CN102635040B - 下穿既有铁路施工时减小轨道施工沉降的方法 - Google Patents

下穿既有铁路施工时减小轨道施工沉降的方法 Download PDF

Info

Publication number
CN102635040B
CN102635040B CN201210119787.4A CN201210119787A CN102635040B CN 102635040 B CN102635040 B CN 102635040B CN 201210119787 A CN201210119787 A CN 201210119787A CN 102635040 B CN102635040 B CN 102635040B
Authority
CN
China
Prior art keywords
railway
construction
distribution beam
lumps
wood
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210119787.4A
Other languages
English (en)
Other versions
CN102635040A (zh
Inventor
辛振省
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
China Railway Group Ltd CREC
Original Assignee
China Railway No 3 Engineering Group Co Ltd
China Railway Group Ltd CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd, China Railway Group Ltd CREC filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN201210119787.4A priority Critical patent/CN102635040B/zh
Publication of CN102635040A publication Critical patent/CN102635040A/zh
Application granted granted Critical
Publication of CN102635040B publication Critical patent/CN102635040B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明属于隧道下穿既有铁路施工的技术领域,具体是一种下穿既有铁路施工时减小轨道施工沉降的方法,解决了现有减小既有运营轨道的施工沉降和扰动的方法存在的缺陷。其步骤如下:在既有营运铁路线的两轨枕之间清理道砟形成方形槽,在方形槽内放入方木于轨道下方,用垫块填充轨道与方木之间的空隙,在轨道两侧和中间分别放置一根刚性分配梁,将方形分配梁与方木固定。本发明的如下有益效果:利用刚性分配梁系统,把列车荷载有效分配,大大减少应力集中程度和对施工扰动的敏感程度,同时大大减少了轨道的沉降,有效保证了列车的正常通行,同时物理加固方法代替注浆加固方法,不仅减沉效果明显提升,而且大大节约施工成本,同时有效节约工期。

Description

下穿既有铁路施工时减小轨道施工沉降的方法
技术领域
本发明属于隧道下穿既有铁路施工的技术领域,具体涉及一种下穿既有铁路施工时减小轨道施工沉降的方法。
背景技术
现有的减小既有运营轨道的施工沉降和扰动的方法为:化学注浆加固地层法,即提前对既有铁路路基地层及下方一定范围内的地层进行提前注浆加固,提高土体参数,以此减小隧道等建筑物下穿或者临近线路施工过程中带来的施工沉降和扰动。但是注浆加固方法有诸多缺点:首先,注浆加固施工本身就会对既有路基产生扰动沉降,特别是黄土地区,黄土的湿陷性十分明显,注浆施工本身就会产生较大沉降,限制了注浆加固方法;其次,大面积注浆加固会给后续施工带来较多困难,土体参数大面积提高,开挖困难,在不允许采用爆破施工的条件下,施工进度缓慢,掘进施工困难。
发明内容
本发明的发明目的:为了解决现有的减小既有运营轨道的施工沉降和扰动的方法存在上述的缺陷,用简便的物理方法有效减小下方隧道施工对营运铁路的沉降和扰动,保证加固效果和工程质量的同时,使得施工作业安全、方便、快捷。
本发明采用如下的技术方案实现:
一种下穿既有铁路施工时减小轨道施工沉降的方法,其特征在于步骤如下:
1)、在既有营运铁路线的两轨枕之间清理道砟形成方形槽;
2)、在方形槽内放入方木于轨道下方,在方木上套上六个U形双头螺丝,并将U形双头螺丝两两调整到方木上对应预放置刚性分配梁的位置的两侧,并用垫块填充轨道与方木之间的空隙,保证轨道的受力能及时传给方木;
3)、在轨道两侧和中间分别放置一根刚性分配梁,然后将每根刚性分配梁两侧已经预设的U形双头螺丝通过两块勒紧钢带连接、并用螺母锁紧,然后在刚性分配梁上拧入将刚性分配梁和方木压紧的压紧螺丝。
本发明具有如下有益效果:利用刚性分配梁系统,把列车荷载有效分配,大大减少应力集中程度和对施工扰动的敏感程度,同时大大减少了轨道的沉降,有效保证了列车的正常通行,同时物理加固方法代替注浆加固方法,不仅减沉效果明显提升,而且大大节约施工成本,同时有效节约工期。本发明简便易操作,适应行强,工作效率高,方遍大面积应用和推广,经济效益和社会效益十分明显,在越来越多的下穿营运铁路施工工况极具推广价值。
附图说明
图1为既有铁路线的示意图,
图2为在两轨枕之间清理出方形槽的示意图,
图3为在方木与轨道之间的空隙塞入垫块的示意图,
图4为刚性分配梁系统的示意图,
图5为完成轨道加固的示意图,
图中:1-轨道,2-道砟,3-轨枕,4-方形槽,5-方木,6-垫块,7-刚性分配梁,8-U形双头螺丝,9-勒紧钢带,10-压紧螺丝。
具体实施方式
    结合附图对本发明的结构示意图作进一步说明。
下穿既有铁路施工时减小轨道施工沉降的方法,其特征在于步骤如下:
1)、在既有营运铁路线(如图1所示)的两轨枕3之间清理道砟形成方形槽4,方形槽的尺寸配合方木的尺寸设置,如图2所示;
2)、在方形槽4内放入方木5于轨道1下方,在方木5上套上六个U形双头螺丝8,并将U形双头螺丝8两两调整到方木5上对应预放置刚性分配梁7的位置的两侧,并用垫块6填充轨道1与方木5之间的空隙,保证轨道的受力能及时传给方木;
3)、如图4、图5所示,在轨道1两侧和中间分别放置一根刚性分配梁7,然后将每根刚性分配梁7两侧已经预设的U形双头螺丝8通过两块勒紧钢带9连接、并用螺母锁紧,然后在刚性分配梁7上拧入将刚性分配梁7和方木5压紧的压紧螺丝10。

Claims (1)

1.一种下穿既有铁路施工时减小轨道施工沉降的方法,其特征在于步骤如下:
1)、在既有营运铁路线的两轨枕(3)之间清理道砟形成方形槽(4);
2)、在方形槽(4)内放入方木(5)于轨道(1)下方,在方木(5)上套上六个U形双头螺丝(8),并将U形双头螺丝(8)两两调整到方木(5)上对应预放置刚性分配梁(7)的位置的两侧,并用垫块(6)填充轨道(1)与方木(5)之间的空隙;
3)、在轨道(1)两侧和中间分别放置一根刚性分配梁(7),然后将每根刚性分配梁(7)两侧已经预设的U形双头螺丝(8)通过两块勒紧钢带(9)连接、并用螺母锁紧,然后在刚性分配梁(7)上拧入将刚性分配梁(7)和方木(5)压紧的压紧螺丝(10)。
CN201210119787.4A 2012-04-23 2012-04-23 下穿既有铁路施工时减小轨道施工沉降的方法 Active CN102635040B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210119787.4A CN102635040B (zh) 2012-04-23 2012-04-23 下穿既有铁路施工时减小轨道施工沉降的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210119787.4A CN102635040B (zh) 2012-04-23 2012-04-23 下穿既有铁路施工时减小轨道施工沉降的方法

Publications (2)

Publication Number Publication Date
CN102635040A CN102635040A (zh) 2012-08-15
CN102635040B true CN102635040B (zh) 2014-04-30

Family

ID=46619607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210119787.4A Active CN102635040B (zh) 2012-04-23 2012-04-23 下穿既有铁路施工时减小轨道施工沉降的方法

Country Status (1)

Country Link
CN (1) CN102635040B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105089698A (zh) * 2014-05-13 2015-11-25 中国铁道科学研究院城市轨道交通中心 一种地铁隧道下穿既有铁路的沉降控制方法
CN107338712A (zh) * 2016-12-29 2017-11-10 沧州渤海新区辰禾工程有限公司 一种路基修建用标柱及路基修建方法
CN110616602B (zh) * 2019-09-17 2021-09-28 西安建筑科技大学 一种顶管下穿既有运营铁路施工的沉降控制装置及方法

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100709099B1 (ko) * 2005-12-27 2007-04-19 한국철도기술연구원 아스팔트계 충전형 포장궤도의 시공방법과 구조
CN101725357B (zh) * 2008-10-23 2011-11-02 上海天演建筑物移位工程有限公司 地铁隧道下穿段施工方法
CN102287195B (zh) * 2011-05-13 2014-09-17 中铁四局集团第二工程有限公司 浅埋暗挖大跨度隧道下穿既有高速铁路施工方法

Also Published As

Publication number Publication date
CN102635040A (zh) 2012-08-15

Similar Documents

Publication Publication Date Title
CN106988758B (zh) 一种用于穿越大型竖向溶洞群隧道施工方法
CN203130108U (zh) 加强型隧道初期支护结构
CN102242633A (zh) 一种超大直径盾构掘进在高水压条件下更换盾尾刷的方法
CN203961994U (zh) 土压平衡盾构机下穿已运营盾构隧道的暗挖隧道结构
CN104453930A (zh) 一种隧道预衬砌施工设备及施工方法
CN102296987A (zh) 巷旁充填沿空留巷软介质接顶方法
CN102635040B (zh) 下穿既有铁路施工时减小轨道施工沉降的方法
CN103953361A (zh) 既有隧道拱部衬砌严重开裂有净空加固体系
CN202989867U (zh) 一种废旧轮胎护面组合式钢结构谷坊
CN104294769A (zh) 一种补桩与增大台帽组合加固已建桥台结构及施工方法
CN103603251B (zh) 利用饱和卤水粘土浆加固盐湖铁路路基的方法
CN103821040B (zh) 用于软土地区运营高速铁路无砟轨道路基的纠偏结构
CN201771514U (zh) 一种带桩基础的暗挖隧道结构
CN103967052B (zh) 一种防护新旧框构桥基底高差土体的方法
CN204097889U (zh) 一种补桩与增大台帽组合加固已建桥台结构
CN203835403U (zh) 一种既有隧道拱部衬砌严重开裂有净空加固体系
CN202830665U (zh) 一种联轨加固装置
CN205604095U (zh) 一种水下玻纤套筒加固修复桥墩
CN201581902U (zh) 砂层顶管盾构机
CN101148988A (zh) 在已建隧道内压重的轨道交通出入段线盾构推进施工方法
CN203462466U (zh) 一种用于桩基纠偏和断桩补强的加固结构
CN103470064A (zh) 一种框架填充墙洞口加大的结构
CN204492851U (zh) 地铁暗挖隧道横通道临时支撑构件
CN103742173B (zh) 控制上覆既有结构沉降的地下工程施工的方法
CN103277116B (zh) 毛石钢筋混凝土优化拱结构治理软岩巷道底鼓的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINA RAILWAY GROUP CO., LTD.

Effective date: 20131010

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20131010

Address after: 030001 Yingze street, Shanxi, No. 269, No.

Applicant after: China Railway Third Engineering Co., Ltd.

Applicant after: China Railway Group Co., Ltd.

Address before: 030001 Yingze street, Shanxi, No. 269, No.

Applicant before: China Railway Third Engineering Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant