CN101917510A - Battery based on use rule and cost management method - Google Patents

Battery based on use rule and cost management method Download PDF

Info

Publication number
CN101917510A
CN101917510A CN2010102310536A CN201010231053A CN101917510A CN 101917510 A CN101917510 A CN 101917510A CN 2010102310536 A CN2010102310536 A CN 2010102310536A CN 201010231053 A CN201010231053 A CN 201010231053A CN 101917510 A CN101917510 A CN 101917510A
Authority
CN
China
Prior art keywords
battery
communication
expense
cost
rule
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010102310536A
Other languages
Chinese (zh)
Inventor
张欣
潘峮
曹亘
郑瑞明
高月红
常永宇
杨大成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Posts and Telecommunications
Original Assignee
Beijing University of Posts and Telecommunications
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Posts and Telecommunications filed Critical Beijing University of Posts and Telecommunications
Priority to CN2010102310536A priority Critical patent/CN101917510A/en
Publication of CN101917510A publication Critical patent/CN101917510A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Abstract

The embodiment of the invention discloses a battery based on a use rule and a cost management method. In the method, by calculating the use rule of equipment, which comprises a rule of power consumption and cost consumption and a rule of power charging and cost charging, and combining the schedule of a user, the consumption of the battery or cost is predicted, and the invention can properly remind the user and suggest the user to charge power or recharge at the right time so as to improve user experience.

Description

Battery and cost management method based on laws of use
Technical field
The present invention relates to the battery of equipment in the radio communication and the management of expense, particularly battery charge and expense and pay the method for management.
Background technology
In radio communication, particularly in the mobile communication, mobile device will carry out general communication, needs usually to rely on powered battery and guarantee that the user can pay the corresponding communication expense, for prepayment service, then require the enough communication costs of residue in the corresponding user account.
And usually, the user does not consider the residue situation of battery and the situation of available expense in real time for the use of mobile device, the problem of bringing like this has two kinds of typical situations, under a kind of situation, the user always just charges when battery dump energy is also very high, and perhaps the user just supplements with money when always remaining communication cost is also a lot of in account; Under the another kind of situation, user's communications can be because in time do not charge or supplement with money and be interrupted.Above situation except causing the telex network demand is not being met, also may make shorten the useful life of battery, for environmental protection and energy-conservation for also be disadvantageous.
Summary of the invention
The objective of the invention is: a kind of battery and cost management method based on the equipment laws of use is provided, by statistics to the equipment laws of use, the consumption of prediction battery or expense, can carry out suitable prompting to the user, advise that it charged or supplement with money on suitable opportunity, to improve user's experience.
According to purpose of the present invention, battery and the cost management method that are proposed based on the equipment laws of use, its basic principle is: at the operating position of communication equipment, add up the rule of its use, comprise charging and the rule of supplementing with money, and can be in conjunction with the arrangement situation of subscriber calendar, and then draw the rule information of its battery consumption and communication cost consumption and predict, if dope the assurance that the possible communication of user can't in time obtain corresponding power supply support and expense, then remind the user, and attempt the method remedy.
The specific implementation step of the method that proposes among the present invention comprises:
Step 1: following steps can be configured to periodic and carry out, and also can be configured to according to the needs of equipment user or the needs execution of the network equipment of communication with it.
Step 2: at using battery powered apparatus, add up the rule of its use, the rule of its communication particularly, can independently add up by the equipment that adopts battery during statistics, perhaps add up by the network equipment of communication with it, or the above-mentioned both sides that communicated by letter by participation unite statistics, thereby obtain using the power consumption rule of equipment of battery or the rule of communication cost cost, for example 7 day each day an of week average number of communications and duration and the corresponding power consumption and the situation of communication cost cost, and the parameter configuration situation of the free communication service of using.
Step 3: if communicate by network equipment, use battery powered apparatus to have a plurality of, network equipment can be to these statistics of using the communication rule of the equipment of battery to unite, and on this basis their power consumption and expense operating position are predicted.
Step 4: at using battery powered apparatus, add up the rule of its battery charge, can independently add up by the equipment that adopts battery during statistics, perhaps add up by the network equipment of communication with it, or the above-mentioned both sides that communicated by letter by participation unite statistics, thereby machine information during the charging that obtains being fit to, for example when and where user's custom charges.
Step 5: at using battery powered apparatus, add up its communication cost and pay the rule of supplementing with money, can independently add up by the equipment that adopts battery during statistics, perhaps add up by the network equipment of communication with it, or the above-mentioned both sides that communicated by letter by participation unite statistics, machine information when thereby the expense that obtains being fit to is supplemented with money, for example when and where user custom is carried out expense and is supplemented with money.
Step 6: at using battery powered apparatus, if possess the function of its user's schedule of storage, then can be in conjunction with user demand corresponding in the schedule, the rule of power consumption that obtains in the correction preceding step and communication cost cost and charging, machine information when supplementing with money, this process can independently be finished by the equipment that adopts battery, perhaps finish, or unite by these above-mentioned both sides that participate in communication and to finish by the network equipment of communication with it.
Step 7: predict according to the resulting rule of the step of front, judge and followingly to be depleted to certain electric weight thresholding or expense thresholding respectively when following at battery storage electric weight or available communication cost, whether may occur that, that is: both be inconvenient to charge or carry out expense and supplement with money, and have very high user demand again, if this occurs, then remind the user to charge timely or expense is supplemented with money, also can remind simultaneously the user select before used free communication service.
Step 8: before and after charging or expense supplements with money, too whether electric weight that judgement is carried out in the recent period or cost consumption prediction optimism still too pessimistic, be lower than certain thresholding if occurred the electric weight or the available expense of battery when that is: when charging or expense are supplemented with money, then existing prediction is too optimistic, and is instead then too pessimistic; If too optimistic, then prediction mode is adjusted to comparatively conservatively, for example electric weight thresholding described in the step 7 or expense thresholding are heightened, otherwise then be adjusted to comparatively radical prediction, for example electric weight thresholding described in the step 7 or expense thresholding are turned down.
Embodiment
Be example with the cellular mobile telephone network that now widely uses, this network or the user that system served use transportable equipment usually, as mobile phone or PDA, they are the powered battery by self being with in most cases, by the base station access communications network that closes on it, electric energy in this process in the consuming cells and the communication cost in the account, the framework that this can be described as very the typical case and has general applicability, we set forth battery and cost management method based on the equipment laws of use proposed by the invention with this.
Certainly, application of the present invention is not limited to cellular mobile telephone network, generally is suitable for for all application scenarios with essential characteristic among this embodiment.Basic step among this embodiment is as follows:
Step 1: the mobile phone of being investigated has been opened the function of adding up its laws of use, and be the network equipment of its service, it is base station etc., also opened this function, user's schedule also is synchronized in the data of storing in the network equipment in the mobile phone, and mobile phone its information about power after charging also is updated in the network equipment.
Step 2: network equipment is at every turn when handling the communication of institute's investigation mobile phone, write down the communication cost of the moment of its communication, lasting duration, power consumption, deduction, by the statistics of certain hour, distribution and the power consumption of correspondence and the situation that communication cost spends on time or space obtain 7 day each day on average communicate by letter in a week.
Step 3: in step 2, if pass through network equipment, as the base station, two or more mobile phone mutual communication are arranged, the statistics that can unite the communication rule of these two or more mobile phones of network equipment then, power consumption and expense operating position of being about to communication this time record respectively in the record of corresponding mobile phone.
Step 4: when mobile phone charges at every turn, can be with the advisory network equipment of charging, network equipment writes down the generally when charging in a day of this mobile phone, where also can write down place that charging takes place.
Step 5: network equipment writes down this mobile phone corresponding account number and generally goes to pay the fees which day of a middle of the month, and the record quantity of paying the fees.
Step 6: if mobile phone is found its user the communication requirement that is different from its general rule is arranged on the schedule of its plan, for example: to go out some day temporarily the meeting rather than in office, then that day mobile phone the traffic may be bigger; Perhaps interim arrangements some day to make a call specific; Perhaps interim arrangements will be sent out an envelope Email some day, and then that these are extra communication requirement estimates that the electric weight that consumes and classmate's expense are adapted on the rule that step 2 adds up.
Step 7: every day special time, as point in evenings 6, network equipment is predicted according to the resulting rule of the step of front, before when determining second day evening by statistics in the past time of (being predicted) user's charging, have how many traffics, and existing battery of mobile phone stores electric weight or what degree available communication cost can be depleted to respectively, if discovery can be reduced to certain electric weight thresholding or below the expense thresholding, then remind the user to charge timely or expense is supplemented with money by specific signaling or note.
Step 8: charging or expense when supplementing with money, if mobile phone finds to occur in the recent period the situation that low electric weight carries out mass communication, judge that then the power quantity predicting carry out in the recent period is too optimistic, and the informing network side apparatus heightens the electric weight thresholding described in the step 7, otherwise turn down or constant; If network side is found to occur in the recent period telex network expenses account remaining sum and crossed low situation about still communicating, judge that then the cost consumption prediction of carrying out in the recent period is too optimistic, and the expense thresholding described in the step 7 is heightened, otherwise turn down or constant.
Can find out more than comprehensive that battery and cost management method based on the equipment laws of use that the present invention proposes have following features:
1, the regularity of utilizing signal post to have, the device battery that better supervisory communications are required and the use of communication cost reduce because the situation that the communication requirement that battery deficiency or expense deficiency cause is not satisfied;
2, the regularity of utilizing signal post to have, the device battery that better supervisory communications are required and the use of communication cost reduce unnecessary battery charging and expense and supplement with money;
3, need not to change the hardware of existing equipment, backward compatibility.

Claims (9)

1. battery and cost management method based on a laws of use, this method is added up the equipment laws of use, the rule that comprises electric quantity consumption, cost consumption, charges and supplement with money, and in conjunction with the arrangement of subscriber calendar, thereby the consumption of prediction battery or expense, can carry out suitable prompting to the user, this method comprises the following steps:
Step 1: for adding up the equipment laws of use and carrying out battery or the operation of cost consumption prediction, can be configured to periodic and carry out, also can be configured to according to the needs of equipment user or the needs execution of the network equipment of communication with it;
Step 2: at using battery powered apparatus, add up the rule of its use, the rule of its communication particularly, can independently add up by the equipment that adopts battery during statistics, perhaps add up by the network equipment of communication with it, or unite statistics, thereby obtain using the power consumption rule of equipment of battery or the rule of communication cost cost by the above-mentioned both sides that participate in communication;
Step 3: if communicate by network equipment, use battery powered apparatus to have a plurality of, network equipment can be to these statistics of using the communication rule of the equipment of battery to unite, and on this basis their power consumption and expense operating position are predicted;
Step 4: at using battery powered apparatus, add up the rule of its battery charge, can independently add up by the equipment that adopts battery during statistics, perhaps add up by the network equipment of communication with it, or unite statistics, thereby machine information during the charging that obtains to be fit to by the above-mentioned both sides that participate in communication;
Step 5: at using battery powered apparatus, add up its communication cost and pay the rule of supplementing with money, can independently add up by the equipment that adopts battery during statistics, perhaps add up by the network equipment of communication with it, or unite statistics, thereby machine information when the expense that obtains being fit to is supplemented with money by the above-mentioned both sides that participate in communication;
Step 6: at using battery powered apparatus, if possess the function of its user's schedule of storage, then can be in conjunction with user demand corresponding in the schedule, the rule of power consumption that obtains in the correction preceding step and communication cost cost and charging, machine information when supplementing with money, this process can independently be finished by the equipment that adopts battery, perhaps finish, or unite by these above-mentioned both sides that participate in communication and to finish by the network equipment of communication with it;
Step 7: predict according to the resulting rule of the step of front, judge and followingly to be depleted to certain electric weight thresholding or expense thresholding respectively when following at battery storage electric weight or available communication cost, whether may occur that, that is: both be inconvenient to charge or carry out expense and supplement with money, and have very high user demand again, if this occurs, then remind the user to charge timely or expense is supplemented with money, also can remind simultaneously the user select before used free communication service;
Step 8: charging or expense when supplementing with money, too whether electric weight that judgement is carried out in the recent period or cost consumption prediction optimism still too pessimistic, be lower than certain thresholding if occurred the electric weight or the available expense of battery when that is: when charging or expense are supplemented with money, then existing prediction is too optimistic, and is instead then too pessimistic; If too optimistic, then prediction mode is adjusted to comparatively conservatively, electric weight thresholding described in the previous step or expense thresholding can be heightened, otherwise then be adjusted to comparatively radical prediction, electric weight thresholding described in the previous step or expense thresholding can be turned down.
2. battery and the cost management method described in claim 1 based on laws of use, it is characterized in that, statistics equipment laws of use also carries out battery or the operation of cost consumption prediction, can be configured to periodic and carry out, also can be configured to according to the needs of equipment user or the needs execution of the network equipment of communication with it.
3. battery and the cost management method described in claim 1 based on laws of use, it is characterized in that, at using battery powered apparatus, add up the rule of its use, particularly the rule of its communication can independently be added up by the equipment that adopts battery during statistics, is perhaps added up by the network equipment of communication with it, or unite statistics, thereby obtain using the power consumption rule of equipment of battery or the rule of communication cost cost by the above-mentioned both sides that participate in communication.
4. battery and the cost management method described in claim 1 based on laws of use, it is characterized in that, if communicate by network equipment, use battery powered apparatus to have a plurality of, network equipment can be to these statistics of using the communication rule of the equipment of battery to unite, and on this basis their power consumption and expense operating position are predicted.
5. battery and the cost management method described in claim 1 based on laws of use, it is characterized in that, at using battery powered apparatus, add up the rule of its battery charge, can independently add up by the equipment that adopts battery during statistics, unite statistics perhaps by the network equipment statistics of communication with it, or by the above-mentioned both sides that participate in communication, thus machine information during the charging that obtains being fit to.
6. battery and the cost management method described in claim 1 based on laws of use, it is characterized in that, at using battery powered apparatus, add up its communication cost and pay the rule of supplementing with money, can independently add up by the equipment that adopts battery during statistics, unite statistics perhaps by the network equipment statistics of communication with it, or by the above-mentioned both sides that participate in communication, thus machine information when the expense that obtains being fit to is supplemented with money.
7. at using battery powered apparatus, if possess the function of its user's schedule of storage, then can be in conjunction with user demand corresponding in the schedule, the rule of power consumption that obtains in the correction preceding step and communication cost cost and charging, machine information when supplementing with money, this process can independently be finished by the equipment that adopts battery, perhaps finish, or unite by these above-mentioned both sides that participate in communication and to finish by the network equipment of communication with it.
8. battery and the cost management method described in claim 1 based on laws of use, it is characterized in that, predict to the resulting rule of step 6 according to step 1, judge and followingly to be depleted to certain electric weight thresholding or expense thresholding respectively when following at battery storage electric weight or available communication cost, whether may occur that, that is: both be inconvenient to charge or carry out expense and supplement with money, and have very high user demand again, if this occurs, then remind the user to charge timely or expense is supplemented with money, also can remind simultaneously the user select before used free communication service.
9. battery and the cost management method described in claim 1 based on laws of use, it is characterized in that, before and after charging or expense supplement with money, too whether electric weight that judgement is carried out in the recent period or cost consumption prediction optimism still too pessimistic, be lower than certain thresholding if occurred the electric weight or the available expense of battery when that is: when charging or expense are supplemented with money, then existing prediction is too optimistic, and is instead then too pessimistic; If too optimistic, then prediction mode is adjusted to comparatively conservatively, electric weight thresholding described in the step 7 or expense thresholding can be heightened, otherwise then be adjusted to comparatively radical prediction, electric weight thresholding described in the step 7 or expense thresholding can be turned down.
CN2010102310536A 2010-07-20 2010-07-20 Battery based on use rule and cost management method Pending CN101917510A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102310536A CN101917510A (en) 2010-07-20 2010-07-20 Battery based on use rule and cost management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102310536A CN101917510A (en) 2010-07-20 2010-07-20 Battery based on use rule and cost management method

Publications (1)

Publication Number Publication Date
CN101917510A true CN101917510A (en) 2010-12-15

Family

ID=43324889

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102310536A Pending CN101917510A (en) 2010-07-20 2010-07-20 Battery based on use rule and cost management method

Country Status (1)

Country Link
CN (1) CN101917510A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103220434A (en) * 2013-05-15 2013-07-24 百度在线网络技术(北京)有限公司 Intelligent reminding method and system, mobile terminal and cloud server
CN104362684A (en) * 2014-10-10 2015-02-18 华为技术有限公司 Charging method and rechargeable equipment
CN105306750A (en) * 2015-09-21 2016-02-03 联想(北京)有限公司 Information processing method and electronic device
CN106789563A (en) * 2016-12-02 2017-05-31 国网山东省电力公司武城县供电公司 Electricity consumption business prompting method and device
CN108012041A (en) * 2017-10-31 2018-05-08 维沃移动通信有限公司 A kind of telephone expenses method for early warning and mobile terminal
CN108808781A (en) * 2018-06-22 2018-11-13 蔚来汽车有限公司 Electric vehicle reservation charging method and apparatus based on big data
CN109361818A (en) * 2018-10-26 2019-02-19 深圳壹账通智能科技有限公司 Charging reminding method, device, storage medium and terminal
CN111050008A (en) * 2019-12-12 2020-04-21 北京金山云网络技术有限公司 Account balance reminding method and device, electronic equipment and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005006794A1 (en) * 2003-07-02 2005-01-20 Wavecom Method for estimating the remaining working life of a battery for a radiocommunication device
CN1794838A (en) * 2004-12-22 2006-06-28 富士通株式会社 Mobile terminal control program and mobile terminal equipment
CN101488594A (en) * 2009-02-16 2009-07-22 中兴通讯股份有限公司 Management method for battery electric power
CN201435612Y (en) * 2009-06-01 2010-03-31 朱丽华 Movable type battery charging exchange device
CN101728859A (en) * 2009-12-17 2010-06-09 中兴通讯股份有限公司 Mobile terminals and system and method for sharing batteries between same

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005006794A1 (en) * 2003-07-02 2005-01-20 Wavecom Method for estimating the remaining working life of a battery for a radiocommunication device
CN1794838A (en) * 2004-12-22 2006-06-28 富士通株式会社 Mobile terminal control program and mobile terminal equipment
CN101488594A (en) * 2009-02-16 2009-07-22 中兴通讯股份有限公司 Management method for battery electric power
CN201435612Y (en) * 2009-06-01 2010-03-31 朱丽华 Movable type battery charging exchange device
CN101728859A (en) * 2009-12-17 2010-06-09 中兴通讯股份有限公司 Mobile terminals and system and method for sharing batteries between same

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103220434A (en) * 2013-05-15 2013-07-24 百度在线网络技术(北京)有限公司 Intelligent reminding method and system, mobile terminal and cloud server
CN104362684A (en) * 2014-10-10 2015-02-18 华为技术有限公司 Charging method and rechargeable equipment
CN105306750A (en) * 2015-09-21 2016-02-03 联想(北京)有限公司 Information processing method and electronic device
CN105306750B (en) * 2015-09-21 2018-07-03 联想(北京)有限公司 A kind of information processing method and electronic equipment
CN106789563A (en) * 2016-12-02 2017-05-31 国网山东省电力公司武城县供电公司 Electricity consumption business prompting method and device
CN106789563B (en) * 2016-12-02 2019-10-08 国网山东省电力公司武城县供电公司 Electricity consumption business prompting method and device
CN108012041A (en) * 2017-10-31 2018-05-08 维沃移动通信有限公司 A kind of telephone expenses method for early warning and mobile terminal
CN108808781A (en) * 2018-06-22 2018-11-13 蔚来汽车有限公司 Electric vehicle reservation charging method and apparatus based on big data
CN109361818A (en) * 2018-10-26 2019-02-19 深圳壹账通智能科技有限公司 Charging reminding method, device, storage medium and terminal
CN111050008A (en) * 2019-12-12 2020-04-21 北京金山云网络技术有限公司 Account balance reminding method and device, electronic equipment and storage medium

Similar Documents

Publication Publication Date Title
CN101917510A (en) Battery based on use rule and cost management method
TWI443030B (en) Charging system of electric vehicle and method for charging electric vehicle
US8829847B2 (en) Hybrid battery system for portable electronic devices
US8509861B2 (en) Hybrid battery system for portable electronic devices
CN103369124A (en) Battery management method and device
EP2590050A1 (en) Hybrid battery system for portable electronic devices
CN107464359A (en) The processing method and system of a kind of prepayment information
CN102984783A (en) Method and apparatus for controlling terminal's access to wireless network
CN102469432A (en) Method and system for recharging mobile phone
US9751418B2 (en) Charge managing system, charger, and program
CN114228556B (en) Method, device, equipment, system and medium for power change scheduling of heavy truck
CN106413053A (en) Mobile terminal and power-saving method thereof
CN101867184A (en) Electrical energy supplying method, power network and power network management system
CN107244250B (en) Intelligent charging system and method for electric vehicle
CN101685144B (en) Mine lamp service life monitoring device and implement method
CN115544704B (en) Charging pile topology determination method and device and storage medium
CN101895402A (en) Charging data management method and device of communication users
CN101827348A (en) Control method and equipment for user credit in prepayment service and service support system
CN101699783A (en) On-line charging data backing-up method, system and charging platforms
CN102137369B (en) Method, device, relevant system and equipment for processing charging ticket
CN216211308U (en) Charging system sharing mobile power supply
Badgujar et al. Smart Charging For Smart Phones
KR101570384B1 (en) Apparatus for energy management
CN101316302B (en) Method for terminal communication bill statistics, and terminal thereof
CN116131370A (en) Method, device, equipment and readable storage medium for charging and discharging energy storage battery

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20101215