CN102587944A - 松软岩层小断面掘进超前支护工艺 - Google Patents
松软岩层小断面掘进超前支护工艺 Download PDFInfo
- Publication number
- CN102587944A CN102587944A CN2012100770515A CN201210077051A CN102587944A CN 102587944 A CN102587944 A CN 102587944A CN 2012100770515 A CN2012100770515 A CN 2012100770515A CN 201210077051 A CN201210077051 A CN 201210077051A CN 102587944 A CN102587944 A CN 102587944A
- Authority
- CN
- China
- Prior art keywords
- supporting
- steel pipe
- stratum
- soft rock
- advance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210077051.5A CN102587944B (zh) | 2012-03-22 | 2012-03-22 | 松软岩层小断面掘进超前支护工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210077051.5A CN102587944B (zh) | 2012-03-22 | 2012-03-22 | 松软岩层小断面掘进超前支护工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102587944A true CN102587944A (zh) | 2012-07-18 |
CN102587944B CN102587944B (zh) | 2014-04-16 |
Family
ID=46477111
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210077051.5A Active CN102587944B (zh) | 2012-03-22 | 2012-03-22 | 松软岩层小断面掘进超前支护工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102587944B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111042062A (zh) * | 2019-12-30 | 2020-04-21 | 中国水电基础局有限公司 | 超深防渗墙成槽方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1240876A (zh) * | 1998-07-03 | 2000-01-12 | 李景堂 | 一种在松软围岩中掘进的支护方法 |
CN1355374A (zh) * | 2000-11-27 | 2002-06-26 | 山东科技大学资源与环境工程学院 | 煤矿网格状超前锚固无人工作面开采方法 |
US20050013672A1 (en) * | 2003-07-14 | 2005-01-20 | Slater Bert W. | Roof bolt bearing plate and method for an underground mine |
CN1580491A (zh) * | 2003-08-01 | 2005-02-16 | 新汶矿业集团汶南煤矿有限责任公司 | 采掘工作面破碎顶板超前支护工艺 |
WO2010092405A2 (en) * | 2009-02-12 | 2010-08-19 | Minova International Limited | Securing method for horizontal and inclined workings |
-
2012
- 2012-03-22 CN CN201210077051.5A patent/CN102587944B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1240876A (zh) * | 1998-07-03 | 2000-01-12 | 李景堂 | 一种在松软围岩中掘进的支护方法 |
CN1355374A (zh) * | 2000-11-27 | 2002-06-26 | 山东科技大学资源与环境工程学院 | 煤矿网格状超前锚固无人工作面开采方法 |
US20050013672A1 (en) * | 2003-07-14 | 2005-01-20 | Slater Bert W. | Roof bolt bearing plate and method for an underground mine |
CN1580491A (zh) * | 2003-08-01 | 2005-02-16 | 新汶矿业集团汶南煤矿有限责任公司 | 采掘工作面破碎顶板超前支护工艺 |
WO2010092405A2 (en) * | 2009-02-12 | 2010-08-19 | Minova International Limited | Securing method for horizontal and inclined workings |
Non-Patent Citations (2)
Title |
---|
孙建林: "不良地质条件下隧洞进口开挖、支护施工技术", 《云南水力发电》, vol. 25, no. 3, 31 December 2009 (2009-12-31), pages 73 - 74 * |
戴俊: "管棚超前支护隧道掘进周边控制爆破方法", 《辽宁工程技术大学学报(自然科学版)》, vol. 30, no. 2, 30 April 2011 (2011-04-30), pages 225 - 228 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111042062A (zh) * | 2019-12-30 | 2020-04-21 | 中国水电基础局有限公司 | 超深防渗墙成槽方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102587944B (zh) | 2014-04-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101328809B (zh) | 无底柱深孔后退式采矿方法 | |
CN108894787A (zh) | 上覆采空区遗留矿柱应力集中的压裂解除方法 | |
CN104763425A (zh) | 一种卸压预裂爆破沿空留巷无煤柱开采方法 | |
CN103557000B (zh) | 利用抽帮充填防治沿空巷道冲击地压的方法 | |
CN104533418A (zh) | 一种用于煤矿井下深孔静力破岩法 | |
CN103277114A (zh) | 地下工程破碎围岩的无喷砼锚网支护方法 | |
CN102071940A (zh) | 煤矿井筒穿越多层采空区的施工方法 | |
CN106014424B (zh) | 一种用于浅覆岩浅埋暗挖隧道的爆破开挖方法 | |
CN104358580B (zh) | 一种带筋钢骨架的大头聚能射孔管式注浆锚杆及施工方法 | |
CN105545353A (zh) | 一种基于膏体充填的人工假顶构筑方法 | |
CN105401946A (zh) | 一种竖井导井的反向爆破开挖方法 | |
CN101967977A (zh) | 两头掘进深埋隧洞贯通过程中控制岩柱型岩爆的施工方法 | |
CN104453898A (zh) | 一种深孔爆破与静压注水相结合的煤层弱化方法 | |
CN102587915A (zh) | 人工假顶下诱导崩落采矿方法 | |
CN109826628A (zh) | 一种坚硬顶板条件下预裂成拱的无煤柱开采方法 | |
CN103114854B (zh) | 一种再造人工间柱回采矿柱的方法 | |
Yang et al. | Application cumulative tensile explosions for roof cutting in Chinese underground coal mines | |
CN107165641B (zh) | 薄层破碎硬质岩石地层中大倾角扶梯通道反方向暗挖施工方法 | |
CN105953671A (zh) | 一种硅质板岩石方边坡开挖施工方法 | |
CN103437770A (zh) | 一种激隙泄压软岩巷道支护方法 | |
CN109184752A (zh) | 一种煤矿用穿越老窑采空区的支护结构及其支护方法 | |
CN103233739A (zh) | 充填体包裹下厚大矿柱开采方法 | |
CN102587944B (zh) | 松软岩层小断面掘进超前支护工艺 | |
CN108518223A (zh) | 一种垂直深孔球状药包落矿方法 | |
CN104989409B (zh) | 一种竖井小断面成孔后全断面开挖方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Advance support technology for small section excavation in soft rock stratum Effective date of registration: 20211203 Granted publication date: 20140416 Pledgee: YIYUAN JINYUAN MINING Co.,Ltd. Pledgor: SHANDONG HUALIAN MINING Co.,Ltd. Registration number: Y2021980014001 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20220713 Granted publication date: 20140416 Pledgee: YIYUAN JINYUAN MINING Co.,Ltd. Pledgor: SHANDONG HUALIAN MINING Co.,Ltd. Registration number: Y2021980014001 |