CN102593824A - Power control system - Google Patents

Power control system Download PDF

Info

Publication number
CN102593824A
CN102593824A CN2012100364333A CN201210036433A CN102593824A CN 102593824 A CN102593824 A CN 102593824A CN 2012100364333 A CN2012100364333 A CN 2012100364333A CN 201210036433 A CN201210036433 A CN 201210036433A CN 102593824 A CN102593824 A CN 102593824A
Authority
CN
China
Prior art keywords
power supply
supply unit
synthetic
circulating water
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100364333A
Other languages
Chinese (zh)
Inventor
杨林
王标
瞿道兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUIZHOU XINGHUA CHEMICAL CO Ltd
Original Assignee
GUIZHOU XINGHUA CHEMICAL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUIZHOU XINGHUA CHEMICAL CO Ltd filed Critical GUIZHOU XINGHUA CHEMICAL CO Ltd
Priority to CN2012100364333A priority Critical patent/CN102593824A/en
Publication of CN102593824A publication Critical patent/CN102593824A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The invention discloses a power control system. The power control system comprises a synthetic circulating water power supply unit, a gas-making circulating water power supply unit, a synthetic circulator power supply unit and a total-drop power distribution unit, wherein the synthetic circulating water power supply unit comprises two transformers; the gas-making circulating water power supply unit comprises a transformer; and the synthetic circulator power supply unit comprises two transformers. The system can better supply power and ensures that the power supply of a whole production system is not influenced when a certain region is in power outage.

Description

A kind of electric control system
Technical field
The present invention relates to the electric control system in the Ammonia Production technology.
Background technology
Power balance is many in the Chemical Manufacture industry at present carries out balanced distribution with workshop section and system, and supply network is comparatively concentrated, comparatively single, in case outage appears occurring in a certain zone, and bigger to the whole production system influence.
Summary of the invention
The present invention is directed to existing electric power system and concentrate single defective, provide a kind of, can comparatively reliably, comparatively flexibly, comparatively stablize the power balance scheme that provides through improved electric control system.Especially for recirculated water workshop section electric power is provided.
Technical scheme of the present invention is: a kind of electric control system comprises synthetic recirculated water power supply unit, circulating water for gasification power supply unit, synthetic circulator power supply unit and always falls power supply unit that synthetic recirculated water power supply unit comprises two transformers; Old circulating water for gasification power supply unit comprises 1 transformer; Synthetic circulator power supply unit comprises two transformers.
Said synthetic recirculated water power supply unit will synthesize recirculated water 3# (75KW mainly supplies cooling tower), 5# (160KW mainly supplies old compression, old decarburization), 6# (185KW supplies refining, ice maker, synthetic) and change to one meter tower switchgear house power supply, and wherein the 6# pump can be changed to boss and falls the 0.4KV power supply.
Synthetic recirculated water power supply unit is newly-increased 2 water supply pumps power supply.
Old gas making cycle power unit is that heat-exchanger pump, a 200KW water supply pump and a 37KW cooling tower fan and two 55KW cooling tower fans are supplied power.
System of the present invention can provide electric power to provide better, guarantees also not influence in a certain when outage zone the power supply of whole production system.
Description of drawings
Fig. 1 is connection layout of old circulating water for gasification switchgear house.
Fig. 2 is synthetic connection layout of recirculated water switchgear house.
Fig. 3 is that connection layout of switchgear house falls in boss.
Embodiment
1, crane span structure fabrication and installation: be replaced by existing one meter tower to the crane span structure that synthesizes recirculated water 500 crane span structure; Newly doing one 500 crane span structure to synthetic recirculated water from circulating water for gasification connects desulphurization circulating water pump crane span structure and accomplishes that the hot and cold water pump locates to be connected with the switchgear house crane span structure that comes out; Newly do 300 crane span structure from existing old circulating water for gasification switchgear house to newly-increased circulating water for gasification blower fan and be connected with the circulating water for gasification pump.
2, synthetic circulating water pump transformation: will synthesize recirculated water 3# (75KW mainly supplies cooling tower), 5# (160KW mainly supplies old compression, old decarburization), 6# (185KW supplies refining, ice maker, synthetic) and change to one meter tower switchgear house power supply, wherein the 6# pump can be changed to boss and falls 0.4KV and supply power; It is little to the influence of synthetic recirculated water so just can to realize that synthetic arbitrary transformer of recirculated water goes wrong.
3, the installation of newly-increased water pump and blower fan: newly-increased 2 power supplys of water supply pump (315KW) supply powers (synthesize recirculated water 1# change low-pressure side 760A, 2# becomes 740A) by synthetic recirculated water switchgear house at present; 2 of heat-exchanger pumps (200KW) are by old circulating water for gasification switchgear house power supply (existing old circulating water for gasification switchgear house load is for often opening a heat-exchanger pump 132KW, a water supply pump 200KW, a cooling tower fan 37KW); 2 55KW of cooling tower fan are also by old circulating water for gasification switchgear house power supply; It is the electric current about 920A, 900A that the synthetic recirculated water load in back is installed like this; The electric current of old circulating water for gasification switchgear house load about 1500A; Old when the time comes circulating water for gasification becomes (low-pressure side rated current 1804A) load factor and is about 83%, in the ideal range of transformer-supplied load.
The line map that the present invention implements is referring to Fig. 1-3, and Fig. 1 is connection layout of old circulating water for gasification switchgear house.Fig. 2 is synthetic connection layout of recirculated water switchgear house.Fig. 3 is that connection layout of switchgear house falls in boss.

Claims (2)

1. an electric control system is characterized in that, comprises synthetic recirculated water power supply unit, circulating water for gasification power supply unit, synthetic circulator power supply unit and always falls power supply unit, and synthetic recirculated water power supply unit comprises two transformers; Old circulating water for gasification power supply unit comprises 1 transformer; Synthetic circulator power supply unit comprises two transformers.
2. electric control system according to claim 1 is characterized in that, old gas making cycle power unit is that heat-exchanger pump, a 200KW water supply pump and a 37KW cooling tower fan and two 55KW cooling tower fans are supplied power.
CN2012100364333A 2012-02-17 2012-02-17 Power control system Pending CN102593824A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100364333A CN102593824A (en) 2012-02-17 2012-02-17 Power control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100364333A CN102593824A (en) 2012-02-17 2012-02-17 Power control system

Publications (1)

Publication Number Publication Date
CN102593824A true CN102593824A (en) 2012-07-18

Family

ID=46482153

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100364333A Pending CN102593824A (en) 2012-02-17 2012-02-17 Power control system

Country Status (1)

Country Link
CN (1) CN102593824A (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1124230A (en) * 1995-12-05 1996-06-12 连云港化肥厂 Producing method for synthetic ammonia

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1124230A (en) * 1995-12-05 1996-06-12 连云港化肥厂 Producing method for synthetic ammonia

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李棣炜: "化工企业节约电能的主要途径", 《安徽化工》, no. 1, 31 March 1983 (1983-03-31), pages 47 - 52 *
王恩详 等: "H_(12)-57/320压缩机配用10kV电机的应用", 《小氮肥设计技术》, no. 3, 30 September 1991 (1991-09-30) *

Similar Documents

Publication Publication Date Title
CN204666753U (en) A kind of test macro of city track traffic engineering car AuCT
MX2015010062A (en) System and method for coupling a monophase power source to a multiphase power network.
Keane et al. Evaluation of advanced operation and control of distributed wind farms to support efficiency and reliability
Ochoa et al. Low-carbon LV networks: Challenges for planning and operation
Ilie et al. Reliability performance assessment in smart grids with demand-side management
Ymeri et al. Impacts of Distributed Generation in Energy Losses and voltage drop in 10 kV line in the Distribution System
Skaanoey et al. AC subsea power transmission architectures, design and challenges, the martin linge case
CN102416759A (en) Fountain solution centralized allocation and supply circular cooling device
CN102593824A (en) Power control system
CN102364321A (en) System for testing cooling and heating capacity of water source heat pump unit
CN204945265U (en) A kind of cable current circulating-heating tests energy-saving pilot system
CN107677971B (en) Comprehensive test platform for high-power converter
CN202334318U (en) High-voltage motor testing power supply device
CN104391526A (en) Remote temperature control circuit for electric cabinet
CN204794114U (en) Intelligent high pressure economize on electricity cabinet
CN203324396U (en) High power locomotive traction current transformer test system
CN205753127U (en) It is applied to the fixing briquetting that power distribution cabinet is installed
CN204407770U (en) The syndeton of circuit breaker and static socket in high-tension switch cabinet
CN214370576U (en) Distributed control type heating power station control system
CN202474583U (en) Adjustable distribution box
CN202406445U (en) Ingot furnace electrical control cabinet
CN205505314U (en) Environmental protection and energy saving temperature and humidity regulation electric cabinet for air -cooler
CN201928567U (en) Pure water treatment device used converter valve experiments
Arun Demand Side Management using Conservation Voltage Reduction (CVR) Techniques
CN201838448U (en) On-load voltage regulation device of power transformer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120718