CN102587412B - Stage construction basement support change method using underground continuous wall as separation containment - Google Patents
Stage construction basement support change method using underground continuous wall as separation containment Download PDFInfo
- Publication number
- CN102587412B CN102587412B CN201210030873.8A CN201210030873A CN102587412B CN 102587412 B CN102587412 B CN 102587412B CN 201210030873 A CN201210030873 A CN 201210030873A CN 102587412 B CN102587412 B CN 102587412B
- Authority
- CN
- China
- Prior art keywords
- basement
- stage
- diaphragm wall
- shaped steel
- support change
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The invention provides a stage construction basement support change method using an underground continuous wall as separation containment. The method comprises the following steps that: 1, a separation containment structure using the underground continuous wall as a body is built, and in addition, pre-buried sectional steel is buried on the underground wall; 2, first-stage basement support change is carried out, support change sectional steel is welded at one end of the pre-buried sectional steel, and the other end of the support change sectional steel is cast with an underground slab of the first-stage basement; 3, secondary second-stage basement support change is carried out, support change sectional steel is welded at the other end of the pre-buried sectional steel in the same way, and a basement slab of the second-stage basement is cast at the other end of the support change sectional steel; 4, the underground continuous wall is dismounted, the pre-buried sectional steel is preserved, the connecting steel bars are tied and bundled, and concrete is cast, so the first-stage basement and the second-stage basement are connected. The support change problem of the front-stage construction basement and the back-stage construction basement can be perfectly solved, the support change effect is good, in addition, the basement structure can be smoothly built, and the construction is convenient.
Description
Technical field
The present invention relates to the realm of building construction, be specifically related to a kind of stage construction basement support change method of going along with sb. to guard him with the separation of diaphragm wall do.
Background technology
In the basement construction of construction projects, due to reasons such as place, safety or funds, usually need to carry out stage construction, stage construction is often taking diaphragm wall as separating space enclosing structure, after having constructed, diaphragm wall is removed, front and back two phases basement is connected.In aggregates for ensureing that basement can connect mutually, just must handle the support replacement problem of front construction in later period part well.Conventionally adopt at present the contrary mode of doing, along with the carrying out of construction successively removed diaphragm wall from top to bottom, so that front and back phase basement is communicated with, construction is trouble comparatively.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of and makes to separate the stage construction basement support change method of going along with sb. to guard him with diaphragm wall, the support replacement problem of phase construction basement before and after can solving well, support replacement is effective, and can be along making basement structure, easy construction.
For solving above-mentioned existing technical problem, the present invention adopts following scheme: a kind of stage construction basement support change method of going along with sb. to guard him with the separation of diaphragm wall do, comprises the following steps:
Step 1: build separation space enclosing structure taking diaphragm wall as main body between first phase basement and the second stage of basement, and the girder and the secondary beam position that are positioned at floor structure on diaphragm wall are embedded into pre-buried shaped steel;
Step 2: when the construction of first phase basement support change, at the support replacement shaped steel of one end of pre-buried shaped steel welding same model, the other end of support replacement shaped steel pours into the basement floor of first phase basement, and the side near diaphragm wall on the basement floor of first phase basement is reserved connecting reinforcement;
Step 3: when the second stage of basement support change construction, weld equally the support replacement shaped steel of same model at the other end of pre-buried shaped steel, the other end of support replacement shaped steel pours into the basement floor of the second stage of basement, and the side near diaphragm wall on the basement floor of the second stage of basement is reserved connecting reinforcement;
Step 4: carry out the dismounting of diaphragm wall from top to bottom, retain pre-buried shaped steel, connecting reinforcement between the basement floor of colligation first phase basement and the basement floor of the second stage of basement, concreting, couples together first phase basement and the second stage of basement.
As preferably, the thickness of described pre-buried shaped steel equals the wall thickness of diaphragm wall.
As preferably, described pre-buried shaped steel is hollow or H type.As preferably, when described basement floor is top board or base plate, building before basement floor, on basement floor near a side pre-embedded steel slab waterstop of diaphragm wall.Beneficial effect: the present invention adopts technique scheme to provide a kind of and makes to separate the stage construction basement support change method of going along with sb. to guard him with diaphragm wall, the support replacement problem of phase construction basement before and after having solved well, support replacement is effective, and can be along making basement structure, easy construction.
Brief description of the drawings
Fig. 1 is the schematic diagram that diaphragm wall of the present invention is imbedded pre-buried shaped steel;
Fig. 2 is first phase basement support change construction floor map of the present invention;
Fig. 3 is the second stage of basement support change construction floor map of the present invention;
Fig. 4 be in the present invention diaphragm wall remove after one, the connection diagram of the second stage of basement;
Fig. 5 is the sectional view of A-A face in Fig. 1;
Fig. 6 is the sectional view of B-B face in Fig. 2;
Fig. 7 is the sectional view of C-C face in Fig. 3;
Fig. 8 is the sectional view of D-D face in Fig. 4.
Detailed description of the invention
As shown in Figures 1 to 8, a kind of stage construction basement support change method of going along with sb. to guard him with the separation of diaphragm wall do, comprises the following steps:
Step 1: build the separation space enclosing structure taking diaphragm wall 1 as main body between first phase basement and the second stage of basement, and the girder 5 and secondary beam 6 positions that are positioned at floor structure on diaphragm wall 1 are embedded into pre-buried shaped steel 2, the thickness of described pre-buried shaped steel 2 equals the wall thickness of diaphragm wall 1;
Step 2: when the construction of first phase basement support change, at the support replacement shaped steel 3 of one end of pre-buried shaped steel 2 welding same model, the other end of support replacement shaped steel 3 pours into the basement floor 4 of first phase basement, and the side near diaphragm wall 1 on the basement floor 4 of first phase basement is reserved connecting reinforcement 7;
Step 3: when the second stage of basement support change construction, weld equally the support replacement shaped steel 3 of same model at the other end of pre-buried shaped steel 2, the other end of support replacement shaped steel 3 pours into the basement floor 4 of the second stage of basement, and the side near diaphragm wall 1 on the basement floor 4 of the second stage of basement is reserved connecting reinforcement 7;
Step 4: carry out the dismounting of diaphragm wall 1 from top to bottom, retain pre-buried shaped steel 2, connecting reinforcement 7 between the basement floor 4 of colligation first phase basement and the basement floor 4 of the second stage of basement, concreting, couples together first phase basement and the second stage of basement.
The support replacement problem of phase construction basement before and after having solved well, support replacement is effective, and can be with top-down along the basement of constructing as mode, easy construction.Pre-buried shaped steel 2 in step 1 is hollow or H type.3 length of support replacement shaped steel described in step 2 and step 3 are determined according to the force analysis of support replacement shaped steel 3.When described basement floor 4 is top board or base plate, building before basement floor 4, on basement floor 4 near a side pre-embedded steel slab waterstop of diaphragm wall 1.
Claims (4)
1. do to separate a stage construction basement support change method of going along with sb. to guard him with diaphragm wall, it is characterized in that: comprise the following steps:
Step 1: build separation space enclosing structure taking diaphragm wall (1) as main body between first phase basement and the second stage of basement, and the girder (5) and secondary beam (6) position that are positioned at floor structure on diaphragm wall (1) are embedded into pre-buried shaped steel (2);
Step 2: when the construction of first phase basement support change, at the support replacement shaped steel (3) of one end of pre-buried shaped steel (2) welding same model, the other end of support replacement shaped steel (3) pours into the basement floor (4) of first phase basement, the reserved connecting reinforcement (7) of the upper side near diaphragm wall (1) of basement floor (4) of first phase basement;
Step 3: when the second stage of basement support change construction, weld equally the support replacement shaped steel (3) of same model at the other end of pre-buried shaped steel (2), the other end of support replacement shaped steel (3) pours into the basement floor (4) of the second stage of basement, the reserved connecting reinforcement (7) of the upper side near diaphragm wall (1) of basement floor (4) of the second stage of basement;
Step 4: carry out the dismounting of diaphragm wall (1) from top to bottom, retain pre-buried shaped steel (2), connecting reinforcement (7) between the basement floor (4) of colligation first phase basement and the basement floor (4) of the second stage of basement, concreting, couples together first phase basement and the second stage of basement.
2. a kind of stage construction basement support change method of going along with sb. to guard him with the separation of diaphragm wall do according to claim 1, is characterized in that: the thickness of described pre-buried shaped steel (2) equals the wall thickness of diaphragm wall (1).
3. a kind of stage construction basement support change method of going along with sb. to guard him with the separation of diaphragm wall do described in, is characterized in that: described pre-buried shaped steel (2) is hollow or H type.
4. a kind of stage construction basement support change method of going along with sb. to guard him with the separation of diaphragm wall do described in, it is characterized in that: when described basement floor (4) is top board or base plate, building, basement floor (4) is front, in the upper side pre-embedded steel slab waterstop near diaphragm wall (1) of basement floor (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210030873.8A CN102587412B (en) | 2012-02-13 | 2012-02-13 | Stage construction basement support change method using underground continuous wall as separation containment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210030873.8A CN102587412B (en) | 2012-02-13 | 2012-02-13 | Stage construction basement support change method using underground continuous wall as separation containment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102587412A CN102587412A (en) | 2012-07-18 |
CN102587412B true CN102587412B (en) | 2014-06-11 |
Family
ID=46476603
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210030873.8A Active CN102587412B (en) | 2012-02-13 | 2012-02-13 | Stage construction basement support change method using underground continuous wall as separation containment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102587412B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102864946B (en) * | 2012-10-23 | 2014-07-16 | 山东建筑大学 | Process for supporting existing buildings through structural steel and horizontal rachel rod member and additionally adding multilayer basement |
CN104631824B (en) * | 2014-12-28 | 2017-07-14 | 上海建工一建集团有限公司 | Structure floor support replacement construction method at interim dividing wall |
CN104652474B (en) * | 2015-01-21 | 2016-08-24 | 中国建筑第八工程局有限公司 | Diaphram wall support changing structure for use and construction method |
CN110080526B (en) * | 2019-04-22 | 2021-05-07 | 上海建工一建集团有限公司 | Stage reverse construction method for basement |
CN110080527B (en) * | 2019-04-22 | 2020-12-04 | 上海建工一建集团有限公司 | Support changing construction method for staged diaphragm wall of reverse construction method steel structure basement |
CN110055975A (en) * | 2019-04-25 | 2019-07-26 | 中建四局第四建筑工程有限公司 | A kind of large-span deep foundation pit basement stage construction method and temporary structure |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000054409A (en) * | 1998-08-05 | 2000-02-22 | Ohbayashi Corp | Work execution method of top-down construction stanchion in underground excavated space peripheral part |
CN101012655A (en) * | 2006-12-30 | 2007-08-08 | 上海市城市建设设计研究院 | Construction method of carrying out underground space rigid connection by stages |
CN201261916Y (en) * | 2008-09-09 | 2009-06-24 | 贵阳铝镁设计研究院 | Late poured band structure adopting profiled bar short beam to improve shear force |
CN201546227U (en) * | 2009-10-31 | 2010-08-11 | 华丰建设股份有限公司 | Steel support beam for supporting foundation pit bracing piling wall and basement structure outer wall |
CN102116036A (en) * | 2009-12-30 | 2011-07-06 | 中国京冶工程技术有限公司厦门分公司 | Method for constructing underground large building by combining top-down construction method technology with sequence construction method technology |
CN103061357A (en) * | 2012-12-26 | 2013-04-24 | 广东省建科建筑设计院 | Connection joint between basement base plate and underground diaphragm wall |
-
2012
- 2012-02-13 CN CN201210030873.8A patent/CN102587412B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000054409A (en) * | 1998-08-05 | 2000-02-22 | Ohbayashi Corp | Work execution method of top-down construction stanchion in underground excavated space peripheral part |
CN101012655A (en) * | 2006-12-30 | 2007-08-08 | 上海市城市建设设计研究院 | Construction method of carrying out underground space rigid connection by stages |
CN201261916Y (en) * | 2008-09-09 | 2009-06-24 | 贵阳铝镁设计研究院 | Late poured band structure adopting profiled bar short beam to improve shear force |
CN201546227U (en) * | 2009-10-31 | 2010-08-11 | 华丰建设股份有限公司 | Steel support beam for supporting foundation pit bracing piling wall and basement structure outer wall |
CN102116036A (en) * | 2009-12-30 | 2011-07-06 | 中国京冶工程技术有限公司厦门分公司 | Method for constructing underground large building by combining top-down construction method technology with sequence construction method technology |
CN103061357A (en) * | 2012-12-26 | 2013-04-24 | 广东省建科建筑设计院 | Connection joint between basement base plate and underground diaphragm wall |
Also Published As
Publication number | Publication date |
---|---|
CN102587412A (en) | 2012-07-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102587412B (en) | Stage construction basement support change method using underground continuous wall as separation containment | |
KR101391637B1 (en) | Constrution methoed for Prestressed Composite Truss girder using steel truss member | |
CN110056092B (en) | Connecting structure of bolting-inserting type upper and lower prefabricated shear walls and superimposed sheet and construction method | |
CN103215894B (en) | Portable interim prestressed stretch-draw anchor block | |
KR101600845B1 (en) | The horizontal structural frame and the underground construction methods using it | |
CN205711776U (en) | A kind of supporting bracket of bridge construction | |
CN204112525U (en) | Band perps precast shear wall structure in strong concrete precast frame | |
CN102587420B (en) | Supporter exchanging method for stage construction basement using cast-in-situ bored piles as separation palisade | |
KR20150005301A (en) | Permanent form and construction method for coping | |
CN110185265A (en) | A kind of isolation baffle plate for bean column node different labels concreting | |
CN203684060U (en) | Temporary steel-frame bridge | |
CN203889454U (en) | Integrated moving device of construction formwork of culvert wall | |
CN202280152U (en) | Structure for arranging embedded part at bottom of reinforced concrete plate | |
JP6543077B2 (en) | Construction method of structure | |
CN202989763U (en) | Sectional type concrete filled steel tube pier adopting non-pulling resistant and non-shearing resistant limitation | |
CN207144456U (en) | Builder's jack I-steel built-in fitting | |
CN110273432A (en) | A kind of existing main structure of subway station enlarging construction method | |
CN106638679B (en) | A kind of precast concrete pipe gallery connection method | |
CN103981810A (en) | Steel tube arch main arch splicing and supporting system | |
CN205224014U (en) | Precast underground continuous wall of pre -buried steel sheet | |
CN103741857A (en) | Floor system with U-shaped steel beams, steel bar trusses and floor bearing plates | |
CN202509403U (en) | Steel pipe support concrete foundation structure | |
KR101485563B1 (en) | The horizontal structural frame | |
CN203741845U (en) | Structure for assisting in communicating fountain pits in semi-reversed construction method | |
CN204589824U (en) | A kind of " embracing ear Implant Method " template system for pier stud construction in water |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |