accident
training
role
prediction
department
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011104507030A
Other languages
Chinese (zh)
Inventor
李昌
陈毅
杨卿
宣宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Sunrise Power Technology Co., Ltd.
Original Assignee
SHANGHAI SUNRISE POWER AUTOMATION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI SUNRISE POWER AUTOMATION CO Ltd filed Critical SHANGHAI SUNRISE POWER AUTOMATION CO Ltd
Priority to CN2011104507030A priority Critical patent/CN102592252A/en
Publication of CN102592252A publication Critical patent/CN102592252A/en
Pending legal-status Critical Current

Links

Abstract

The invention provides a designing method of a training framework based on a multi-role electric power system, relating to the technical field of a simulated training framework and solving the technical problem of improving an accident responding and managing capability. The method comprises the following specific steps of: 1) establishing an accident predetermined plan, wherein the predetermined plan comprises an accident predetermined plan subject, a power grid state before an accident and a phenomenon in an accident happening process; and carrying out a multi-role accident management step; 2) according to the accident predetermined plan, distributing roles participating in accident management; 3) according to the accident predetermined plan and the distributed roles, decomposing the multi-role accident management step into a plurality of steps; and 4) realizing united training, wherein the realization of the united training is divided into three substeps of: substep 1, initializing the current power grid state before the accident in the accident predetermined plan; substep 2, carrying out multi-role management on the phenomenon in the accident happening process of the accident predetermined plan step by step; and substep 3, judging a training result of the accident predetermined plan. The method disclosed by the invention can realize the united training of personnel of a plurality of departments.

Description

Electric system training architecture design method based on polygonal look
Technical field
The present invention relates to emulation training framework technology, particularly relate to a kind of technology of the electric system training architecture design method based on polygonal look.
Background technology
Along with the scale of electrical network enlarges day by day, help improving the most optimum distribution of resources ability on the one hand, help the access and the transmission of extensive regenerative resource; On the other hand, the complexity of operation of power networks and control is also increasingly high, and the risk that occurrence of large-area has a power failure also strengthens day by day, and safe transmission and the reliability supply that realizes electric energy proposed significant challenge.
The commercial operation requirement of current electric system; Operation to equipment is had higher requirement, and the operation maintenance personnel that require a plurality of departments are the fault of response apparatus fast and efficiently, can in the shortest time, fix a breakdown; Guarantee the security of equipment operation, guarantee the reliability of electrical production.In this case, should be technically with equipment on, the environment of automatic operating maintainer study, training is provided, operation maintenance personnel's the capability in handling accident and the fast development of electric system are adapted.But present training to new operation maintenance personnel; All rely on electric system work of maintenance personnel experience and treatment facility fault experience to realize; This training method can not satisfy putting into operation of modern novel device, the requirement of power network development speed and scale.
Summary of the invention
To the defective that exists in the above-mentioned prior art; Technical matters to be solved by this invention provides a kind ofly can unite training to multidisciplinary personnel, improves the electric system training architecture design method based on polygonal look of operation maintenance personnel to the reaction processing capacity of power grid accident.
In order to solve the problems of the technologies described above, a kind of electric system training architecture design method based on polygonal look provided by the present invention is characterized in that concrete steps are following:
1) sets up accident prediction
Phenomenon when preceding electric network state, accident generation take place for comprise said accident prediction accident prediction exercise question, accident, polygonal look accident treatment step;
Wherein, The accident prediction exercise question derives from contingent power grid accident in the true environment; Electric network state derived from the possible state when electrical network normally moves in the true environment before accident took place; Phenomenon derived from contingent power grid accident in the true environment when accident took place, and polygonal look accident treatment step is meant the step of processing accident when accident takes place;
2) distribute a plurality of roles
Accident prediction according to step 1 foundation; Distribute the role who participates in accident treatment; Can supply the role who distributes to comprise automatic operating department, traffic department, maintenance department, department of subordinate, higher level department in the Operation of Electric Systems department, reach the production firm of each running subsystem in the electric system;
3) the accident treatment step of the polygonal look of decomposition
The accident prediction of setting up according to step 1, and the role that distributes of step 2 are decomposed into multistep with the accident treatment step of polygonal look, and maximum 2 roles of each step participate in the processing accident;
4) uniting training realizes
Unite training and realize being divided into following 3 steps;
Preceding electric network state takes place to the accident in the accident prediction of step 1 foundation and carries out initialization in the first step;
Second step, the role of the participation accident treatment of distributing by step 2,3 step of decomposition set by step, phenomenon was carried out polygonal look step-by-step processing when the accident in the accident prediction that step 1 is set up took place;
In the 3rd step, the training result of the accident prediction that step 1 is set up passes judgment on.
Electric system training architecture design method based on polygonal look provided by the invention; Electrical network situation according in the true environment is set up accident prediction; Distribute the role who participates in accident treatment according to accident prediction, and the accident treatment step is decomposed, carry out accident treatment by the role who distributes according to accident prediction then and unite training; Can unite training to multidisciplinary personnel, improve the reaction processing capacity of operation maintenance personnel power grid accident.
Embodiment
Below in conjunction with specific embodiment the present invention is described in further detail, but present embodiment is not limited to the present invention, every employing analog structure of the present invention and similar variation thereof all should be listed protection scope of the present invention in.
A kind of electric system training architecture design method based on polygonal look that the embodiment of the invention provided is characterized in that concrete steps are following:
1) sets up accident prediction
Phenomenon when preceding electric network state, accident generation take place for comprise said accident prediction accident prediction exercise question, accident, polygonal look accident treatment step;
Wherein, The accident prediction exercise question derives from contingent power grid accident in the true environment; Electric network state derived from the possible state when electrical network normally moves in the true environment before accident took place; Phenomenon derived from contingent power grid accident in the true environment when accident took place, and polygonal look accident treatment step is meant the step of processing accident when accident takes place;
2) distribute a plurality of roles
Accident prediction according to step 1 foundation; Distribute the role who participates in accident treatment; Can supply the role who distributes to comprise automatic operating department, traffic department, maintenance department, department of subordinate, higher level department in the Operation of Electric Systems department, reach the production firm of each running subsystem in the electric system;
3) the accident treatment step of the polygonal look of decomposition
The accident prediction of setting up according to step 1, and the role that distributes of step 2 are decomposed into multistep with the accident treatment step of polygonal look, and maximum 2 roles of each step participate in the processing accident;
4) uniting training realizes
Unite training and realize being divided into following 3 steps;
Preceding electric network state takes place to the accident in the accident prediction of step 1 foundation and carries out initialization in the first step;
Second step, the role of the participation accident treatment of distributing by step 2,3 step of decomposition set by step, phenomenon was carried out polygonal look step-by-step processing when the accident in the accident prediction that step 1 is set up took place;
In the 3rd step, the training result of the accident prediction that step 1 is set up passes judgment on.

Claims (1)

1. electric system training architecture design method based on polygonal look is characterized in that concrete steps are following:
1) sets up accident prediction
Phenomenon when preceding electric network state, accident generation take place for comprise said accident prediction accident prediction exercise question, accident, polygonal look accident treatment step;
Wherein, The accident prediction exercise question derives from contingent power grid accident in the true environment; Electric network state derived from the possible state when electrical network normally moves in the true environment before accident took place; Phenomenon derived from contingent power grid accident in the true environment when accident took place, and polygonal look accident treatment step is meant the step of processing accident when accident takes place;
2) distribute a plurality of roles
Accident prediction according to step 1 foundation; Distribute the role who participates in accident treatment; Can supply the role who distributes to comprise automatic operating department, traffic department, maintenance department, department of subordinate, higher level department in the Operation of Electric Systems department, reach the production firm of each running subsystem in the electric system;
3) the accident treatment step of the polygonal look of decomposition
The accident prediction of setting up according to step 1, and the role that distributes of step 2 are decomposed into multistep with the accident treatment step of polygonal look, and maximum 2 roles of each step participate in the processing accident;
4) uniting training realizes
Unite training and realize being divided into following 3 steps;
Preceding electric network state takes place to the accident in the accident prediction of step 1 foundation and carries out initialization in the first step;
Second step, the role of the participation accident treatment of distributing by step 2,3 step of decomposition set by step, phenomenon was carried out polygonal look step-by-step processing when the accident in the accident prediction that step 1 is set up took place;
In the 3rd step, the training result of the accident prediction that step 1 is set up passes judgment on.
CN2011104507030A 2011-12-29 2011-12-29 Designing method of training framework based on multi-role electric power system Pending CN102592252A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011104507030A CN102592252A (en) 2011-12-29 2011-12-29 Designing method of training framework based on multi-role electric power system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011104507030A CN102592252A (en) 2011-12-29 2011-12-29 Designing method of training framework based on multi-role electric power system

Publications (1)

Publication Number Publication Date
CN102592252A true CN102592252A (en) 2012-07-18

Family

ID=46480848

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011104507030A Pending CN102592252A (en) 2011-12-29 2011-12-29 Designing method of training framework based on multi-role electric power system

Country Status (1)

Country Link
CN (1) CN102592252A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102831792A (en) * 2012-07-20 2012-12-19 国家电网公司 Distribution network fault simulation system and simulation method thereof

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101059847A (en) * 2006-04-21 2007-10-24 北京宽信信息技术有限公司 Emergent scheme training system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101059847A (en) * 2006-04-21 2007-10-24 北京宽信信息技术有限公司 Emergent scheme training system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
闾洪庆: "分布式变电运行事故预案仿真培训系统的研究", 《华北电力大学硕士学位论文》, 8 December 2008 (2008-12-08) *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102831792A (en) * 2012-07-20 2012-12-19 国家电网公司 Distribution network fault simulation system and simulation method thereof
CN102831792B (en) * 2012-07-20 2015-09-02 国家电网公司 Distribution Network Failure analogue system and emulation mode thereof

Similar Documents

Publication Publication Date Title
CN106385034A (en) Power grid dynamic partition calculating method based on N-1 security checking
CN102324788A (en) Power dispatching integrated anti-misoperation simulation comprehensive management platform
CN101299533B (en) Reliability design method for large electric network safety steady cooperativeness defensive system
CN105006827A (en) New energy power station three-layer distributed AGC power control method and new energy power station three-layer distributed AGC power control system
CN104657150A (en) Automatic operation and maintenance method under cluster environment
CN106532745A (en) Frequency coordination control method specific to send-out islands of multiple direct current circuits
CN101860024A (en) Implementation method for integrating provincial dispatch organization PAS system and local-level dispatch organization PAS systems in electric power system
CN104463465A (en) Real-time monitoring cluster processing method based on distributed models
CN104678773B (en) Intelligent construction group and its control method based on public cloud service
CN102592252A (en) Designing method of training framework based on multi-role electric power system
CN102111017B (en) Automatic remote maintenance system of transforming plant
CN104201767A (en) Optimized switching-on/off control method for busbar automatic transfer switch pressure plate
CN104090496A (en) Smart grid control operation continuous analog simulation method
CN105389667B (en) Support that the distribution system framework of integration is robbed in allotment
CN102033616A (en) Sharing and mutual-backup system for multi-system terminal computer host
CN103872778B (en) The wind-powered electricity generation control centre device that a kind of redundancy is arranged
CN106056304A (en) Flexible DC interconnection device address selection method and device
CN204143590U (en) There is the valve Room intelligent inspection robot of function of smoking alarm
CN105449871A (en) Large-scale wind power plant real-time online monitoring system
CN105046585A (en) Multi-region security checking method with freely tailorable calculation range
CN106254438B (en) A kind of power distribution network CPS main website based on open communication
CN115657493A (en) Digital twin simulation test system of power grid dispatching platform
Wiboonrat Data center infrastructure management WLAN networks for monitoring and controlling systems
CN205231848U (en) Distribution network automated management system
CN106655222A (en) Method for carrying out cluster management on UPSs to participate in power adjustment of power network

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: SHANGHAI SUNRISE PROTECTIVE RELAY ELECTRIC CO.,LTD

Free format text: FORMER OWNER: SHANGHAI SUNRISE POWER AUTOMATION CO., LTD.

Effective date: 20130624

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20130624

Address after: 200233 Guiping Road, Xuhui District, No. 470, building 12, building 5, building

Applicant after: Shanghai Sunrise Power Technology Co., Ltd.

Address before: 200233 Shanghai City, Xuhui District Road No. 159 15 Tianzhou room unit 1301

Applicant before: Shanghai Sunrise Power Automation Co., Ltd.

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120718