CN102588010B - Method for estimating throttling frequency-modulation load characteristics of condensed water for thermoelectric generating set - Google Patents

Method for estimating throttling frequency-modulation load characteristics of condensed water for thermoelectric generating set Download PDF

Info

Publication number
CN102588010B
CN102588010B CN201210039965.2A CN201210039965A CN102588010B CN 102588010 B CN102588010 B CN 102588010B CN 201210039965 A CN201210039965 A CN 201210039965A CN 102588010 B CN102588010 B CN 102588010B
Authority
CN
China
Prior art keywords
change
water flow
unit load
oxygen
eliminating device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210039965.2A
Other languages
Chinese (zh)
Other versions
CN102588010A (en
Inventor
张宝
童小忠
吴文健
罗志浩
顾正皓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201210039965.2A priority Critical patent/CN102588010B/en
Publication of CN102588010A publication Critical patent/CN102588010A/en
Application granted granted Critical
Publication of CN102588010B publication Critical patent/CN102588010B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Eletrric Generators (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

The invention discloses a method for estimating throttling frequency-modulation load characteristics of condensed water for a thermoelectric generating set. The method comprises the steps of: collecting data, calculating water-level change speeds of a deaerator and a hot well; determining a functional relation and determining the functional relation according to the steps. According to the method for estimating the throttling frequency-modulation load characteristics of condensed water for the thermoelectric generating set, the frequency-modulation load characteristics of condensed water stream can be accurately grasped through the method.

Description

A kind of thermal power generator water of condensation throttling frequency modulation part throttle characteristics appraisal procedure
Technical field
The present invention relates to thermal power generation technical field, relate to more specifically a kind of thermal power generator water of condensation throttling frequency modulation part throttle characteristics appraisal procedure.
Background technique
In order to improve the Primary frequency control ability and coordination level of control of thermal power generator, at present, power plant is generally in the control mode of improving unit, especially the super (super-) critical steam-turbine unit that is representative for the 1000MW steam turbine of above vapour-Siemens co-production, due to the method for operation of its use high-pressure regulation porthole standard-sized sheet, omnidistance sliding pressure, boiler accumulation of energy cannot rapid conversion be generation load, has seriously reduced the fm capacity of unit.For this reason, seeking a kind of new frequency modulation method is the task of top priority, and just in this case, water of condensation throttling frequency modulation technology comes into one's own gradually.
Water of condensation throttling frequency modulation be in fact by rapid change by the condensing water flow of low-pressure heater, carry out the amount of drawing gas of instantaneous change steam turbine set respective heater, thereby change fast the process of unit generation load.The part throttle characteristics of water of condensation throttling frequency modulation mainly refers to after condensing water flow flip-flop, relation is over time measured in power of the assembling unit change, and two aspects are the most key, and the one, the maximum power value that unit can change, be water of condensation throttling frequency modulation potentiality, the 2nd, load responding speed.
The generation load that water of condensation throttling can transform and the structural feature of unit own and relating to parameters, General Theoretical Analysis thinks that its limiting value is under rated load, to excise low-pressure heater and oxygen-eliminating device draws gas, makes it to return to acting in steam turbine, the obtainable increased power value of unit, but actual tests result shows, the change amount of the actual power of the assembling unit that can obtain of water of condensation throttling can obvious deviation theory value.Accurately grasp water of condensation throttling frequency modulation part throttle characteristics, both contributed to project decision, also contribute to the raising of unit frequency modulation control precision.
Therefore, how accurately to grasp water of condensation throttling frequency modulation part throttle characteristics, become those skilled in the art's important technological problems to be solved.
Summary of the invention
In order to solve the problems of the technologies described above, the invention provides a kind of thermal power generator water of condensation throttling frequency modulation part throttle characteristics appraisal procedure, can grasp exactly by the method the current frequency modulation part throttle characteristics of condensing.
A kind of thermal power generator water of condensation throttling frequency modulation part throttle characteristics appraisal procedure provided by the invention, comprises step:
Data capture, under the condition remain unchanged in unit load command value, condensing water flow pace of change command value remaining unchanged, hot well water-feeding valve is closed and deaerator level is withdrawn from automatically, oxygen-eliminating device and water level of thermal well end value when collection deaerator level control valve pass hour oxygen-eliminating device and water level of thermal well initial value, deaerator level control valve turn down rear each Preset Time point unit load actual value and finish to gather unit load value, repeatedly change unit working condition, change unit load command value and condensing water flow pace of change command value, each change after unit load command value and condensing water flow pace of change command value, keeping, this unit load command value and condensing water flow pace of change command value are constant, under the condition that hot well water-feeding valve is closed and deaerator level is withdrawn from automatically, gather deaerator level control valve and close hour oxygen-eliminating device and water level of thermal well initial value, oxygen-eliminating device and water level of thermal well end value when deaerator level control valve turns down rear each described Preset Time point unit load actual value and finishes to gather unit load value,
Calculate oxygen-eliminating device and water level of thermal well pace of change, according to the oxygen-eliminating device collecting and water level of thermal well initial value, end value and acquisition time, the SEA LEVEL VARIATION speed U of calculating unit oxygen-eliminating device and hot well under each working condition;
Determine function relation, according to formula Δ N=Δ D c∑ (k iΔ H i) and each described Preset Time point unit load actual value carry out matching, draw the relation between unit load variable quantity and the condensing water flow variable quantity of each time point; Derive the relation of unit load relative variation Y and time T according to the relation between the unit load variable quantity of each time point and condensing water flow variable quantity; According to the SEA LEVEL VARIATION speed of oxygen-eliminating device and hot well under each working condition, derive the relation between oxygen-eliminating device and water level of thermal well pace of change U and condensing water flow variable quantity Q;
Determine function relation according to described step, each relation of determining, draws the curve of unit load variations amount and condensing water flow variable quantity relation, unit load relative variation and time relationship and oxygen-eliminating device and water level of thermal well pace of change and condensing water flow variable quantity relation.
Preferably, described in described step data capture, each Preset Time point is respectively deaerator level control valve and turns down rear 15s, 1min, 3min, 5min.
Preferably, in described step data capture, by manually changing fast deaerator level control valve aperture to change condensing water flow pace of change command value.
Preferably, in described step data capture, by controlling condensate pump rotating speed to change condensing water flow pace of change command value.
A kind of thermal power generator water of condensation throttling frequency modulation part throttle characteristics appraisal procedure provided by the invention, comprise step: data capture, under the condition remain unchanged in unit load command value, condensing water flow pace of change command value remaining unchanged, hot well water-feeding valve is closed and deaerator level is withdrawn from automatically, oxygen-eliminating device and water level of thermal well end value when collection deaerator level control valve pass hour oxygen-eliminating device and water level of thermal well initial value, deaerator level control valve turn down rear each Preset Time point unit load actual value and finish to gather unit load value, repeatedly change unit working condition, change unit load command value and condensing water flow pace of change command value, each change after unit load command value and condensing water flow pace of change command value, keeping, this unit load command value and condensing water flow pace of change command value are constant, under the condition that hot well water-feeding valve is closed and deaerator level is withdrawn from automatically, gather deaerator level control valve and close hour oxygen-eliminating device and water level of thermal well initial value, oxygen-eliminating device and water level of thermal well end value when deaerator level control valve turns down rear each described Preset Time point unit load actual value and finishes to gather unit load value, calculate oxygen-eliminating device and water level of thermal well pace of change, according to the oxygen-eliminating device collecting and water level of thermal well initial value, end value and acquisition time, the SEA LEVEL VARIATION speed U of calculating unit oxygen-eliminating device and hot well under each working condition, determine function relation, according to formula Δ N=Δ D c∑ (k iΔ H i) and each described Preset Time point unit load actual value carry out matching, draw the relation between unit load variable quantity and the condensing water flow variable quantity of each time point, derive the relation of unit load relative variation Y and time T according to the relation between the unit load variable quantity of each time point and condensing water flow variable quantity, according to the SEA LEVEL VARIATION speed of oxygen-eliminating device and hot well under each working condition, derive the relation between oxygen-eliminating device and water level of thermal well pace of change U and condensing water flow variable quantity Q, determine function relation according to described step, each relation of determining, draws the curve of unit load variations amount and condensing water flow variable quantity relation, unit load relative variation and time relationship and oxygen-eliminating device and water level of thermal well pace of change and condensing water flow variable quantity relation.
According to thermal power generator water of condensation throttling frequency modulation part throttle characteristics appraisal procedure provided by the invention, pass through field measurement, power of the assembling unit variable quantity while obtaining different load, different condensing water flow change amount, observe the impact of the water level of water of condensation throttling on oxygen-eliminating device, hot well, according to the theory unit load variable quantity that draws this conclusion that is directly proportional to condensing water flow variable quantity of deriving, calculate different condensing water flow change amounts, unit load variable quantity in the same time not; Or calculate the speed of SEA LEVEL VARIATION according to the constant interval of oxygen-eliminating device and water level of thermal well permission, by thering is definite proportionate relationship between SEA LEVEL VARIATION speed and condensing water flow variable quantity, determine condensing water flow variable quantity, thereby calculate under this water level limit value, the producible load variations amount of any time unit, thus the assessment of water of condensation throttling frequency modulation potentiality completed.Therefore, thermal power generator water of condensation throttling frequency modulation part throttle characteristics appraisal procedure provided by the invention, can grasp by the method the current frequency modulation part throttle characteristics of condensing exactly.
Brief description of the drawings
Fig. 1 is unit load variable quantity and condensing water flow variable quantity relation curve schematic diagram in the specific embodiment of the invention;
Fig. 2 is unit load relative variation and time relationship schematic diagram in the specific embodiment of the invention;
Fig. 3 is oxygen-eliminating device and water level of thermal well pace of change and condensing water flow variable quantity relation curve schematic diagram.
Wherein, in Fig. 1, represent after 15s, represent after 1min,---represent after 3min, represent after 5min;
In Fig. 3, represent oxygen-eliminating device,---represent A hot well, represent B hot well.
Embodiment
The invention provides a kind of thermal power generator water of condensation throttling frequency modulation part throttle characteristics appraisal procedure, can grasp exactly by the method the current frequency modulation part throttle characteristics of condensing.
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technological scheme in the embodiment of the present invention is clearly and completely described, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment who obtains under creative work prerequisite, belong to the scope of protection of the invention.
Thermal power generator water of condensation throttling frequency modulation part throttle characteristics appraisal procedure provided in the present embodiment, comprises step:
Data capture, under the condition remain unchanged in unit load command value, condensing water flow pace of change command value remaining unchanged, hot well water-feeding valve is closed and deaerator level is withdrawn from automatically, oxygen-eliminating device and water level of thermal well end value when collection deaerator level control valve pass hour oxygen-eliminating device and water level of thermal well initial value, deaerator level control valve turn down rear each Preset Time point unit load actual value and finish to gather unit load value, repeatedly change unit working condition, change unit load command value and condensing water flow pace of change command value, each change after unit load command value and condensing water flow pace of change command value, keeping, this unit load command value and condensing water flow pace of change command value are constant, under the condition that hot well water-feeding valve is closed and deaerator level is withdrawn from automatically, gather deaerator level control valve and close hour oxygen-eliminating device and water level of thermal well initial value, oxygen-eliminating device and water level of thermal well end value when deaerator level control valve turns down rear each described Preset Time point unit load actual value and finishes to gather unit load value,
Calculate oxygen-eliminating device and water level of thermal well pace of change, according to the oxygen-eliminating device collecting and water level of thermal well initial value, end value and acquisition time, the SEA LEVEL VARIATION speed U of calculating unit oxygen-eliminating device and hot well under each working condition;
Determine function relation, according to formula Δ N=Δ D c∑ (k iΔ H i) and each described Preset Time point unit load actual value carry out matching, draw the relation between unit load variable quantity and the condensing water flow variable quantity of each time point; Derive the relation of unit load relative variation Y and time T according to the relation between the unit load variable quantity of each time point and condensing water flow variable quantity; According to the SEA LEVEL VARIATION speed of oxygen-eliminating device and hot well under each working condition, derive the relation between oxygen-eliminating device and water level of thermal well pace of change U and condensing water flow variable quantity Q;
Determine function relation according to described step, each relation of determining, draws the curve of unit load variations amount and condensing water flow variable quantity relation, unit load relative variation and time relationship and oxygen-eliminating device and water level of thermal well pace of change and condensing water flow variable quantity relation.
According to thermal power generator water of condensation throttling frequency modulation part throttle characteristics appraisal procedure provided by the invention, pass through field measurement, power of the assembling unit variable quantity while obtaining different load, different condensing water flow change amount, observe the impact of the water level of water of condensation throttling on oxygen-eliminating device, hot well, according to the theory unit load variable quantity that draws this conclusion that is directly proportional to condensing water flow variable quantity of deriving, calculate different condensing water flow change amounts, unit load variable quantity in the same time not; Or calculate the speed of SEA LEVEL VARIATION according to the constant interval of oxygen-eliminating device and water level of thermal well permission, by thering is definite proportionate relationship between SEA LEVEL VARIATION speed and condensing water flow variable quantity, determine condensing water flow variable quantity, thereby calculate under this water level limit value, the producible load variations amount of any time unit, thus the assessment of water of condensation throttling frequency modulation potentiality completed.Therefore, thermal power generator water of condensation throttling frequency modulation part throttle characteristics appraisal procedure provided by the invention, can grasp by the method the current frequency modulation part throttle characteristics of condensing exactly.
Content will be respectively deaerator level control valve taking each Preset Time point and turn down rear 15s, 1min, 3min, 5min as example below, and thermal power generator water of condensation throttling frequency modulation part throttle characteristics appraisal procedure provided by the invention is described in detail.
When collection in worksite data, requirement remains unchanged in unit load command value, condensing water flow pace of change command value remains unchanged, require unit AGC, boiler-turbine coordinated, primary frequency modulation to withdraw from, turbine high-pressure regulates porthole standard-sized sheet, and steady load operation more than some minutes remains unchanged with guarantee unit load command value; When test, hot well water-feeding valve is closed, and deaerator level is withdrawn from automatically, and the each low-pressure heater water level of unit drops into automatically, and deaerator level control valve has certain two-way adjustment allowance, to ensure that condensing water flow pace of change command value remains unchanged.
When image data, manually change fast aperture or the condensate pump rotating speed of deaerator level control valve, record the parameters such as unit load, condensing water flow, oxygen-eliminating device and water level of thermal well, at least continue 5min or water level parameter and reach when control boundary value is set, manually adjust oxygen-eliminating device and water level of thermal well to normal value.Above-mentioned test point several operating modes under different load, different condensing water flow change amount are carried out.
Unit load variation delta N and condensing water flow variation delta D cbetween theoretical relationship be Δ N=Δ D c∑ (k iΔ H i), wherein Δ H irepresent the actual specific enthalpy drop that i level is drawn gas while returning to turbine body acting, k ifor scaling factor.This formula is to draw in the specific enthalpies of drawing gas at different levels, level heater condensate specific enthalpy, water of condensation specific enthalpy etc. are not constant in the situation that, does not also consider mechanical efficiency and generating efficiency.
When water of condensation throttling, the parameter of steam turbine heat engine system changes comparatively complicated, too much hypothesis is processed accumulation with simplification and is got up to make theoretical analysis result can depart from actual conditions, reduce to a certain extent theoretical accuracy in computation, therefore, the assessment of water of condensation throttling frequency modulation part throttle characteristics has been needed to carry out in conjunction with on-the-spot actual test, for this reason, this embodiment, in conjunction with on-site data gathering result, is calculated water of condensation throttling frequency modulation potentiality, and key step is as follows:
(1) arrange test data
Start to close hour timing with deaerator level control valve, need to arrange and obtain following data relationship curve according to test result under different operating modes: the relation curve between condensing water flow change amount and representational moment (being generally 15s, 1min, 3min and 5min) unit load change amount; Taking 5min moment changing load amount as benchmark, the load relative variation relation over time that other moment is average; Calculate 1min to the interior oxygen-eliminating device of 5min and water level of thermal well pace of change, and obtain the relation curve between it and condensing water flow change amount.
(2) use specific function to be related to matched curve
This conclusion that is directly proportional to condensing water flow variable quantity according to unit load variable quantity, rejects the data of this conclusion of substantial deviation, and usage ratio is related to the relation curve between matching condensing water flow change amount and representational moment unit load change amount; Do not consider the impact of the factors such as shape, internal unit take, the SEA LEVEL VARIATION of oxygen-eliminating device and hot well must be the linear relationship of negative correlation, both SEA LEVEL VARIATION speed is also all proportional with condensing water flow variable quantity, therefore, usage ratio is related to matching condensing water flow change amount and oxygen-eliminating device, water level of thermal well pace of change relation curve; Use quadratic function or cubic function to be related to the load relative variation relation curve over time that matching is average.
(3) calculate water of condensation throttling frequency modulation potentiality
The corresponding load variations amount of any condensing water flow variable quantity of inscribing while calculating certain representativeness according to matching relation; Calculate the load variations relative quantity of any time according to matching relation, can calculate thus the load variations amount of any condensing water flow variable quantity, any time unit.In order to ensure the security of operation of unit, it is high that oxygen-eliminating device and hot well are provided with water level, low limit value, the normal runtime value of water level is with high, scope between low limit value has formed the operable interval of water of condensation throttling frequency modulation, according to needing the Time Calculation of fm role to go out the speed of SEA LEVEL VARIATION, owing to thering is definite proportionate relationship between SEA LEVEL VARIATION speed and condensing water flow variable quantity, can determine condensing water flow variable quantity, thereby can calculate under this water level limit value, the producible load variations amount of any time unit, thereby complete the assessment of water of condensation throttling frequency modulation potentiality.
On the basis of above-mentioned result of calculation, the test result of load responding time during in conjunction with site test, can complete the assessment of water of condensation throttling frequency modulation part throttle characteristics.
Application the present invention; can be before water of condensation throttling frequency modulation function be implemented; understand its frequency modulation potentiality by test; observe the Changing Pattern of oxygen-eliminating device and water level of thermal well; so that formulate effective control strategy; rationally determine the isoparametric control range of water level, improve frequency modulation control precision, guarantee unit safety operation.
Content, by being example for certain the 660MW ultra supercritical fired power generating unit that uses upper vapour-Siemens N660-25/600/600 type steam turbine, describes in detail to method provided by the invention below.
The load-characteristic test of water of condensation throttling frequency modulation is carried out at scene, shown in main experimental data following table.
According to these table data, draw and close after valve not in the same time condensing water flow variable quantity with the relation curve of load variations amount, and be related in proportion matching, obtain following serial function relation:
Close after valve 15s: Δ N=-0.0123 Δ D c-0.1211
Close after valve 1min: Δ N=-0.0183 Δ D c-0.3959
Close after valve 3min: Δ N=-0.0294 Δ D c-1.5528
Close after valve 5min: Δ N=-0.0321 Δ D c-0.3799
The relative load variable quantity Y relation of T in time:
Y=3E-07T 3-0.0008T 2+0.4347T+33.525
Relation between oxygen-eliminating device and water level of thermal well pace of change U and condensing water flow variable quantity Q:
Oxygen-eliminating device: U=0.1528Q+2.529;
A hot well: U=-0.1168Q-6.5763
B hot well: U=-0.1121Q-4.63
By above-mentioned serial relation, can draw out as shown in Figure 1, Figure 2 with Fig. 3 in curve, please refer to Fig. 1-Fig. 3, Fig. 1 is unit load variable quantity and condensing water flow variable quantity relation curve schematic diagram in the specific embodiment of the invention; Fig. 2 is unit load relative variation and time relationship schematic diagram in the specific embodiment of the invention; Fig. 3 is oxygen-eliminating device and water level of thermal well pace of change and condensing water flow variable quantity relation curve schematic diagram.
In the situation that deaerator level allows excursion definite, the time of water of condensation fm role as required, can calculate deaerator level pace of change, and obtain corresponding condensing water flow variable quantity by Fig. 3, then obtained the load variations amount of different representative moment units by Fig. 1, finally can obtain closing data after valve 5min is the unit relative load variable quantity of benchmark, any time, thereby completes the calculating that water of condensation is regulated to frequency modulation potentiality.In conjunction with the load responding time after water of condensation throttling, can realize the assessment to this unit water of condensation throttling frequency modulation part throttle characteristics.
Above a kind of thermal power generator water of condensation throttling frequency modulation part throttle characteristics appraisal procedure provided by the present invention is described in detail, applied specific case herein principle of the present invention and mode of execution are set forth, above embodiment's explanation is just for helping to understand method of the present invention and core concept thereof.It should be pointed out that for those skilled in the art, under the premise without departing from the principles of the invention, can also carry out some improvement and modification to the present invention, these improvement and modification also fall in the protection domain of the claims in the present invention.

Claims (4)

1. a thermal power generator water of condensation throttling frequency modulation part throttle characteristics appraisal procedure, is characterized in that, comprises step:
Data capture, under the condition remain unchanged in unit load command value, condensing water flow pace of change command value remaining unchanged, hot well water-feeding valve is closed and deaerator level is withdrawn from automatically, oxygen-eliminating device and water level of thermal well end value when collection deaerator level control valve pass hour oxygen-eliminating device and water level of thermal well initial value, deaerator level control valve turn down rear each Preset Time point unit load actual value and finish to gather unit load value, repeatedly change unit working condition, change unit load command value and condensing water flow pace of change command value, each change after unit load command value and condensing water flow pace of change command value, keeping, this unit load command value and condensing water flow pace of change command value are constant, under the condition that hot well water-feeding valve is closed and deaerator level is withdrawn from automatically, gather deaerator level control valve and close hour oxygen-eliminating device and water level of thermal well initial value, oxygen-eliminating device and water level of thermal well end value when deaerator level control valve turns down rear each described Preset Time point unit load actual value and finishes to gather unit load value,
Calculate oxygen-eliminating device and water level of thermal well pace of change, according to the oxygen-eliminating device collecting and water level of thermal well initial value, end value and acquisition time, the SEA LEVEL VARIATION speed U of calculating unit oxygen-eliminating device and hot well under each working condition;
Determine function relation, according to formula Δ N=Δ D c∑ (k iΔ H i) and each described Preset Time point unit load actual value carry out matching, in formula, Δ N represents power of the assembling unit change amount, Δ D crepresent variable quantity, the k of condensing water flow ifor scaling factor, Δ H irepresenting that i level is drawn gas returns to the turbine body actual specific enthalpy drop in when acting, draws the relation between unit load variable quantity and the condensing water flow variable quantity of each time point; Derive the relation of unit load relative variation Y and time T according to the relation between the unit load variable quantity of each time point and condensing water flow variable quantity; According to the SEA LEVEL VARIATION speed of oxygen-eliminating device and hot well under each working condition, derive the relation between oxygen-eliminating device and water level of thermal well pace of change U and condensing water flow variable quantity Q;
Determine function relation according to described step, each relation of determining, draws the curve of unit load variations amount and condensing water flow variable quantity relation, unit load relative variation and time relationship and oxygen-eliminating device and water level of thermal well pace of change and condensing water flow variable quantity relation.
2. thermal power generator water of condensation throttling frequency modulation part throttle characteristics appraisal procedure as claimed in claim 1, it is characterized in that, described in described step data capture, each Preset Time point is respectively deaerator level control valve and turns down latter 15 seconds, 1 minute, 3 minutes, 5 minutes.
3. thermal power generator water of condensation throttling frequency modulation part throttle characteristics appraisal procedure as claimed in claim 2, it is characterized in that, in described step data capture, by manually changing fast deaerator level control valve aperture to change condensing water flow pace of change command value.
4. thermal power generator water of condensation throttling frequency modulation part throttle characteristics appraisal procedure as claimed in claim 2, is characterized in that, in described step data capture, by controlling condensate pump rotating speed to change condensing water flow pace of change command value.
CN201210039965.2A 2012-02-21 2012-02-21 Method for estimating throttling frequency-modulation load characteristics of condensed water for thermoelectric generating set Active CN102588010B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210039965.2A CN102588010B (en) 2012-02-21 2012-02-21 Method for estimating throttling frequency-modulation load characteristics of condensed water for thermoelectric generating set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210039965.2A CN102588010B (en) 2012-02-21 2012-02-21 Method for estimating throttling frequency-modulation load characteristics of condensed water for thermoelectric generating set

Publications (2)

Publication Number Publication Date
CN102588010A CN102588010A (en) 2012-07-18
CN102588010B true CN102588010B (en) 2014-12-10

Family

ID=46477170

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210039965.2A Active CN102588010B (en) 2012-02-21 2012-02-21 Method for estimating throttling frequency-modulation load characteristics of condensed water for thermoelectric generating set

Country Status (1)

Country Link
CN (1) CN102588010B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104714526B (en) * 2015-01-08 2017-10-10 华北电力大学 The load control system estimated and method are adjusted based on condensate throttling
CN104932450B (en) * 2015-04-15 2017-11-28 华北电力大学 A kind of fired power generating unit control method for coordinating based on condensate throttling
CN106842981A (en) * 2016-12-08 2017-06-13 海南电力技术研究院 A kind of method of the real-time simulation for simulating fired power generating unit flexibility capability
CN107893988B (en) * 2017-10-13 2019-09-27 国网河北能源技术服务有限公司 Heat regenerative system carbonated drink optimal control method under Large-scale fire-electricity unit depth peak regulation
CN109857033B (en) * 2019-02-28 2020-10-09 中国能源建设集团广东省电力设计研究院有限公司 Condensate throttling switching control method and device and computer equipment
CN110107489B (en) * 2019-04-19 2020-09-18 中国神华能源股份有限公司 Control method, system and unit for condensate water pump
CN112327624B (en) * 2020-11-06 2021-12-28 西安交通大学 Peak-shaving operation method for coal-fired unit
CN113756895B (en) * 2021-08-16 2022-08-05 西安交通大学 Control method for improving flexibility of coal-fired unit through condensate throttling
CN113847230B (en) * 2021-09-29 2024-03-26 西安热工研究院有限公司 Analysis method for deep variable frequency expected effect of condensate pump

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2083178A (en) * 1981-09-01 1982-03-17 Gen Electric Deaerator level control
US4345438A (en) * 1980-09-02 1982-08-24 General Electric Company Deaerator level control
JPH07253201A (en) * 1994-03-16 1995-10-03 Toshiba Corp Water heater/feeder controller
JP2003269702A (en) * 2002-03-13 2003-09-25 Hitachi Ltd Deaerator level controller
RU2275510C1 (en) * 2004-12-15 2006-04-27 Государственное образовательное учреждение высшего профессионального образования "Ульяновский государственный технический университет" Thermal power station
CN102200120A (en) * 2010-03-26 2011-09-28 浙江省电力试验研究院 Precomputation method of frequency conversion transformation working condition points of condensate pump for thermoelectric generating set

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4345438A (en) * 1980-09-02 1982-08-24 General Electric Company Deaerator level control
GB2083178A (en) * 1981-09-01 1982-03-17 Gen Electric Deaerator level control
JPH07253201A (en) * 1994-03-16 1995-10-03 Toshiba Corp Water heater/feeder controller
JP2003269702A (en) * 2002-03-13 2003-09-25 Hitachi Ltd Deaerator level controller
RU2275510C1 (en) * 2004-12-15 2006-04-27 Государственное образовательное учреждение высшего профессионального образования "Ульяновский государственный технический университет" Thermal power station
CN102200120A (en) * 2010-03-26 2011-09-28 浙江省电力试验研究院 Precomputation method of frequency conversion transformation working condition points of condensate pump for thermoelectric generating set

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
凝结水节流技术在电厂的应用探讨;王国凯等;《内蒙古电力技术》;20110430;第29卷(第2期);第45-47页 *
岱海电厂#1机组凝结水节流响应负荷变化试验分析;李西军等;《电站系统工程》;20100731;第26卷(第4期);第39-41页 *
李西军等.岱海电厂#1机组凝结水节流响应负荷变化试验分析.《电站系统工程》.2010,第26卷(第4期),第39-41页. *
王国凯等.凝结水节流技术在电厂的应用探讨.《内蒙古电力技术》.2011,第29卷(第2期),第45-47页. *

Also Published As

Publication number Publication date
CN102588010A (en) 2012-07-18

Similar Documents

Publication Publication Date Title
CN102588010B (en) Method for estimating throttling frequency-modulation load characteristics of condensed water for thermoelectric generating set
CN105201564B (en) Main-steam-flow-based steam turbine sliding pressure optimization control method
WO2017050207A1 (en) Method for analyzing energy efficiency of generator set
CN111535879B (en) Control method for bypass system of gas-steam combined cycle unit
CN102146812B (en) Actual-measurement modeling method for prime mover and speed governor thereof of electric power system
Yao et al. Concentrated solar power plant modeling for power system studies
CN110162870B (en) Method for determining optimal sliding pressure curve of throttling regulation steam turbine based on seasons
CN109538317A (en) A kind of Dynamic calculation method of the heat regenerative system that can be improved peak load regulation ability and heat regenerative system heat storage can vapor (steam) temperature
CN105046578B (en) Test the experimental method of cogeneration units heat supply period electric load adjustment capability
CN105512800A (en) Method for determining peak adjustment scheduling of heat supply unit according to mode of ordering power by heat
CN101609312A (en) Adopt the generating set optimization control method of specific steam consumption correction sliding pressure operation curve
CN108757059A (en) A kind of steam turbine determines sliding pressure curve experiments optimization method in the case where throttling with vapour
CN104330667A (en) Monitoring method for determining influence of speed regulating system on low-frequency oscillation damping
CN113191566B (en) Online determination system and method for optimal operation mode of heat pump cascade heat supply unit
CN113489024B (en) Multi-mode steam extraction auxiliary peak regulation and frequency modulation control system and method for cogeneration unit
CN110284933A (en) A method of improving small steam turbine electricity generation system efficiency
CN102588020B (en) Solar power generation and thermal power generation combined turbine-generator unit and realizing method
Baughn et al. A comparison of the predicted and measured thermodynamic performance of a gas turbine cogeneration system
CN110273715A (en) A kind of Turbo-generator Set remodeling method based on No. 0 hydrophobic mode of high-pressure heater
CN101738491A (en) Method and device for acquiring characteristic value of steam turbo-generator rotor
JP5745647B2 (en) Solar thermal combined cycle power plant
CN112709609B (en) Method for obtaining electric power range by heat supply flow
CN105804819A (en) Regulation and control method for improving recovery amount of sintering waste heat and operational stability of power generation system
Da-hai et al. Modeling and parameter measurement research pressurized water reactor nuclear power generator's prime mover and governor
Daneshvar et al. Transient Modeling of Single-Pressure Combined CyclePower Plant Exposed to Load Reduction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20121026

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121026

Address after: The eight district of Hangzhou city in Zhejiang province 310014 Huadian Zhaohui under No. 1 Lane

Applicant after: Zhejiang Electric Power Test And Research Insititute

Applicant after: State Grid Corporation of China

Address before: The eight district of Hangzhou city in Zhejiang province 310014 Huadian Zhaohui under No. 1 Lane

Applicant before: Zhejiang Electric Power Test And Research Insititute

ASS Succession or assignment of patent right

Owner name: ZHEJIANG ELECTRIC POWER RESEARCH INSTITUTE OF ZHEJ

Free format text: FORMER OWNER: ZHEJIANG ELECTRIC POWER TEST AND RESEARCH INSITITUTE

Effective date: 20121123

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121123

Address after: Hangzhou City, Zhejiang province 310014 eight District No. 1, Huadian Zhaohui

Applicant after: Electric Power Science Research Institute of Zhejiang Electric Power Company

Applicant after: State Grid Corporation of China

Address before: The eight district of Hangzhou city in Zhejiang province 310014 Huadian Zhaohui under No. 1 Lane

Applicant before: Zhejiang Electric Power Test And Research Insititute

Applicant before: State Grid Corporation of China

C14 Grant of patent or utility model
GR01 Patent grant