CN102619190A - Permeable framework - Google Patents
Permeable framework Download PDFInfo
- Publication number
- CN102619190A CN102619190A CN2012100815751A CN201210081575A CN102619190A CN 102619190 A CN102619190 A CN 102619190A CN 2012100815751 A CN2012100815751 A CN 2012100815751A CN 201210081575 A CN201210081575 A CN 201210081575A CN 102619190 A CN102619190 A CN 102619190A
- Authority
- CN
- China
- Prior art keywords
- water
- frame
- permeable
- connecting portion
- permeable frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Revetment (AREA)
Abstract
The invention discloses a permeable framework comprising a base frame, and further comprises four hooked connecting components, wherein the base frame is a right pyramid, and comprises 6 frame rods which are the same in length and connected with each other; and the hooked connecting components extend outwards from the four points of the right pyramid along the frame rods respectively, and are L-shaped or C-shaped. The hooked connecting components which are arranged in different directions and can be hooked with each other are additionally arranged on the basis of the right pyramid-shaped permeable framework, so as to be snapped in the right pyramid of an original dispersing body. Therefore, a bottom protection group structure is formed; and even when the speed of part water flow is larger, a single self hooked permeable framework structure can not be scoured away due to the mutual coverture and the protection effect of a periphery structure, so as to perform a favorable underwater bottom protection function and a function of protecting part of a river bed from being scoured.
Description
Technical field
The invention belongs to rivers bank protection work technical field, particularly a kind of water-permeable frame that can collude certainly.
Background technology
After general Underwater Engineering (waterway regulation, dyke, bridge pier, port and pier etc.) is implemented; Flow dynamic changes greatly near the engineering works; Yi Yin along dike stream, Yue Diliu, stream, whirlpool etc. produces the local scour problem; Cause the local riverbed degradation of submerged structure serious, cause the abutment jackstone to cave in and fall generation landslide or collapse on the bank, jeopardize the safety and stablization of engineering structures; Also bring simultaneously the smooth implementation that engineering quantity strengthens, investment increases and incur loss through delay engineering, therefore need protect near the riverbed surface of the certain limit submerged structure.
Through for many years engineering practice and research, soft raft (adding concrete interlock block ballast or sand rib ballast) is proved to be one of more excellent river bottom protection structure of effect, has been widely used in domestic and international water conservancy, the marine traffic engineering.It is firm relatively that its main advantage is to arrange the body self structure, can adapt to the beach face river-bed deformation of certain amplitude, less to local current change, do not influence flood passage, shipping etc.
In soft raft utilization reality for many years, also exist following several problem and perplexing water conservancy marine traffic engineering circle:
(1) under the effect of local current, row know from experience occur washing away of degree varies collapse, arrange tear, arranging is exposed to outer even the phenomenon such as unsettled of arranging, and needs certain regular maintenance work of later stage;
(2) especially at the edge of soft raft or the gradient is bigger, landform changes violent slightly place, ballast can break away from soft raft because of the variation unstability of terrain slope, cause soft raft to be raised or tear because of losing ballast protection quilt, and safeguard function partly reduces or loses;
(3) to arrange construction requirement higher for soft raft, needs certain professional equipment, and have also that the subaqueous construction location is difficult, the rafting ERROR CONTROL is difficult, seam and irregular section linking, last person's upset, arrange problems affect soft raft river bottom protection effects such as body contraction, late detection difficulty;
(4) when the gradient under water is big, be not suitable for the soft raft river bottom protection.
For many years; Domestic and international many engineering units have carried out certain exploration and research with regard to how to optimize and promote soft raft river bottom protection effect always; But all be difficult to fundamentally overcome an above-mentioned difficult problem basically, visible this problem has become one of decision hydraulic engineering key of success problem.
Cause the key problem of soft raft destructible to be to arrange the poor effect that body self is subdued flow energy, can not on row's body, utilize natural silt to increase ballast (short silt poor effect), and under instability condition, not possess interlock and link effect.
In the reality of middle and lower reach of Yangtze River bank protection work, improved soft raft technology has appearred, and as shown in Figure 1, it mainly is dangerous section dangerous section and the common just triangular centrum water-permeable frame of row's body edge increase that is prone to destruction at row's body.Major defect through the common just triangular centrum water-permeable frame of engineering practice proof is:
On the one hand, because the weight of single just triangular centrum water-permeable frame is less, when the approach velocity of current increased, the active force that current align triangular centrum water-permeable frame also increased, and caused just triangular centrum water-permeable frame slip, the unstability of rolling easily; On the other hand; Because the resistance effect of just triangular centrum water-permeable frame group; Water flow structure and vortex system of forming around it can make the buffer zone edge occur darker jet-bedding everywhere, and when jet-bedding reaches certain slope, thereby frame body can tumble and loses the beach face ballast in the jet-bedding and guard effect.
Although the mode that adopts the series connection crowd to throw with regard to the relatively poor problem of linking property of water-permeable frame body in the current engineering construction is improved more; But also cause its attaching property variation to river-bed deformation; Cost increases; The requirement of tackling construction technology mutually also uprises, and yet is difficult to the situation of avoiding ballast unstability and row's body to destroy simultaneously.
Summary of the invention
Linking property is poor and the technical problem of the attaching property difference in riverbed is proposed a kind of each water-permeable frame that makes can link together the water-permeable frame that can not slide, rolls each other in order to solve water-permeable frame in the existing river bottom protection structure in the present invention.
In order to achieve the above object, technical scheme of the present invention is following:
Pedestal, it is whole to be just triangular centrum, is interconnected by the frame bar of 6 equal in length; Also comprise having respectively at place, 4 summits of said just triangular centrum and prolong the parts that link that a said frame bar extends outward.
Further be characterized as and saidly have the frame bar that can link parts and comprise first connecting portion and second connecting portion, said first connecting portion is for connecting the stem portion of second connecting portion, and said second connecting portion is for linking portion.
The portion of linking that further is characterized as said second connecting portion is the L type, or sickle, and it is different to link direction.
Further be characterized as said hook direction two or two corresponding reverse settings respectively.
Further being characterized as the frame pole length that constitutes said just triangular centrum framework is 80cm-120cm.
Further being characterized as the said first connecting portion length is 10cm-30cm, and the length of second connecting portion is 140cm-160cm.
The material that further is characterized as said frame bar is the screw-thread steel concrete.
Advantage of the present invention is:
Water-permeable frame of the present invention river bottom protection structure is under water compared with common just triangular centrum water-permeable frame, and it can not only replace ballast, also can replace soft raft fully simultaneously, is a kind of new Underwater Engineering river bottom protection technology, and its advantage has:
(1) on former just triangular centrum water-permeable frame architecture basics; Increased the linked parts of 4 different directions, it can make an original prose style free from parallelism the snap-in of just triangular centrum framework together, form the river bottom protection group structure; Even local water velocity is bigger; Because the mutual shielding and the protective effect of peripheral structure, be difficult to wash away single from linking formula water-permeable frame structure, thereby can play good river bottom protection under water and the effect of protecting local riverbed not washed away.
(2) during former just triangular vertebral body structure, under the local extreme flow condition, because the current scour, monomer structure can lose center of gravity in the place that surpasses the balance gradient and move, rolls or landing causes soft raft to lose the ballast protection; The formula that links certainly water-permeable frame after the improvement can be because the effect that links of peripheral block, even in the overbalance gradient, lose under the condition such as center of gravity stable, the not slippage that still can keep structure.
Before (3) the ballast group structure that constitutes of water-permeable frame of the present invention had overcome because that the crowd throws or hardware chaining causes is unsettled or do not press close to the riverbed problem; No any hard connection or hinged between the monomer whose structure; Can change in natural adaptation under the action of gravity complicated riverbed or beach face landform, subsides end property is good.
(4) owing to increased the linked parts of different directions, this structure will more be strengthened the dispersion and the energy dissipating reduction of speed effect of local current, thereby protect the stable of soft raft indirectly.
(5) because the quick-acting fruits of the nearly underflow of aforesaid good reduction; Add because stable hole and self the hollow structure that exists between the ballast structure group; Can on soft raft, form certain silt alluvial environment from the formula water-permeable frame of linking, short silt effect is excellent than monomer structure.
(6) in addition; Because effects such as property, energy dissipating, short silt at the bottom of its good whole property, stability, the subsides; Can utilize silt as additional ballast rightly from the formula water-permeable frame of linking, to reducing the investment of soft raft ballast, the protection environment and the good effect that economizes on resources.
Description of drawings
Fig. 1 is a water-permeable frame structural representation of the prior art.
Fig. 2 is a water-permeable frame structural representation of the present invention.
The specific embodiment
Below through specific instantiation and accompanying drawings embodiment of the present invention, those skilled in the art can understand other advantage of the present invention and effect easily by the content that this manual disclosed.The present invention also can implement or use through other different instantiation, and each item details in this manual also can be based on different viewpoints and application, carries out various modifications and change under the spirit of the present invention not deviating from.
As shown in Figure 2, the water-permeable frame sketch map of a preferred embodiment of the present invention, water-permeable frame 100 comprises pedestal 10 in the present embodiment.Pedestal 10, it is whole to be just triangular centrum, comprises that the frame bar 30 of 6 equal in length interconnects, and forms 4 summits 40 and have respectively at 40 places, 4 summits of pedestal 10 to prolong a frame bar 30 outwardly directed parts 50 that link.Certainly the linked parts 50 here can be the L type in the present embodiment, can be sickle in other embodiments and collude body etc., as long as can make interlock each other between water-permeable frame, do not do any restriction in this present invention.
As shown in Figure 2, the water-permeable frame sketch map of a preferred embodiment of the present invention, water-permeable frame 100 comprises pedestal 10 in the present embodiment.Pedestal 10, it is whole to be just triangular centrum, comprises that the frame bar 30 of 6 equal in length interconnects, and forms 4 summits 40 and have respectively at 40 places, 4 summits of pedestal 10 to prolong a frame bar 30 outwardly directed parts 50 that link.Certainly the linked parts 50 here can be the L type in the present embodiment, can be sickle in other embodiments and collude body etc., as long as can make interlock each other between water-permeable frame, do not do any restriction in this present invention.
In the present embodiment, 6 frame bars 30 of pedestal 10 wherein have 4 frame bars 30 to extend at the place, summit and can link parts 50, and the frame bar are different in twos.Have the frame bar 30 that can link parts 50 and comprise first connecting portion 300 and second connecting portion 301; First connecting portion 300 is for connecting the stem portion of second connecting portion; Second connecting portion 301 is for linking portion; So direction difference two or two correspondences that link of second connecting portion 301 of all the linked parts 50 in the water-permeable frame 100 oppositely are provided with on the whole; Can guarantee interlock, make to guarantee linking of water-permeable frame 100 when casting water-permeable frame 100, and water-permeable frame 100 is with linking between the riverbed in the river shoal in all directions.
The frame pole length of first framework is 80cm-120cm in the present embodiment, and the best is 100cm.Having frame bar 30 first connecting portions 300 length that can link parts 50 is 10cm-30cm, and the best is 20cm, and the length of second connecting portion 301 is 140cm-160cm, and the best is 150cm.
Water-permeable frame of the present invention river bottom protection structure is under water compared with common just triangular cone water-permeable frame, and it can not only replace ballast, also can replace soft raft fully simultaneously, is a kind of technology of river bottom protection under water, and its advantage has:
(1) on former just triangular centrum water-permeable frame architecture basics; Increased the linked parts of 4 different directions, it can make an original prose style free from parallelism the snap-in of just triangular centrum framework together, form the river bottom protection group structure; Even local water velocity is bigger; Because the mutual shielding and the protective effect of peripheral structure, be difficult to wash away single from linking formula water-permeable frame structure, thereby can play good river bottom protection under water and the effect of protecting local riverbed not washed away.
(2) during former positive triangular pyramid body structure, under the local extreme flow condition, because the current scour, monomer structure can lose center of gravity in the place that surpasses the balance gradient and move, rolls or landing causes soft raft to lose the ballast protection; Water-permeable frame of the present invention after the improvement can be because the effect that links of peripheral block, even in the overbalance gradient, lose under the condition such as center of gravity stable, the not slippage that still can keep structure.
Before (3) the ballast group structure that constitutes of water-permeable frame of the present invention had overcome because that the crowd throws or hardware chaining causes is unsettled or do not press close to the riverbed problem; No any hard connection or hinged between the monomer whose structure; Can change in natural adaptation under the action of gravity complicated riverbed or beach face landform, subsides end property is good.
(4) owing to increased linked parts 50 structures of different directions, this structure will more be strengthened the dispersion and the energy dissipating reduction of speed effect of local current, thereby protect the stable of soft raft indirectly.
(5) because the quick-acting fruits of the nearly underflow of aforesaid good reduction are added owing to the stable hole and self the hollow structure that exist between the ballast structure group, and water-permeable frame of the present invention can form certain silt alluvial environment on soft raft, short silt effect is excellent than monomer structure.
(6) in addition; Because effects such as property, energy dissipating, short silt at the bottom of its good whole property, stability, the subsides; Water-permeable frame of the present invention can utilize silt as additional ballast rightly, to reducing the investment of soft raft ballast, the protection environment and the good effect that economizes on resources.
More than demonstration and description is basic principle of the present invention, principal character and major advantage of the present invention.The technician of the industry should understand; The present invention is not restricted to the described embodiments; That describes in the foregoing description and the manual just explains principle of the present invention; The present invention also has various changes and modifications under the prerequisite that does not break away from spirit and scope of the invention, and these variations and improvement all fall in the scope of the invention that requires protection.The present invention requires protection domain to be defined by appending claims and equivalent thereof.
Claims (7)
1. water-permeable frame comprises:
Pedestal, it is whole to be just triangular centrum, is interconnected by the frame bar of 6 equal in length;
It is characterized by, also comprise, have respectively at place, 4 summits of said just triangular centrum and prolong the parts that link that a said frame bar extends outward.
2. water-permeable frame according to claim 1 is characterized by, and said have the frame bar that can link parts and comprise first connecting portion and second connecting portion, and said first connecting portion is for connecting the stem portion of second connecting portion, and said second connecting portion is for linking portion.
3. water-permeable frame according to claim 1 is characterized by, and the portion of linking of said second connecting portion is the L type, or sickle, and it is different to link direction.
4. water-permeable frame according to claim 3 is characterized by, and said direction difference two or two correspondences that link oppositely are provided with.
5. water-permeable frame according to claim 1 is characterized by, and the frame pole length that constitutes said just triangular centrum framework is 80cm-120cm.
6. water-permeable frame according to claim 2 is characterized by, and the said first connecting portion length is 10cm-30cm, and the length of second connecting portion is 140cm-160cm.
7. according to the described water-permeable frame of above any claim, it is characterized by, the material of said frame bar is the screw-thread steel concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210081575.1A CN102619190B (en) | 2012-03-26 | 2012-03-26 | Permeable framework |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210081575.1A CN102619190B (en) | 2012-03-26 | 2012-03-26 | Permeable framework |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102619190A true CN102619190A (en) | 2012-08-01 |
CN102619190B CN102619190B (en) | 2014-05-07 |
Family
ID=46559374
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210081575.1A Expired - Fee Related CN102619190B (en) | 2012-03-26 | 2012-03-26 | Permeable framework |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102619190B (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103103961A (en) * | 2013-02-25 | 2013-05-15 | 金发科技股份有限公司 | Protection hook connecting bodies |
CN103122621A (en) * | 2013-02-25 | 2013-05-29 | 金发科技股份有限公司 | Protective hooking body |
CN103122625A (en) * | 2013-02-25 | 2013-05-29 | 金发科技股份有限公司 | Protective hooking body |
CN103122619A (en) * | 2013-02-25 | 2013-05-29 | 金发科技股份有限公司 | Protective hooking body |
CN103381619A (en) * | 2013-07-18 | 2013-11-06 | 长江武汉航道局 | One-step molding mould for concrete four-face hexagon permeable frame |
CN108589647A (en) * | 2018-05-16 | 2018-09-28 | 重庆市万闸防汛器材有限责任公司 | The collapsible three plugs triangular pyramid frame assembly of center moulding frame |
CN109356094A (en) * | 2018-12-12 | 2019-02-19 | 交通运输部天津水运工程科学研究所 | A kind of ecological environment-friendly type pyramid shield beach body and the shield beach structure using the shield beach body |
CN110255461A (en) * | 2019-07-25 | 2019-09-20 | 长沙理工大学 | A kind of ordered arrangement Triangular Taper Penetrating water-permeable frame turnover device in groups |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2361671Y (en) * | 1998-10-06 | 2000-02-02 | 水利部西北水利科学研究所 | Flood control bank protection four-face six-side permeable frame |
CN1963028A (en) * | 2006-11-10 | 2007-05-16 | 河海大学 | Method for protecting bridge pier by using tetrahedral water-permeable frame group |
CN100387780C (en) * | 2003-04-01 | 2008-05-14 | 李江山 | Block for embankment |
KR20120003633A (en) * | 2010-07-05 | 2012-01-11 | 대한민국(관리부서 : 산림청 국립산림과학원장) | Wood bank crib, structure and method for constructing thereof |
CN202595702U (en) * | 2012-03-26 | 2012-12-12 | 上海河口海岸科学研究中心 | Water-permeable frame |
-
2012
- 2012-03-26 CN CN201210081575.1A patent/CN102619190B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2361671Y (en) * | 1998-10-06 | 2000-02-02 | 水利部西北水利科学研究所 | Flood control bank protection four-face six-side permeable frame |
CN100387780C (en) * | 2003-04-01 | 2008-05-14 | 李江山 | Block for embankment |
CN1963028A (en) * | 2006-11-10 | 2007-05-16 | 河海大学 | Method for protecting bridge pier by using tetrahedral water-permeable frame group |
KR20120003633A (en) * | 2010-07-05 | 2012-01-11 | 대한민국(관리부서 : 산림청 국립산림과학원장) | Wood bank crib, structure and method for constructing thereof |
CN202595702U (en) * | 2012-03-26 | 2012-12-12 | 上海河口海岸科学研究中心 | Water-permeable frame |
Non-Patent Citations (1)
Title |
---|
徐国宾等: "一种新型江河护岸工程技术-混凝土四面六边透水框架群", 《2005年新世纪水利工程科技前沿论坛论文集》 * |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103103961B (en) * | 2013-02-25 | 2015-12-23 | 金发科技股份有限公司 | A kind of protection links body |
CN103103961A (en) * | 2013-02-25 | 2013-05-15 | 金发科技股份有限公司 | Protection hook connecting bodies |
CN103122625A (en) * | 2013-02-25 | 2013-05-29 | 金发科技股份有限公司 | Protective hooking body |
CN103122619A (en) * | 2013-02-25 | 2013-05-29 | 金发科技股份有限公司 | Protective hooking body |
CN103122621B (en) * | 2013-02-25 | 2015-07-01 | 金发科技股份有限公司 | Protective hooking body |
CN103122619B (en) * | 2013-02-25 | 2015-06-03 | 金发科技股份有限公司 | Protective hooking body |
CN103122621A (en) * | 2013-02-25 | 2013-05-29 | 金发科技股份有限公司 | Protective hooking body |
CN103122625B (en) * | 2013-02-25 | 2015-09-09 | 金发科技股份有限公司 | A kind of protection links body |
CN103381619A (en) * | 2013-07-18 | 2013-11-06 | 长江武汉航道局 | One-step molding mould for concrete four-face hexagon permeable frame |
CN103381619B (en) * | 2013-07-18 | 2015-06-10 | 长江武汉航道局 | One-step molding mould for concrete four-face hexagon permeable frame |
CN108589647A (en) * | 2018-05-16 | 2018-09-28 | 重庆市万闸防汛器材有限责任公司 | The collapsible three plugs triangular pyramid frame assembly of center moulding frame |
CN109356094A (en) * | 2018-12-12 | 2019-02-19 | 交通运输部天津水运工程科学研究所 | A kind of ecological environment-friendly type pyramid shield beach body and the shield beach structure using the shield beach body |
CN110255461A (en) * | 2019-07-25 | 2019-09-20 | 长沙理工大学 | A kind of ordered arrangement Triangular Taper Penetrating water-permeable frame turnover device in groups |
CN110255461B (en) * | 2019-07-25 | 2024-04-02 | 长沙理工大学 | Orderly-arranged four-side six-side permeable frame grouping overturning device |
Also Published As
Publication number | Publication date |
---|---|
CN102619190B (en) | 2014-05-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102619190B (en) | Permeable framework | |
CN207538048U (en) | A kind of protection structure of ecological revetment | |
CN208167654U (en) | A kind of ecology disappears wave type water conservancy protective slope structure | |
CN2361671Y (en) | Flood control bank protection four-face six-side permeable frame | |
CN202595702U (en) | Water-permeable frame | |
CN105155464B (en) | A kind of kickboard device reinforced that promotees to become silted up for mattress sinking | |
CN207130672U (en) | A kind of Novel water conservancy dykes and dams | |
CN106192882A (en) | Two-way cross transmission combination form system | |
CN209194504U (en) | A kind of reinforcement river bottom protection geotechnique pad | |
CN111560917A (en) | Detachable rapid breach repairing structure | |
CN103588085B (en) | Special lifting appliance for dual-I-shaped water-permeable framework | |
CN203545448U (en) | Special lifting appliance for dual-I-shaped water permeable framework | |
CN101892651A (en) | Hollow round platform bank protection structure | |
CN206873398U (en) | Man-made island shore protection safeguard structure | |
CN205894011U (en) | Hydraulic engineering is with unrestrained piece that disappears | |
CN102828489B (en) | System for arranging piles to fix riverbed main stream | |
CN204047317U (en) | A kind of ecological management device for falling zone contour cultivation | |
CN208055980U (en) | A kind of permeable erosion control wall construction of hydraulic engineering | |
CN103122620B (en) | Protective hooking body | |
CN209260664U (en) | A kind of ecological environment-friendly type pyramid shield beach body and the shield beach structure using the shield beach body | |
CN201778302U (en) | Hollow truncated cone shaped bank protection structure | |
CN202899082U (en) | System for defining riverbed mainstream by placing piles | |
CN203256689U (en) | Protective hooking and connecting body and piled-up space structure composed of same | |
CN102561262A (en) | Anti-scouring device and method for modular artificial netlike beddings | |
CN103663100B (en) | A kind of duplexing font water-permeable frame special hanger |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140507 Termination date: 20200326 |
|
CF01 | Termination of patent right due to non-payment of annual fee |