CN102623928A - Grounding wire hook for overhead transmission line power cut overhaul - Google Patents

Grounding wire hook for overhead transmission line power cut overhaul Download PDF

Info

Publication number
CN102623928A
CN102623928A CN2012100956618A CN201210095661A CN102623928A CN 102623928 A CN102623928 A CN 102623928A CN 2012100956618 A CN2012100956618 A CN 2012100956618A CN 201210095661 A CN201210095661 A CN 201210095661A CN 102623928 A CN102623928 A CN 102623928A
Authority
CN
China
Prior art keywords
hook
section
gear
cylindrical section
fixing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100956618A
Other languages
Chinese (zh)
Other versions
CN102623928B (en
Inventor
杨冬
王世祥
王长征
陈美权
韩黎明
汤可刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
MaAnshan Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
MaAnshan Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MaAnshan Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical MaAnshan Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority to CN201210095661.8A priority Critical patent/CN102623928B/en
Publication of CN102623928A publication Critical patent/CN102623928A/en
Application granted granted Critical
Publication of CN102623928B publication Critical patent/CN102623928B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention relates to a grounding wire hook for overhead transmission line power cut overhaul, belonging to a transmission line overhaul device. The grounding wire hook is characterized by mainly comprising a hook body, a lower pressing plate, an upper fixing plate, ear plates, an operation ring, a rack, a gear shaft, a lower fixing plate, a grounding stud and a gear, wherein the upper part of the hook body is an arc hook head section extending leftwards, and the lower part of the hook is a cylindrical section; the cylindrical section of the hook body is fixedly penetrated in round through holes on the right parts of the upper fixing plate and the lower fixing plate; the gear shaft and the gear are arranged on the front and back ear plates of the cylindrical section of the hook body; the operation ring is fixedly arranged on the front end section of the gear shaft; a rack pole provided with the rack is penetrated in an upper rectangular through hole and a lower rectangular through hole on the left parts of the upper fixing plate and the lower fixing plate, and the rack is engaged with the gear; the lower pressing plate is sleeved on the cylindrical section on the upper end part of the rack pole; and the operation ring is tightly clamped and rotated by a metal hook on an insulated operation rod to drive the gear and the rack to engage and link so as to ensure that the lower pressing plate and a lead are compacted or loosened, so that grounding quickness and reliability are achieved.

Description

The overhead transmission line interruption maintenance is linked up with earth connection
Technical field
The invention belongs to the power transmission lines overhauling device, especially relate to a kind of 35-220kV overhead transmission line maintenance and link up with earth connection.
Background technology
The Along with people's growth in the living standard, electricity needs constantly increases, and power grid construction constantly raises speed; The workload that the overhead transmission line power failure is transformed constantly increases: the bow line that usually must open or overlap the strain insulator shaft tower is to dwindle power failure scope and interruption duration; In the ever-increasing interruption maintenance operation process of this type, need on the lead of strain insulator shaft tower both sides, hang earth connection, but because the restriction of working space; Causing hanging earth connection usually is that low-angle hangs and improper vertical hanging; But the earth connection that uses at present can only vertical hanging, in case the low-angle suspension is scrapped and lost the ground connection effect in order to hang firm very easily twisting into two parts the earth connection hanging head.。
Summary of the invention
The objective of the invention is to propose a kind of overhead transmission line interruption maintenance and link up with earth connection, not only rational in infrastructure, safe and reliable; Can reliably be suspended on 35-220kV and the above overhead transmission line with arbitrarily angled apace; And can use an action bars operation, and realize multi-use, improve the efficient of hanging earthing conductor; Reduce cost, reduce potential safety hazard.
The objective of the invention is to realize like this: a kind of overhead transmission line interruption maintenance is with earth connection hook (being called for short the earth connection hook); It is characterized in that: this overhead transmission line interruption maintenance mainly is made up of Hook, lower platen, upper mounted plate, otic placode, operation ring, tooth bar, gear shaft, bottom plate, ground stud and gear with the earth connection hook; The arc gib head section that stretch for a left side on the top of this Hook; The cross section of this gib head section can rectangular or flat; The bottom of this Hook is a cylindrical section; The cylindrical section of this Hook fixedly is installed in the round tube hole of upper mounted plate and bottom plate right part and the outer bottom plate that stretches out of its lower end section downwards; Front and back otic placode with holes is stretched, the shouldered gear shaft of rear end section that before and after this, is slidingly installed in the hole of otic placode, the gear that fixed installation is meshed with tooth bar on the gear shaft part between the otic placode of front and back in the left side that is welded respectively, the corresponding lower portion symmetry compartment of terrain that is positioned at upper mounted plate on the cylindrical section of Hook; The front end rigion of this gear shaft is outer forward stretch out front ear plate and on the front end rigion of gear shaft perforate fixed installation operation ring, the right side of the section fixed installation ground stud in the lower end of Hook; The structure of this upper mounted plate and bottom plate is identical to be rectangular slab and symmetrical compartment of terrain and to be and to be horizontally disposed with; Right part at upper and lower fixing plate is offered round tube hole symmetrically respectively; About this, fixedly install the cylindrical section of Hook in the round tube hole; Left part at this upper and lower fixing plate is offered rectangular through-hole symmetrically respectively; This up and down the rectangular through-hole intermediate gap install ordinatedly cross section rectangular and right flank on the tooth bar post of tooth bar, the corresponding engagement of this rack and pinion, all corresponding outer upper and lower fixing plate that stretches out of the upper and lower side section of this tooth bar post are installed; And the upper end of this tooth bar post is the little cylindrical section of diameter, and the slip suit offers centre bore and upper surface is the rectangle lower platen of arc surface on this cylindrical section.
During use, on ground stud, be fixedly connected earlier earth connection, the adjustment lower platen; Make the arc gib head of Hook parallel up and down each other, use special-purpose metal hook equipped on the insulating bar to hook the operation ring, Hook is hung on the overhead power transmission conducting wire with lower platen; Then the special-purpose metal hook on the insulating bar will be operated ring card jail and rotation, rotate, rotate with regard to driven gear axle and gear like this thereby drive the operation ring; Wheel and rack engagement interlock; Make that lower platen is up to compress or make that lower platen is descending unclamps with lead with lead, promptly accomplish the suspension or the dismounting work of this earth connection hook and earth connection, ground connection is fast and reliably.
Overhead transmission line interruption maintenance proposed by the invention is linked up with earth connection, and is rational in infrastructure, easy to use, improved the fail safe of 35-220kV and above overhead transmission line upkeep operation and the efficient of service work greatly.
Combine accompanying drawing and embodiment that overhead transmission line interruption maintenance proposed by the invention is described further with the earth connection hook at present.
Description of drawings:
Fig. 1 is the schematic perspective view that overhead transmission line interruption maintenance proposed by the invention is linked up with earth connection.
Among Fig. 1: 1, Hook 2, lower platen 3, upper mounted plate 4, otic placode 5, operation ring 6, tooth bar 7, gear shaft 8, bottom plate 9, ground stud 10, gear 11, tooth bar post 12, lead.
Embodiment
As can be seen from Figure 1: a kind of overhead transmission line interruption maintenance is with earth connection hook (being called for short the earth connection hook); It is characterized in that: this overhead transmission line interruption maintenance mainly is made up of Hook 1, lower platen 2, upper mounted plate 3, otic placode 4, operation ring 5, tooth bar 6, gear shaft 7, bottom plate 8, ground stud 9 and gear 10 with the earth connection hook; The arc gib head section that stretch for a left side on the top of this Hook 1; The cross section of this gib head section can rectangular or flat; The bottom of this Hook 1 is a cylindrical section; The cylindrical section of this Hook 1 fixedly is installed in the round tube hole of upper mounted plate 3 and bottom plate 8 right parts and the outer bottom plate 8 that stretches out of its lower end section downwards; Front and back otic placode 4 with holes is stretched, the shouldered gear shaft 7 of rear end section that before and after this, is slidingly installed in the hole of otic placode 4, the gear 10 that fixed installation is meshed with tooth bar 6 on the gear shaft part between the front and back otic placode 4 in the left side that is welded respectively, the corresponding lower portion symmetry compartment of terrain that is positioned at upper mounted plate 3 on the cylindrical section of Hook 1; The front end rigion of this gear shaft 7 is outer forward stretch out front ear plate 4 and on the front end rigion of gear shaft 7 perforate fixed installation operation ring 5, the right side of the section fixed installation ground stud 9 in the lower end of Hook; The structure of this upper mounted plate 3 and bottom plate 8 is identical to be rectangular slab and symmetrical compartment of terrain and to be and to be horizontally disposed with; Right part at upper and lower fixing plate 3,8 is offered round tube hole symmetrically respectively; About this, fixedly install the cylindrical section of Hook 1 in the round tube hole; Left part at this upper and lower fixing plate 3,8 is offered rectangular through-hole symmetrically respectively; This up and down the rectangular through-hole intermediate gap install ordinatedly cross section rectangular and right flank on the tooth bar post 11 of tooth bar 6, this tooth bar 6 and gear 10 corresponding engagements, all corresponding upper and lower fixing plate 3,8 that stretches out outward of the upper and lower side section of this tooth bar post 11 are installed; And the upper end of this tooth bar post 11 is the little cylindrical section of diameter, and the slip suit offers centre bore and upper surface is the rectangle lower platen 2 of arc surface on this cylindrical section.
During use, on ground stud 9, be fixedly connected earth connection earlier, adjustment lower platen 2; Make the arc gib head of Hook 1 parallel up and down each other, use special-purpose metal hook equipped on the insulating bar to hook operation ring 5, Hook 1 is hung on the overhead power transmission conducting wire 12 with lower platen 2; Make the special-purpose metal hook on the insulating bar will operate ring 5 card jail and rotations then, rotate, rotate with regard to driven gear axle 7 and gear 10 like this thereby drive operation ring 5; Gear 10 and tooth bar 6 engagement interlocks; Make that lower platen 2 is up to compress or make that lower platen 2 is descending unclamps with lead 12 with lead 12, promptly accomplish the suspension or the dismounting work of this earth connection hook and earth connection, ground connection is fast and reliably.

Claims (1)

1. an overhead transmission line interruption maintenance is linked up with earth connection; It is characterized in that: this overhead transmission line interruption maintenance mainly is made up of Hook (1), lower platen (2), upper mounted plate (3), otic placode (4), operation ring (5), tooth bar (6), gear shaft (7), bottom plate (8), ground stud (9) and gear (10) with the earth connection hook; The arc gib head section that stretch for a left side on the top of this Hook (1); Rectangular or the flat of the cross section of this gib head section; The bottom of this Hook (1) is a cylindrical section; The cylindrical section of this Hook (1) fixedly is installed in the round tube hole of upper mounted plate (3) and bottom plate (8) right part and the outer bottom plate (8) that stretches out of its lower end section downwards; Front and back otic placode (4) with holes is stretched on the left side that is welded respectively, the lower portion symmetry compartment of terrain that correspondence is positioned at upper mounted plate (3) on the cylindrical section of Hook (1); Shouldered gear shaft of rear end section (7) is slidingly installed in the hole of otic placode (4) before and after this; On the gear shaft part between the front and back otic placode (4), fixedly mount gear (10), the front end rigion of this gear shaft (7) is outer forward stretch out front ear plate (4) and on the front end rigion of gear shaft (7) perforate fixed installation operation ring (5), at the right side fixed installation ground stud (9) of the lower end section of Hook (1); The structure of this upper mounted plate (3) and bottom plate (8) is identical to be rectangular slab and symmetrical compartment of terrain and to be and to be horizontally disposed with; Right part at upper and lower fixing plate (3,8) is offered round tube hole symmetrically respectively; About this, fixedly install the cylindrical section of Hook (1) in the round tube hole; Left part at this upper and lower fixing plate (3,8) is offered rectangular through-hole symmetrically respectively; This up and down the rectangular through-hole intermediate gap install ordinatedly cross section rectangular and right flank on the tooth bar post (11) of tooth bar (6) is installed; This tooth bar (6) and the corresponding engagement of gear (10); The upper and lower side section of this tooth bar post (11) is all corresponding stretches out upper and lower fixing plate (3,8) outward, and the upper end of this tooth bar post (11) is the little cylindrical section of diameter, and the slip suit offers centre bore and upper surface is the rectangle lower platen (2) of arc surface on this cylindrical section.
CN201210095661.8A 2012-04-01 2012-04-01 Grounding wire hook for overhead transmission line power cut overhaul Active CN102623928B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210095661.8A CN102623928B (en) 2012-04-01 2012-04-01 Grounding wire hook for overhead transmission line power cut overhaul

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210095661.8A CN102623928B (en) 2012-04-01 2012-04-01 Grounding wire hook for overhead transmission line power cut overhaul

Publications (2)

Publication Number Publication Date
CN102623928A true CN102623928A (en) 2012-08-01
CN102623928B CN102623928B (en) 2014-09-03

Family

ID=46563673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210095661.8A Active CN102623928B (en) 2012-04-01 2012-04-01 Grounding wire hook for overhead transmission line power cut overhaul

Country Status (1)

Country Link
CN (1) CN102623928B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103206488A (en) * 2013-03-30 2013-07-17 国家电网公司 Cone gear driving structure capable of changing operation stations
CN105020239A (en) * 2014-04-28 2015-11-04 国家电网公司 Portal compression-shear hook device
CN105514848A (en) * 2016-01-27 2016-04-20 国网浙江宁波市鄞州区供电公司 Ground wire assembly
CN107369926A (en) * 2016-05-13 2017-11-21 国网青海省电力公司海东供电公司 10kV #1 bars O&M operates servicing unit and method
CN107845975A (en) * 2017-11-29 2018-03-27 贵州电网有限责任公司 A kind of ground wire operating lever for strain rod tower
CN108390301A (en) * 2018-04-09 2018-08-10 贵州电网有限责任公司 Trolley type switch cabinet common ground tool
CN110504638A (en) * 2019-06-26 2019-11-26 国网浙江省电力有限公司嘉兴供电公司 A kind of transmission line of electricity potential transfer device
CN113267205A (en) * 2021-07-21 2021-08-17 广东电网有限责任公司中山供电局 Optical fiber MEMS sensor for cable joint
CN113904273A (en) * 2021-10-08 2022-01-07 刘玉军 Cable shielding layer repairing method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201282301Y (en) * 2008-10-16 2009-07-29 甘肃省电力公司兰州超高压输变电公司 M type winding hook for large corner inner angle side grounding wire
CN202034506U (en) * 2011-03-21 2011-11-09 四川省电力公司攀枝花电业局 Lead hanging hook of earth wire
CN202084667U (en) * 2011-06-10 2011-12-21 山东电力集团公司日照供电公司 Transformer station grounding wire clamp
JP2012039679A (en) * 2010-08-03 2012-02-23 Chugoku Electric Power Co Inc:The Grounding hook

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201282301Y (en) * 2008-10-16 2009-07-29 甘肃省电力公司兰州超高压输变电公司 M type winding hook for large corner inner angle side grounding wire
JP2012039679A (en) * 2010-08-03 2012-02-23 Chugoku Electric Power Co Inc:The Grounding hook
CN202034506U (en) * 2011-03-21 2011-11-09 四川省电力公司攀枝花电业局 Lead hanging hook of earth wire
CN202084667U (en) * 2011-06-10 2011-12-21 山东电力集团公司日照供电公司 Transformer station grounding wire clamp

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103206488A (en) * 2013-03-30 2013-07-17 国家电网公司 Cone gear driving structure capable of changing operation stations
CN105020239A (en) * 2014-04-28 2015-11-04 国家电网公司 Portal compression-shear hook device
CN105514848A (en) * 2016-01-27 2016-04-20 国网浙江宁波市鄞州区供电公司 Ground wire assembly
CN107369926A (en) * 2016-05-13 2017-11-21 国网青海省电力公司海东供电公司 10kV #1 bars O&M operates servicing unit and method
CN107369926B (en) * 2016-05-13 2023-11-07 国网青海省电力公司海东供电公司 Operation and maintenance auxiliary device and operation method for 10kV #1 rod
CN107845975A (en) * 2017-11-29 2018-03-27 贵州电网有限责任公司 A kind of ground wire operating lever for strain rod tower
CN107845975B (en) * 2017-11-29 2023-12-29 贵州电网有限责任公司 Grounding wire operating rod for tension-resistant tower
CN108390301A (en) * 2018-04-09 2018-08-10 贵州电网有限责任公司 Trolley type switch cabinet common ground tool
CN110504638A (en) * 2019-06-26 2019-11-26 国网浙江省电力有限公司嘉兴供电公司 A kind of transmission line of electricity potential transfer device
CN113267205A (en) * 2021-07-21 2021-08-17 广东电网有限责任公司中山供电局 Optical fiber MEMS sensor for cable joint
CN113904273A (en) * 2021-10-08 2022-01-07 刘玉军 Cable shielding layer repairing method

Also Published As

Publication number Publication date
CN102623928B (en) 2014-09-03

Similar Documents

Publication Publication Date Title
CN102623928B (en) Grounding wire hook for overhead transmission line power cut overhaul
CN204144479U (en) A kind of earth connection
CN204230457U (en) Universal connector earth wire operation rod
CN103457214A (en) Ground potential operation non-bearing connection wire clamp
CN103427370B (en) The live replacing device of ultra-high-tension power transmission line strain insulator string
CN203481420U (en) Grounding wire device used for power transmission line overhauling
CN204873405U (en) Gallows with electronic knock off joint
CN202871413U (en) Tension wheel for interlocking armoring machine
CN2404241Y (en) Apparatus capable of changing strain insulator-chain electrical insulator
CN210404094U (en) Anti-drop high-voltage power line grounding wire with alarm device
CN202662843U (en) UC plain end screw type multipurpose grounded wire end clip
CN203632114U (en) Single-wheel insulating pulley
CN203398707U (en) Wire-bracing clamp
CN203111401U (en) Rear flat fork of electric vehicle
CN202927423U (en) Hanging and fixing device universally used for overhead line structure cross arm angle iron
CN202439579U (en) Ship-shaped section insulator
CN202190026U (en) Retractable bottle supporting rack for electric power operation repair
CN105977860B (en) A kind of replacement overhead transmission line composite cross-arm insulator device and method
CN203367920U (en) Earth potential working non-bearing-force connection wire clamp
CN203014263U (en) insulator hanging bracket of concrete pole
CN207490436U (en) The double models for hanging V-type composite insulator string replacing options of ± 500kV DC power transmission lines duplex
CN205985971U (en) Special link plate structure of unwrapping wire coaster
CN201877696U (en) Support for overhauling outdoor disconnecting switch
CN206060050U (en) It is double to divide the offline coaster of overhead transmission line
CN209029173U (en) A kind of right angle hanging plate of Novel anti-fracture and deformation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: MA ANSHAN POWER SUPPLY COMPANY, STATE GRID ANHUI E

Effective date: 20131018

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: ANHUI ELECTRIC POWER COMPANY MAANSHAN POWER SUPPLY BRANCH

Effective date: 20131018

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 243000 MAANSHAN, ANHUI PROVINCE TO: 100031 XICHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20131018

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: MAANSHAN POWER SUPPLY COMPANY OF STATE GRID ANHUI ELECTRIC POWER COMPANY

Address before: 243000 No. 7 flower rain Road, Yucheng District, Anhui, Ma'anshan

Applicant before: Anhui Electric Power Corporation Ma'anshan Power Supply Company

C14 Grant of patent or utility model