CN102621944A - Automatic checkout system for transformer substation remote signaling function - Google Patents

Automatic checkout system for transformer substation remote signaling function Download PDF

Info

Publication number
CN102621944A
CN102621944A CN2012100411419A CN201210041141A CN102621944A CN 102621944 A CN102621944 A CN 102621944A CN 2012100411419 A CN2012100411419 A CN 2012100411419A CN 201210041141 A CN201210041141 A CN 201210041141A CN 102621944 A CN102621944 A CN 102621944A
Authority
CN
China
Prior art keywords
acquisition module
data
open3000
transformer station
signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100411419A
Other languages
Chinese (zh)
Other versions
CN102621944B (en
Inventor
陆路
陈小平
许源
张勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Taizhou Power Supply Co of Jiangsu Electric Power Co
Original Assignee
Taizhou Power Supply Co of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taizhou Power Supply Co of Jiangsu Electric Power Co filed Critical Taizhou Power Supply Co of Jiangsu Electric Power Co
Priority to CN2012100411419A priority Critical patent/CN102621944B/en
Publication of CN102621944A publication Critical patent/CN102621944A/en
Application granted granted Critical
Publication of CN102621944B publication Critical patent/CN102621944B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses an automatic checkout system for a transformer substation remote signaling function, which comprises a data acquisition module, an Open3000 system and an enterprise management information system. An input end of the acquisition module is connected with a transformer substation, an output end of the acquisition module is connected with a network transmission device of the Open3000 system, a network interface of the Open3000 system is connected with the enterprise management information system, signals of various state quantities in the transformer substation are acquired by the acquisition module and then are transmitted to the Open3000 system by a network transmission device of the Open3000 system, the Open3000 system is used for checking out the signals and data in a database and then transmitting the signals and the data into the enterprise management information system, and the enterprise management information system opens a data access function to an external system so as to facilitate inquiry of technicians.

Description

A kind of transformer station remote signalling function automatic checkout system
Technical field
The present invention relates to a kind of transformer station remote signalling function automatic checkout system.
Background technology
In newly-built, enlarging during transformer station, dispatching automation personnel, monitor staff need with on-the-spot transformer station construction, commissioning staff verification pilot signal repeatedly.Along with the foundation of company's " big operation " system, transformer station's quantity of Surveillance center's monitoring grows with each passing day, and the checking signal workload is bigger, when the working site more for a long time because the monitor staff of dispatching center is limited, can incur loss through delay field adjustable work.The monitor staff needs the quantity of information of verification bigger simultaneously, in the process of checking signal, also influences the monitoring to electrical network.
Summary of the invention
The invention provides a kind of transformer station remote signalling function automatic checkout system, it not only can reduce both sides' workload, and improves the verification work efficiency of signal and the quality of assurance checking and accepting.
The present invention has adopted following technical scheme: a kind of transformer station remote signalling function automatic checkout system; It comprises data acquisition module, Open3000 system and management information system in enterprise; The input end of acquisition module is connected with transformer station; The output terminal of acquisition module is connected with the network transmission device of Open3000 system; The network interface of Open3000 system is connected with management information system in enterprise, and the network transmission device through the Open3000 system after acquisition module is gathered each state quantity signal in the transformer station sends the Open3000 system to, and the Open3000 system carries out the data in signal and the database to send management information system in enterprise to after the checking treatment; Management information system in enterprise is convenient to technician's inquiry to the function of outside open system data access.
Be telemetry-acquisition between described acquisition module and the transformer station; Telemetry-acquisition is that the alternating current in the transformer station, voltage, power, frequency, DC voltage, main transformer temperature and gear signal are gathered the back and uploaded to the monitoring backstage; Supplying the field operator that it is made operating mode keeps watch on; Behind foreign current and voltage input process voltage transformer (VT) and the current transformer isolated variable, forceful electric power is pressed, the magnitude of current converts corresponding light current voltage signal to; Input to A-D converter through low-pass filter again, get into central processing unit by A-D converter conversion back.After the processing of central processing unit sampled, digital, calculate various remote measurement calculated amount, the various remote measurement amounts of recomposition are given acquisition module through communication port.Be the remote signalling collection between described acquisition module and the transformer station, the quantity of state that comprehensive automation system of transformer substation should be gathered comprises: circuit-breaker status, disconnector state; The load tap changer signal; The transforming plant primary equipment alarm signal, various protection trip signals, anticipating signal; Adopt photoelectricity isolation method input system, all data according to joint provisions through data communication module stipulations are transferred to acquisition module at scheduling station and each factory's station end.Described Open3000 system comprises place of safety I, place of safety II and place of safety III; Place of safety I comprises network transmission line and data check circuit; Network transmission line is to be formed by router and serial communication devices in series; The data check circuit is formed by commercial data base server, SCADA server, AGC server workstation and PAS server serial connection successively, and acquisition module is connected with router, is connected with communication subsystem through data acquisition between network transmission line and the data check circuit; Network transmission line will be gathered the back signal and carry out after the verification of data check circuit through exporting to place of safety II and place of safety III behind the PAS server respectively; Place of safety II is the DTS subsystem, and place of safety III is the WEB subsystem, and signal is transferred to management information system in enterprise through the WEB subsystem after the verification; Management information system in enterprise is convenient to technician's inquiry to the function of outside open system data access.Being based on IEC60870-5-104, DL476-92 or DNP3.0 communications protocol between the router of described Open3000 system and the acquisition module transmits.Described acquisition module is a distant place acquisition module.
The present invention has following beneficial effect: the present invention can realize receiving in real time the information of transformer station's dispatch automated system; Signals such as transformer station's remote measurement that this intelligent checking system synchronization reflection dispatch automated system receives, remote signalling; After the present invention receives signals such as the remote measurement, remote signalling of transformer station; With benchmark remote signalling table intelligent checking in the database, and the defeated signal of will omitting, misinformate generates that form makes things convenient for the monitor staff and the field staff is auxiliary consults, and is easy to use; The present invention utilizes existing oOpen3000 system, the MIS of company net Platform Implementation signal synchronous collection, transfer function.Precision, real-time to acquired signal are had relatively high expectations, and have effectively improved the accuracy of checking and accepting signal, with existing production network be Platform Implementation data in real time share, effectively reduced staff's the duplication of labour in the checking and accepting.In sum; The regulation and control personnel cooperate the field staff of transformer station when checking signal; Accomplish checking and accepting in conjunction with this Acceptance Test System as aid; Can improve field personnel in the whole acceptance process and regulation and control personnel's work efficiency greatly, guarantee the accuracy of checking and accepting simultaneously, and provide many convenient for checking and accepting.
Description of drawings
Fig. 1 is a system chart of the present invention
Embodiment
Embodiment one, in Fig. 1, the invention provides a kind of transformer station remote signalling function automatic checkout system; It comprises data acquisition module, Open3000 system and management information system in enterprise, and the input end of acquisition module is connected with transformer station, and acquisition module is a distant place acquisition module; The output terminal of acquisition module is connected with the network transmission device of Open3000 system, and the network interface of Open3000 system is connected with management information system in enterprise, and the network transmission device through the Open3000 system after acquisition module is gathered each state quantity signal in the transformer station sends the Open3000 system to; Be the remote signalling collection between acquisition module and the transformer station; The quantity of state that comprehensive automation system of transformer substation should be gathered comprises: circuit-breaker status, disconnector state, load tap changer signal; The transforming plant primary equipment alarm signal; Various protection trip signals, anticipating signal adopts photoelectricity isolation method input system; All data are held with each factory station at scheduling station according to the stipulations of joint provisions through data communication module and are transferred to acquisition module; The Open3000 system carries out the data in signal and the database to send management information system in enterprise to after the checking treatment, and management information system in enterprise is convenient to technician's inquiry to the function of outside open system data access.The intelligence check-back signal is also shared on Enterprise MIS with the verification data result, and this automatic checkout system provides a login platform, supplies the on-site acceptance staff through MIS instant signal of checking and accepting on network.The Open3000 system comprises place of safety I, place of safety II and place of safety III; Place of safety I comprises network transmission line and data check circuit; Network transmission line is to be formed by router and serial communication devices in series; The data check circuit is formed by commercial data base server, SCADA server, AGC server workstation and PAS server serial connection successively; Acquisition module is connected with router, is based on IEC60870-5-104, DL476-92 or DNP3.0 communications protocol between the router of Open3000 system and the acquisition module and transmits, and is connected with communication subsystem through data acquisition between network transmission line and the data check circuit; Network transmission line will be gathered the back signal and carry out after the verification of data check circuit through exporting to place of safety II and place of safety III behind the PAS server respectively; Place of safety II is the DTS subsystem, and place of safety III is the WEB subsystem, and signal is transferred to management information system in enterprise through the WEB subsystem after the verification; Management information system in enterprise is convenient to technician's inquiry to the function of outside open system data access.
Also can be telemetry-acquisition between acquisition module of the present invention and the transformer station; Telemetry-acquisition is that the alternating current in the transformer station, voltage, power, frequency, DC voltage, main transformer temperature and gear signal are gathered the back and uploaded to the monitoring backstage; Supplying the field operator that it is made operating mode keeps watch on; Behind foreign current and voltage input process voltage transformer (VT) and the current transformer isolated variable, forceful electric power is pressed, the magnitude of current converts corresponding light current voltage signal to; Input to A-D converter through low-pass filter again, get into central processing unit by A-D converter conversion back.After the processing of central processing unit sampled, digital, calculate various remote measurement calculated amount, the various remote measurement amounts of recomposition are given acquisition module through communication port, and other are identical with embodiment one.

Claims (6)

1. transformer station's remote signalling function automatic checkout system; It is characterized in that it comprises data acquisition module, Open3000 system and management information system in enterprise; The input end of acquisition module is connected with transformer station; The output terminal of acquisition module is connected with the network transmission device of Open3000 system; The network interface of Open3000 system is connected with management information system in enterprise, and the network transmission device through the Open3000 system after acquisition module is gathered each state quantity signal in the transformer station sends the Open3000 system to, and the Open3000 system carries out the data in signal and the database to send management information system in enterprise to after the checking treatment; Management information system in enterprise is convenient to technician's inquiry to the function of outside open system data access.
2. transformer station according to claim 1 remote signalling function automatic checkout system; It is characterized in that being between described acquisition module and the transformer station telemetry-acquisition; Telemetry-acquisition is that the alternating current in the transformer station, voltage, power, frequency, DC voltage, main transformer temperature and gear signal are gathered the back and uploaded to the monitoring backstage, supplies the field operator that it is made operating mode and keeps watch on, and foreign current and voltage are imported through behind voltage transformer (VT) and the current transformer isolated variable; Forceful electric power is pressed; The magnitude of current converts corresponding light current voltage signal to, inputs to A-D converter through low-pass filter again, gets into central processing unit by A-D converter conversion back.After the processing of central processing unit sampled, digital, calculate various remote measurement calculated amount, the various remote measurement amounts of recomposition are given acquisition module through communication port.
3. transformer station according to claim 1 remote signalling function automatic checkout system; It is characterized in that being the remote signalling collection between described acquisition module and the transformer station, the quantity of state that comprehensive automation system of transformer substation should be gathered comprises: circuit-breaker status, disconnector state; The load tap changer signal; The transforming plant primary equipment alarm signal, various protection trip signals, anticipating signal; Adopt photoelectricity isolation method input system, all data according to joint provisions through data communication module stipulations are transferred to acquisition module at scheduling station and each factory's station end.
4. transformer station according to claim 1 remote signalling function automatic checkout system; It is characterized in that described Open3000 system comprises place of safety I, place of safety II and place of safety III; Place of safety I comprises network transmission line and data check circuit, and network transmission line is to be formed by router and serial communication devices in series, and the data check circuit is formed by commercial data base server, SCADA server, AGC server workstation and PAS server serial connection successively; Acquisition module is connected with router; Be connected with communication subsystem through data acquisition between network transmission line and the data check circuit, network transmission line will be gathered the back signal and carry out after the verification of data check circuit through exporting to place of safety II and safe III behind the PAS server respectively, and safe II is the DTS subsystem; Place of safety III is the WEB subsystem; Signal is transferred to management information system in enterprise through the WEB subsystem after the verification, and management information system in enterprise is convenient to technician's inquiry to the function of outside open system data access.
5. transformer station according to claim 1 remote signalling function automatic checkout system is characterized in that being based on IEC60870-5-104, DL476-92 or DNP3.0 communications protocol between router and the acquisition module of described Open3000 system transmits.
6. according to any described transformer station remote signalling function automatic checkout system among the claim 1-5, it is characterized in that described acquisition module is a distant place acquisition module.
CN2012100411419A 2012-02-23 2012-02-23 Automatic checkout system for transformer substation remote signaling function Active CN102621944B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100411419A CN102621944B (en) 2012-02-23 2012-02-23 Automatic checkout system for transformer substation remote signaling function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100411419A CN102621944B (en) 2012-02-23 2012-02-23 Automatic checkout system for transformer substation remote signaling function

Publications (2)

Publication Number Publication Date
CN102621944A true CN102621944A (en) 2012-08-01
CN102621944B CN102621944B (en) 2013-11-27

Family

ID=46561909

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100411419A Active CN102621944B (en) 2012-02-23 2012-02-23 Automatic checkout system for transformer substation remote signaling function

Country Status (1)

Country Link
CN (1) CN102621944B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102938098A (en) * 2012-10-15 2013-02-20 深圳供电局有限公司 Power grid operation manner expert system
CN103279834A (en) * 2013-06-03 2013-09-04 国家电网公司 Transformer substation monitoring information classification automated processing method
CN103412533A (en) * 2013-08-01 2013-11-27 国家电网公司 Automatic checking system of smart power grid dispatching monitoring information
CN105046344A (en) * 2015-05-15 2015-11-11 北京科东电力控制系统有限责任公司 Primary station data quality optimizing method for intelligent power grid dispatching technical support system
CN105207364A (en) * 2015-10-19 2015-12-30 国家电网公司 Automated management system of power distribution network
CN105404269A (en) * 2015-10-23 2016-03-16 江苏省电力公司南京供电公司 Three-remote signal acceptance system of intelligent transformer station
CN105554454A (en) * 2015-12-15 2016-05-04 成都交大光芒科技股份有限公司 Visual tele-control monitoring system and method for isolating switch
CN106300676A (en) * 2016-09-21 2017-01-04 国网天津市电力公司 A kind of implementation method of Centralized Monitoring transformer station remote signalling lexical or textual analysis function
CN107453485A (en) * 2017-09-04 2017-12-08 国网安徽省电力公司合肥供电公司 A kind of management and running information method for inspecting and system
CN107785893A (en) * 2017-11-21 2018-03-09 国网四川省电力公司眉山供电公司 220kV and following power network a kind of remote signalling error analysis methodology
CN109818420A (en) * 2019-03-26 2019-05-28 国网北京市电力公司 Measuring and controlling equipment and TT&C system
CN111934433A (en) * 2020-08-28 2020-11-13 中域高科(武汉)信息技术有限公司 Automatic rechecking method, device, equipment and system for transformer substation monitoring background

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006164182A (en) * 2004-12-10 2006-06-22 Bridgestone Corp Fa information management system and method
CN201289606Y (en) * 2008-11-12 2009-08-12 石家庄供电公司 Networking five-defense closedown system of unmanned on-duty transforming plant
CN101846985A (en) * 2009-03-25 2010-09-29 鸿富锦精密工业(深圳)有限公司 Remote data acquisition system and method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006164182A (en) * 2004-12-10 2006-06-22 Bridgestone Corp Fa information management system and method
CN201289606Y (en) * 2008-11-12 2009-08-12 石家庄供电公司 Networking five-defense closedown system of unmanned on-duty transforming plant
CN101846985A (en) * 2009-03-25 2010-09-29 鸿富锦精密工业(深圳)有限公司 Remote data acquisition system and method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘海霞: "基于标准化平台的电网调度自动化集成系统", 《中国优秀硕士学位论文全文数据库(信息科技辑)》 *
国家电力调度通信中心: "《国家电网公司继电保护培训教材(上册)》", 31 May 2009, 中国电力出版社 *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102938098A (en) * 2012-10-15 2013-02-20 深圳供电局有限公司 Power grid operation manner expert system
CN103279834A (en) * 2013-06-03 2013-09-04 国家电网公司 Transformer substation monitoring information classification automated processing method
CN103412533A (en) * 2013-08-01 2013-11-27 国家电网公司 Automatic checking system of smart power grid dispatching monitoring information
CN103412533B (en) * 2013-08-01 2016-03-02 国家电网公司 The mechanical check system of intelligent grid dispatching and monitoring information
CN105046344A (en) * 2015-05-15 2015-11-11 北京科东电力控制系统有限责任公司 Primary station data quality optimizing method for intelligent power grid dispatching technical support system
CN105046344B (en) * 2015-05-15 2020-02-18 北京科东电力控制系统有限责任公司 Master station data quality optimization method for support system of intelligent power grid scheduling technology
CN105207364A (en) * 2015-10-19 2015-12-30 国家电网公司 Automated management system of power distribution network
CN105404269B (en) * 2015-10-23 2017-09-19 江苏省电力公司南京供电公司 A kind of remote signalling Acceptance Test System of intelligent substation three
CN105404269A (en) * 2015-10-23 2016-03-16 江苏省电力公司南京供电公司 Three-remote signal acceptance system of intelligent transformer station
CN105554454B (en) * 2015-12-15 2018-07-13 成都交大光芒科技股份有限公司 Disconnecting switch visualizes Remote monitor and control system and method
CN105554454A (en) * 2015-12-15 2016-05-04 成都交大光芒科技股份有限公司 Visual tele-control monitoring system and method for isolating switch
CN106300676A (en) * 2016-09-21 2017-01-04 国网天津市电力公司 A kind of implementation method of Centralized Monitoring transformer station remote signalling lexical or textual analysis function
CN107453485A (en) * 2017-09-04 2017-12-08 国网安徽省电力公司合肥供电公司 A kind of management and running information method for inspecting and system
CN107453485B (en) * 2017-09-04 2020-02-21 国网安徽省电力公司合肥供电公司 Scheduling operation information inspection method and system
CN107785893A (en) * 2017-11-21 2018-03-09 国网四川省电力公司眉山供电公司 220kV and following power network a kind of remote signalling error analysis methodology
CN109818420A (en) * 2019-03-26 2019-05-28 国网北京市电力公司 Measuring and controlling equipment and TT&C system
CN111934433A (en) * 2020-08-28 2020-11-13 中域高科(武汉)信息技术有限公司 Automatic rechecking method, device, equipment and system for transformer substation monitoring background

Also Published As

Publication number Publication date
CN102621944B (en) 2013-11-27

Similar Documents

Publication Publication Date Title
CN102621944B (en) Automatic checkout system for transformer substation remote signaling function
CN103217566A (en) Current online monitoring integrated system of on-load tap changer
CN201699481U (en) Intelligent controller of 10-20kV section switch
CN102539971A (en) Electric energy quality monitoring terminal of intelligent substation
CN104242472B (en) A kind of railway station low buckling distribution intelligent monitor system
CN103066696A (en) Monitoring system of photovoltaic power generation unit
CN107896005A (en) A kind of comprehensive automation system of transformer substation
CN202404181U (en) Novel intelligent transformer station electric energy quality monitoring terminal
CN203259586U (en) Current on-line monitoring integrated system of on-load tap-changer
CN103560583A (en) Micro-unit monitor based on DSP
CN202257904U (en) Remote wireless monitoring system of filed device
CN201138439Y (en) Customer integrated automation data acquisition system
CN108964259A (en) A kind of power grid intelligence control system
CN103199626A (en) Switch cabinet integrated monitoring terminal
CN203251142U (en) Switch cabinet integrated monitoring terminal
CN207518354U (en) A kind of comprehensive automation system of transformer substation
CN203251140U (en) Monitoring system of photovoltaic power generation unit
CN205070606U (en) Novel DTU and distribution network automation system for distribution network automation
CN204334123U (en) Intelligent power network power transmission and transforming equipment on-Line Monitor Device
CN209545252U (en) A kind of intelligent substation management system
CN203630949U (en) Intelligent power distribution wireless collecting module based on ZIGBEE
CN203908586U (en) Smart current transformer of ring main unit
CN202424316U (en) Power quality monitoring terminal applicable to smart grid
CN201846133U (en) Intelligent control device of 10KV-20KVcable ring main unit
CN103236810B (en) Intelligent electric machine control protection system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: JIANGSU ELECTRIC POWER COMPANY TAIZHOU POWER SUPPL

Effective date: 20121122

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: TAIZHOU POWER SUPPLY CO. OF JIANGSU ELECTRIC POWER CO.

Effective date: 20121122

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 225300 TAIZHOU, JIANGSU PROVINCE TO: 100031 XICHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20121122

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: Jiangsu Electric Power Company

Applicant after: Taizhou Power Supply Co. of Jiangsu Electric Power Co.

Address before: 225300 Phoenix West Road, Jiangsu, Taizhou, No. 2

Applicant before: Taizhou Power Supply Co. of Jiangsu Electric Power Co.

C14 Grant of patent or utility model
GR01 Patent grant