CN102628900A - 基于表底值的线损信息分段检测方法 - Google Patents

基于表底值的线损信息分段检测方法 Download PDF

Info

Publication number
CN102628900A
CN102628900A CN2012100815535A CN201210081553A CN102628900A CN 102628900 A CN102628900 A CN 102628900A CN 2012100815535 A CN2012100815535 A CN 2012100815535A CN 201210081553 A CN201210081553 A CN 201210081553A CN 102628900 A CN102628900 A CN 102628900A
Authority
CN
China
Prior art keywords
electricity
meter
cutover
line loss
value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100815535A
Other languages
English (en)
Inventor
蒋勇斌
崔浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI RUNPOWER INFORMATION TECHNOLOGY Co Ltd
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Original Assignee
SHANGHAI RUNPOWER INFORMATION TECHNOLOGY Co Ltd
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI RUNPOWER INFORMATION TECHNOLOGY Co Ltd, Shanghai Municipal Electric Power Co filed Critical SHANGHAI RUNPOWER INFORMATION TECHNOLOGY Co Ltd
Priority to CN2012100815535A priority Critical patent/CN102628900A/zh
Publication of CN102628900A publication Critical patent/CN102628900A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明涉及一种基于表底值的线损信息分段检测方法,该方法用于在电网线路发生割接时检测线损率,包括以下步骤:处理模块通过供电侧电表的月初表底值和月末表底值读取供电侧电量;处理模块选取割接前的所有售电侧电表,并根据所述售电侧电表的月初表底值和割接时的表底值读取第一售电侧电量;处理模块选取割接后的所有售电侧电表,并根据所述售电侧电表的月末表底值和割接时的表底值读取第二售电侧电量;处理模块根据获取的供电侧电量、第一售电侧电量和第二售电侧电量计算线损率。与现有技术相比,本发明可以在割接产生供电结构变化的情况下准确的检测线损率。

Description

基于表底值的线损信息分段检测方法
技术领域
本发明涉及一种线损信息检测方法,尤其是涉及一种基于电表的表底值的线损信息分段检测方法。
背景技术
目前馈线线损计算多采用软件计算的方式,依靠GPRS采集供售电侧的电度量数据,然后通过计算供售电侧电量差值来计算线损率。此种方法虽然简单、直观、易于理解,但随着用电负荷的不断增大,一个电站往往不能满足用电需求的增长,需要增加电站,来分担一部分用电负荷,在用电负荷转移过程中,即供电拓扑发生变化的情况下,直接计算供售电量差值的方法将不适用。
发明内容
本发明的目的就是为了克服上述现有技术存在的缺陷而提供一种基于表底值的线损信息分段检测方法。
本发明的目的可以通过以下技术方案来实现:
一种基于表底值的线损信息分段检测方法,该方法用于在电网线路发生割接时检测线损率,包括以下步骤:
1)处理模块通过供电侧电表的月初表底值和月末表底值读取供电侧电量;
2)处理模块选取割接前的所有售电侧电表,并根据所述售电侧电表的月初表底值和割接时的表底值读取第一售电侧电量;
3)处理模块选取割接后的所有售电侧电表,并根据所述售电侧电表的月末表底值和割接时的表底值读取第二售电侧电量;
4)处理模块根据获取的供电侧电量、第一售电侧电量和第二售电侧电量计算线损率,计算公式为:
ΔR = E g - E s 1 - E s 2 E g
其中,ΔR为线损率,Eg为供电侧电量,Es1为第一售电侧电量,Es2为第二售电侧电量。
所述的处理模块通过GPRS网络向供电侧电表和售电侧电表读取信息。
与现有技术相比,本发明可以对应电网线路割接所产生的供电结构变化的情况,无论供电结构如何变化,将变化时刻的表底值记录下来采用分段计算,最后累加的方式即可算出准确的线损率。
附图说明
图1为本发明的流程图。
具体实施方式
下面结合附图和具体实施例对本发明进行详细说明。
实施例
如图1所示,一种基于表底值的线损信息分段检测方法,该方法用于在电网线路发生割接时检测线损率,包括以下步骤:
第一步,处理模块通过供电侧电表的月初表底值和月末表底值读取供电侧电量;
第二步,处理模块选取割接前的所有售电侧电表,并根据所述售电侧电表的月初表底值和割接时的表底值读取第一售电侧电量(割接时的表底值与月初表底值之差);
第三步,处理模块选取割接后的所有售电侧电表,并根据所述售电侧电表的月末表底值和割接时的表底值读取第二售电侧电量(月末表底值与割接时的表底值之差);
第四步,处理模块根据获取的供电侧电量、第一售电侧电量和第二售电侧电量计算线损率,计算公式为:
ΔR = E g - E s 1 - E s 2 E g
其中,ΔR为线损率,Eg为供电侧电量,Es1为第一售电侧电量,Es2为第二售电侧电量,处理模块通过GPRS网络向供电侧电表和售电侧电表读取信息。
采用该方法可以对应电网线路割接所产生的供电结构变化的情况,无论供电结构如何变化,将变化时刻的表底值记录下来采用分段计算,最后累加的方式即可算出准确的线损率。

Claims (2)

1.一种基于表底值的线损信息分段检测方法,该方法用于在电网线路发生割接时检测线损率,其特征在于,包括以下步骤:
1)处理模块通过供电侧电表的月初表底值和月末表底值读取供电侧电量;
2)处理模块选取割接前的所有售电侧电表,并根据所述售电侧电表的月初表底值和割接时的表底值读取第一售电侧电量;
3)处理模块选取割接后的所有售电侧电表,并根据所述售电侧电表的月末表底值和割接时的表底值读取第二售电侧电量;
4)处理模块根据获取的供电侧电量、第一售电侧电量和第二售电侧电量计算线损率,计算公式为:
ΔR = E g - E s 1 - E s 2 E g
其中,ΔR为线损率,Eg为供电侧电量,Es1为第一售电侧电量,Es2为第二售电侧电量。
2.根据权利要求1所述的一种基于表底值的线损信息分段检测方法,其特征在于,所述的处理模块通过GPRS网络向供电侧电表和售电侧电表读取信息。
CN2012100815535A 2012-03-23 2012-03-23 基于表底值的线损信息分段检测方法 Pending CN102628900A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100815535A CN102628900A (zh) 2012-03-23 2012-03-23 基于表底值的线损信息分段检测方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100815535A CN102628900A (zh) 2012-03-23 2012-03-23 基于表底值的线损信息分段检测方法

Publications (1)

Publication Number Publication Date
CN102628900A true CN102628900A (zh) 2012-08-08

Family

ID=46587194

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100815535A Pending CN102628900A (zh) 2012-03-23 2012-03-23 基于表底值的线损信息分段检测方法

Country Status (1)

Country Link
CN (1) CN102628900A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103869192A (zh) * 2014-03-18 2014-06-18 中国能源建设集团广东省电力设计研究院 智能电网线损检测方法和系统

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0498734A1 (fr) * 1991-02-08 1992-08-12 France Telecom Dispositif pour la détection d'un branchement non autorisé sur une ligne téléphonique d'abonné
US20040036464A1 (en) * 2002-06-17 2004-02-26 Lewis Brewer Loss measurement system
CN101206239A (zh) * 2007-08-01 2008-06-25 许之端 配网线损的实时测量方法
CN201210322Y (zh) * 2008-06-24 2009-03-18 广东东方电讯科技有限公司 一种预付费电表
CN101958544A (zh) * 2010-08-11 2011-01-26 金华电业局 电力配电线路线损率计算系统及方法
CN102280874A (zh) * 2010-06-10 2011-12-14 上海市电力公司 一种台区线损率检测系统
CN102279320A (zh) * 2011-04-13 2011-12-14 上海市电力公司 一种基于误差分析的确定线损率合理区间的方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0498734A1 (fr) * 1991-02-08 1992-08-12 France Telecom Dispositif pour la détection d'un branchement non autorisé sur une ligne téléphonique d'abonné
US20040036464A1 (en) * 2002-06-17 2004-02-26 Lewis Brewer Loss measurement system
CN101206239A (zh) * 2007-08-01 2008-06-25 许之端 配网线损的实时测量方法
CN201210322Y (zh) * 2008-06-24 2009-03-18 广东东方电讯科技有限公司 一种预付费电表
CN102280874A (zh) * 2010-06-10 2011-12-14 上海市电力公司 一种台区线损率检测系统
CN101958544A (zh) * 2010-08-11 2011-01-26 金华电业局 电力配电线路线损率计算系统及方法
CN102279320A (zh) * 2011-04-13 2011-12-14 上海市电力公司 一种基于误差分析的确定线损率合理区间的方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘东旗: "实现手拉手配电线路线损自动计算与统计功能的思路", 《电气应用》 *
邢义等: "基于少量测点的配电网分段式线损计算方法", 《重庆工学院学报(自然科学)》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103869192A (zh) * 2014-03-18 2014-06-18 中国能源建设集团广东省电力设计研究院 智能电网线损检测方法和系统
CN103869192B (zh) * 2014-03-18 2016-08-24 中国能源建设集团广东省电力设计研究院有限公司 智能电网线损检测方法和系统

Similar Documents

Publication Publication Date Title
CN105588995B (zh) 一种电力计量自动化系统线损异常检测方法
EP1955088B1 (en) Method and system for the calibration of meters
CN108062616B (zh) 一种具有约束条件的用电异常检测系统
CN202281802U (zh) 一种三相三线电能计量表
CN102175922A (zh) 基于pmu量测数据的电力线路参数的辨识与估计方法
CN103018679A (zh) 一种铅酸电池初始荷电状态soc0的估算方法
CN102280874A (zh) 一种台区线损率检测系统
CN108181527A (zh) 一种基于能量指标的电压暂降综合严重程度的评估方法
CN105510864B (zh) 一种电能表误差计量的检测方法
CN106054023B (zh) 一种输电线路单端测距中估计两侧系统阻抗的方法
CN107632898A (zh) 一种基于自动化核抄的电量数据异常分析方法
CN109100674B (zh) 一种基于分布式电能的计量方法、误差检测方法及装置
CN101988957B (zh) 变电站合并单元电量采样准确性的动态检测方法及系统
CN105044451B (zh) 基于最小二乘法曲线拟合的带电更换电能表电量追补优化方法
CN105093163A (zh) 一种电子式电能表的误差调试方法
CN105301421B (zh) 一种同期线损测量平台及方法
CN105322539A (zh) 一种配电网scada系统电压数据修正方法
CN102628900A (zh) 基于表底值的线损信息分段检测方法
CN107203495B (zh) 一种s参数圆形插值方法
CN107462265A (zh) 一种基于采集数据分析的电能表需量异常判断方法
CN107449993A (zh) 一种基于故障录波器的故障测距方法及测距装置
CN105572504A (zh) 一种用于中低压混合配电网的窃电检测的控制方法及系统
CN102867762A (zh) 一种光刻晶圆洗边和边胶去除量测稳定性的监控方法
CN110865328A (zh) 基于ami的智能电表相位识别、拓扑辨识及阻抗估计方法
CN105762794B (zh) 计及同步相量测量单元的配电网潮流计算方法及系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA SHANGHAI RUNPOWER

Free format text: FORMER OWNER: SHANGHAI RUNPOWER INFORMATION TECHNOLOGY CO., LTD.

Effective date: 20121210

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121210

Address after: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Applicant after: Shanghai Electric Power Corporation

Applicant after: State Grid Corporation of China

Applicant after: Shanghai Runpower Information Technology Co., Ltd.

Address before: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Applicant before: Shanghai Electric Power Corporation

Applicant before: Shanghai Runpower Information Technology Co., Ltd.

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120808