CN102607539B - Simple measurement setting-out method - Google Patents

Simple measurement setting-out method Download PDF

Info

Publication number
CN102607539B
CN102607539B CN2012100685921A CN201210068592A CN102607539B CN 102607539 B CN102607539 B CN 102607539B CN 2012100685921 A CN2012100685921 A CN 2012100685921A CN 201210068592 A CN201210068592 A CN 201210068592A CN 102607539 B CN102607539 B CN 102607539B
Authority
CN
China
Prior art keywords
lead device
line
arc length
point
horizontal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2012100685921A
Other languages
Chinese (zh)
Other versions
CN102607539A (en
Inventor
武非非
杨志勇
石广明
惠安东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
Tianjin MCC20 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin MCC20 Construction Co Ltd filed Critical Tianjin MCC20 Construction Co Ltd
Priority to CN2012100685921A priority Critical patent/CN102607539B/en
Publication of CN102607539A publication Critical patent/CN102607539A/en
Application granted granted Critical
Publication of CN102607539B publication Critical patent/CN102607539B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a simple measurement setting-out method, which includes the steps: (a), connecting a facade 0-degree line of vertical equipment; (b), determining a horizontal projection position of the 0-degree line; (c), adjusting and aligning light emitted from a light source with an optional first point on the facade 0-degree line, allowing light emitted from a calibrating light source of a thread guide to irradiate a housing of the vertical equipment, and forming a second point and a third point; (d), measuring the length of a first arc between the first point and the second point and the length of a second arc between the first point and the third point, moving the thread guide until a numeric difference between the first arc length and the second arc length is between 0.5mm-1.2mm, and marking the position of the thread guide; (e), placing a support at the marked position of the thread guide and leveling; (f), placing the thread guide on the support and leveling; (g), moving the thread guide and repeating the step (c) and the step (d), rotating the light source towards the ground where the equipment is mounted, and selecting a plurality of points on the ground. By the method, measurement difficulty is reduced.

Description

The ordinary surveying line-putting method
Technical field
The present invention relates to a kind of method of measuring lead-in wire, particularly the lead-in wire method of concentric reducing circular section building.
Background technology
At present, in industry and covil construction were constructed, measuring unwrapping wire was a very important job.Traditional measurement paying-off implement is transit and total powerstation.But traditional survey instrument is while drawing this elevation of building line on surface level, very inconvenient in the situation that only have line of elevation of building.And there is no an effective measurement unwrapping wire way of cover.Especially the section when buildings is concentric reducing bowlder, uses traditional survey instrument to be difficult to the lead-in wire work of facade to plane.For example, the blast furnace engineering of metallurgical industry construction work.After the beginning civil engineering was complete, survey crew can stay and put the tapping hole center line at the cast house platform.But after blast furnace shell and frame installation have been constructed, often can be because a variety of causes causes on the cast house platform iron mouth center line damaged or wipe.But fitter's work is very important and iron mouth center line is to cast house.At this moment, just be difficult to this measurement setting-out work by the traditional measurement instrument.
Summary of the invention
The object of the present invention is to provide a kind of work of measuring that greatly reduced, reduced the ordinary surveying line-putting method of the difficulty of measuring.
Ordinary surveying line-putting method of the present invention, it comprises the following steps:
(a) each encloses 0 ° of point left while making installation to connect vertical equipment, and 0 ° of point on each circle is connected and draws 0 ° of line of facade;
(b) determine the horizontal projection position of described 0 ° of line by visual inspection;
(c) work light of adjusting down-lead device makes any the first point on 0 ° of line of optical registration facade that work light launches, simultaneously the irradiation launched of the regulation light source of down-lead device is on the vertical equipment housing, thereby obtains laying respectively at the second point of any first both sides and thirdly; Work light is positioned on the perpendicular bisector of two regulation light source line line segments and the plane at the light place that work light is sent and the parallel light that two regulation light sources send;
(d) measure the first arc length between first and second point and first and thirdly between the second arc length, if differing in size of the first arc length and the second arc length, in the situation that first of maintenance is constant, mobile down-lead device, until the difference of the numerical values recited of the first arc length and the second arc length is at 0.5mm-1.2mm, the position at mark down-lead device place then;
(e) with the down-lead device position of stentplacement at mark, and will fix after the plane leveling of laying down-lead device;
(f) down-lead device is placed on support and with down-lead device and transfers to level by mounting seat;
(g) mobile down-lead device makes be positioned on 0 ° of line of last furnace shell at first, and then the difference of the size of the first arc length and the second arc length be fixed on down-lead device on support at 0.5mm-1.2mm, again regulates down-lead device and makes it to be horizontal;
(h) regulate down-lead device the light corresponding point that work light is sent just in time are positioned on 0 ° of line of last furnace shell facade, then repeatedly adjust down-lead device position in the horizontal direction until the numerical values recited of the first arc length and the second arc length is equal;
(i) unclamp the work light set bolt of down-lead device, make the ground direction rotation of work light to erecting equipment, choose some points on the ground of installed vertical equipment, after then will these some points connecting, snap the line obtains 0 ° of line of facade and draws horizontal line on horizontal installation ground.
The invention has the beneficial effects as follows: by very simple method, in the ungratified situation of condition, the datum line of facade is guided on plane.Greatly reduce the work of measuring, reduced the difficulty of measuring.This method is applicable to the various situations that the facade datum line caused plane.The various buildings that applicable same upper radius-of-curvature equates and the surface of structures.Pillar for example, metope, variable cross section cylindrical shell, uniform cross section cylindrical shell, taper structures etc.Cross section is oval-shaped building and structures surface, because of radius-of-curvature unequal, and inapplicable.Because of manufacture craft less demanding, so be not suitable for accuracy requirement error 1mm with interior measurement lead-in wire work.As it is very high to measure lead-in wire operating error requirement, need improve equipment making technique.
Description of drawings
Fig. 1 is the measuring process sketch that adopts ordinary surveying line-putting method of the present invention;
Fig. 2 is the measuring process sketch that adopts ordinary surveying line-putting method of the present invention;
Fig. 3 is the structural representation of down-lead device of realizing a kind of embodiment of the inventive method;
Fig. 4 is the vertical view of down-lead device shown in Figure 3;
Fig. 5 is the structural representation of the base in down-lead device shown in Figure 3;
Fig. 6 is the structural representation of the rotation adjustable base in down-lead device shown in Figure 3;
Fig. 7 is the structural representation of the horizontal adjustable base in down-lead device shown in Figure 3;
Fig. 8 is the structural representation of the horizontal mounting seat in down-lead device shown in Figure 3;
Fig. 9-1st, the rotation adjustable base internal structure schematic diagram in down-lead device shown in Figure 3;
Fig. 9-2nd, the 1-1 sectional view of the rotation adjustable base shown in Fig. 9-1;
Figure 10-1st, the level in down-lead device shown in Figure 3 is observed calibration base and horizontal adjustable base internal structure schematic diagram;
Figure 10-2nd, shown in Figure 10-1 level observe the 2-2 sectional view of calibration base and horizontal adjustable base.
Embodiment
Ordinary surveying line-putting method of the present invention as illustrated in fig. 1 and 2, it comprises the following steps: left 0 ° of point when (a) connecting each circle manufacturing of vertical equipment and installing, and 0 ° of point on each circle is connected and draws 0 ° of line of facade; (b) determine the horizontal projection position of described 0 ° of line by visual inspection; (c) work light of adjusting down-lead device makes any first B on 0 ° of line of source alignment facade that work light Q launches, simultaneously the regulation light source P of down-lead device, light source irradiation that R launches be on the vertical equipment housing, thereby obtain laying respectively at the second point A of any first both sides and C thirdly; (d) measure the first arc length between first and second point and first and thirdly between the second arc length, if differing in size of the first arc length and the second arc length, in the situation that first of maintenance is constant, mobile down-lead device, until the difference of the numerical values recited of the first arc length and the second arc length is at 0.5mm-1.2mm, the position at mark down-lead device place then; (e) with the down-lead device position of stentplacement at mark, and will fix after the plane leveling of laying down-lead device; (f) down-lead device is placed on support and with down-lead device and transfers to level by mounting seat; (g) mobile down-lead device makes be positioned on 0 ° of line of last furnace shell at first, and then the difference of the size of the first arc length and the second arc length be fixed on down-lead device on support at 0.5mm-1.2mm, again regulates down-lead device and makes it to be horizontal; (h) regulate down-lead device the light corresponding point B ' that work light Q sends just in time is positioned on 0 ° of line of last furnace shell facade, then repeatedly adjust down-lead device position in the horizontal direction until the numerical values recited of the first arc length LA ' B ' and the second arc length LB ' C ' is equal; (i) unclamp the work light set bolt of down-lead device, make the ground direction rotation of work light to erecting equipment, choose some points on the ground of installed vertical equipment, after then will these some points connecting, snap the line obtains 0 ° of line of facade and draws horizontal line on horizontal installation ground.
In concrete use procedure, should determine the distance of down-lead device apart from last furnace shell according to actual conditions.Distance too closely can strengthen inevitable error.Step h should, through adjustment and repetition measurement repeatedly, make every effort to error is dropped to minimum.
Structure such as Fig. 3-10 as the device of a kind of embodiment of realizing the inventive method are depicted as: it comprises three levelness adjusting bolts 10 of setting triangular in shape, the top of described three the levelness adjusting bolts 10 that vertically arrange is threaded with rotation adjustable base 7 respectively, and the bottom of three levelness adjusting bolts 10 is threaded with mounting seat 11 respectively.Connecting link 14 upper ends that are arranged between rotation adjustable base 7 and horizontal adjustable base 8 are fixedly connected with horizontal adjustable base 8; Connecting link 14 lower end covers have rotation accurate adjustment horizontal gear 17.The rotation accurate adjustment bolt connecting link 15 of rotation accurate adjustment bolt 13 is rotatedly connected with the rotation adjustable base, described rotation accurate adjustment bolt connecting link 15 is fixedly linked with the vertical gear 16 of rotation accurate adjustment of axis along continuous straight runs setting, the rotation accurate adjustment horizontal gear 17 interlock settings that the vertical gear 16 of described rotation accurate adjustment and axis vertically arrange.The levelness calibration is observed with base 5 and is connected by the guide rail slide block structure with horizontal adjustable base, makes it that relative sliding of left and right directions can occur.Built-in first Saw blade 21 that is fixedly connected with of base 5 is observed in the levelness calibration; Be fixedly connected with the second Saw blade 20 in horizontal adjustable base 8; Horizontal accurate adjustment bolt connecting link 18 and the horizontal adjustable base 8 of horizontal accurate adjustment bolt 9 are rotatedly connected, be connected with the vertical gear 19 of horizontal accurate adjustment that the axis along continuous straight runs arranges on described horizontal accurate adjustment bolt connecting link 18, vertical 19 whiles and the second Saw blade 20, the first Saw blade 21 interlock settings of gear of described horizontal accurate adjustment.Be fixed with 2 work light supports 3 on the end face of described levelness calibration observation base 5.Work light support 3 tops are with trepanning and bearing, and with work light connecting link 22, by trepanning and bearing, are connected, and work light connecting link 22 can be twisted.Be provided with screw thread at work light support 3 tops of a side and with work light set bolt 4, be connected; , by tightening bolt 4, it is subjected to displacement downwards with work light connecting link 22 contacts, thereby the work light connecting link can't be twisted.The centre of work light connecting link 22 is fixedly connected with work light source 1, be separately installed with calibration with light source 2 on the described observation base of the side that is positioned at two work light supports, work light is positioned on the perpendicular bisector of two regulation light source line line segments and the plane at the light place that work light is sent and the parallel light that two regulation light sources send.Certainly realize that the inventive method is not limited to this structure.
Embodiment 1
(a) each encloses 0 ° of point left while making installation to connect vertical equipment, and 0 ° of point on each circle is connected and draws 0 ° of line of facade; (b) determine the horizontal projection position of described 0 ° of line by visual inspection; (c) work light of adjusting down-lead device makes any the first point on 0 ° of line of source alignment facade that work light launches, simultaneously the light source irradiation launched of the regulation light source of down-lead device is on the vertical equipment housing, thereby obtains laying respectively at the second point of any first both sides and thirdly; (d) measure the first arc length between first and second point and first and thirdly between the second arc length, if differing in size of the first arc length and the second arc length, in the situation that first of maintenance is constant, mobile down-lead device, until the difference of the numerical values recited of the first arc length and the second arc length is at 0.5mm, the position at mark down-lead device place then; (e) with the down-lead device position of stentplacement at mark, and will fix after the plane leveling of laying down-lead device; (f) down-lead device is placed on support and with down-lead device and transfers to level by mounting seat; (g) mobile down-lead device makes be positioned on 0 ° of line of last furnace shell at first, and then the difference of the size of the first arc length and the second arc length be fixed on down-lead device on support at 0.5mm, again regulates down-lead device and makes it to be horizontal; (h) regulate down-lead device the light corresponding point that work light is sent just in time are positioned on 0 ° of line of last furnace shell facade, then repeatedly adjust down-lead device position in the horizontal direction until the numerical values recited of the first arc length and the second arc length is equal; (i) unclamp the work light set bolt of down-lead device, make the ground direction rotation of work light to erecting equipment, choose some points on the ground of installed vertical equipment, after then will these some points connecting, snap the line obtains 0 ° of line of facade and draws horizontal line on horizontal installation ground.
Through using the resulting horizontal line error in ground about the 1mm left and right.Can meet the general precision requirement of installing and using that the plant equipment of (in accuracy requirement error 3mm) and structure install of having relatively high expectations.
Embodiment 2
(a) each encloses 0 ° of point left while making installation to connect vertical equipment, and 0 ° of point on each circle is connected and draws 0 ° of line of facade; (b) determine the horizontal projection position of described 0 ° of line by visual inspection; (c) work light of adjusting down-lead device makes any the first point on 0 ° of line of source alignment facade that work light launches, simultaneously the light source irradiation launched of the regulation light source of down-lead device is on the vertical equipment housing, thereby obtains laying respectively at the second point of any first both sides and thirdly; (d) measure the first arc length between first and second point and first and thirdly between the second arc length, if differing in size of the first arc length and the second arc length, in the situation that first of maintenance is constant, mobile down-lead device, until the difference of the numerical values recited of the first arc length and the second arc length is at 0.8mm, the position at mark down-lead device place then; (e) with the down-lead device position of stentplacement at mark, and will fix after the plane leveling of laying down-lead device; (f) down-lead device is placed on support and with down-lead device and transfers to level by mounting seat; (g) mobile down-lead device makes be positioned on 0 ° of line of last furnace shell at first, and then the difference of the size of the first arc length and the second arc length be fixed on down-lead device on support at 0.8mm, again regulates down-lead device and makes it to be horizontal; (h) regulate down-lead device the light corresponding point that work light is sent just in time are positioned on 0 ° of line of last furnace shell facade, then repeatedly adjust down-lead device position in the horizontal direction until the numerical values recited of the first arc length and the second arc length is equal; (i) unclamp the work light set bolt of down-lead device, make the ground direction rotation of work light to erecting equipment, choose some points on the ground of installed vertical equipment, after then will these some points connecting, snap the line obtains 0 ° of line of facade and draws horizontal line on horizontal installation ground.
After using on ground resulting horizontal line error less than 2mm.Can meet the requirement of installing and using that the plant equipment of accuracy requirement general (in accuracy requirement error 5mm) and structure install.
Embodiment 3
(a) each encloses 0 ° of point left while making installation to connect vertical equipment, and 0 ° of point on each circle is connected and draws 0 ° of line of facade; (b) determine the horizontal projection position of described 0 ° of line by visual inspection; (c) work light of adjusting down-lead device makes any the first point on 0 ° of line of source alignment facade that work light launches, simultaneously the light source irradiation launched of the regulation light source of down-lead device is on the vertical equipment housing, thereby obtains laying respectively at the second point of any first both sides and thirdly; (d) measure the first arc length between first and second point and first and thirdly between the second arc length, if differing in size of the first arc length and the second arc length, in the situation that first of maintenance is constant, mobile down-lead device, until the difference of the numerical values recited of the first arc length and the second arc length is at 1.2mm, the position at mark down-lead device place then; (e) with the down-lead device position of stentplacement at mark, and will fix after the plane leveling of laying down-lead device; (f) down-lead device is placed on support and with down-lead device and transfers to level by mounting seat; (g) mobile down-lead device makes be positioned on 0 ° of line of last furnace shell at first, and then the difference of the size of the first arc length and the second arc length be fixed on down-lead device on support at 1.2mm, again regulates down-lead device and makes it to be horizontal; (h) regulate down-lead device the light corresponding point that work light is sent just in time are positioned on 0 ° of line of last furnace shell facade, then repeatedly adjust down-lead device position in the horizontal direction until the numerical values recited of the first arc length and the second arc length is equal; (i) unclamp the work light set bolt of down-lead device, make the ground direction rotation of work light to erecting equipment, choose some points on the ground of installed vertical equipment, after then will these some points connecting, snap the line obtains 0 ° of line of facade and draws horizontal line on horizontal installation ground.
After using on ground resulting horizontal line error less than 5mm.Can meet the requirement of installing and using that the plant equipment of accuracy requirement not high (in accuracy requirement error 1cm) and structure install.

Claims (1)

1. ordinary surveying line-putting method is characterized in that it comprises the following steps:
(a) each encloses 0 ° of point left while making installation to connect vertical equipment, and 0 ° of point on each circle is connected and draws 0 ° of line of facade;
(b) determine the horizontal projection position of described 0 ° of line by visual inspection;
(c) work light of adjusting down-lead device makes any the first point on 0 ° of line of optical registration facade that work light launches, simultaneously the irradiation launched of the regulation light source of down-lead device is on the vertical equipment housing, thereby obtains laying respectively at the second point of any first both sides and thirdly; Work light is positioned on the perpendicular bisector of two regulation light source line line segments and the plane at the light place that work light is sent and the parallel light that two regulation light sources send;
(d) measure the first arc length between first and second point and first and thirdly between the second arc length, if differing in size of the first arc length and the second arc length, in the situation that first of maintenance is constant, mobile down-lead device, until the difference of the numerical values recited of the first arc length and the second arc length is at 0.5mm-1.2mm, the position at mark down-lead device place then;
(e) with the down-lead device position of stentplacement at mark, and will fix after the plane leveling of laying down-lead device;
(f) down-lead device is placed on support and with down-lead device and transfers to level by mounting seat;
(g) mobile down-lead device makes be positioned on 0 ° of line of last furnace shell at first, and then the difference of the size of the first arc length and the second arc length be fixed on down-lead device on support at 0.5mm-1.2mm, again regulates down-lead device and makes it to be horizontal;
(h) regulate down-lead device the light corresponding point that work light is sent just in time are positioned on 0 ° of line of last furnace shell facade, then repeatedly adjust down-lead device position in the horizontal direction until the numerical values recited of the first arc length and the second arc length is equal;
(i) unclamp the work light set bolt of down-lead device, make the ground direction rotation of work light to erecting equipment, choose some points on the ground of installed vertical equipment, after then will these some points connecting, snap the line obtains 0 ° of line of facade and draws horizontal line on horizontal installation ground.
CN2012100685921A 2012-03-15 2012-03-15 Simple measurement setting-out method Active CN102607539B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100685921A CN102607539B (en) 2012-03-15 2012-03-15 Simple measurement setting-out method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100685921A CN102607539B (en) 2012-03-15 2012-03-15 Simple measurement setting-out method

Publications (2)

Publication Number Publication Date
CN102607539A CN102607539A (en) 2012-07-25
CN102607539B true CN102607539B (en) 2013-11-13

Family

ID=46525142

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100685921A Active CN102607539B (en) 2012-03-15 2012-03-15 Simple measurement setting-out method

Country Status (1)

Country Link
CN (1) CN102607539B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112414380B (en) * 2020-11-06 2022-07-05 通号建设集团第一工程有限公司 High-rise building construction measurement positioning pay-off method
CN112729262B (en) * 2020-12-26 2022-08-12 新疆工程学院 Forced alignment connecting device for gyroscopic total station

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20003940U1 (en) * 2000-03-07 2000-05-25 Riwa Tec Gmbh Messgeraete Hand Console for spirit levels, in particular for laser spirit levels and for rotating laser devices
US7243434B1 (en) * 2006-01-08 2007-07-17 Fred Zucker Laser theodolite and kit for converting a new or pre-existing theodolite into a laser theodolite
CN2911607Y (en) * 2006-12-11 2007-06-13 青海利都建筑环境装饰设计有限公司 Portable universal-purpose laser paying out instrument
CN201387324Y (en) * 2008-12-29 2010-01-20 居涛 Plane rectangular setting-out instrument
CN201666794U (en) * 2010-04-15 2010-12-08 上海宝钢设备检修有限公司 Special line laying tool for lateral central lines on working layer of molten iron mixer body
CN202119374U (en) * 2011-07-12 2012-01-18 涂闽杰 Arc building structure setting-out detector

Also Published As

Publication number Publication date
CN102607539A (en) 2012-07-25

Similar Documents

Publication Publication Date Title
CN105698776B (en) A kind of two dimension reference vehicular transfer device and its measurement method
CN110487258B (en) Prism support device and using method thereof
CN104457716A (en) Measurement and control method for bridge construction
CN104060839B (en) Be exclusively used in large stadium metal curtain wall steel construction vertical keel construction control method
CN204024092U (en) A kind of Novel section steel post positioning component
CN102607539B (en) Simple measurement setting-out method
JP5213905B2 (en) Wire sag measurement method and apparatus
CN105805506A (en) Level bracket structure and leveling method thereof
CN204899252U (en) Built -in fitting accuracy control regulator
CN203587057U (en) Height measuring device
CN104446018B (en) Two vertical limestone kilns of thorax many plane three-dimensionals coordinate is just being looked for, levelling method
CN202511798U (en) Simple thread guide
CN201217936Y (en) Signal generating structure of plastering machine aligning apparatus
CN102636160B (en) Entire lofting method for ultra-long-distance roll-line roller bed bolt of metallurgical industry
CN105570622B (en) Equipment leveling method
CN205640122U (en) Surveyor's level supporting structure
CN211060834U (en) Template concatenation displacement monitoring devices
CN104808690A (en) Pipe gradient measuring instrument
CN108151720A (en) A kind of installation measuring method of inclined-plane basis mixing machine roller seat
CN211849564U (en) Wireless frame bolt positioning device
CN109680711B (en) Ring-arranged direct-buried bolt pre-embedding positioning device and construction method
CN210182909U (en) Stable box positioning device for secondary structure wall line box
RU2515200C1 (en) Method to determine coordinates of points of surface in 3d system of coordinates
CN209820468U (en) Central hanging scaffold for measuring and controlling hyperbolic cooling tower barrel body
CN109262539B (en) Installation method for controlling tangent line of furnace bottom and furnace top rollers

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: TIANJIN XINBIN ENGINEERING TECHNOLOGY MONITORING C

Free format text: FORMER OWNER: TIANJIN MCC20 CONSTRUCTION CO., LTD.

Effective date: 20150715

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150715

Address after: 300301, room 2284-101, building A, China Merchants Road, No. ten bridge, Dongli District, Tianjin

Patentee after: TIANJIN XINBIN ENGINEERING TECHNOLOGY INSPECTION CO.,LTD.

Address before: 300301, No. ten bridge, Tianjin, Dongli

Patentee before: TIANJIN MCC 20 CONSTRUCTION Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20230419

Address after: No.88, West 2nd Road, Airport Economic Zone, Dongli District, Tianjin 300308

Patentee after: MCC TIANGONG GROUP Corp.,Ltd.

Address before: Room 2284-101, Zone A, China Merchants Building, No. 10 Bridge, Wushi Street, Dongli District, Tianjin, 300301

Patentee before: TIANJIN XINBIN ENGINEERING TECHNOLOGY INSPECTION CO.,LTD.

TR01 Transfer of patent right