CN102610935B - 一种土壤非开挖接地降阻方法 - Google Patents

一种土壤非开挖接地降阻方法 Download PDF

Info

Publication number
CN102610935B
CN102610935B CN 201210095035 CN201210095035A CN102610935B CN 102610935 B CN102610935 B CN 102610935B CN 201210095035 CN201210095035 CN 201210095035 CN 201210095035 A CN201210095035 A CN 201210095035A CN 102610935 B CN102610935 B CN 102610935B
Authority
CN
China
Prior art keywords
soil
resistance
excavation
earth mat
resistance reduction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201210095035
Other languages
English (en)
Other versions
CN102610935A (zh
Inventor
王鹏云
李万春
曾琳
曾艳
李楠
王再军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Yitong Meier Technology Co., Ltd.
Original Assignee
KUNMING YITONG MEIER LIGHTING PROTECTION ENGINEERING Co Ltd
YUNNAN KUNMING AGRICULTURAL METEOROLOGICAL TEST STATION
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KUNMING YITONG MEIER LIGHTING PROTECTION ENGINEERING Co Ltd, YUNNAN KUNMING AGRICULTURAL METEOROLOGICAL TEST STATION filed Critical KUNMING YITONG MEIER LIGHTING PROTECTION ENGINEERING Co Ltd
Priority to CN 201210095035 priority Critical patent/CN102610935B/zh
Publication of CN102610935A publication Critical patent/CN102610935A/zh
Application granted granted Critical
Publication of CN102610935B publication Critical patent/CN102610935B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Manufacturing Of Electrical Connectors (AREA)

Abstract

一种土壤非开挖接地降阻方法,属于防雷施工技术,尤其是一种非开挖工程降阻技术。本发明一种接地土壤非开挖降阻方法,其特征在于该方法是在接地土壤上设置两个水平降阻地网,一层降阻地网位于土壤表面形成表层地网,另一层位于地面下土壤电阻小于300Ω.m的土壤层中形成地下地网;其中,表层地网为钢筋网,地下地网是采用定向钻进非开挖铺管方法将降阻剂通过铺设的管道上的小孔高压喷射到土壤中,与土壤结合形成;表层地网和地下地网之间通过垂直接地连接线连接。这种非开挖的降阻技术,不会影响交通、破坏环境,施工期短,综合成本低,且其降阻效果明显,具有较高的社会经济价值。

Description

一种土壤非开挖接地降阻方法
技术领域
本发明属于防雷施工技术,尤其是一种非开挖工程接地降阻技术。
背景技术
在电力、电信、建筑、广播、电视、铁路、公路、航空、水运、国防军工、冶金矿山、煤炭、石油、化工、纺织、医药卫生、文化教育等行业中应用到电气接地装置时,则需要对接地土壤进行降阻处理。传统的降阻方法是在土壤表面铺设焊接的钢筋网。而出于降低接地成本的目的,后来采用降阻剂来降阻,降阻剂是一种良好的导电体,将它使用于接地体和土壤之间时,一方面能够与接地体紧密接触,形成足够大的电流流通面;另一方面它能向周围土壤渗透,降低周围土壤电阻率。降阻剂能减少施工工作量,可少打接地体,尤其可用水平接地体代替难于施工的垂直接地体,施工方便,可解决施工场地受局限的困难,可大量节省金属材料。
输变电接地网对于各种设备、仪器的可靠运行和工作人员的人身安全起着重要作用,壤电阻率是接地系统有效性、安全性以及鉴定接地系统是否符合要求的重要参数。然而,由于受地理条件的限制,许多输变电设施不得不建在高土壤电阻率地区,这些地区的电阻率较高,采用普遍的接地降阻方法,很难达到现行标准、规程要求的指标。普遍的,在土壤电阻率低、土质较好的区域,通过一定范围的水平接地网,接地电阻值比较容易达到规程要求。而在高土壤电阻率环境条件下,用扩大地网面积、增加接地体和降阻剂等方法,并在水平接地网四周增加深井接地极,也很难达到接地规程要求。
在均匀土壤条件下,土壤电阻率低于300Ω.m时,主要采用复合接地、引外接地方法,扩大接地网面积,增加散流面,并辅以降阻剂、接地模块、电解地极等方式进行降阻。但为保护耕地,目前,大部分输变电设施主要建在山区高土壤电阻率地区,输变电设施地网设计受地形限制,无法有效扩大其接地网面积,而且其降阻效果不是很明显。实践表明,在高土壤电阻率的山区,使用常规降阻方法,实际降阻效果差异较大。因此,在工程中为了适宜不同地形、地貌、地质条件下接地降阻需要,采用局部换土、引外接地极、深井接地的方法进行降阻。而且降阻剂一般都会腐蚀接地体,大大缩短接地体的寿命,导致接地电阻、跨步电压与接触电压的设计计算值偏高,无法满足现行标准的要求。近年来,随着电力系统短路容量的增加,由于接地不良引起的事故扩大问题屡有发生,因此接地问题越来越受到重视。在设计施工过程中如何合理确定接地装置的设计方案,降低接地电阻是变电站电气设计施工的关键。
发明内容
本发明所要解决的就是地面土壤电阻高于300Ω.m时,采用普遍的方式难以有效达到降低接地电阻,保证电力系统的可靠运行和变电站工作人员的人身安全的问题,提供一种接地土壤非开挖降阻方法。
本发明一种土壤非开挖接地降阻方法,其特征在于该方法是在接地土壤中设置两个水平降阻地网,一层降阻地网位于土壤表面形成表层地网,另一层位于地面下土壤电阻小于300Ω.m的土壤层中形成地下地网;其中,表层地网为钢筋网,地下地网是采用定向钻进非开挖铺管方法将活性降阻剂通过铺设的管道上的小孔高压喷射到土壤中,与土壤结合形成;表层地网和地下地网之间通过垂直接地连接线连接。
所述的活性降阻剂,采用有机质含量为10%~60%,PH值为6.0~7.0的混合物,具有土壤胶体的作用,离子交换性强,导电性能好,同时,活性降阻剂与土壤性质相似,与土壤的融合程度高,容易在土壤中分散,并与土壤完全结合,并且该种降阻剂属环境友好型产品,不会对使用区域产生环境污染,且能有效起到降阻的作用。
所述的管道为中空合成材料管,管壁上密集2.0mm孔径小孔。
本发明的这种接地降阻方法,尤其适合于土壤质地较差,土壤分布不均匀,土壤电阻率高于300Ω.m的地区。在这些地区,采用复合地网和外引接地极,降阻效果不明显,只能采用深井垂直压力灌注降阻剂的措施降低接地电阻,如果该地区地下是花岗岩、岩山石、砾石、粹石、或岩石碎屑混合土,一方面深井垂直接地需要穿透岩山层,降阻工程则尤其显得困难,施工难度大,成本高昂;另一方面,深井垂直接地,受地形限制,不能在地面下形成有效的电流散流通面,降阻效果差。但是采用本发明的降阻方法,在地表设置水平地网为常规的方式,在地表下设置地网则可根据地质勘探报告,找到电阻率小于300Ω.m的土壤层,采用地下牵引钻机,利用地表仪器接收导向钻头内的钻进参数信号,由地表钻机来实现钻孔轨迹控制,将管道铺设于钻孔轨迹中,然后采用高压喷射的方式将降阻剂从管道上设置的孔中喷射渗透到土壤中,与土壤相结合形成降阻地网。
这种非开挖的降阻技术,不会影响交通、破坏环境,施工期短,综合成本低,且其降阻效果明显,具有较高的社会经济价值。
附图说明
图1为本发明的结构示意图。
图2为本发明的管道结构示意图。
图3为本发明土壤电阻率分布及牵引钻工作示意图。
其中,表层地网1,地下地网2,垂直接地连接线3,活性降阻剂4,管道5,小孔6,土壤电阻高值区7,土壤电阻小于300Ω.m分布层及牵引钻路径8。
具体实施方式
实施例1: 在土壤类型为沙砾、砾石、粹石、岩石,石灰岩、风化土岩石、沉积岩等,土壤质地较差,土壤分布不均匀,土壤电阻率在300Ω.m以上的山区,建设输变电设施时,首先对地勘报告进行分析,采用数值模拟方法,分析地下分层土壤电阻率空间分布,得到土壤电阻率小于300Ω.m的分布层8,确定分布层拐点的经度、纬度和深度三维坐标然后在牵引钻机的控制板上,根据土壤电阻率分布层拐点的经度、纬度和深度三维坐标,设定牵引钻路径8;牵引钻头牵引中空合成材料管道5,深入土壤电阻率小于300Ω.m的的土层,管道壁上密集2.0mm孔径的小孔6,牵引钻头牵引管道达到设计位置时,采用压力灌注方式,将活性降阻剂4灌注到土壤电阻率小于300Ω.m的土层中,使活性降阻剂沿土壤空隙均匀分散,形成地下地网2。在土壤电阻高值区7的土壤表面,采用钢筋网铺设形成表层地网1,地下地网2与土壤表层地网1相连接,形成立体地网,扩大地网面积和散流面积。

Claims (3)

1.一种土壤非开挖接地降阻方法,其特征在于该方法是在接地土壤上设置两个水平降阻地网,一层降阻地网位于土壤表面形成表层地网(1),另一层位于地面下土壤电阻小于300Ω.m的土壤层中形成地下地网(2);其中,表层地网(1)为钢筋网,地下地网(2)是采用定向钻进非开挖铺管方法,利用牵引钻头牵引管道(5)将降阻剂(4)通过铺设的所述管道(5)上的小孔(6)高压喷射到土壤中,与土壤结合形成;表层地网(1)和地下地网(2)之间通过垂直接地连接线(3)连接。
2.如权利要求1所述一种土壤非开挖接地降阻方法,其特征在于所述的降阻剂(4)采用有机质含量为10%~60%,PH值为6.0~7.0的混合物。
3.如权利要求1所述一种土壤非开挖接地降阻方法,其特征在于所述的管道(5)为中空合成材料管,管壁上密集2.0mm孔径小孔。
CN 201210095035 2012-03-31 2012-03-31 一种土壤非开挖接地降阻方法 Expired - Fee Related CN102610935B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201210095035 CN102610935B (zh) 2012-03-31 2012-03-31 一种土壤非开挖接地降阻方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201210095035 CN102610935B (zh) 2012-03-31 2012-03-31 一种土壤非开挖接地降阻方法

Publications (2)

Publication Number Publication Date
CN102610935A CN102610935A (zh) 2012-07-25
CN102610935B true CN102610935B (zh) 2013-12-25

Family

ID=46528169

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201210095035 Expired - Fee Related CN102610935B (zh) 2012-03-31 2012-03-31 一种土壤非开挖接地降阻方法

Country Status (1)

Country Link
CN (1) CN102610935B (zh)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104319593A (zh) * 2014-11-17 2015-01-28 句容华源电器设备有限公司 一种变电站接地网斜井降阻技术
CN104362441A (zh) * 2014-11-18 2015-02-18 句容华源电器设备有限公司 高土壤电阻率变电站接地网降阻方法
CN104505605B (zh) * 2014-11-26 2018-03-20 中国石油天然气集团公司 降低管道站场接地电阻及延长接地体寿命的装置及方法
CN110277661B (zh) * 2019-05-13 2021-10-08 张昱 不用二次挖沟槽可持续维护保养的防雷接地施工方法
CN112186700B (zh) * 2020-09-27 2022-05-24 国网湖北省电力有限公司十堰供电公司 一种输电线路防雷方法
CN112332123A (zh) * 2020-11-05 2021-02-05 四川华能宝兴河水电有限责任公司 一种水电站分层土壤接地降阻方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1237811A (zh) * 1999-07-09 1999-12-08 清华大学 在高土壤电阻率地区降低发变电站接地电阻的方法
CN2457752Y (zh) * 2000-11-24 2001-10-31 孟庆波 高土壤电阻率区域的接地装置
CN200969406Y (zh) * 2006-06-12 2007-10-31 中山火炬开发区电气安装工程有限公司 一种联合接地网

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100621876B1 (ko) * 2006-07-13 2006-09-11 정용기 등전위화 접지 시스템 및 그의 시공 방법

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1237811A (zh) * 1999-07-09 1999-12-08 清华大学 在高土壤电阻率地区降低发变电站接地电阻的方法
CN2457752Y (zh) * 2000-11-24 2001-10-31 孟庆波 高土壤电阻率区域的接地装置
CN200969406Y (zh) * 2006-06-12 2007-10-31 中山火炬开发区电气安装工程有限公司 一种联合接地网

Also Published As

Publication number Publication date
CN102610935A (zh) 2012-07-25

Similar Documents

Publication Publication Date Title
CN102610935B (zh) 一种土壤非开挖接地降阻方法
CN104696010B (zh) 一种矿山突水综合治理方法
Wang et al. Karst geology and mitigation measures for hazards during metro system construction in Wuhan, China
Panthi Analysis of engineering geological uncertainties related to tunnelling in Himalayan rock mass conditions
CN105040667B (zh) 高填方变形无线远程综合监测系统及安装监测方法
Uromeihy et al. Evaluation and treatment of seepage problems at Chapar-Abad Dam, Iran
CN104901030B (zh) 一种变电站降阻接地装置施工方法
CN105547616A (zh) 土石坝渗漏隐患探测及定向处理方法及其探测设备
CN105137488B (zh) 基于人工注液的地下水流场描述方法
Banks et al. Anomalous buried hollows in London: development of a hazard susceptibility map
CN105807336A (zh) 适用于多地球物理探测方法的综合孤石探测模型试验装置及试验方法
Gao et al. Dynamic monitoring of water in a working face floor using 2D electrical resistivity tomography (ERT)
CN209206026U (zh) 一种用于四维跟踪和注射修复土壤及地下水的装置
CN102437437B (zh) 砂卵砾石区域接地降阻工艺方法
Wang et al. Study of roof water inrush control technology and water resources utilization during coal mining in a Karst area
CN108242604B (zh) 一种输电线路杆塔水平接地降阻装置及施工方法
CN109304351A (zh) 一种用于四维跟踪和注射修复土壤及地下水的装置及方法
Shi et al. Study on the mechanisms and prevention of water inrush events in a deeply buried high-pressure coal seam—a case study of the Chensilou coal mine in China
Kumar et al. Liquefaction hazard mapping of Lucknow: A part of Indo-Gangetic Basin (IGB)
Li et al. Environmental engineering issues induced by abandoned coal mine hidden disasters
CN104533289A (zh) 架空输电线路接地网非开挖施工方法
CN105098389B (zh) 一种利用设备基础降低接地电阻的方法和结构
CN210768905U (zh) 一种煤炭开采底板疏放水模拟装置
Hu et al. Evaluation Method of Water Hazard Control Effect of Coal Seam Floor in Deep Mining: Sequence Verification Evaluation
CN106249287A (zh) 一种煤矿岩层移动角的确定方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: Five 650228 dump roads, Xishan District, Yunnan, Kunming

Patentee after: Yunnan Kunming Agricultural Meteorological Test Station

Patentee after: Yunnan Yitong Meier Technology Co., Ltd.

Address before: Five 650228 dump roads, Xishan District, Yunnan, Kunming

Patentee before: Yunnan Kunming Agricultural Meteorological Test Station

Patentee before: Kunming Yitong Meier Lighting Protection Engineering Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131225

Termination date: 20210331

CF01 Termination of patent right due to non-payment of annual fee