CN102620634A - 重要结构构件应力应变监测方法 - Google Patents

重要结构构件应力应变监测方法 Download PDF

Info

Publication number
CN102620634A
CN102620634A CN2012100482895A CN201210048289A CN102620634A CN 102620634 A CN102620634 A CN 102620634A CN 2012100482895 A CN2012100482895 A CN 2012100482895A CN 201210048289 A CN201210048289 A CN 201210048289A CN 102620634 A CN102620634 A CN 102620634A
Authority
CN
China
Prior art keywords
data
strain
monitoring
monitoring point
stress
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100482895A
Other languages
English (en)
Inventor
蔡庆军
郭青松
吴洪章
姜滨厚
周方华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN2012100482895A priority Critical patent/CN102620634A/zh
Publication of CN102620634A publication Critical patent/CN102620634A/zh
Pending legal-status Critical Current

Links

Abstract

本发明公开了一种重要结构构件应力应变监测方法,在建筑结构上布置复数个监测点;在所述建筑结构的每一所述监测点上安装固定至少三个应变传感器;收集所述应变传感器的数据并存储,并将每一所述监测点对应的数据作为该监测点的初始工况数据;再次收集所述应变传感器的数据并进行温度修正;存储温度修正后的所述数据,并将每一所述监测点对应的数据作为该监测点的当前工况数据;通过所述当前工况数据和所述初始工况数据分析对应监测点的应力和应变的大小。由于采用了本发明的一种重要结构构件应力应变监测方法,具有步骤简单、监测精确的优点,从而确保结构在风荷载、施工荷载、温度荷载、偶然荷载等作用下受力安全。

Description

重要结构构件应力应变监测方法
技术领域
本发明涉及一种监测方法,尤指一种重要结构构件应力应变监测方法。 
背景技术
重要结构构件应力应变监控对于建成后结构的施工质量,保证在施工过程与运营状态的安全性有着至关重要的作用,而目前尚缺乏一种有效的针对建筑物结构压缩变形的监测方法。 
发明内容
本发明的目的在于克服现有技术的缺陷,而提供一种重要结构构件应力应变监测方法,具有步骤简单、监测精确的优点,从而确保结构在风荷载、施工荷载、温度荷载、偶然荷载等作用下受力安全。 
实现上述目的的技术方案是: 
本发明的一种重要结构构件应力应变监测方法,包括如下步骤: 
在建筑结构上布置复数个监测点; 
在所述建筑结构的每一所述监测点上安装固定至少三个应变传感器; 
收集所述应变传感器的数据并存储,并将每一所述监测点对应的数据作为该监测点的初始工况数据; 
再次收集所述应变传感器的数据并进行温度修正; 
存储温度修正后的所述数据,并将每一所述监测点对应的数据作为该监测点的当前工况数据; 
通过所述当前工况数据和所述初始工况数据分析对应监测点的应力和应变的大小。 
上述应变传感器分别安装固定于对应所述监测点的不同应力方向。 
当上述建筑结构为金属结构时,所述应变传感器通过电弧焊接或螺接的方式安装固定于所述监测点; 
当所述建筑结构为混凝土结构时,所述应变传感器通过粘接或锚杆钻孔的方式安装固定于所述监测点。 
上述应变传感器采用振弦式应变计。 
通过一频率读数仪收集上述应变传感器的数据并存储。 
本发明由于采用了以上技术方案,使其具有以下有益效果是: 
每一监测点上安装固定至少三个分别安装固定于不同应力方向的应变传感器,使得通过检测能够全面了解每一监测点实际应力状态,对于不同机构的建筑结构应变传感器采用不同的固定方法,确保传感器与建筑结构的有效连接,保证监测结果的精确性。振弦式应变计的采用保证了监测过程的具有精度高、防水性能好,稳定性强特点。振弦式读数仪实现监测数据的采集和存储。温度修正保证了监测结果的精确度。 
具体实施方式
下面结合具体实施例对本发明作进一步说明。 
本发明的一种重要结构构件应力应变监测方法,包括如下步骤: 
首先,在建筑结构上布置复数个监测点; 
然后,在建筑结构的每一监测点上安装固定至少三个振弦式应变计; 
当建筑结构为金属结构时,振弦式应变计通过电弧焊接或螺接的方式安装固定于监测点;当建筑结构为混凝土结构时,振弦式应变计通过粘接或锚杆钻孔的方式安装固定于监测点;确保振弦式应变计与建筑结构的有效连接,保证监测结果的精确性。而为全面了解监测点实际应力状态,振弦式应变计分别安装固定于对应监测点的不同应力方向。 
振弦式应变计的采用保证了监测过程的具有精度高、防水性能好,稳定性强特点。 
接着,通过一频率读数仪收集振弦式应变计的数据并存储,并将每一监测点对应的数据作为该监测点的初始工况数据;振弦式读数仪实现监测数据的采集和存储;全密封结构的设计使得读数仪可在各种恶劣环境下工作。大屏幕液晶显示器具有高亮背光,即使在夜晚也能清晰显示读数。读数仪不仅可直接显示各种振弦式仪器的振弦信号与温度,存储的数据可通过通讯电缆传输到计算机上并输入电子表格或数据库。利用RS-485通讯接口可实现对接入系列集线箱的振弦式仪器进行自动测量并存储读数。振弦式读数仪采用轻巧的优质铝合金外壳,先进的锂离子电池供电并具有充电接口。读数仪体积小,重量轻,携带十分方便。 
然后,再次收集应变传感器的数据并进行温度修正,实测应变要扣除温度的影响,由于每一个振弦应变计都带有温度计,可直接根据温度读数 进行温度修正,温度修正保证了监测结果的精确度; 
接着,通过振弦式读数仪存储温度修正后的数据,存储的数据可通过通讯电缆传输到计算机上并输入电子表格或数据库,并将每一监测点对应的数据作为该监测点的当前工况数据; 
再次收集应变传感器的数据并存储,并将每一监测点对应的数据作为该监测点的当前工况数据; 
最后,通过当前工况数据和初始工况数据分析对应监测点的应力和应变的大小,计算初始工况数据和当前工况数据中形变数据的差值的绝对值;根据该绝对值的数值大小判断的当前应变量的大小。当建筑结构往上施工时,外框钢柱将分担部分荷载,其中该荷载包括结构自重,施工设备以及各种施工活荷载等。外框钢柱受力后,将会产生相应的形变,譬如受压后钢柱会被压缩,反之受拉后被拉长。根据虎克定律,材料的变形与受力状态存在着一定的关系,简单来说就是应力等于应变和材料弹性模量的乘积。通过计算获得应力。 
以上结合实施例对本发明进行了详细说明,本领域中普通技术人员可根据上述说明对本发明做出种种变化例。因而,实施例中的某些细节不应构成对本发明的限定,本发明将以所附权利要求书界定的范围作为本发明的保护范围。 

Claims (5)

1.一种重要结构构件应力应变监测方法,其特征在于,包括如下步骤:
在建筑结构上布置复数个监测点;
在所述建筑结构的每一所述监测点上安装固定至少三个应变传感器;
收集所述应变传感器的数据并存储,并将每一所述监测点对应的数据作为该监测点的初始工况数据;
再次收集所述应变传感器的数据并进行温度修正;
存储温度修正后的所述数据,并将每一所述监测点对应的数据作为该监测点的当前工况数据;
通过所述当前工况数据和所述初始工况数据分析对应监测点的应力和应变的大小。
2.根据权利要求1所述的重要结构构件应力应变监测方法,其特征在于,所述应变传感器分别安装固定于对应所述监测点的不同应力方向。
3.根据权利要求2所述的重要结构构件应力应变监测方法,其特征在于,
当所述建筑结构为金属结构时,所述应变传感器通过电弧焊接或螺接的方式安装固定于所述监测点;
当所述建筑结构为混凝土结构时,所述应变传感器通过粘接或锚杆钻孔的方式安装固定于所述监测点。
4.根据权利要求2或3所述的重要结构构件应力应变监测方法,其特征在于,所述应变传感器采用振弦式应变计。
5.根据权利要求4所述的重要结构构件应力应变监测方法,其特征在于,通过一频率读数仪收集所述应变传感器的数据并存储。
CN2012100482895A 2012-02-28 2012-02-28 重要结构构件应力应变监测方法 Pending CN102620634A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100482895A CN102620634A (zh) 2012-02-28 2012-02-28 重要结构构件应力应变监测方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100482895A CN102620634A (zh) 2012-02-28 2012-02-28 重要结构构件应力应变监测方法

Publications (1)

Publication Number Publication Date
CN102620634A true CN102620634A (zh) 2012-08-01

Family

ID=46560709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100482895A Pending CN102620634A (zh) 2012-02-28 2012-02-28 重要结构构件应力应变监测方法

Country Status (1)

Country Link
CN (1) CN102620634A (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102968922A (zh) * 2012-12-03 2013-03-13 河海大学 超静定结构温度应力实验装置
CN103149100A (zh) * 2013-02-18 2013-06-12 东南大学 一种混凝土轴心拉伸徐变试验仪及测试方法
CN104727288A (zh) * 2015-03-20 2015-06-24 济南轨道交通集团有限公司 锚索自由段周围岩土体位移、压力测试装置及方法
CN104501863B (zh) * 2014-12-10 2016-09-28 西安工程大学 复合横担应力应变在线监测系统及其监测方法
CN106840477A (zh) * 2017-01-16 2017-06-13 长沙理工大学 一种长期监测psc结构预应力损失的装置及方法
CN107655617A (zh) * 2017-09-30 2018-02-02 广西交通科学研究院有限公司 振弦式压力传感器的温度影响修正方法
CN107727018A (zh) * 2017-09-30 2018-02-23 广西交通科学研究院有限公司 振弦式应变传感器的温度影响修正方法
CN108548627A (zh) * 2018-03-26 2018-09-18 广船国际有限公司 一种船舶结构热点应力的监测方法
CN109708691A (zh) * 2018-12-07 2019-05-03 岭东核电有限公司 一种多通道温度及应力应变在线测量集成系统及方法
CN111855027A (zh) * 2020-07-30 2020-10-30 河北建设勘察研究院有限公司 一种桥梁结构中桥面板和新建承台的应力监测方法
CN112129239A (zh) * 2020-09-23 2020-12-25 北京城建集团有限责任公司 一种建筑模板支撑系统的监测方法及装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5553504A (en) * 1993-11-23 1996-09-10 Grumman Aerospace Corporation Intrumented patch for repair of fatigue damaged or sensitive structure
CN201141786Y (zh) * 2007-12-26 2008-10-29 上海市建筑装饰工程有限公司 一种建筑物结构改造信息化监测系统
CN101469968A (zh) * 2007-12-27 2009-07-01 上海市建筑装饰工程有限公司 建筑结构原位变形监测方法
CN101963532A (zh) * 2010-08-12 2011-02-02 刘文峰 桥梁重要构件应力分布的监测方法
CN102032957A (zh) * 2010-11-25 2011-04-27 中铁六局集团有限公司 钢管混凝土拱桥拱脚节点应力监测方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5553504A (en) * 1993-11-23 1996-09-10 Grumman Aerospace Corporation Intrumented patch for repair of fatigue damaged or sensitive structure
CN201141786Y (zh) * 2007-12-26 2008-10-29 上海市建筑装饰工程有限公司 一种建筑物结构改造信息化监测系统
CN101469968A (zh) * 2007-12-27 2009-07-01 上海市建筑装饰工程有限公司 建筑结构原位变形监测方法
CN101963532A (zh) * 2010-08-12 2011-02-02 刘文峰 桥梁重要构件应力分布的监测方法
CN102032957A (zh) * 2010-11-25 2011-04-27 中铁六局集团有限公司 钢管混凝土拱桥拱脚节点应力监测方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张如一等: "《应变电测与传感器》", 31 January 1999, 清华大学出版社 *
李书兵: "大跨度拱桥支架应力应变监测及分析", 《建筑》 *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102968922A (zh) * 2012-12-03 2013-03-13 河海大学 超静定结构温度应力实验装置
CN103149100A (zh) * 2013-02-18 2013-06-12 东南大学 一种混凝土轴心拉伸徐变试验仪及测试方法
CN104501863B (zh) * 2014-12-10 2016-09-28 西安工程大学 复合横担应力应变在线监测系统及其监测方法
CN104727288A (zh) * 2015-03-20 2015-06-24 济南轨道交通集团有限公司 锚索自由段周围岩土体位移、压力测试装置及方法
CN106840477A (zh) * 2017-01-16 2017-06-13 长沙理工大学 一种长期监测psc结构预应力损失的装置及方法
CN106840477B (zh) * 2017-01-16 2019-03-08 长沙理工大学 一种长期监测psc结构预应力损失的装置及方法
CN107727018A (zh) * 2017-09-30 2018-02-23 广西交通科学研究院有限公司 振弦式应变传感器的温度影响修正方法
CN107655617A (zh) * 2017-09-30 2018-02-02 广西交通科学研究院有限公司 振弦式压力传感器的温度影响修正方法
CN107727018B (zh) * 2017-09-30 2020-03-03 广西交通科学研究院有限公司 振弦式应变传感器的温度影响修正方法
CN107655617B (zh) * 2017-09-30 2020-08-14 广西交科集团有限公司 振弦式压力传感器的温度影响修正方法
CN108548627A (zh) * 2018-03-26 2018-09-18 广船国际有限公司 一种船舶结构热点应力的监测方法
CN108548627B (zh) * 2018-03-26 2020-12-04 广船国际有限公司 一种船舶结构热点应力的监测方法
CN109708691A (zh) * 2018-12-07 2019-05-03 岭东核电有限公司 一种多通道温度及应力应变在线测量集成系统及方法
CN111855027A (zh) * 2020-07-30 2020-10-30 河北建设勘察研究院有限公司 一种桥梁结构中桥面板和新建承台的应力监测方法
CN112129239A (zh) * 2020-09-23 2020-12-25 北京城建集团有限责任公司 一种建筑模板支撑系统的监测方法及装置

Similar Documents

Publication Publication Date Title
CN102620634A (zh) 重要结构构件应力应变监测方法
CN104344993B (zh) 一种构件承载力和材料性能参数的试验测量方法
CN203758658U (zh) 输电线路力学监测数字传感器
CN106441761A (zh) 一种发动机叶片的疲劳试验装置
CN203908712U (zh) 输电线路铁塔应力在线监测系统
CN202033191U (zh) 基于物联网的智能型风力发电机轴承监测系统
CN201731984U (zh) 基于无线倾角的桥梁结构挠度测量系统
CN206177542U (zh) 一种发动机叶片的疲劳试验装置
CN205246013U (zh) 一种电缆曲率测量装置
CN107525685A (zh) 一种气动凿岩机性能的测试系统及其测试系统
CN102507175A (zh) 栓接结合面的法向静力学特性测试实验装置
CN102620877B (zh) 利用螺栓固有频率测量螺栓载荷的方法
CN106225982A (zh) 一种螺栓弯矩与拉力解耦测试传感器及其测试方法
CN202947794U (zh) 变压器器身表面振动信号的采集测试装置
CN203350139U (zh) 高温旋转弯曲疲劳裂纹扩展测量装置
CN103323282A (zh) 一种塔式起重机安全评估方法及其评估设备
CN204984740U (zh) 风力发电机塔筒结构监测系统
CN207227503U (zh) 一种基于多加速度传感器信息融合的振动时效效果在线评价系统
CN203133054U (zh) 一种小麦茎秆抗倒性的量化与分析系统
CN102998042B (zh) 离合器拖曳转矩测量装置
CN201096746Y (zh) 铝合金点焊过程质量监测仪
CN202946137U (zh) 一种基于多传感器信息融合的抽油井数字示功仪
CN202329994U (zh) 栓接结合面的法向静力学特性测试实验装置
CN103033252A (zh) 变压器器身表面振动信号的采集方法
CN203432944U (zh) 一种木材应力波缺陷检测装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120801