CN102623966A - 一种母线差动保护方法 - Google Patents

一种母线差动保护方法 Download PDF

Info

Publication number
CN102623966A
CN102623966A CN2012100956177A CN201210095617A CN102623966A CN 102623966 A CN102623966 A CN 102623966A CN 2012100956177 A CN2012100956177 A CN 2012100956177A CN 201210095617 A CN201210095617 A CN 201210095617A CN 102623966 A CN102623966 A CN 102623966A
Authority
CN
China
Prior art keywords
sampling
bus
interval
current
differential protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100956177A
Other languages
English (en)
Other versions
CN102623966B (zh
Inventor
宋小会
刘星
魏勇
王定国
李国斌
Original Assignee
Xuji Group Co Ltd
XJ Electric Co Ltd
Xuchang XJ Software Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuji Group Co Ltd, XJ Electric Co Ltd, Xuchang XJ Software Technology Co Ltd filed Critical Xuji Group Co Ltd
Priority to CN201210095617.7A priority Critical patent/CN102623966B/zh
Publication of CN102623966A publication Critical patent/CN102623966A/zh
Priority to US13/651,482 priority patent/US8773828B2/en
Application granted granted Critical
Publication of CN102623966B publication Critical patent/CN102623966B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H3/00Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
    • H02H3/38Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection responsive to both voltage and current; responsive to phase angle between voltage and current
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H7/00Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
    • H02H7/22Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions for distribution gear, e.g. bus-bar systems; for switching devices
    • H02H7/226Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions for distribution gear, e.g. bus-bar systems; for switching devices for wires or cables, e.g. heating wires
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H1/00Details of emergency protective circuit arrangements
    • H02H1/0061Details of emergency protective circuit arrangements concerning transmission of signals
    • H02H1/0069Details of emergency protective circuit arrangements concerning transmission of signals by means of light or heat rays

Landscapes

  • Emergency Protection Circuit Devices (AREA)

Abstract

本发明涉及一种母线差动保护方法,对于每个带电间隔,首先根据电压采样值确定电压过零点,然后以电压过零点为同步信号,根据设定的采样时间周期,在电流拟合曲线上重新采样电流值,得到一个采样序列,各采样序列由采样点的电流值和采样序号构成,各间隔的采样序列,相同时刻的采样点的采样序号相同;最后根据各间隔的采样序列进行计算,进行差动保护。由于同一母线段上电压过零点时刻相同,因此同一母线段不同带电间隔经过“重采样”后相同采样序号的电流采样值是同步的,同步的电流采样值便可以进行差动计算。所以,本发明的方法省去了GPS相关设备,减少了系统依赖性,保护稳定性强,还能够设备降低成本。

Description

一种母线差动保护方法
技术领域
本发明属于电力工程领域的继电保护自动化领域,具体为基于一种同步采样新方法和通道传输技术的,适用于各种电压等级的母线差动保护。
背景技术
母线是电力系统发电厂、变电站中的重要设备之一,起着汇集和分配电能的作用。母线虽然总长度不过几十米或上百米,但由于连接的设备多、电气接线复杂,设备绝缘老化、污秽以及雷击等均会引起短路故障;同时由于操作频繁,值班人员的误操作等也会引起人为三相故障(如带地线合闸等);因此,母线的短路故障在电力系统中仍占有一定的比例,且故障性质一般比较严重,对电力系统的安全危害较大。鉴于此,目前在我国的电力系统中要求110kV及以上电压等级母线及35kV电压等级的重要母线均需要装设母线差动保护。
当前国内外常规的母线差动保护,是把母线上所有间隔的回路电流量引入母线差动保护装置,由母线差动保护装置完成模拟量的同步采样及差动逻辑判别。这种方法需要接入大量二次电缆,不仅电缆投资大,而且现场施工工作量大,在智能变电站中已经很难得到运行单位的认可。
现阶段在智能变电站中,我们主要采取GPS同步时钟技术,在采集的电流电压数据中加入时间标签,这样就可以求出同一时刻母线上面的差流。但是随之而来的弊端也是明显的,这种母线差动保护对GPS信号具有很强的依赖性,在失去GPS同步信号时差动保护就要退出运行;同时GPS数据信息还要占用大量的通道资源。
发明内容
本发明的目的是提供一种基于电压过零点同步的母线差动保护方法,用以解决现有母线差动保护对GPS信号依赖强的问题。
为实现上述目的,本发明的方案是:一种母线差动保护方法,其特征在于,包括如下步骤:
A.  连续对母线电压进行采样,同时,分别同步地对母线上所有间隔的电流进行采样;
B.  对母线电压采样值、各间隔的电流采样值分别进行拟合,得到母线电压拟合曲线和各间隔的电流拟合曲线;
C.  在母线电压拟合曲线上确定一个电压过零点;对于每个间隔的电流拟合曲线,从上述电压过零点开始,按照设定的采样时间周期,在各自的电流拟合曲线上依次进行采样,得到每个间隔的采样序列,所述采样序列包括采样点的电流采样值,以及采样点对应的采样序号;各间隔的采样序列,相同时刻的采样点的采样序号相同;
D.  存储各间隔的采样序列,将各间隔的采样序列的相同采样序号的电流值进行差动计算,并以计算结果为依据进行差动保护。
步骤A中,所述母线为同一条母线,所述母线电压是该母线上的PT柜采集的母线电压。
步骤A中,所述母线为并列运行的两条母线,所述母线电压是任一条母线上的PT柜采集的母线电压。
各间隔的采样序列通过EPON网络发送至OLT设备,并由OLT设备发送至母线保护装置,由母线保护装置进行存储与计算。
由于同一母线段不同间隔采集的电压完全相同,因此具有相同的过零时刻。本发明正是基于这一点进行不同间隔之间电流量的同步,从而省掉了GPS等对时手段。
对于每个带电间隔,首先根据电压采样值确定电压过零点,然后以电压过零点为同步信号,根据设定的采样时间周期,在电流拟合曲线上重新采样(下面称为“重采样” )电流值,得到一个采样序列,各采样序列由采样点的电流值和采样序号构成,各间隔的采样序列,相同时刻的采样点的采样序号相同;最后根据各间隔的采样序列进行计算,进行差动保护。由于同一母线段上电压过零点时刻相同,因此同一母线段不同带电间隔经过“重采样”后相同采样序号的电流采样值是同步的,同步的电流采样值便可以进行差动计算。所以,本发明的方法省去了GPS相关设备,减少了系统依赖性,保护稳定性强,还能够设备降低成本。
附图说明
图1 母线接线示意图;
图2 过零点同步原理图;
图3 采样数据传输原理图;
图4 采样数据存储原理图。
具体实施方式
下面结合附图对本发明做进一步详细的说明。
如图1所示的单母分段接线,除分段间隔JG0外共有6个间隔JG1~JG6,其中JG1~JG3属于I母,JG4~JG6属于II母,PT1和PT2分别属于I母和II母。当母线分列运行时,JG1~JG3采集PT1电压,具有共同的电压过零点;JG4~JG6采集PT2电压,具有共同的电压过零点。当母线并列运行时,JG1~JG6具有采集同一PT(PT1或PT2)电压,具有共同的电压过零点。
如果对I母进行差动保护,对I母的电压采样由PT1获得,I母上的间隔包括JG1~JG3。如果对II母进行差动保护,对II母的电压采样由PT1获得,II母上的间隔包括JG4~JG6。对I母与II母并列运行时的差点保护,母线电压采样由PT1和PT2中任意一个获得,间隔包括JG1~JG6。
由于在一个周波中,不论电压如何波动,其电压过零点总是确定的,过零点是正弦波形从负幅值转变成正幅值或者从正幅值转为负幅值,以下实施例中取电压由负到正为过零点。
首先进行初始采样,采样母线电压和各间隔电流,设一个周波中采样N个点。
若一个周波中采样N个点,N=0,1,2,3 ……,记其中一个周波电压过零点前一个采样点的采样时刻为t(0+k*N),电压采样值为u(0+k*N),电流采样值为i(0+k*N),其中k=0,1,2,3 ……,k为周波数。下一个采样点的采样时刻为t(1+k*N),电压采样值为u(1+k*N),电流采样值为i(1+k*N),依次到第N个采样点。
然后分别对母线电压和各间隔电流(1-n,n为带电间隔数)采样值进行拟合,得到它们的拟合曲线,如图2所示。图2中,一个周波采样8个点,在母线电压的线性拟合曲线上,可以求出电压过零点的时刻t0’,然后在各间隔的电流拟合曲线上求出电压过零点t0’对应的电流值I(0),即在电流拟合曲线上的电流采样值,所谓“重采样”值。将电压过零点时刻t0’从电压拟合曲线对应到电流拟合曲线的方法采用:在电压拟合曲线上求出t(0+k*N)和t0’的时间差X,由于在电流拟合曲线上i(0+k*N)到I(0)的时间差也是X,从而在电流拟合曲线上定位t0’。作为其他实施方式,求出t(1+k*N)和t0’的时间差也是可行的。
获得了电压过零点的 “重采样”值I(0),选取一定的时间周期在在各间隔的电流拟合曲线上依次采样,分别求出各间隔的采样序列;采样序列包括采样点的电流采样值,以及采样点对应的采样序号;各间隔的采样序列,相同时刻的采样点的采样序号相同。如图2,间隔1的采样序列I(0),I(1),……,I(N-1)……,间隔n的采样序列I(0),I(1),……,I(N-1)……。由于同一母线段上电压过零点时刻相同,因此同一母线段不同间隔经过重采样后相同采样序号的电流采样值是同步的,即各间隔的采样序列的相同采样序号的电流值是同步的。
存储各间隔的采样序列,将各间隔的采样序列的相同采样序号的电流值进行差动计算,并以计算结果为依据进行差动保护。如图3,智能采集装置集成了ONU模块,经过CPU模块进行重采样后的采样数据附带相应的采样序号传输至ONU模块,ONU模块再通过EPON网络将采样数据上传。经过测试,在1个OLT设备下挂8个ONU模块的情况下,ONU模块的最长传输等待延时不超过500微秒(远远小于电流/电压模拟量的周期20毫秒),因此可以有效避免对时逻辑发生跨周波序号对应的错误情况发生。
如图4,母线保护装置对经过EPON通讯网络上送的同一母线段上不同间隔的采样数据按照采样序号0~N对齐存放。依据电压过零点同步原理,采样序号相同的采样数据是同一时刻的数据,可以进行差流计算。母线保护装置据此可以进行差动保护的各种逻辑运算并根据实际故障情况正确动作出口。
由于ONU模块的最长传输等待延时+传输延时不超过2ms,故同一时刻接收到的采样序号存在两种情况:1)采样序号相差较小,小于N/4。以两个间隔为例,如某一时刻间隔1的采样序号如果为10,间隔2的采样序号只能为9或者11,序号差小于N/4; 2)在电压过零点附近,存在采样序号相差较大(大于N/2)的情况。以两个间隔为例,如某一时刻间隔1的采样序号为本周波的序号0,间隔2的采样序号可能为上一周波的序号N-1。
上述两种情况之外,均应为由于通讯异常,造成数据接收出现异常的情况。故装置设置通讯异常告警逻辑,避免跨周波数据存储错误的情况发生。当同一时刻接收到的采样序号差大于N/4(N为每周波采样点数)且小于N/2时,母线保护装置发通讯异常告警信息并闭锁差动保护。

Claims (4)

1.一种母线差动保护方法,其特征在于,包括如下步骤:
A ,连续对母线电压进行采样,同时,分别同步地对母线上所有间隔的电流进行采样;
B ,对母线电压采样值、各间隔的电流采样值分别进行拟合,得到母线电压拟合曲线和各间隔的电流拟合曲线;
C ,在母线电压拟合曲线上确定一个电压过零点;对于每个间隔的电流拟合曲线,从上述电压过零点开始,按照设定的采样时间周期,在各自的电流拟合曲线上依次进行采样,得到每个间隔的采样序列,所述采样序列包括采样点的电流采样值,以及采样点对应的采样序号;各间隔的采样序列,相同时刻的采样点的采样序号相同;
D ,存储各间隔的采样序列,将各间隔的采样序列的相同采样序号的电流值进行差动计算,并以计算结果为依据进行差动保护。
2.根据权利要求1所述的一种母线差动保护方法,其特征在于,步骤A中,所述母线为同一条母线,所述母线电压是该母线上的PT柜采集的母线电压。
3.根据权利要求1所述的一种母线差动保护方法,其特征在于,步骤A中,所述母线为并列运行的两条母线,所述母线电压是任一条母线上的PT柜采集的母线电压。
4.根据权利要求2所述的一种母线差动保护方法,其特征在于,各间隔的采样序列通过EPON网络发送至OLT设备,并由OLT设备发送至母线保护装置,由母线保护装置进行存储与计算。
CN201210095617.7A 2012-04-01 2012-04-01 一种母线差动保护方法 Expired - Fee Related CN102623966B (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201210095617.7A CN102623966B (zh) 2012-04-01 2012-04-01 一种母线差动保护方法
US13/651,482 US8773828B2 (en) 2012-04-01 2012-10-15 Busbar differential protection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210095617.7A CN102623966B (zh) 2012-04-01 2012-04-01 一种母线差动保护方法

Publications (2)

Publication Number Publication Date
CN102623966A true CN102623966A (zh) 2012-08-01
CN102623966B CN102623966B (zh) 2015-01-07

Family

ID=46563709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210095617.7A Expired - Fee Related CN102623966B (zh) 2012-04-01 2012-04-01 一种母线差动保护方法

Country Status (2)

Country Link
US (1) US8773828B2 (zh)
CN (1) CN102623966B (zh)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103078295A (zh) * 2013-01-25 2013-05-01 绍兴电力局 一种数字化变压器差动保护装置及其保护方法
CN103248005A (zh) * 2013-05-10 2013-08-14 国家电网公司 一种同杆并架双回线路交流电气量采样同步方法
CN104242262A (zh) * 2014-08-28 2014-12-24 山东大学 一种基于故障分量均值积的快速母线保护方法
CN104410052A (zh) * 2014-09-29 2015-03-11 国家电网公司 基于pon网络通信的电流差动保护系统及其保护方法
CN106129976A (zh) * 2016-07-12 2016-11-16 许继集团有限公司 基于Hausdorff距离算法的差动保护方法及装置
CN106207989A (zh) * 2016-07-08 2016-12-07 山东鲁能智能技术有限公司 基于交流电压过零点的区域电网保护数据插值同步方法、系统
CN104102831B (zh) * 2014-07-09 2017-04-12 国电南瑞科技股份有限公司 插值式采样值保护方法
CN108666990A (zh) * 2018-06-07 2018-10-16 广东科瑞德电气科技有限公司 一种电网差动保护方法及系统
CN109856451A (zh) * 2018-10-09 2019-06-07 胡大良 一种多回路电气量检测系统
CN111697541A (zh) * 2020-04-30 2020-09-22 国网江苏省电力有限公司电力科学研究院 一种配电网线路电流差动保护同步方法及系统
CN112018733A (zh) * 2019-05-28 2020-12-01 国网浙江省电力有限公司舟山供电公司 一种应用于馈线自动化的区域差动保护方法
CN112688284A (zh) * 2021-01-21 2021-04-20 华中科技大学 基于电压过零点的配电网差动保护数据同步方法和系统

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106026040B (zh) * 2016-08-04 2018-05-11 南京国电南自电网自动化有限公司 一种防止采样异常大数的母线差动保护方法
CN113937730A (zh) * 2021-09-26 2022-01-14 长园深瑞继保自动化有限公司 匝间保护方法、装置及计算机设备
CN114094536B (zh) * 2021-10-19 2024-05-28 南京国电南自电网自动化有限公司 一种基于智能识别的继电保护采样防误系统及方法
CN116127332B (zh) * 2022-12-01 2023-08-15 深圳市华众自动化工程有限公司 一种模拟量数据处理装置及方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5424622A (en) * 1993-11-29 1995-06-13 Baldor Electric Company, Inc. Dynamic brake assembly
CN101841446A (zh) * 2010-05-25 2010-09-22 许继集团有限公司 纵联通道传输装置、光纤差动保护装置及方法
JP4585404B2 (ja) * 2005-08-09 2010-11-24 株式会社日立製作所 同期制御方法、同期制御回路及び通信装置
CN102095976A (zh) * 2009-12-15 2011-06-15 西安爱邦电气有限公司 一种双母单分段接线母线差动保护自动分析装置
CN102201160A (zh) * 2011-04-21 2011-09-28 河南电力试验研究院 一种新型用电信息采集系统

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NZ563188A (en) * 2007-11-05 2010-03-26 Auckland Uniservices Ltd Power control

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5424622A (en) * 1993-11-29 1995-06-13 Baldor Electric Company, Inc. Dynamic brake assembly
JP4585404B2 (ja) * 2005-08-09 2010-11-24 株式会社日立製作所 同期制御方法、同期制御回路及び通信装置
CN102095976A (zh) * 2009-12-15 2011-06-15 西安爱邦电气有限公司 一种双母单分段接线母线差动保护自动分析装置
CN101841446A (zh) * 2010-05-25 2010-09-22 许继集团有限公司 纵联通道传输装置、光纤差动保护装置及方法
CN102201160A (zh) * 2011-04-21 2011-09-28 河南电力试验研究院 一种新型用电信息采集系统

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
林国松: "光纤电流纵差保护及其在地铁供电系统中的应用", 《中国优秀硕士学位论文全文数据库》 *
闫志辉等: "重采样移相技术在过程层IED中的应用", 《电力系统保护与控制 》 *

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103078295B (zh) * 2013-01-25 2015-04-15 绍兴电力局 一种数字化变压器差动保护装置及其保护方法
CN103078295A (zh) * 2013-01-25 2013-05-01 绍兴电力局 一种数字化变压器差动保护装置及其保护方法
CN103248005A (zh) * 2013-05-10 2013-08-14 国家电网公司 一种同杆并架双回线路交流电气量采样同步方法
CN103248005B (zh) * 2013-05-10 2016-04-20 国家电网公司 一种同杆并架双回线路交流电气量采样同步方法
CN104102831B (zh) * 2014-07-09 2017-04-12 国电南瑞科技股份有限公司 插值式采样值保护方法
CN104242262A (zh) * 2014-08-28 2014-12-24 山东大学 一种基于故障分量均值积的快速母线保护方法
CN104410052A (zh) * 2014-09-29 2015-03-11 国家电网公司 基于pon网络通信的电流差动保护系统及其保护方法
CN106207989B (zh) * 2016-07-08 2018-07-24 山东鲁能智能技术有限公司 基于交流电压过零点的区域电网保护数据插值同步方法、系统
CN106207989A (zh) * 2016-07-08 2016-12-07 山东鲁能智能技术有限公司 基于交流电压过零点的区域电网保护数据插值同步方法、系统
CN106129976B (zh) * 2016-07-12 2019-02-05 许继集团有限公司 基于Hausdorff距离算法的差动保护方法及装置
CN106129976A (zh) * 2016-07-12 2016-11-16 许继集团有限公司 基于Hausdorff距离算法的差动保护方法及装置
CN108666990A (zh) * 2018-06-07 2018-10-16 广东科瑞德电气科技有限公司 一种电网差动保护方法及系统
CN108666990B (zh) * 2018-06-07 2020-03-31 广东科瑞德电气科技有限公司 一种电网差动保护方法及系统
CN109856451A (zh) * 2018-10-09 2019-06-07 胡大良 一种多回路电气量检测系统
CN112018733A (zh) * 2019-05-28 2020-12-01 国网浙江省电力有限公司舟山供电公司 一种应用于馈线自动化的区域差动保护方法
CN111697541A (zh) * 2020-04-30 2020-09-22 国网江苏省电力有限公司电力科学研究院 一种配电网线路电流差动保护同步方法及系统
CN111697541B (zh) * 2020-04-30 2022-08-23 国网江苏省电力有限公司电力科学研究院 一种配电网线路电流差动保护同步方法及系统
CN112688284A (zh) * 2021-01-21 2021-04-20 华中科技大学 基于电压过零点的配电网差动保护数据同步方法和系统
CN112688284B (zh) * 2021-01-21 2022-02-18 华中科技大学 基于电压过零点的配电网差动保护数据同步方法和系统

Also Published As

Publication number Publication date
US20130258536A1 (en) 2013-10-03
CN102623966B (zh) 2015-01-07
US8773828B2 (en) 2014-07-08

Similar Documents

Publication Publication Date Title
CN102623966B (zh) 一种母线差动保护方法
CN102055544B (zh) 电力系统二次设备时间同步监测系统及监测方法
CN102981099B (zh) 基于遗传算法的配电网单相接地故障定位方法及定位装置
CN105467277B (zh) 一种基于pmu的配电网混合故障测距方法及装置
CN106771870A (zh) 一种配电网接地故障定位方法及系统
CN106199330B (zh) 一种海上风电场集电线路故障定位系统和方法
CN102495322B (zh) 基于iec61850的数字式继电保护装置同步性能测试方法
CN102608450A (zh) 适用于智能变电站的测试校验系统及校验方法
CN103827678A (zh) 用于配电系统中分布式波形记录的方法
CN104360298A (zh) 一种合并单元测试仪的性能测试系统及方法
CN107741549A (zh) 基于模拟量及数字量同步发生的智能变电站同步性测试仪
CN101576743A (zh) 分布式环网柜监控终端
CN109283431A (zh) 一种基于有限pmu的配电网故障区段定位方法
CN107453405A (zh) 一种基于暂态录波故障指示器的故障定位方法及系统
CN104297638A (zh) 一种高精度、低成本的配电网故障定位方法
CN104201782A (zh) 一种变电站故障处理系统
CN103746304B (zh) 智能化变电站的改造方法
CN103117597A (zh) 风力发电箱式变压器智能监控系统及其控制方法
CN110907752A (zh) 一种配电网单相接地故障时零序电流暂态起始点获取方法
CN201256292Y (zh) Gis数字式间隔测控装置
CN202600092U (zh) 小电流接地故障区段在线定位系统
CN204256149U (zh) 一种合并单元测试仪的性能测试系统
CN103905045A (zh) 基于物理层采样值的交流模数转换设备实时响应检测方法
CN202586509U (zh) 一种微电网综合监测系统
CN102832713A (zh) 一种基于can总线的配电自动化终端及其模拟量采集方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: XUJI ELECTRIC CO., LTD.

Free format text: FORMER OWNER: XUJI GROUP CO., LTD.

Effective date: 20131212

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20131212

Address after: No. 1298 Xuchang City, Henan province 461000 XJ Avenue

Applicant after: Xuji Electric Co., Ltd.

Applicant after: Xuchang Xuji Software Technology Co., Ltd.

Address before: No. 1298 Xuchang City, Henan province 461000 XJ Avenue

Applicant before: Xuji Group Co., Ltd.

Applicant before: Xuji Electric Co., Ltd.

Applicant before: Xuchang Xuji Software Technology Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150107

Termination date: 20200401

CF01 Termination of patent right due to non-payment of annual fee