CN102592216A - GPRS-communication-based control method for special transformer prepayment system - Google Patents
GPRS-communication-based control method for special transformer prepayment system Download PDFInfo
- Publication number
- CN102592216A CN102592216A CN2012100139566A CN201210013956A CN102592216A CN 102592216 A CN102592216 A CN 102592216A CN 2012100139566 A CN2012100139566 A CN 2012100139566A CN 201210013956 A CN201210013956 A CN 201210013956A CN 102592216 A CN102592216 A CN 102592216A
- Authority
- CN
- China
- Prior art keywords
- acquisition terminal
- specially
- main website
- control method
- business hours
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention relates to a GPRS-communication-based (general packet radio service) control method for a special transformer prepayment system. The special transformer prepayment system structurally comprises a remote payment center master station server and a group of special transformer acquisition terminals with master control units, wherein the special transformer acquisition terminals and the master station server are subjected to information interaction with the help of a GPRS communication channel; the key points are that a special storage which is connected with a CPU of the master station server in a matching way and stores identification codes and an identification mapping relation database of corresponding service grade is additionally arranged, on this basis, the control method for the special transformer prepayment system is achieved. The control method can better meet the humanized requirements and the user service requirements of various industries, a user is effectively prevented from suffering economic loss and safety loss resulting from a communication operator or an electric power company, the image of the electric power company is improved, and the control method well adapts to the requirements of the electricity market.
Description
Technical field
The invention belongs to the electric power prepaid system technical field, relate to special change user's pre-payment management control method, specifically available conscientiously the control method of a cover based on the special change payment system of GPRS communication.
Background technology
State Grid Corporation of China more and more paid attention to special change user's pre-payment management in recent years, and special change payment system has successively been installed by each local electricity company, and main website adopts the wireless GPRS technology with the communication between the terminal in most systems.The GPRS communication channel by move, wireless telecommunications unit of operation such as UNICOM provides.Under the situation of GPRS Communications failure, run into some practical problemss on the control method of terminal after the user owes the electricity charge, for example under the GPRS communication abnormal conditions, the user is electricity payment, electricity consumption normally; Not handling official business during night or festivals or holidays in the Utilities Electric Co. business hall, like the subscriber arrearage outage, can't carry out electricity payment, electricity consumption; Some important department unit, the back entail dangers to life security that particularly has a power failure or cause the unit arrearage of very big property loss after can not have a power failure, but need report to the police, urge user's electricity payment; In addition according to the standard of the Fare Collection System of power industry; The electricity cost that specially becomes the user mainly contains two parts and forms; The electric degree electricity charge take with the moon basically; The tradition payment system only considers that the electric degree electricity charge have ignored a month basic expense, causes and calculates the change of user's remaining sum greatly, causes Utilities Electric Co. to suffer certain economic loss.
See that from three kinds of situation set forth above traditional payment system does not meet the demand of the good service of national intelligent grid on control method.Therefore adopt the control method of GPRS communication payment system to be badly in need of reforming, to adapt to the requirement of electricity market based on the actual conditions of using.
Summary of the invention
Some drawbacks that the present invention produces on control method for traditional payment system more than changing; Improve the good service quality of national intelligent grid; Designed a kind of control method of the special change payment system based on the GPRS communication; The hommization more of this control method has adapted to the requirement of electricity market.
The technical scheme that the present invention adopts is: based on the control method of the special change payment system of GPRS communication; Comprise remote payment central master station server in the structure of described special change payment system, carry out one group of special change acquisition terminal that has main control unit of information interaction by the GPRS communication port with the main website server; Key is: set up with the special change acquisition terminal identify label sign indicating number of storing of the supporting connection of the server CPU of main website and corresponding grade of service identification code with supportingly be connected, the private memory of mapping relations database; On this basis, specially become in the practical implementation step of control method of payment system and comprise:
A, specially become acquisition terminal and gather the demand charge balance amount information in real time, when Sorry, your ticket has not enough value, specially become acquisition terminal and send to the main website server and set up the GPRS connection request, if successful connection skips to step b; Get nowhere if connect, then skip to step e;
B, specially become acquisition terminal and send power down request information to remote payment central master station server; The server CPU of main website is according to the grade of service identification code that should specially become acquisition terminal identify label sign indicating number Query Database record; If be designated the emphasis user, then skip to step c; If be non-emphasis user, then skip to steps d;
C, main website server send refusal outage service signal to specially becoming acquisition terminal, skip to step e;
D, main website server send and allow the outage service signal to specially becoming acquisition terminal, specially become acquisition terminal and carry out the automatic trip operation, skip to step f;
E, specially become the normal electricity consumption of acquisition terminal, and send prompt messages;
F, end.
Key of the present invention is: grade of service sign has been indicated each and has specially been become acquisition terminal user that whether attaches most importance to; Through before outage, special change acquisition terminal device service class letter sign indicating number being inquired about; Even satisfied the demand that emphasis user's arrearage can not be cut off the power supply; Hospital for example, but need to send alarm notification, remind the timely electricity payment of user.Simultaneously; Also be provided with in the main website data in server storehouse and whether allow specially to become the identification information of normal business hours outage of delaying time after the acquisition terminal arrearage; Effectively overcome the Utilities Electric Co. business hall during not handling official business during night or festivals or holidays; If subscriber arrearage cuts off the power supply, can't carry out the situation of electricity payment.Also have, special change acquisition terminal of the present invention is in the process of carrying out electricity charge remaining sum statistics, directly with taking basically by the moon by the sky deduction, in order to avoid user's remaining sum calculates inaccurate and make Utilities Electric Co. suffer economic loss.
The invention has the beneficial effects as follows: this control method meets the hommization demand more; Satisfied the users service needs of all trades and professions; The economy that the reason owing to communication operator or Utilities Electric Co. causes the user, the loss of secure context have effectively been avoided; Improve the image of Utilities Electric Co., adapted to the requirement of electricity market.
Below in conjunction with accompanying drawing the present invention is elaborated.
Description of drawings
Fig. 1 is the process flow diagram of the inventive method.
Embodiment
Control method based on the special change payment system of GPRS communication; Comprise remote payment central master station server in the structure of described special change payment system, carry out one group of special change acquisition terminal that has main control unit of information interaction by the GPRS communication port with the main website server; Importantly: set up with the special change acquisition terminal identify label sign indicating number of storing of the supporting connection of the server CPU of main website and corresponding grade of service identification code with supportingly be connected, the private memory of mapping relations database; On this basis, specially become in the practical implementation step of control method of payment system and comprise:
A, specially become acquisition terminal and gather the demand charge balance amount information in real time, when Sorry, your ticket has not enough value, specially become acquisition terminal and send to the main website server and set up the GPRS connection request, if successful connection skips to step b; Get nowhere if connect, then skip to step e;
B, specially become acquisition terminal and send power down request information to remote payment central master station server; The server CPU of main website is according to the grade of service identification code that should specially become acquisition terminal identify label sign indicating number Query Database record; If be designated the emphasis user, then skip to step c; If be non-emphasis user, then skip to steps d;
C, main website server send refusal outage service signal to specially becoming acquisition terminal, skip to step e;
D, main website server send and allow the outage service signal to specially becoming acquisition terminal, specially become acquisition terminal and carry out the automatic trip operation, skip to step f;
E, specially become the normal electricity consumption of acquisition terminal, and send prompt messages;
F, end.
Grade of service sign has been indicated each and has specially been become acquisition terminal user that whether attaches most importance to; Through before outage, special change acquisition terminal device service class letter being inquired about; Even satisfied the demand that emphasis user's arrearage can not be cut off the power supply; Hospital for example, but need to send alarm notification, remind the timely electricity payment of user.Like this, each user's different demands for services have been taken into full account, hommization more.
Also store in the described database and whether allow specially to become the identification information of normal business hours outage of delaying time after the acquisition terminal arrearage; And set up the first memory that stores normal business hours table at the main website server; On this basis, the transmission of main website server allows the outage service signal to specially setting up as judging before the change acquisition terminal in the steps d:
Whether allowing of storing in d1, the server CPU of the main website Query Database specially becomes the identification information of the normal business hours outage of delaying time after the acquisition terminal arrearage, if, then skip to d2, if not, continue execution in step d;
The normal business hours of storing in d2, the main website server lookup first memory are shown, if the normal business hours are then continued execution in step d; If not the normal business hours, then the information of forward delay interval to normally business hours outage arrives the normal business hours and continues execution in step d to specially becoming acquisition terminal.
The described normal business hours are the office hours in the working day except that legal festivals or holidays.
Like this, effectively overcome the Utilities Electric Co. business hall during not handling official business during night or festivals or holidays,, can't carry out the situation of electricity payment, met the demand of the good service of national intelligent grid if subscriber arrearage cuts off the power supply.
Also be provided with month second memory of basic expense that stores that is connected with main control unit in the described special change acquisition terminal, specially become acquisition terminal and deduct by the sky according to a month basic expense of storing in the second memory.The economic loss of Utilities Electric Co. has effectively been avoided in such setting.
The present invention originally specially becomes payment system and comprises three system levels: main website of system layer, Communication Layer, terminating layer in the specific implementation.Main website of system layer is the core of total system.Follow the electric network model of IEC61970 CIM standard, and the api interface of following the CIS standard is provided, the plug and play of the third party software of respective standard is followed in realization, is convenient to the function expansion and the wider information integration of system.The internal system function modoularization, systemic-function is set up together like the mode of playing with building blocks, and helps the cutting and the expansion of systemic-function.Remote payment central master station server can be made amendment to user's's (being that each specially becomes acquisition terminal) electricity consumption details, and whether can defining user's (being that each specially becomes acquisition terminal), the user attaches most importance to; Whether definition allows the normal business hours outage of delaying time behind the subscriber arrearage late into the night; Whether definition allows user's arrearage electricity consumption during festivals or holidays.
Communication Layer: the special-purpose communication channel of the wireless GPRS that main website of system and terminal adopt communication operator to provide carries out communication.Between the main website of system is with the terminal, firewall box is installed, has been satisfied the requirement of electric power secondary security protection fully.
Terminating layer (promptly specially become acquisition terminal) directly is responsible for the calculating and the outage control of demand charge, is installed in the user transformers side, behind subscriber arrearage, can add mode such as bright through electric bell, liquid crystal and remind the user.
On this basis; The pre-configured database storing by following information structuring of main website server comprises the identify label of special change acquisition terminal, and corresponding grade of service sign, whether allows specially to become the identification information parameter of normal business hours outage of delaying time after the acquisition terminal arrearage in private memory in the database.User's electricity cost also comprises a month basic expense, specially becomes acquisition terminal when calculating demand charge, and the moon that will in second memory, store, basic expense was also deducted by the sky simultaneously, carried out the remaining sum statistics afterwards,
A, when Sorry, your ticket has not enough value when reaching trip value, specially become acquisition terminal and send to the main website server and set up the GPRS connection request, if successful connection skips to step b; Get nowhere if connect, then skip to step e;
B, specially become acquisition terminal and send power down request information to remote payment central master station server, the server CPU of main website if be designated the emphasis user, then skips to step c according to the grade of service sign that should specially become acquisition terminal identify label Query Database record; If be non-emphasis user, then skip to steps d;
C, main website server send refusal outage service signal to specially becoming acquisition terminal, skip to step e;
Whether allowing of storing in d1, the server CPU of the main website Query Database specially becomes the identification information of the normal business hours outage of delaying time after the acquisition terminal arrearage; If; Then skip to d2, if not, the main website server sends and allows the outage service signal to specially becoming acquisition terminal; Specially become acquisition terminal and carry out the automatic trip operation, skip to step f;
The normal business hours table of storing in d2, the main website server lookup first memory, if the normal business hours, the main website server sends and allows the outage service signal to specially becoming acquisition terminal, specially becomes acquisition terminal and carries out the automatic trip operation, skips to step f; If not the normal business hours; Then the information of forward delay interval to normal business hours outage is to specially becoming acquisition terminal, and to normal after hours, the main website server sends and allows the outage service signal to specially becoming acquisition terminal; Specially become acquisition terminal and carry out the automatic trip operation, skip to step f;
E, specially become the normal electricity consumption of acquisition terminal, and send prompt messages;
F, end.
This control method meets the hommization demand more; Satisfied the users service needs of all trades and professions; Effectively avoid the economy that the reason owing to communication operator or Utilities Electric Co. causes the user, the loss of secure context, improved the image of Utilities Electric Co., adapted to the requirement of electricity market.
Claims (5)
1. based on the control method of the special change payment system of GPRS communication; Comprise remote payment central master station server in the structure of described special change payment system, carry out one group of special change acquisition terminal that has main control unit of information interaction by the GPRS communication port with the main website server; It is characterized in that: set up with the special change acquisition terminal identify label sign indicating number of storing of the supporting connection of the server CPU of main website and corresponding grade of service identification code with supportingly be connected, the private memory of mapping relations database; On this basis, specially become in the practical implementation step of control method of payment system and comprise:
A, specially become acquisition terminal and gather the demand charge balance amount information in real time, when Sorry, your ticket has not enough value, specially become acquisition terminal and send to the main website server and set up the GPRS connection request, if successful connection skips to step b; Get nowhere if connect, then skip to step e;
B, specially become acquisition terminal and send power down request information to remote payment central master station server; The server CPU of main website is according to the grade of service identification code that should specially become acquisition terminal identify label sign indicating number Query Database record; If be designated the emphasis user, then skip to step c; If be non-emphasis user, then skip to steps d;
C, main website server send refusal outage service signal to specially becoming acquisition terminal, skip to step e;
D, main website server send and allow the outage service signal to specially becoming acquisition terminal, specially become acquisition terminal and carry out the automatic trip operation, skip to step f;
E, specially become the normal electricity consumption of acquisition terminal, and send prompt messages;
F, end.
2. the control method of the special change payment system based on the GPRS communication according to claim 1; It is characterized in that: also store whether allow specially to become the identification information of normal business hours outage of delaying time after the acquisition terminal arrearage in the described database; And set up the first memory that stores normal business hours table at the main website server; On this basis, the transmission of main website server allows the outage service signal to specially setting up as judging before the change acquisition terminal in the steps d:
Whether allowing of storing in d1, the server CPU of the main website Query Database specially becomes the identification information of the normal business hours outage of delaying time after the acquisition terminal arrearage, if, then skip to d2, if not, continue execution in step d;
The normal business hours of storing in d2, the main website server lookup first memory are shown, if the normal business hours are then continued execution in step d; If not the normal business hours, then the information of forward delay interval to normally business hours outage arrives the normal business hours and continues execution in step d to specially becoming acquisition terminal.
3. the control method of the special change payment system based on the GPRS communication according to claim 2, it is characterized in that: the described normal business hours are the office hours in the working day except that legal festivals or holidays.
4. the control method of the special change payment system based on the GPRS communication according to claim 1; It is characterized in that: also be provided with month second memory of basic expense that stores that is connected with main control unit in the described special change acquisition terminal, specially become acquisition terminal and deduct by the sky according to a month basic expense of storing in the second memory.
5. the control method of the special change payment system based on the GPRS communication according to claim 1 is characterized in that: described main website server and specially become between the acquisition terminal and be provided with firewall box.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100139566A CN102592216A (en) | 2012-01-17 | 2012-01-17 | GPRS-communication-based control method for special transformer prepayment system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100139566A CN102592216A (en) | 2012-01-17 | 2012-01-17 | GPRS-communication-based control method for special transformer prepayment system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102592216A true CN102592216A (en) | 2012-07-18 |
Family
ID=46480817
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012100139566A Pending CN102592216A (en) | 2012-01-17 | 2012-01-17 | GPRS-communication-based control method for special transformer prepayment system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102592216A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105424996A (en) * | 2015-12-11 | 2016-03-23 | 国网北京市电力公司 | Ammeter control system and method |
CN112700592A (en) * | 2020-12-02 | 2021-04-23 | 国网辽宁省电力有限公司阜新供电公司 | Special transformer user pre-purchase electricity warning method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1838000A (en) * | 2006-04-10 | 2006-09-27 | 石家庄科林自动化有限公司 | Remote control device for electricity charge prepayment |
CN1859213A (en) * | 2006-03-01 | 2006-11-08 | 华为技术有限公司 | System and method for securing service lelel in content distribution network |
GB2455965A (en) * | 2007-10-11 | 2009-07-01 | Landis & Gyr Ag | Remote control of commodity access and metering |
CN201425752Y (en) * | 2009-03-10 | 2010-03-17 | 中山汇海华天科技有限公司 | Novel non-card prepaid electrical management system |
-
2012
- 2012-01-17 CN CN2012100139566A patent/CN102592216A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1859213A (en) * | 2006-03-01 | 2006-11-08 | 华为技术有限公司 | System and method for securing service lelel in content distribution network |
CN1838000A (en) * | 2006-04-10 | 2006-09-27 | 石家庄科林自动化有限公司 | Remote control device for electricity charge prepayment |
GB2455965A (en) * | 2007-10-11 | 2009-07-01 | Landis & Gyr Ag | Remote control of commodity access and metering |
CN201425752Y (en) * | 2009-03-10 | 2010-03-17 | 中山汇海华天科技有限公司 | Novel non-card prepaid electrical management system |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105424996A (en) * | 2015-12-11 | 2016-03-23 | 国网北京市电力公司 | Ammeter control system and method |
CN105424996B (en) * | 2015-12-11 | 2018-04-03 | 国网北京市电力公司 | Ammeter control system and method |
CN112700592A (en) * | 2020-12-02 | 2021-04-23 | 国网辽宁省电力有限公司阜新供电公司 | Special transformer user pre-purchase electricity warning method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104166901A (en) | Fault urgent repair site auxiliary mobile platform based on distribution network | |
CN101951027A (en) | Uniform data acquisition and monitoring system of low-medium voltage power distribution network | |
CN2772099Y (en) | Power utilization in-situ service terminal device | |
CN103595816A (en) | Integrated electric marketing charge-reminding platform system | |
CN105182033A (en) | Credit management billing method and system of intelligent electric meter system | |
EP2171401A1 (en) | Intelligent automatic meter reading system for collecting and managing data from metering devices | |
CN102568108A (en) | Prepayment reminding method for intelligent electric meter based on remote charge control mode | |
CN108711044A (en) | A kind of the remote meter reading settlement method and system of water meter | |
US7940901B2 (en) | Remote management of products and services | |
CN107835252A (en) | A kind of intelligent interactive system based on intelligent electric meter data acquisition | |
CN109828131B (en) | Method for recording occurrence events by intelligent electric meter | |
CN109308766B (en) | Fault positioning system and processing method for remote fee control switching on and off execution failure | |
CN101917510A (en) | Battery based on use rule and cost management method | |
CN102592216A (en) | GPRS-communication-based control method for special transformer prepayment system | |
CN118246664A (en) | Time-sharing energy storage method for electric power | |
CN102364784B (en) | Method for realizing distribution network load automation acquisition and displaying by using load control terminal | |
CN103680106A (en) | Intelligent air switch system | |
CN201425751Y (en) | Non-card prepaid electrical management system | |
CN105205605B (en) | Interactive service system of city intelligent portal terminal and electric power marketing terminal | |
CN116012005B (en) | Real-time electric charge settlement system and method | |
CN104240149A (en) | Energy efficiency metering system | |
CN103581953A (en) | Association method for wireless drive test data and signaling monitoring data | |
CN201425754Y (en) | Novel non-card prepaid electrical management system | |
CN101106815A (en) | Novel communication solution method to lock cell | |
CN114168638A (en) | Intelligent decoration industry number pool matching strategy system and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120718 |