CN102587413A - Structure for supporting construction elevator foundation on top plate of basement and construction method thereof - Google Patents

Structure for supporting construction elevator foundation on top plate of basement and construction method thereof Download PDF

Info

Publication number
CN102587413A
CN102587413A CN2012100558165A CN201210055816A CN102587413A CN 102587413 A CN102587413 A CN 102587413A CN 2012100558165 A CN2012100558165 A CN 2012100558165A CN 201210055816 A CN201210055816 A CN 201210055816A CN 102587413 A CN102587413 A CN 102587413A
Authority
CN
China
Prior art keywords
basement
construction
basement roof
supporting
construction elevator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100558165A
Other languages
Chinese (zh)
Inventor
刘玉涛
彭亮
夏清准
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN2012100558165A priority Critical patent/CN102587413A/en
Publication of CN102587413A publication Critical patent/CN102587413A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a structure for supporting a construction elevator foundation on the top plate of a basement. The construction elevator foundation is located on the top plate of a basement, a support structure is arranged between the soleplate of the basement and the top plate of the basement to reinforce the top plate of the basement, the support structure is a brick masonry column, the bottom of the brick masonry column is supported on the soleplate of the basement, and the top of the brick masonry column is supported in the center below the top plate of the basement. The invention also provides a construction method of the structure for supporting a construction elevator foundation on the top plate of a basement. In the invention, a brick masonry column is provided before the construction of the top plate of the basement to bear the vertical loads of the construction elevator, not only cost is saved, but also the construction is safe. The construction operation is simple and feasible.

Description

The structure and the job practices thereof on construction elevator basis on the supporting basement roof
Technical field
The present invention relates to a kind of method that is adopted with the construction elevator basis on the brick support column reinforcing basement roof.
Background technology
The form of more employing steel pipe scaffold or shaped steel supporting when present construction elevator basis at the construction field (site) is positioned on the basement roof, intensity is not high and expense is many, roof break is not tightly caused on the supporting top easily.
Summary of the invention
Technical problem to be solved by this invention just provides a kind of structure and job practices thereof that supports construction elevator basis on the basement roof, has both saved cost, and safer, and constructing operation is simple and feasible.
For solving the problems of the technologies described above; The present invention adopts following technical scheme: the structure on construction elevator basis on the supporting basement roof; The construction elevator basis is positioned on the basement roof, is provided with supporting construction between basement bottom board and basement roof to the basement roof reinforcement, it is characterized in that: said supporting construction is a brick post; The brick column bottom is supported on the basement bottom board, and the brick column top is supported on center, basement roof below.
As preferably, be provided with one deck malthoid between said brick column top and the basement roof.
The present invention also provides the job practices of the structure on construction elevator basis on the above-mentioned supporting basement roof; It is characterized in that comprising following process: build the brick post by laying bricks or stones after the basement bottom board construction is accomplished; The brick post is floating with capital after building by laying bricks or stones at the bottom of the top board; Carry out follow-up basement main structure construction then until accomplishing basement roof, when this brick post maintenance after intensity, can do the construction elevator basis.
As preferably, said brick post is built by laying bricks or stones at the bottom of the top board and capital is put one deck malthoid after floating.
The present invention is provided with the vertical load that a brick post bears construction elevator before the basement roof construction, both saved cost, and safer, and constructing operation is simple and feasible.
Description of drawings
Below in conjunction with the accompanying drawing and the specific embodiment the present invention is further described:
Fig. 1 is a brick support column sectional drawing;
Fig. 2 is the A-A sectional drawing of Fig. 1;
Fig. 3 is the relativeness figure of construction elevator and brick support column.
The specific embodiment
Extremely shown in Figure 3 like Fig. 1; Support the structure on construction elevator basis on the basement roof for the present invention; Wherein construction elevator basis 6 is positioned on the basement roof 5, is provided with supporting construction between basement bottom board 1 and basement roof to the basement roof reinforcement, and said supporting construction is a brick post 2; The brick column bottom is supported on the basement bottom board, and the brick column top is supported on center, basement roof below.Be provided with one deck malthoid 4 between said brick column top and the basement roof.
Construction elevator basis 6 is positioned at 5 last times of basement roof, need be to the basement roof reinforcement, and this method is when doing basement bottom board 1, to do brick post 2, the mortar joint 3 of controlling well is built by laying bricks or stones at the bottom of the top board and capital is floating, puts one deck malthoid 4, the basement roof of constructing then.When these brick post 2 maintenances after intensity, can do construction elevator basis 6, reach installation elevator standard joint 7 after the intensity.When surpassing one deck like basement, the floor gap reinforcement means is the same.
After construction elevator was removed, promptly dismountable this brick post 2 tore malthoid 4, will remove with flooring contact site mortar then.
Reinforcing and processing method when the present invention provides a kind of simple and reliable construction elevator basis on basement roof for the job site, safety benefit and economic benefit are fairly obvious.This bearing post simple structure, solid and reliable, durable stable, easy for installation is convenient to apply widely.

Claims (4)

1. the structure on construction elevator basis on the supporting basement roof; Construction elevator basis (6) is positioned on the basement roof (5); Be provided with supporting construction to the basement roof reinforcement between basement bottom board (1) and basement roof; It is characterized in that: said supporting construction is a brick post (2), and the brick column bottom is supported on the basement bottom board, and the brick column top is supported on center, basement roof below.
2. the structure on construction elevator basis is characterized in that: be provided with one deck malthoid (4) between said brick column top and the basement roof on the supporting basement roof according to claim 1.
3. the job practices of the structure on construction elevator basis on the supporting basement roof; It is characterized in that comprising following process: build the brick post by laying bricks or stones after the basement bottom board construction is accomplished; The brick post is floating with capital after building by laying bricks or stones at the bottom of the top board; Carry out follow-up basement main structure construction then until accomplishing basement roof, when this brick post maintenance after intensity, can do the construction elevator basis.
4. the job practices of the structure on construction elevator basis on the supporting basement roof according to claim 3 is characterized in that: said brick post is built by laying bricks or stones at the bottom of the top board and capital is put one deck malthoid after floating.
CN2012100558165A 2012-03-06 2012-03-06 Structure for supporting construction elevator foundation on top plate of basement and construction method thereof Pending CN102587413A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100558165A CN102587413A (en) 2012-03-06 2012-03-06 Structure for supporting construction elevator foundation on top plate of basement and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100558165A CN102587413A (en) 2012-03-06 2012-03-06 Structure for supporting construction elevator foundation on top plate of basement and construction method thereof

Publications (1)

Publication Number Publication Date
CN102587413A true CN102587413A (en) 2012-07-18

Family

ID=46476604

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100558165A Pending CN102587413A (en) 2012-03-06 2012-03-06 Structure for supporting construction elevator foundation on top plate of basement and construction method thereof

Country Status (1)

Country Link
CN (1) CN102587413A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103103994A (en) * 2013-03-08 2013-05-15 中天建设集团有限公司 Detachable top plate reinforcing support device and application thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1279319A (en) * 1999-06-29 2001-01-10 陈星� Full-reverse construction technology for basement
JP2003034939A (en) * 2001-07-24 2003-02-07 Taisei Corp Underground inverted construction method
CN1804255A (en) * 2005-12-16 2006-07-19 张国梁 Reversed construction method for building
CN202440851U (en) * 2012-03-06 2012-09-19 中天建设集团有限公司 Structure for supporting construction elevator foundation on basement top plate

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1279319A (en) * 1999-06-29 2001-01-10 陈星� Full-reverse construction technology for basement
JP2003034939A (en) * 2001-07-24 2003-02-07 Taisei Corp Underground inverted construction method
CN1804255A (en) * 2005-12-16 2006-07-19 张国梁 Reversed construction method for building
CN202440851U (en) * 2012-03-06 2012-09-19 中天建设集团有限公司 Structure for supporting construction elevator foundation on basement top plate

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
落金,戴渊: "高层双塔楼建筑共用施工电梯技术", 《科教文汇》 *
陈华荣: "施工电梯安装在地下室顶板上时结构支承方案", 《山西建筑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103103994A (en) * 2013-03-08 2013-05-15 中天建设集团有限公司 Detachable top plate reinforcing support device and application thereof

Similar Documents

Publication Publication Date Title
CN203867216U (en) Detachable steel frame supporting structure for ultra-high-rise building cantilevered plate
CN203188121U (en) Cast-in-place bridge floor suspending mold of half-through or through arch bridge
CN201148730Y (en) Super large diameter cylindrical silo hydraulic slip mold construction operating platform
CN102561690A (en) Construction method for supporting structures on two sides of post-cast strip by use of brick column
CN106760101A (en) A kind of prefabricated superimposed sheet
CN103628680A (en) Construction method for large-area steel structure hanging layer
CN202324606U (en) U-shaped force bearing seat
CN104594655A (en) Application method for dismantling temporary supports in brick-concrete structure wall
CN203429641U (en) Single-side supporting formwork reinforcing structure system for building construction
CN102561392A (en) Structure for supporting construction elevator foundation on basement top plate and construction method thereof
CN102146731A (en) Supporting structure for floor formwork of steel structure building and construction method
CN104110136A (en) Erecting method for concrete pouring formwork with structural transition layer comprising H-type steel crossbeam
CN102912981B (en) Gate type high-rise building connected structure construction device
CN102505839A (en) Arc-shaped mold plate for casting arc-shaped shear wall of industrial factory building and manufacture method of arc-shaped mold plate
CN103669720A (en) Precast beam and reinforced concrete structure with tenon anchor system
CN103276894A (en) Support system of large-cross-section girder transfer floor of hollow floor system and construction technology
CN205348761U (en) Basement does not have reinforced structure of no basic lift of installation on back board
CN202689536U (en) Ultra-high concrete beam and slab structure template erecting system
CN103758343A (en) Hanging type construction method and hanging device for reinforced concrete floor
CN202440851U (en) Structure for supporting construction elevator foundation on basement top plate
CN204098314U (en) Steel plate combination floor
CN102677907A (en) Method for manually installing steel beam at top of silo
CN203924703U (en) Chamfered edge important actor hat cone plate
CN202440833U (en) Structure for supporting construction elevator base on top plate of basement
CN103112766A (en) Construction elevator suspending over basement roof of building and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120718