CN102620616A - 阶梯式超前掘进同步光爆施工巷道的方法 - Google Patents

阶梯式超前掘进同步光爆施工巷道的方法 Download PDF

Info

Publication number
CN102620616A
CN102620616A CN2012101110921A CN201210111092A CN102620616A CN 102620616 A CN102620616 A CN 102620616A CN 2012101110921 A CN2012101110921 A CN 2012101110921A CN 201210111092 A CN201210111092 A CN 201210111092A CN 102620616 A CN102620616 A CN 102620616A
Authority
CN
China
Prior art keywords
quick
fried
construction
synchronizable optical
district
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101110921A
Other languages
English (en)
Inventor
董金奎
范作鹏
张忠辉
邱俊刚
孙广华
王相君
商继红
于斌
董金波
邱英魁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Gold Mining (laizhou) Co Ltd Jiaojia Gold Mine
Original Assignee
Shandong Gold Mining (laizhou) Co Ltd Jiaojia Gold Mine
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Gold Mining (laizhou) Co Ltd Jiaojia Gold Mine filed Critical Shandong Gold Mining (laizhou) Co Ltd Jiaojia Gold Mine
Priority to CN2012101110921A priority Critical patent/CN102620616A/zh
Publication of CN102620616A publication Critical patent/CN102620616A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明是一种阶梯式超前掘进同步光爆施工巷道的方法,首先施工自由空间区,自由空间区的上方为同步光爆区,前方为施工超前掘进区,然后在同步光爆区和超前掘进区分别施工炮孔,最后装药、起爆、清理岩石;循环上述步骤直至完成巷道施工。确保了爆破面整齐、规则,半壁孔率更高,克服了现有施工方法一次成巷效果不佳,需要二次压顶修复造成施工成本相对较高的缺陷。

Description

阶梯式超前掘进同步光爆施工巷道的方法
 
技术领域  
本发明涉及一种巷道掘进施工技术,具体地说,是一种阶梯式超前掘进同步光爆施工巷道的方法。
背景技术  
在井下重要开拓巷道掘进过程中,多数采用光面爆破技术进行施工,通过提高井巷工程的开挖顶板和两帮整齐程度,达到提高顶板和两帮岩石稳固性的效果。但是由于施工方法、施工参数、爆破效果等各种因素,造成在实际施工中爆破效果不是很理想,普遍存在爆破面不整齐或不连续的现象,达不到标准,在实际工作中往往不得不进行二次压顶修复才能满足要求,导致施工效率不高。
在施工方法方面,现有的光面爆破方式是全断面(或称为同一断面)气爆。这种做法的主要缺点是,由于爆破间隔较短,而且爆破后会产生岩体膨胀,导致靠近顶板和两帮设计位置的炮眼内炸药起爆时自由空间较小,进而导致爆破面不整齐或不连续,半壁孔率仅50~60%。
发明内容  
本发明所要解决的技术问题是,提供一种阶梯式超前掘进同步光爆施工巷道的方法,确保爆破面整齐、规则,半壁孔率更高,以克服现有施工方法一次成巷效果不佳,需要二次压顶修复造成施工成本相对较高的缺陷。
本发明提供的技术方案是:
一种阶梯式超前掘进同步光爆施工巷道的方法,其特征在于按照以下步骤施工:
首先施工自由空间区,其深度2~2.5米,高度为巷道总高度的60~93%,自由空间区的上方为同步光爆区,自由空间区的前方为施工超前掘进区,施工超前掘进区的深度与自由空间区深度相同;
然后在同步光爆区和超前掘进区分别施工同步光爆炮孔和超前掘进炮孔,在施工超前掘进炮孔时,按照同步光爆区的设计要求需要施工一排靠近同步光爆区的分界炮孔,在施工同步光爆炮孔时,使作为边孔的同步光爆炮孔的轴线向外偏斜3~5°;炮孔直径为同步光爆区厚度的5~10%;孔距为同步光爆区厚度的75~90%; 
最后装药、起爆、清理岩石;
循环上述步骤直至完成巷道施工。
装药结构分为堵塞段、孔底加强段和均匀装药段三段,堵塞段的长度为0.2~0.3m,均匀装药段采用轴向间隔不偶合装药,并要求沿孔轴线方向均匀分布。
起爆采用毫秒非电塑料导爆管起爆系统。
药卷直径32mm,不偶合系数为1.25;装药密度为150-200g/m。
本发明的积极效果在于:
本发明采用了阶梯式超前掘进同步光爆施工方法,其中同步光爆区起爆时具有足够的自由空间,爆破效果好,爆破面整齐、规则。经实验半壁孔率提高到95%左右。
采用本发明的施工方法,不仅可以节省修整巷道费用,并可减少大量巷道喷射砼支护巷道费用,综合经济效益明显。同时由于该技术方案施工可靠,爆破效果优良,无需二次修复,对提高生产效率具有积极作用,如推广应用其社会效益明显。
附图说明
图1是本发明施工方法的原理示意图。
图2是图1的端面示意图。
图3是本发明实际施工的金矿巷道的效果图片。
具体实施方式
下面结合附图和实施例进一步说明本发明。
一、施工超前掘进区、同步光爆区和自由空间区
首先施工自由空间区C,其深度2~2.5米,高度为巷道总高度的60~93%,自由空间区C的上方为同步光爆区B,自由空间区C的前方为施工超前掘进区A,施工超前掘进区A的深度与自由空间区C深度相同。
二、施工炮孔
然后在同步光爆区B和超前掘进区A分别施工同步光爆炮孔B1和超前掘进炮孔A1。在施工同步光爆炮孔B1时,使作为边孔的同步光爆炮孔B1的轴线向外偏斜3~5°,以确保孔底落在设计轮廓线外100~150mm处,以便在钻凿下一循环同步光爆炮孔B1钻机有足够的空间可用。
在施工超前掘进炮孔A1时,按照同步光爆区B的设计要求需要施工一排靠近同步光爆区B的分界炮孔A2,该排分界炮孔A2起爆后留出下一循环同步光爆区B的壁面。
炮孔直径为同步光爆区B厚度的5~10%。坚硬、稳定的岩石上,眼距应大而抵抗线应小,一般采用60-70cm。
孔距为同步光爆区B厚度的75~90%,本发明优选60cm。
三、装药与起爆
1)、 炸药选取:针对岩石坚硬的情况,通过引进“粒状乳化铵油炸药”,各项性能指标均优于传统使用的2#岩石乳化炸药,有利于提高爆破效果。
2)、装药结构:分为堵塞段、孔底加强段和均匀装药段三段,堵塞段的作用是延长爆生气体的作用时间,且保证孔口段只产生裂缝而不出现爆破漏斗,本发明优选0.2~0.3m。孔底加强段:由于孔底受岩石夹持作用,故需用较大的线装药密度。均匀装药段一般为轴向间隔不偶合装药,并要求沿孔轴线方向均匀分布。
3)、起爆:本发明采用的是毫秒非电塑料导爆管起爆系统,为保证同时起爆,光面爆破最后采用导爆索起爆,并采用分段并联法。光爆层可采用导爆索连接,也可使用一段毫秒导爆管。
本发明采用的是直径32mm的药卷,不偶合系数为1.25。
装药密度:在保证沿炮孔连心线破裂的前提下,应尽可能少装药。本发明优选采用150-200g/m。
影响轮廓爆破质量的因素,除施工方法和爆破参数外,主要是钻孔设计位置和施工精度。这是因为爆生裂缝极易沿岩体原生裂隙、节理发展,而钻孔精度则是保证周边控爆质量的先决条件。为了控制炮孔底部的偏离,本发明选用对空间要求较小的优良钻机(一般采用YT28),凿岩时边孔口开在设计轮廓线上。此外,炮孔之间要互相平行,孔底要落在同一平面上。
本发明申请人焦家金矿西矿区利用本发明的施工方法已经实现掘进500多米,全部巷道光面爆破质量较好,参见图3。

Claims (4)

1.一种阶梯式超前掘进同步光爆施工巷道的方法,其特征在于按照以下步骤施工:
首先施工自由空间区(C),其深度2~2.5米,高度为巷道总高度的60~93%,自由空间区(C)的上方为同步光爆区(B),自由空间区(C)的前方为施工超前掘进区(A),施工超前掘进区(A)的深度与自由空间区(C)深度相同;
然后在同步光爆区(B)和超前掘进区(A)分别施工同步光爆炮孔(B1)和超前掘进炮孔(A1),在施工超前掘进炮孔(A1)时,按照同步光爆区(B)的设计要求需要施工一排靠近同步光爆区(B)的分界炮孔(A2),在施工同步光爆炮孔(B1)时,使作为边孔的同步光爆炮孔(B1)的轴线向外偏斜3~5°;炮孔直径为同步光爆区(B)厚度的5~10%;孔距为同步光爆区(B)厚度的75~90%; 
最后装药、起爆、清理岩石;
循环上述步骤直至完成巷道施工。
2.如权利要求1所述的阶梯式超前掘进同步光爆施工巷道的方法,其特征在于:装药结构分为堵塞段、孔底加强段和均匀装药段三段,堵塞段的长度为0.2~0.3m,均匀装药段采用轴向间隔不偶合装药,并要求沿孔轴线方向均匀分布。
3.如权利要求1所述的阶梯式超前掘进同步光爆施工巷道的方法,其特征在于:起爆采用毫秒非电塑料导爆管起爆系统。
4.如权利要求1所述的阶梯式超前掘进同步光爆施工巷道的方法,其特征在于:药卷直径32mm,不偶合系数为1.25;装药密度为150-200g/m。
CN2012101110921A 2012-04-17 2012-04-17 阶梯式超前掘进同步光爆施工巷道的方法 Pending CN102620616A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101110921A CN102620616A (zh) 2012-04-17 2012-04-17 阶梯式超前掘进同步光爆施工巷道的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101110921A CN102620616A (zh) 2012-04-17 2012-04-17 阶梯式超前掘进同步光爆施工巷道的方法

Publications (1)

Publication Number Publication Date
CN102620616A true CN102620616A (zh) 2012-08-01

Family

ID=46560692

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101110921A Pending CN102620616A (zh) 2012-04-17 2012-04-17 阶梯式超前掘进同步光爆施工巷道的方法

Country Status (1)

Country Link
CN (1) CN102620616A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109611094A (zh) * 2018-12-25 2019-04-12 山东黄金矿业(莱西)有限公司 一种气囊悬顶充填采矿法
CN110057257A (zh) * 2019-04-24 2019-07-26 中南大学 硬岩隧道光面爆破光爆孔无导爆索无竹片三段式装药结构与装药方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101520292A (zh) * 2009-03-12 2009-09-02 路桥集团国际建设股份有限公司 一种隧道式锚碇洞室的开挖爆破方法
CN101893415A (zh) * 2010-04-20 2010-11-24 中矿金业股份有限公司 拱形控顶光面控柱爆破方法
CN102252570A (zh) * 2011-06-29 2011-11-23 中国一冶集团有限公司 深坑岩体爆破开挖施工方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101520292A (zh) * 2009-03-12 2009-09-02 路桥集团国际建设股份有限公司 一种隧道式锚碇洞室的开挖爆破方法
CN101893415A (zh) * 2010-04-20 2010-11-24 中矿金业股份有限公司 拱形控顶光面控柱爆破方法
CN102252570A (zh) * 2011-06-29 2011-11-23 中国一冶集团有限公司 深坑岩体爆破开挖施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
胡正平: "预留光爆层全断面一次爆破在光爆中的应用", 《爆破器材》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109611094A (zh) * 2018-12-25 2019-04-12 山东黄金矿业(莱西)有限公司 一种气囊悬顶充填采矿法
CN110057257A (zh) * 2019-04-24 2019-07-26 中南大学 硬岩隧道光面爆破光爆孔无导爆索无竹片三段式装药结构与装药方法
CN110057257B (zh) * 2019-04-24 2021-07-16 中南大学 硬岩隧道光面爆破光爆孔无导爆索无竹片三段式装药结构与装药方法

Similar Documents

Publication Publication Date Title
CN108661643B (zh) 一种采煤工作面末采回撤通道切顶卸压护巷方法
CN102808622B (zh) 中深孔、深孔联合爆破技术回收矿柱的方法
CN110779403B (zh) 一种复杂环境下露天深孔台阶预裂孔逐孔起爆预裂爆破成缝的方法
CN102587916B (zh) 一种崩矿嗣后充填采矿方法
CN104453904B (zh) 免拉槽分段充填采矿法
CN102182461A (zh) 倾斜中厚金属矿体高效采矿方法
CN104790954A (zh) 巷旁充填沿空留巷切顶爆破卸压方法
CN109900174B (zh) 适用于不同分段高度的快速爆破拉槽方法
CN110307762B (zh) 一种基于深孔逐孔起爆技术的天井快速成井方法
CN108132005B (zh) 一种中深孔上向孔内微差爆破的方法
CN111551084B (zh) 一种大倾角煤层深孔爆破落煤方法
CN104895574A (zh) 一种大截面隧道控制爆破振速的施工方法
CN106440981B (zh) 节理裂隙发育花岗岩矿山提高大块产率的深孔爆破方法
CN111256549A (zh) 一种岩巷深孔多重楔直孔内分段微差掏槽爆破方法
CN108625855B (zh) 一种充填体下的采矿方法
CN114166082A (zh) 一种隧道超前钻探孔组合精确控制爆破结构及施工工艺
CN102620616A (zh) 阶梯式超前掘进同步光爆施工巷道的方法
CN204782953U (zh) 外定向多级脉冲增效射孔器
CN210741274U (zh) 一种深孔爆破快速成井的施工结构
CN111521082A (zh) 一种反井钻施工高溜井配合中深孔分段爆破一次成井方法
CN111336881A (zh) 一种薄煤层半煤岩巷中深孔光面爆破方法
CN103410513B (zh) 难采矿体机械化回采工艺
CN110579145A (zh) 一种井下矿扇形孔爆破的装药方法
Tolqin CONSTRUCTION OF LOG CABINS AND SCHEMES OF DEVELOPMENT OF THE LOG STRIP
CN204718515U (zh) 光面爆破精细化装药定向诱导装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120801