, 7-linkage section II, 8-freezes soil layer.
The specific embodiment
Freezing pipe plays draw out method in the freezing process shield end reinforcing process; Step is following: after freezing to accomplish, carry out the salt solution circulation earlier and thawed 5 ~ 10 minutes, utilize the clamp plate to fix stuck freezing pipe 1 termination then; The clamp plate and freeze between the soil layer 8 and relatively the axle center of freezing pipe 1 be symmetrical set some jack 2; Each jack rises the top synchronously, progressively outwards extracts freezing pipe, is all extracted until whole freezing pipe; Described clamp plate comprises the raising plate 3 of two symmetries; The inboard of two raising plates 3 comprises linkage section I 5, arc gripping section 6 and the linkage section II 7 that links to each other successively; The upper and lower convexity that all is provided with of linkage section I 5, arc gripping section 6 and linkage section II 7 relative raising plates 3, the linkage section I of two raising plates and linkage section II connect 4 through hold-down bolt respectively and connect.Pulling out the elevation of vertical and horizontal frozen pipe distinguishes as shown in Figures 2 and 3.

Claims (1)

1. freezing pipe plays draw out method in the freezing process shield end reinforcing process; It is characterized in that step is following: after shield end is reinforced and freezed to accomplish; Carry out salt solution circulation earlier and thawed 5 ~ 10 minutes, utilize the clamp plate fix stuck freezing pipe (1) termination then, at the clamp plate with freeze between the soil layer (8) and the axle center of relative freezing pipe (1) is symmetrical set some jack (2); The quantity of jack is more than or equal to two; Each jack rises the top synchronously, progressively outwards extracts freezing pipe, is all extracted until whole freezing pipe; Described clamp plate comprises the raising plate (3) of two symmetries; The inboard of two raising plates (3) comprises linkage section I (5), arc gripping section (6) and the linkage section II (7) that links to each other successively; Linkage section I (5), arc gripping section (6) and linkage section II (7) be the upper and lower convexity that all is provided with of raising plate (3) relatively, and the linkage section I of two raising plates is connected through hold-down bolt (4) respectively with the linkage section II.
CN2012101197982A 2012-04-23 2012-04-23 Freezing pipe pulling method in reinforcing process of freezing-method shield end head Pending CN102635360A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101197982A CN102635360A (en) 2012-04-23 2012-04-23 Freezing pipe pulling method in reinforcing process of freezing-method shield end head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101197982A CN102635360A (en) 2012-04-23 2012-04-23 Freezing pipe pulling method in reinforcing process of freezing-method shield end head

Publications (1)

Publication Number Publication Date
CN102635360A true CN102635360A (en) 2012-08-15

Family

ID=46619921

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101197982A Pending CN102635360A (en) 2012-04-23 2012-04-23 Freezing pipe pulling method in reinforcing process of freezing-method shield end head

Country Status (1)

Country Link
CN (1) CN102635360A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790961A (en) * 2015-04-27 2015-07-22 海南大学 Vertical cup type freezing reinforcement structure and method at shield tunnel end
CN113123794A (en) * 2021-03-29 2021-07-16 北京中煤矿山工程有限公司 Horizontal freezing pipe drawing device
CN113373900A (en) * 2021-04-23 2021-09-10 林树良 Intelligent pulling device for freezing pipe in foundation pit reinforcing construction
CN113753791A (en) * 2021-09-18 2021-12-07 广东韶钢松山股份有限公司 Special tool and method for replacing and sealing energy accumulator joint

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58143017A (en) * 1982-02-17 1983-08-25 Takechi Koumushiyo:Kk Pressing and drawing device for steel pipe
CN2285322Y (en) * 1997-03-12 1998-07-01 熊湘哲 Top pressing type machine for drawing out joint pipe
JP3460147B2 (en) * 2000-09-07 2003-10-27 シンコー株式会社 Method and apparatus for pulling out foundation pile
CN101418568A (en) * 2007-10-22 2009-04-29 上海隧道工程股份有限公司 Construction method for thrusting diaphragm wall locking pipe
KR101062539B1 (en) * 2010-02-03 2011-09-06 엄광수 Steel pipe pile drawing machine
CN202081845U (en) * 2011-06-08 2011-12-21 成都四海岩土工程有限公司 Assembled hydraulic tube drawing bench

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58143017A (en) * 1982-02-17 1983-08-25 Takechi Koumushiyo:Kk Pressing and drawing device for steel pipe
CN2285322Y (en) * 1997-03-12 1998-07-01 熊湘哲 Top pressing type machine for drawing out joint pipe
JP3460147B2 (en) * 2000-09-07 2003-10-27 シンコー株式会社 Method and apparatus for pulling out foundation pile
CN101418568A (en) * 2007-10-22 2009-04-29 上海隧道工程股份有限公司 Construction method for thrusting diaphragm wall locking pipe
KR101062539B1 (en) * 2010-02-03 2011-09-06 엄광수 Steel pipe pile drawing machine
CN202081845U (en) * 2011-06-08 2011-12-21 成都四海岩土工程有限公司 Assembled hydraulic tube drawing bench

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王江涛等: "《南水北调中线穿黄工程泥水盾构施工技术》", 30 June 2010 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790961A (en) * 2015-04-27 2015-07-22 海南大学 Vertical cup type freezing reinforcement structure and method at shield tunnel end
CN113123794A (en) * 2021-03-29 2021-07-16 北京中煤矿山工程有限公司 Horizontal freezing pipe drawing device
CN113123794B (en) * 2021-03-29 2022-08-05 北京中煤矿山工程有限公司 Horizontal freezing pipe drawing device
CN113373900A (en) * 2021-04-23 2021-09-10 林树良 Intelligent pulling device for freezing pipe in foundation pit reinforcing construction
CN113753791A (en) * 2021-09-18 2021-12-07 广东韶钢松山股份有限公司 Special tool and method for replacing and sealing energy accumulator joint

Similar Documents

Publication Publication Date Title
CN102635360A (en) Freezing pipe pulling method in reinforcing process of freezing-method shield end head
CN202658606U (en) Freezing pipe removing device
CN202380803U (en) Derrick auxiliary tool
CN104404950A (en) Construction method for steel bar isolated dust-free oriented self-breaking pile head
CN103278394B (en) Comprehensive test device for joint sealing and hydraulic circulating of pipe body
CN205990920U (en) A kind of tunnel inverted arch self-propelled trestle
CN202132071U (en) Filling and sealing mould for roadway slope expansion for pillarless mining for fully mechanized sublevel caving face
CN204163400U (en) Subway station variable cross section tie template
CN105332376B (en) Hydraulic mechanical hand-lifting stake clamping device and pile-drawing machine
CN203826743U (en) 10kV earthing drill rod pulling device
CN105525612A (en) High-efficiency tubular pile connector
CN202560241U (en) Molding shield tunnel top duct sheet dismantling device
CN102943615A (en) Horizontal-buckling support insulating ladder
CN203967264U (en) A kind of portable dedicated earthing device
CN203655316U (en) Top isolating device for coal mine filling bracket
CN206737541U (en) Bit platform is entered in a kind of angle steel tower high-altitude
CN202280477U (en) Automatic pulling and shifting device of scraper conveyor for thin coal layer
CN104879166B (en) A kind of high-seam working face step is from pick return channel method
CN203891906U (en) Temporary support device for open-off cut tunneling of fully mechanized mining face of steep coal seam
CN204144645U (en) Earth rod extracting apparatus
CN202585763U (en) Spiral ground rod
CN207863968U (en) A kind of mobile platform in shield section
CN209687516U (en) A kind of rapidly solidified device of Stope roof country rock
CN202790928U (en) Adjustable cable support
CN203161459U (en) Fixing device used for fixing wind power generator tower barrel with platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120815